Amendment 0001 Drawings 3 of 3.pdf

PDF 30 MB Posted

Attached to
NAF MWR Army Lodging, Camp Zama, Japan
Solicitation number
NAFQJ3-23-B-0001
Issued by

About this file

This file is an amendment to drawings related to the federal contract opportunity solicitation number NAFQJ3-23-B-0001 from the Department of the Army Corps of Engineers Engineering District Japan. The solicitation is for lodging services at Camp Zama in Japan to be provided by the NAF MWR Army. The amendment adds three additional drawings to the solicitation but does not specify the type of lodging services required, pricing terms, response dates, or any other salient details regarding the opportunity.

View the file

Other files

File Type Posted
Abstract of Bids NAFQJ3-23-B-0001.pdf PDF
NAFQJ3-23-B-0001 Amend 0015.pdf PDF
NAFQJ3-23-B-0001 Amend 0015 Drawings.pdf PDF
NAFQJ3-23-B-0001 Amend 0014.pdf PDF
NAFQJ3-23-B-0001 Amend 0013.pdf PDF
NAFQJ3-23-B-0001 Amend 0012.pdf PDF
NAFQJ3-23-B-0001 Amend 0011 Specifications.pdf PDF
NAFQJ3-23-B-0001 Amend 0011.pdf PDF
NAFQJ3-23-B-0001 Amend 0011 AS-BUILTS A-20-112.pdf PDF
NAFQJ3-23-B-0001 Amend 0011 Drawings.pdf PDF
NAFQJ3_23_B_0001_0010.pdf PDF
Zama Lodge Pre-Award Site Visit Sign-in Sheet 26 MAR 2024.pdf PDF
Prebid Conf 2 NAFQJ323B0001 Army Lodging.pdf PDF
Zama Lodge Pre Bid Conference Attendance 25 March 2024.pdf PDF
0_USAGJ 1529 CZ Zama Lodge.pdf PDF
NAFQJ3_23_B_0001_0009 FINAL.pdf PDF
0_USAGJ 1529 CZ Zama Lodge.pdf PDF
NAFQJ3_23_B_0001_0008.pdf PDF
NAFQJ3_23_B_0001_0007.pdf PDF
NAFQJ3_23_B_0001_0006.pdf PDF
NAFQJ3-23-B-0001-0005.pdf PDF
NAFQJ323B0001 AM-0004 Specifications.pdf PDF
NAFQJ323B0001 AM-0004 Drawings.pdf PDF
NAFQJ3-23-B-0001-0004.pdf PDF
NAFQJ3-23-B-0001-0003.pdf PDF
NAFQJ323B0001 AM-0003 As Builts.pdf PDF
NAFQJ323B0001 AM-0003 Drawings.pdf PDF
AM-0003 Equipment Schedule Cut Sheets.pdf PDF
NAFQJ323B0001 AM-0003 Specifications.pdf PDF
Amendment 0001 Drawings 2 of 3.pdf PDF
Amendment 0001 Drawings 1 of 3.pdf PDF
NAFQJ323B0001-0001.pdf PDF
Pre-Bid Conference Roster.pdf PDF
Zama Lodge Site Visit Roster.pdf PDF
Prebid Conf_NAFQJ323B0001 Army Lodging.pptx PPTX presentation
USAGJ 1529 Site Visit - Army Lodging - Camp Zama.pdf PDF
Camp Zama Drawings_Part 2 of 3.pdf PDF
Specs_Zama Lodge.pdf PDF
Camp Zama Drawings_Part 3 of 3.pdf PDF
Camp Zama Drawings_Part 1 of 3.pdf PDF
NAFQJ323B0001.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

MAIN

ENTRY

ADMIN OFFICE

LUGGAGE

COMM

CASH

ASST OFFICE

GM OFFICE

STAFF

MEN'S

STAFF WOMEN'S

SERVICE CORR

SERV ELEV

LOBBY

REAR

ENTRY

ELECTRICAL

ROOM

HSKP OFFICE

SOILED

LINEN

ARMP

MEN'S

WOMEN'S

PREP KITCHEN

DINING

RECV/MAINT

OFFICE

STORAGE

RECEIVING

MECH

STAIR #1

FIRE RISER

STAFF

ENTRY

BREAK ROOM

STAIR #2

PANTRY

ELEVATOR

LOBBY

HALLWAY 2

SERV

ENTRY

ELEVATOR

ELEVATOR

P101A

P101B

P101C

12.1

C

10.9

J

K

FRONT

DESK

RECEPTION

LOUNGE

6 7 8 9 10

LINEN

P-401

P-403

JAN

PREP

KITCHEN

BREAKFAST

BAR

STAFF

VEST

BOILER

VEST

JAN

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS

INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING

MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.

