This solicitation notice is for an Indefinite Delivery Indefinite Quantity (IDIQ) multiple award contract for construction projects between $2,000 and $15,000,000 in the Washington DC metropolitan area. The General Services Administration (GSA) Public Buildings Service (PBS) National Capital Region (NCR) will award approximately 15 contracts for a one year base period plus four one-year options, not to exceed a total of $500,000,000. Work will include design-bid-build, design-build, and design-build with design intent documents delivery methods and involve repair, alteration, and tenant finish projects. Offerors must be small businesses qualified as a Small Disadvantaged Business, ANC, HUBZone, VOSB, SDVOSB, WOSB, EDWOSB or Small Business. A pre-proposal conference will be held virtually on October 16, 2023 and an in-person site visit for a seed project is required on October 17, 2023 with proposals due by November 6, 2023.

View the file

Other files

File Type Posted
Solicitation Amendment 47PM0123R0023_0010-executed 24 01 09.pdf PDF
Solicitation Amendment 47PM0123R0023_0009-executed 24 01 05.pdf PDF
RFI Round 3 Clarifications-FINAL 23 12 20.pdf PDF
GSA WNRC-Geotechnical Report-20210621.pdf PDF
UNIT PRICING SHEET for SEED WNRC RET WALL.xlsx XLSX spreadsheet
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual 2312 20.pdf PDF
Solicitation Amendment 47PM0123R0023_0008-executed 23 12 20.pdf PDF
RFI Clarifications - IDIQ 2024 - Round 2 RFI.pdf PDF
Site Visit Attendee List 23 10 17.pdf PDF
Solicitation Amendment 47PM0123R0023_0007-executed 23 12 19.pdf PDF
Solicitation Amendment 47PM0123R0023_0006-executed 23 12 11 .pdf PDF
MDE Stamped Plans - WNRC Ret Wall Replacement GSA-Site Plans-2022-02-23.pdf PDF
Solicitation Amendment 47PM0123R0023_0005-executed 23 12 01.pdf PDF
SOW 2023 12 1_rev.pdf PDF
Bid Form version 7_23 12 01.xlsx XLSX spreadsheet
22-SF-0088 - MDE Final Approval - WNRC Ret Wall Replacement GSA.pdf PDF
055213 Pipe and Tube Railings.pdf PDF
RFI Response 23 12 01.pdf PDF
Solicitation Amendment 47PM0123R0023_0004-executed 23 11 28.pdf PDF
Solicitation Amendment 47PM0123R0023_0003 .pdf PDF
Form D - Subcontractor Relationships Form v2 23 11 07.docx DOCX document
Form E-IDIQ Management Plan V1 23 11 07.docx DOCX document
Form B - Prior Experience Form v2 23 11 07.docx DOCX document
Form C - Key Personnel Form v2 23 11 07.docx DOCX document
The Solicitation v2 23 11 07.pdf PDF
Solicitation Amendment 47PM0123R0023_0002-executed 23 10 30.pdf PDF
NCR Pre-Proposal Conference Presentation 10 16 2023v1.pdf PDF
Solicitation Amendment 47PM0123R0023_0001-executed 23 10 16 .pdf PDF
Virtual Site Visit Attendees 23 10 16.pdf PDF
Form D - Subcontractor Relationships Form v1 23 10 12.docx DOCX document
47PM0123R0023 SF1442 v1 23 10 12.pdf PDF
Form B - Prior Experience Form v1 23 10 12.docx DOCX document
Form C - Key Personnel Form v1 23 10 12.docx DOCX document
Wage Determination MD20230054 23 09 01.pdf PDF
Offeror Representations and Certifications Form 23 10 05.pdf PDF
SEED SOW 23 02 16.pdf PDF
GSA Form 527.pdf PDF
Site Visit Authorization Request (VAR) Template.xlsx XLSX spreadsheet
Pre-Proposal Request for Information (RFI) Template.xlsx XLSX spreadsheet
The Solicitation 23 10 05.pdf PDF
SF1442 47PM0123R0023 .pdf PDF
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual.pdf PDF
Form F - Socio Economic Status Form.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Drawings .pdf PDF
Form E-IDIQ Management Plan.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Specifications.pdf PDF
Price Proposal Pricing Bid Form.xlsx XLSX spreadsheet
The Agreement 23 10 05.pdf PDF
Form A - Past Performance Form.docx DOCX document
Form C - Key Personnel Form.docx DOCX document
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS
OBJECTIVE
This form was created by the Office of Design and Construction, Small Projects Division to bring consistancy to the bids GSA receives from our vendors. The bid form is based on the Construction Specifications Institute (CSI) 50 Division Master Format. Of the 36 active divisions, 29 are listed on this form.
Any word in BLUE is a link to that specific page.
If a Division page for your specific project is not listed on this form, notify the assigned Contracting Officer or Contracting Specialist. They will have the Division page you need added to the form.
BID SHEET
This sheet is populated from the Division sheets. All calculations are done for you. Vendors only need to fill in those cells highlighted in GREEN to include the Proposal Version, Date of your proposal, percentages for Labor Burden, Overhead, Profit and Bond (if applicable).
PROJECT INFORMATION: The form will come to you with the Project Name, Building Number and Project Manager Name included. If the form does not contain these items return it to your assigned Contracting Team for correction.
