NAFQJ323B0001 AM-0004 Specifications.pdf

PDF 619 KB Posted

Attached to
NAF MWR Army Lodging, Camp Zama, Japan
Solicitation number
NAFQJ3-23-B-0001
Issued by

About this file

This document is a LEED v4 checklist for a proposed Army Lodging Facility at Camp Zama, Japan to be constructed under solicitation NAFQJ3-23-B-0001. The project will include construction of a new seven-story building consisting of 103 guest suites, support facilities such as elevators, mechanical and electrical rooms, and site work including vehicle parking areas and walkways. The checklist reviews the potential credits under LEED v4 for Building Design and Construction and notes status of achieving various prerequisites and credits. Waivers are noted where Department of Defense requirements preclude certain credits. The Army Corps of Engineers Japan District is the contracting agency seeking construction of the Army Lodging Facility.

View the file

Other files

File Type Posted
Abstract of Bids NAFQJ3-23-B-0001.pdf PDF
NAFQJ3-23-B-0001 Amend 0015.pdf PDF
NAFQJ3-23-B-0001 Amend 0015 Drawings.pdf PDF
NAFQJ3-23-B-0001 Amend 0014.pdf PDF
NAFQJ3-23-B-0001 Amend 0013.pdf PDF
NAFQJ3-23-B-0001 Amend 0012.pdf PDF
NAFQJ3-23-B-0001 Amend 0011 Specifications.pdf PDF
NAFQJ3-23-B-0001 Amend 0011.pdf PDF
NAFQJ3-23-B-0001 Amend 0011 AS-BUILTS A-20-112.pdf PDF
NAFQJ3-23-B-0001 Amend 0011 Drawings.pdf PDF
NAFQJ3_23_B_0001_0010.pdf PDF
Zama Lodge Pre-Award Site Visit Sign-in Sheet 26 MAR 2024.pdf PDF
Prebid Conf 2 NAFQJ323B0001 Army Lodging.pdf PDF
Zama Lodge Pre Bid Conference Attendance 25 March 2024.pdf PDF
0_USAGJ 1529 CZ Zama Lodge.pdf PDF
NAFQJ3_23_B_0001_0009 FINAL.pdf PDF
0_USAGJ 1529 CZ Zama Lodge.pdf PDF
NAFQJ3_23_B_0001_0008.pdf PDF
NAFQJ3_23_B_0001_0007.pdf PDF
NAFQJ3_23_B_0001_0006.pdf PDF
NAFQJ3-23-B-0001-0005.pdf PDF
NAFQJ323B0001 AM-0004 Drawings.pdf PDF
NAFQJ3-23-B-0001-0004.pdf PDF
NAFQJ3-23-B-0001-0003.pdf PDF
NAFQJ323B0001 AM-0003 As Builts.pdf PDF
NAFQJ323B0001 AM-0003 Drawings.pdf PDF
AM-0003 Equipment Schedule Cut Sheets.pdf PDF
NAFQJ323B0001 AM-0003 Specifications.pdf PDF
Amendment 0001 Drawings 3 of 3.pdf PDF
Amendment 0001 Drawings 2 of 3.pdf PDF
Amendment 0001 Drawings 1 of 3.pdf PDF
NAFQJ323B0001-0001.pdf PDF
Pre-Bid Conference Roster.pdf PDF
Zama Lodge Site Visit Roster.pdf PDF
Prebid Conf_NAFQJ323B0001 Army Lodging.pptx PPTX presentation
USAGJ 1529 Site Visit - Army Lodging - Camp Zama.pdf PDF
Camp Zama Drawings_Part 2 of 3.pdf PDF
Specs_Zama Lodge.pdf PDF
Camp Zama Drawings_Part 3 of 3.pdf PDF
Camp Zama Drawings_Part 1 of 3.pdf PDF
NAFQJ323B0001.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED v4 for BD+C: Hospitality Project Checklist Project Name: Army Lodging Facility, Camp Zama