10. THE ACKNOWLEDGEMENT OF THE BURIED FIBER OPTIC CONDUIT ON THIS PROJECT SITE IS MISSION-CRITICAL. REFER TO G-003 GENERAL NOTES FOR COMMENTARY.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:2

P

M

P-101

F

IR

S T

F L O

O R

D R

A

IN

W

A S

T E

A N

D V

E N

T P

L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

FIRST FLOOR DRAIN, WASTE, AND VENT PLAN

0 800040002000

KEY PLAN

PLAN NORTH

NOT TO SCALE

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

11 12

B

D

E

H

MAIN ENTRY

ADMIN OFFICE

LUGGAGE

COMM

CASH

ASST OFFICE

GM OFFICE

STAFF MEN'S

SERVICE CORR

SERV ELEV

LOBBY

REAR

ENTRY

112ELECTRICAL

ROOM

HSKP

OFFICE

LINEN

BREAK ROOM

RECEPTION

PANTRY

FRONT

DESK

ELEVATOR

LOBBY

ELEVATOR

ELEVATOR

C

10.9

6 7 8 9 10

50ø S WITH 50ø V TO SK-1

100ø S DOWN FROM ABV 1ST

FLOOR CEILING TO BLW

FLOOR. CO AT BASE OF RISER.

SK-1

50ø V UP TO 2ND

FLOOR

SP-1

FD-1

100ø S

100ø S DOWN FROM 2ND FLOOR

TO ABV 1ST FLOOR CEILING;

OFFSET PIPE ABV CLG AS

REQUIRED TO DROP TO BLW

FLOOR WHERE SHOWN

100ø S DOWN FROM 2ND

FLOOR TO ABV 1ST FLOOR

CEILING; OFFSET PIPE ABV

CLG AS REQUIRED TO

DROP TO BLW FLOOR

WHERE SHOWN

100ø S DOWN

FROM ABV 1ST

FLOOR CEILING

TO BLW FLOOR

100ø S DOWN FROM

2ND FLOOR TO

UNDERFLOOR.

125ø S

125ø S

100ø S

50ø S

P-403

100ø S

100ø S DOWN FROM ABV

1ST FLOOR CEILING TO

BLW FLOOR. CO AT BASE

OF RISER.

100ø S DOWN FROM

2ND FLOOR TO ABV 1ST

FLOOR CEILING;

OFFSET PIPE ABV CLG

AS REQUIRED TO DROP

TO BLW FLOOR WHERE

SHOWN

SOILED LINEN

125ø S

100ø S

100ø S

P A

IN-LINE CO

50ø V

50ø V UP TO

2ND FLOOR

100ø S

100ø S

OFFSET DRAIN

UNDERGROUND AS

REQUIRED TO AVOID BEAM

125ø FCO

100ø S

100ø S

STAFF

WOMEN'S

VEST

130JAN

100ø ST SEE

P-102 FOR

CONTINUATION

100ø S DOWN FROM 2ND FLOOR TO

ABV 1ST FLOOR CEILING; OFFSET

PIPE ABV CLG AS REQUIRED TO DROP

TO BLW FLOOR WHERE SHOWN.

PROVIDE CO AT BASE OF RISER

200ø FCO

200ø FCO

200ø S

125ø S

100ø S 50ø S

40ø V

EWC-1

50ø S WITH 40ø V TO

EWC-1

50ø S

FD-1

WSB-1

SK-3

50ø S WITH 50ø V TO SK-3

50ø S TO

WSB-1

80ø S

TO FD-1

DROP OVERFLOW ALONG

WALL AND TERMINATE AT

EXTERIOR DISCHARGE

50ø S

50ø V RISE TO

ABV 1ST FLOOR

CEILING

WSB-1

50ø S TO FD-1

100ø S

100ø S

80ø V UP TO

2ND FLR

50ø V

100ø WCO

100ø WCO

P C

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE

DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS

AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING

SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS,

WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS

AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED

BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES;

EXCEPT AS INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE

APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM

SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 mm.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS

SHALL NOT INCLUDE THE USE OF QUARTER BENDS,

SHORT SWEEP QUARTER BENDS, AND UNLESS

ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL

NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND

ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR,

ELECTRICAL CONTRACTOR, AND SPRINKLER

CONTRACTOR PRIOR TO THE INSTALLATION OF

PLUMBING SYSTEM PIPING AND APPURTENANCES IN

ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP

FABRICATED AND FIELD FABRICATED DUCT AND PIPE

INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF

PENETRATION REQUIREMENTS AND PIPE SUPPORT

REQUIREMENTS TO ENSURE COMPLIANCE WITH THE

ROOFING MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING

AND INSTALLING ALL FIXTURES AND PIPING INDICATED

ON PLUMBING DRAWINGS, SCHEDULES AND IN

SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS

(mm).

