This document provides approval from the Maryland Department of the Environment for stormwater management and sediment and erosion control plans related to a retaining wall replacement project at the Washington National Records Center in Suitland, Maryland. The General Services Administration is seeking bids under solicitation number NCRFY24SolicitationConstructionIDIQ for an indefinite delivery/indefinite quantity construction contract to replace the retaining wall. Pennoni Associates Inc. prepared the stormwater management and sediment control plans approved by this document. Bidders should note that a stormwater management waiver has been granted for the project in accordance with the Maryland Stormwater Management and Erosion & Sediment Control Guidelines for State and Federal Projects.

View the file

Other files

File Type Posted
Solicitation Amendment 47PM0123R0023_0010-executed 24 01 09.pdf PDF
Solicitation Amendment 47PM0123R0023_0009-executed 24 01 05.pdf PDF
Bid Form_version 8_2024 01 05 .xlsx XLSX spreadsheet
RFI Round 3 Clarifications-FINAL 23 12 20.pdf PDF
GSA WNRC-Geotechnical Report-20210621.pdf PDF
UNIT PRICING SHEET for SEED WNRC RET WALL.xlsx XLSX spreadsheet
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual 2312 20.pdf PDF
Solicitation Amendment 47PM0123R0023_0008-executed 23 12 20.pdf PDF
RFI Clarifications - IDIQ 2024 - Round 2 RFI.pdf PDF
Site Visit Attendee List 23 10 17.pdf PDF
Solicitation Amendment 47PM0123R0023_0007-executed 23 12 19.pdf PDF
Solicitation Amendment 47PM0123R0023_0006-executed 23 12 11 .pdf PDF
MDE Stamped Plans - WNRC Ret Wall Replacement GSA-Site Plans-2022-02-23.pdf PDF
Solicitation Amendment 47PM0123R0023_0005-executed 23 12 01.pdf PDF
SOW 2023 12 1_rev.pdf PDF
Bid Form version 7_23 12 01.xlsx XLSX spreadsheet
055213 Pipe and Tube Railings.pdf PDF
RFI Response 23 12 01.pdf PDF
Solicitation Amendment 47PM0123R0023_0004-executed 23 11 28.pdf PDF
Solicitation Amendment 47PM0123R0023_0003 .pdf PDF
Form D - Subcontractor Relationships Form v2 23 11 07.docx DOCX document
Form E-IDIQ Management Plan V1 23 11 07.docx DOCX document
Form B - Prior Experience Form v2 23 11 07.docx DOCX document
Form C - Key Personnel Form v2 23 11 07.docx DOCX document
The Solicitation v2 23 11 07.pdf PDF
Solicitation Amendment 47PM0123R0023_0002-executed 23 10 30.pdf PDF
NCR Pre-Proposal Conference Presentation 10 16 2023v1.pdf PDF
Solicitation Amendment 47PM0123R0023_0001-executed 23 10 16 .pdf PDF
Virtual Site Visit Attendees 23 10 16.pdf PDF
Form D - Subcontractor Relationships Form v1 23 10 12.docx DOCX document
47PM0123R0023 SF1442 v1 23 10 12.pdf PDF
Form B - Prior Experience Form v1 23 10 12.docx DOCX document
Form C - Key Personnel Form v1 23 10 12.docx DOCX document
Wage Determination MD20230054 23 09 01.pdf PDF
Offeror Representations and Certifications Form 23 10 05.pdf PDF
SEED SOW 23 02 16.pdf PDF
GSA Form 527.pdf PDF
Site Visit Authorization Request (VAR) Template.xlsx XLSX spreadsheet
Pre-Proposal Request for Information (RFI) Template.xlsx XLSX spreadsheet
The Solicitation 23 10 05.pdf PDF
SF1442 47PM0123R0023 .pdf PDF
GSA WNRC Retaining Wall-100_ Final Submission-Project Manual.pdf PDF
Form F - Socio Economic Status Form.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Drawings .pdf PDF
Form E-IDIQ Management Plan.docx DOCX document
GSA WNRC Retaining Wall-100_ Final Submission-Specifications.pdf PDF
Price Proposal Pricing Bid Form.xlsx XLSX spreadsheet
The Agreement 23 10 05.pdf PDF
Form A - Past Performance Form.docx DOCX document
Form C - Key Personnel Form.docx DOCX document
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORMWATER MANAGEMENT AND SEDIMENT & EROSION CONTROL APPROVAL

STATE/FEDERAL PROJECTS

SEDIMENT & STORMWATER PLAN REVIEW DIVISION

MDE NUMBER: 22-SF-0088 APPROVED BY: ____________________________________

Program Manager, Sediment, Stormwater, and Dam Safety EFFECTIVE DATE: May 6, 2022 (Pursuant to Criteria Noted Below)

IN COMPLIANCE WITH: Environment Article, Sections 4-106 and 4-205 Annotated Code of Maryland

APPROVAL IS HEREBY GRANTED: General Services Administration ADDRESS: Suitland Federal Center

4600 Silver Hill Rd Hillcrest Heights, MD 20746 Attn: Mr. Ronald Scott

HEREINAFTER KNOWN AS OWNER,

FOR THE PLANS AND SPECIFICATIONS PRESENTED FOR: Contract No.RMD84124 AI No. 173737

Retaining Wall Replacement, Washington National Records Center (WNRC), Suitland, MD - Prince George’s County

PREPARED BY: Pennoni Associates Inc.

This APPROVAL is granted subject to the following conditions:

1. This Approval shall become null and void if the construction authorized herein has not been completed within three (3) years from the granting of this Approval, except that these limits may be extended at the discretion of the Department when requested by the owner or authorized agent.

2. The Approval is subject to all laws and regulations now in effect and may be revoked if it is subsequently determined that this authorization violates other laws of the State. Construction shall comply with approved terms.

3. The location and dimensions of all sediment control structures and stormwater management facilities, as well as grading, excavation, and filling shall be in accordance with plans approved by the Department of the Environment/ Water and Science Administration (MDE/WSA). The owner or authorized agent must obtain written approval from the MDE/WSA for any plan modifications or changes. A copy of the approved plan with any approved modifications and this Approval shall be available at the construction site for reference during the construction period.

4. Off-site borrow or waste sites require local county and Soil Conservation District approvals if they are located on private property or MDE/WSA approval if on State or federal property. Local approval numbers shall be furnished to the MDE/WSA Inspector.

5. The Owner or his authorized agent shall notify the MDE/WSA Compliance Program at (410) 537-3510, at least seven (7) days prior to initiation of the project and five (5) days after work ends.

6. A stormwater management waiver has been granted for this project in accordance with Section 3.3.A of the Maryland Stormwater Management and Erosion & Sediment Control Guidelines for State and Federal Projects.