Date: 5/26/23 (RTA) - Revised 6/22/23

Y ? N D/C Status 1 Credit 1 D

5 1 10 16 Status 0 Credit 16 D

1 Credit 1 D 2 Credit 2 D

2 3 Credit 5 D 1 4 Credit 5 D

1 Credit 1 D 1 Credit 1 D

1 Credit Green Vehicles 1 D

7 0 3 10 Status Y Prereq Required C

1 Credit 1 D 2 Credit 2 D 1 Credit 1 D

3 Credit 3 D 2 Credit 2 D 1 Credit 1 D

7 0 4 11 Status Y Prereq Required D Y Prereq Required D Y Prereq Building-Level Water Metering Required D 2 Credit 2 D 5 1 Credit 6 D

2 Credit 2 D 1 Credit Water Metering 1 D

12 0 21 33 Status Y Prereq Required C Y Prereq Required D Y Prereq Required D Y Prereq Required D

6 Credit 6 C 11 7 Credit 18 D

1 Credit 1 D 2 Credit 2 C

Revised calculated energy cost savings is 28.8%.

DOD Waiver on sharing data. Trend will be provided via BAS.

Understand Electrical Demand Response program is not available at Zama.

V4.1 (ECB #10) Reviewed, not achievable due to soil condition. Design retains 100% undergrnd.

DOD Waiver-CIR allows Gov to be CxA.

DOD Waiver - sharing of data not required.

Not requested by stakeholder.

DOD Waiver - sharing of data not required.

Option 1 - No irrigation [RP] Calculated reduction is 49.81.

V4.1 (ECB #10) None in this project.

Metering water into bldg. Not metering 2 subsystems, as reqd.

Reduced Parking Footprint

Construction Activity Pollution Prevention

Site Assessment

Rainwater Management Open Space

Water Efficiency

Minimum Energy Performance

Outdoor Water Use Reduction

Advanced Energy Metering Demand Response

Fundamental Commissioning and Verification Energy and Atmosphere

Enhanced Commissioning

Outdoor Water Use Reduction

Heat Island Reduction Light Pollution Reduction

Integrative Process

Location and Transportation

Sensitive Land Protection High Priority Site

Sustainable Sites

Site Development - Protect or Restore Habitat

LEED for Neighborhood Development Location

Surrounding Density and Diverse Uses Access to Quality Transit Bicycle Facilities

V4.1 (ECB #10) - extensive analysis not incorporated.

Option 1 previously developed site.

Neither option 1, 2 or 3 apply to this site.

Optimize Energy Performance

Building-Level Energy Metering Fundamental Refrigerant Management

Cooling Tower Water Use Indoor Water Use Reduction

Indoor Water Use Reduction

Option 2 achievable (2 pts). Option 1 (3 pts) not acheivable, adjacent density appears low.

High frequency of route trips req'd, will be challenging to achieve.

V4.1 (ECB #10) Achievement subject to GBCI accepting number of spaces in bicycle storage.

Appears achievable. Requires designated carpool spaces (3) in preferred location.

JDDG states HPSB 'Green Vehicles' reqt not to be pursued.

Option 1, non-roof measures & high-reflectance roof.

Option 2 appears achievable, for uplighting and light tresspass.

Option 1 - No irrigation DOD Waiver, Gender ratio: N/A

Appears achievable Option 1 appears achievable. [RP] Appears achievable

Army Lodging Facility Camp Zama, Japan

NAFQJ3-23-B-0001

Final RTA Submittal

ATTACHMENT 01 33 29-B Page 1 zimemi Strikethrough 5/26/23 (RTA) - Revised 6/22/23 zimemi Text Box 1/3/2024 zimemi Text Box

AM-0004

zimemi Pen zimemi Text Box CxA to be provided by KTR.

j2ee9kny Line j2ee9kny Line

3 Credit 3 D 1 Credit 1 D

2 Credit 2 C

2 1 10 13 Status Y Prereq Required D Y Prereq Required C

5 Credit 5 C

2 Credit 2 C

1 1 Credit 2 C 2 Credit Building Product Disclosure and Optimization - Material Ingredients 2 C