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:0

P

M

P101B

F

IR

S T

F L O

O R

P A

R T

IA

L D

R A

IN

W A

S T

E

A N

D V

E N

T P

L A

N

Z O

N E

B

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 501

FIRST FLOOR PARTIAL DRAIN, WASTE AND VENT PLAN - ZONE B

ZONE B

KEY PLAN

PLAN NORTH

NOT TO SCALE

PLUMBING KEYNOTES

# KEY NOTE

1 INSTALL SUMP PUMP UNDER ELEVATOR AT 1.5 METERS BELOW

GROUND. ROUTE PIPING FROM SUMP ABOVE FIRST FLOOR

CEILING TO SSK-1 IN JANITOR'S CLOSET RM. 108.

2 SEE CIVIL FOR SITE STORM DRAIN CONNECTION POINT

LOCATION.

0 400020001000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

HSKP

CLOSET

GUEST

LAUNDRY

FS1

FS1

FS2

FS2

GUEST

CORRIDOR

ES

FS1

STAIR #2

GUEST

ELEV

LOBBY

SERV

ELEV

LOBBY

GUEST

STORAGE

GUEST

STORAGE

STORAGE

STORAGE

12.1

C

10.9

J

K

ES

ES

FS1

TELECOM

ELECTRICAL

ES-ABA

ES

ES

ES

6 7 8 9 10

P-405

P-405

P-408

ROUTE TO BELOW

SECOND FLOOR

DROP STORM TO BELOW

SECOND FLOOR AND

ROUTE AS SHOWN

FS2

P-407

DROP 150MM ST

ALONG WALL ON

FIRST FLOOR

DROP STORM TO

BELOW SECOND FLOOR

AND ROUTE AS SHOWN

DROP FROM ABV FIRST FLOOR

CLG LVL TO BELOW GROUND

DROP TO BELOW

SECOND FLR

CONNECT TO STORM

RISER ABOVE

SECOND FLOOR CLG

200ø ST

100 ⌀ ST DROP IN

CAVITY ON FIRST FLOOR

100ø ST

80ø ST 100ø ST

100ø ST

3 4

200ø ST

FS2

RD-2RD-1RD-2RD-1

RD-2

RD-1

RD-2RD-1

RD-2 RD-1 RD-2 RD-1

RD-2RD-1 RD-2 RD-1

S1

S2

S3

S4

SEE P101C FOR

CONTINUATION

ENSURE SANITARY

PIPING IS ROUTED

OUTSIDE COMM

133 BELOW.

S5

S6 S6

S5

S7

S8

S9

S10

S11 S11

S13

S14

DROP FROM ABV FIRST FLOOR

CLG LVL TO BELOW GROUND

ROUTE 100ø S TO

UNDER 3RD FLOOR

P-407

100ø S

200ø ST

80ø ST

RD-1

RD-2

SEE P101B FOR

CONTINUATION

RD-1RD-2

100ø ST

100ø ST

100 ⌀ ST DROP IN

CAVITY ON FIRST FLOOR.

SEE P101C FOR

CONTINUATION.

100ø S

SEE P101C FOR

CONTINUATION

100ø ST

DW

W W

ROUTE 200⌀ ST PIPING

BLW 2ND FLR AND ABV 1ST

FLR CEILING

100ø ST

100ø ST

100ø ST

100ø ST 100ø ST

RD-1RD-2

100 ⌀ ST DROP IN

CAVITY ON FIRST FLOOR.

SEE A-413 FOR

CONTINUATION

SEE P101C FOR

CONTINUATION. 100⌀

ST DOWN TO FIRST

FLOOR. ROUTE

OUTSIDE OF

BUILDING.

100ø ST

100 ⌀ ST DOWN

FROM 2ND FLR

CANOPY

4 4

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS

INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING

MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.