Proposal Version: Document the version of the proposal. Any changes to the proposal will need a new identifing proposal version indicated. For Example: The base bid could be version 1. If negotiations require changes to the proposal the revised proposal could be version "2" or "R1".
DATE: Enter the date of your proposal. If the proposal is revised, for example after negotiations, a current date must be included.
Labor Burden: Include current certified labor burden rate. All rates will be entered as a percentage.
Overhead: Enter appropriate Overhead rate as a percentage, not to exceed what is allowed per the FAR.
Profit: Enter the appropriate Profit rate as a percentage, not to exceed what is allowed per the FAR.
Bond: Enter the appropriate Bond rate as a percentage.
Design Costs: The design costs have been separated from the Division 1 sheet to its own sheet. All design elements shall be included on sheet 1A only.
Abestos Abatement (AA): GSA tracks and funds any activities for AA separately from the rest of the project. All costs associated with AA shall be listed on sheet 2A only. The appropriate Labor Burden, Overhead, Profit and Bond shall be entered on the Summary Bid Sheet in the form of a percentage.
Self Performance: All contracts have a minimum self performance limit IAW the FAR or requirements of the contract. The Contracting Officer may set a more stringent minimum standard for any project. The Summary Bid Form includes a contractor Self Performing Percentange. It is located at the bottom of the page and highlited in yellow. This information allows the vendor and the Project Management team to determine if the minimum self performance requirement is being met.
Add Alternate/Option Pricing: Enter the "TITLE" or identification for each Add Alt/Option pricing used. All work (divisions) included in the Add Alt/Option work will be identified on a single sheet. Enter Labor Burden, OH, Profit, Bond for each Add Alt/Option. The total will be included on the bid sheet separately.
DIVISION SHEETS
Division sheets are set up to calculate material and either self- performed labor or sub-performed labor. If both self-performed and sub-performed labor are entered on the sheet on the same line, the sheet will not total for that line item. If both self-performed and sub-performed labor will be used on the same activity then a separate line must be used. See the example page for more information. Vendors can only access those cells in white. All others are locked for calculations.
Description of Work: Enter the description of work. Be specific in the description. For Example: If there are 5 different types of doors on the project then we should see 5 line items for doors with type, size, ect…
MATERIALS
Quantity (QTY): Enter the quantity of each line item.
Unit of Issue (UOI): Click on the cell, a drop down arrow will appear. Choose an appropriate UOI for the item being priced. A list of abbreviations are located at the bottom of this page.
Material Cost: Enter the cost of the material in relation to the UOI.
LABOR
Quantity: Enter the quanty (QTY) in a numerical format.
Unit of Issue (UOI): Click on the cell under UOI. A drop down arrow will appear. Choose from the list provided. A list of abbreviations are located at the bottom of this page.
Rate: Enter the rate in relation to the UOI in either the Self-Performed or Sub-Performed columns. Note: Entering costs in both Self and Sub Performed columns will result in no total for that item. If both Self and Sub-performed labor is needed for the same activity then a second line shall be used.
Additional Rows: Not enough rows for the division? Not a problem. Contact your assigned Contracting Officer or Contracting Specialist. They will have additional rows added. Just let them know how many you need.
ADD ALTERNATE/OPTION SHEETS
Add Alternate tabs are provided for optional pricing as requested in a SOW. They are located past the Division tabs. Add Alt/Option tabs provide input from the vendor for Labor Burden, Overhead, Profit and Bond on each sheet. A total price for each Add Alt will be shown on the Bid Sheet independent from the base bid price.
The contractor shall enter the cost (difference) of the add alternate. For Example: The base contract requires paint grade doors at $10 ea. The Add Alt is for stain grade doors at $20 ea. The difference ($10 ea) shall be listed in the Add Alt pricing.
The required brake down (Lump Sum vs. detailed break out) will be determined by the Contracting Officer.
SUBMITTING YOUR BID
When you're ready, submit the entire bid package to your assigned Contracting Officer or Contracting Specialist. Note: The entire package must be submitted. In addition, at your descretion, you may save the "Summary Bid Sheet" as a PDF format and submit it along with the entire package.
ABBREVIATIONS
MaterialsLabor
EAEachHRHour
RLRollDYDay
PKPackageWKWeek
SFSquare FootMNMonth
LFLinear Foot
BXBox
SQSquare
HRHour
WKWeek
MNMonth
LOTLot
TNTon
SYSquare Yard
CFCubic Foot
CYCubic Yard