2 Credit 2 C

8 4 4 Indoor Environmental Quality 16 Status Y Prereq Required D Y Prereq Required D 1 1 Credit 2 D

3 Credit 3 C 1 Credit Construction Indoor Air Quality Management Plan 1 C 2 Credit 2 C 1 Credit 1 D 1 1 Credit 2 D

3 Credit 3 D 1 Credit 1 D 1 Credit 1 D

4 2 0 Innovation 6 Status 1 Credit 5 D

1 Credit Innovation or Pilot D 1 Credit Innovation or Pilot D

1 Credit Innovation or Pilot or Exemplary C 1 Credit Innovation or Pilot or Exemplary D 1 Credit 1 D/C

4 0 1 Regional Priority 4 Status 1 Credit Regi SSc4 Rainwater Management D

1 Credit Regi WEc1 Outdoor Water Use Reduction 1 D 1 Credit Regi WEc2 Indoor Water Use Reduction 1 D 1 Credit Regi EAc2 Optimize energy performance 1 D 1 Credit Regi SSc2 Site Devel - protect or restore habitat 1 D

Credit Regi EAc1 Enhanced commissioning C

50 8 53 TOTALS Possible Points: 110

Not pursuing, 2 pts required.

At 2 pts At 4 pts

Not pursuing

Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110

V4.1 (ECB #10) pursuing 2 out of 3 reqts.

Green Cleaning program of Army Lodging

LEED AP w/ specialty on design. Contractor team also required to have LEED AP w/ specialty.

Environmental Ed program of Army Lodging Integrated Pest Management

IEQc8 exemplary appears achievable.

MRc5 exemplary, if contractor achieves Option 2 along with Option 1.

At 8 pts At 2 pts

LEED Accredited Professional

V4.1 (ECB #10) Option 1/Path 1, or Option 2, acceptable to JED

Option 1, ASHRAE 55 Option 1 (public spaces) achievable, Option 2 (4 of 8 strategies) to be investigated.

Per VE direction, guestroom window size reduced to code minimum, credit not achievable.

2 of 4 kinds of views appear to be met.

Option 1, ASHRAE 62.1 Non-smoking building. No smoking exterior signage to be provided.

Option 1, Mechanically ventilated space.

V4.1 (ECB #10) appears more achievable. Requirements in spec.

V4.1 (ECB #10) v4.1 has East Asia equivalent for filtration.

V4.1 (ECB #10) Option 1 nor 2 readily achievable. Not available from Japanese manufacturers.

V4.1 (ECB #10) Certified wood & recycled content specified, products to pursue for compliance.

V4.1 (ECB #10) Option 1 nor 2 readily achievable. Not available from Japanese manufacturers.

JDDG states HPSB 'Green Power & Carbon Offset' reqt not to be pursued.

Plan from contactor required in 01 74 19 Not pursued, available software tools only have database for North America.

procluded by LCCA. At Charrette, confirmed not to be pursued.

Equipment & refrigerant selections are compliant.

Green Power and Carbon Offsets

Renewable Energy Production

Enhanced Indoor Air Quality Strategies

Materials and Resources Storage and Collection of Recyclables Construction and Demolition Waste Management Planning Building Life-Cycle Impact Reduction

Building Product Disclosure and Optimization - Environmental Product Declarations

Quality Views Acoustic Performance

Innovation or Pilot

Low-Emitting Materials

Indoor Air Quality Assessment Thermal Comfort Interior Lighting Daylight

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Construction and Demolition Waste Management

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke Control

Enhanced Refrigerant Management

Army Lodging Facility Camp Zama, Japan

NAFQJ3-23-B-0001

Final RTA Submittal

ATTACHMENT 01 33 29-B Page 2 zimemi Snapshot zimemi Text Box

AM-0004

Attachment 01 33 29-B

File details come from the government source that posted it. Updated .