Example

EXAMPLE 1 (INCORRECT ENTRY)
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
Security Escort$0.0010HR$10.00$100.00$10.00$100.00$100.00$100.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00INCORRECT ENTRY$0.00NO CALCULATION PROVIDEDERROR:#VALUE!$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00NO TOTAL$0.00ERROR:#VALUE!
Total$0.00$100.00$100.00$0.00ERROR:#VALUE!ERROR:#VALUE!
EXAMPLE 2 (CORRECT ENTRY)
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & Labor
Security Escort$0.0010HR$10.00$100.00$0.00$100.00
Security Escort$0.0010HR$0.00$10.00$100.00$100.00
$0.00CORRECT ENTRY$0.00CALCULATION PROVIDED
$0.00$0.00$0.00
$0.00$0.00TOTAL
Total$0.00$100.00$100.00$200.00
BACK TO:
Instructions
Bid Sheet

Bid Sheet

PROJECT NAME:
BUILDING NUMBER:
SOLICITATION NO:
PROJECT MANAGER:PROPOSAL VERSION:
CONTRACTOR NAME:DATE:
PRE-AWARD SUMMARY BID SHEETTotal from all pages
Division NumberDivision NameMaterialsSelf Performed WorkSub-Contractor PerformedTOTALMat/Self PerformedMat/Sub Performed
DIV 1General Requirements$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 1ADesign$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 2Existing Conditions$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 3Concrete$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 4Masonry$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 5Metals$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 6Wood, Plastics and Composites$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 7Thermal & Moisture Protection$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 8Openings$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 9Finishes$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 10Specialities$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 11Equipment$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 12Furnishings$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 13Special Construction$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 14Conveying Equipment$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 21Fire Suppression$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 22Plumbing$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 23Heating, Ventilating, and AC$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 25Integrated Automation$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 26Electrical$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 27Communications$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 28Electronic Safety and Security$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 31Earthwork$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 32Exterior Improvements$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 33Utilities$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 34Transportation$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 41Material Processing$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 42Process Heat/Cool/Dry Equipment$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 46Water and Wastewater Equip$0.00$0.00$0.00$0.00$ - 0$ - 0
DIV 48Electrical Power Generation$0.00$0.00$0.00$0.00$ - 0$ - 0
Sub-Total$0.00$0.00$0.00$0.00$ - 0$ - 0Mark UpTotal
Labor BurdenEnter labor burden percentage$0.00$ - 0$ - 0$0.00$0.00
OverheadEnter percentage markup:$0.00$0.00$0.00
ProfitEnter percentage markup:$0.00$0.00$0.00
BondEnter Percentage of Bond:$0.00$0.00$0.00
Total (Construction)$0.00$0.00
MaterialsSelf Performed WorkSub-Contractor Performed WorkTotal
DIV 2AAbestos Abatement$ - 0$ - 0$ - 0$0.00Mark UpTotal
Labor BurdenEnter labor burden percentage$0.00$ - 0$0.00
OverheadEnter percentage markup:$0.00$0.00$0.00
ProfitEnter percentage markup:$0.00$0.00$0.00
BondEnter percentage of Bond:$0.00$0.00$0.00
Total (Abestos Abatement)$0.00$0.00
PROJECT TOTAL$0.00
Contractor is self performingERROR:#DIV/0!of the project.
ADD ALTERNATE/OPTION PRICING
TITLEADD ALTERNATETOTAL
ADD ALTERNATE/OPTION 1$ - 0
ADD ALTERNATE/OPTION 2$ - 0
ADD ATLERNATE/OPTION 3$ - 0
ADD ALTERNATE/OPTION 4$ - 0
ADD ALTERNATE/OPTION 5$ - 0
BACK TO:
Instructions
Example
NOTES:
Cells in GREEN are for contractor input.
Abestos abatement(AA) is funded separately from all other construction work. Input all AA work in Division 2A only.
Links are provided in BLUE

Div 1

DIVISION 1: GENERAL CONDITIONS
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
Project Manager$0.00$0.00$0.00$0.00$0.00$0.00
Superintendent$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control/Safety Manager$0.00$0.00$0.00$0.00$0.00$0.00
Security$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 1A

DIVISION 1A: DESIGN
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 2

DIVISION 2: EXISTING CONDITIONS
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 2A

DIVISION 2A: ASBESTOS ABATEMENT
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 3

DIVISION 3: CONCRETE
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
Back To:
Bid Sheet
Instructions
Example

Div 4

DIVISION 4: MASONRY
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 5

DIVISION 5: METALS
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 6

DIVISION 6: WOOD, PLASTIC, COMPOSITES
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 7

DIVISION 7: THERMAL AND MOISTURE PROTECTION
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 8

DIVISION 8: OPENINGS
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 9

DIVISION 9: FINISHES
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 10

DIVISION 10: SPECIALITIES
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 11

DIVISION 11: EQUIPMENT
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 12

DIVISION 12: FURNISHINGS
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 13

DIVISION 13: SPECIAL CONSTRUCTION
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 14

DIVISION 14: CONVEYING EQUIPMENT
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 21

DIVISION 21: FIRE SUPPRESSION
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 22

DIVISION 22: PLUMBING
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
MOVE TO:
Bid Sheet
Instructions
Example

Div 23

DIVISION 23: HEATING, VENTILATING, AND AIR CONDITIONG (HVAC)
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 25

DIVISION 25: INTEGRATED AUTOMATION
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 26

DIVISION 26: ELECTRICAL
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 27

DIVISION 27: COMMUNICATIONS
Description of WorkMATERIALSLABORTOTAL
QTYUnit of IssueMaterial CostTotal Material CostQTYUnit of IssueRate Self PerformedSub TotalRate Sub-ContractedSub TotalTOTAL Material & LaborMat/Self PerformMat/Sub Performed
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total$0.00$0.00$0.00$0.00$0.00$0.00
BACK TO:
Bid Sheet
Instructions
Example

Div 28

DIVISION 28: ELECTRONIC SAFETY AND SECURITY