10. THE ACKNOWLEDGEMENT OF THE BURIED FIBER OPTIC CONDUIT ON THIS PROJECT SITE IS MISSION-CRITICAL. REFER TO G-003 GENERAL NOTES FOR COMMENTARY.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:5

P

M

P-102

S E

C O

N D

F L O

O R

D R

A

IN

W

A S

T E

A

N D

V E

N T

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

SECOND FLOOR DRAIN, WASTE AND VENT PLAN

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

PLUMBING KEYNOTES

# KEY NOTE

1 ROUTE 200 DIAMETER ST DRAIN BELOW GRADE AND TO BUILDING

EXTERIOR TO SITE STORM.

2 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR

TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON

OVERALL FLOOR PLANS.

3 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR

TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON

OVERALL FLOOR PLANS.

4 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR

TYPICAL ES BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON

OVERALL FLOOR PLANS.

5 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF

TYPICAL ES-ABA BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON

OVERALL FLOOR PLANS.

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

12.1

C

10.9

100⌀ S DWN,

100⌀ V UP

STAIR #1

FS1

FS1

FS2

FS2

ES

ES-ABA

FS2

ES

ES

FS2

ES

ES

GUEST

CORRIDOR

FS1

ES

ES

GUEST

ELEV.

LOBBY

SERV

ELEV

LOBBY

HSKP CLOSET

STAIR #2

6 7 8 9 10

RD-1

TYP

P-405

4 TYP

P-405

3 TYP

FS1

ES

ES

P-408

2 6 6 2

RD-2

P-407

JAN

S1

S2

S3

S4

S5

S6 S6

S5

S7

S8

S9

S10

S11 S11

S13

S14

S12 S12S10

ELECTRICAL

TELECOM

GUEST

STORAGE

GUEST STORAGE

STORAGE

307STORAGE

STORAGE

STORAGE

P-407

6 6 6 6

CONNECT TO STORM RISER

ABOVE SECOND FLOOR CLG

125ø ST 125ø ST

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS

INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING

MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:1

P

M

P-103

T H

IR

D

F L O

O R

D R

A

IN

W

A S

T E

A

N D

V E

N T

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

THIRD FLOOR DRAIN, WASTE, AND VENT PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST

FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED

CONNECTIONS.

2 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

3 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

4 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST

FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED

CONNECTIONS.

5 ROUTE 125MM STORM DRAIN AND OVERFLOW LEADERS FROM ABOVE ACROSS

CORRIDOR AND CONNECT TO STORM RISERS ON WEST SIDE.

6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS. KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

W W

DW

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

C

100ø S DWN, 100ø V UP

(TYP.)

STAIR #1

FS1

FS1

FS2

FS2

ES

ES-ABA

FS2

ES

ES

FS2

ES

ES

GUEST

CORRIDOR

ES

ES

FS1

FS1

ES

ES

GUEST

ELEV

LOBBY

SERV

ELEV

LOBBY

GUEST

LAUNDRY

HSKP

CLOSET

STAIR #2

6 7 8 9 10

TYP TYP TYPTYP

P-405

4 TYP

P-405

3 TYP

P-408

P-407

2 2

6 6 6 6

TELECOM

ELECTRICAL

GUEST

STORAGE

GUEST

STORAGE

S1

S2

S3

S4

S5

S6

S6

S5

S7

S8

S9

S10

S11 S11

S13

S14

S12 S12S10

STORAGE

STORAGE

STORAGE

STORAGE

P-405

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS

INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING

MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:2

P

M

P-104

F O

U R

T H

F L O

O R

D R

A

IN

W

A S

T E

A

N D

V E

N T

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

FOURTH FLOOR DRAIN, WASTE, AND VENT PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

2 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

3 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE

SECOND FLOOR CEILING.

4 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST

FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED

CONNECTIONS.

5 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST

FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED

CONNECTIONS.

6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

C

100MM S DWN,

100MM V UP

100⌀ S DWN,

100⌀ V UP

100MM S DWN,

100MM V UP (TYP.)

STAIR #1

FS1

FS1

FS2

FS2

ES

ES-ABA

FS2

ES

ES

FS2

GUEST STORAGE

ES

ES

GUEST

CORRIDOR

TELECOM

ES

ES

FS1

FS1

ES

ES

GUEST

ELEV

LOBBY

SERV

ELEV

LOBBY

HSKP CLOSET

STAIR #2

100MM S DWN,

100MM V UP

6 7 8 9 10

TYP

P-405

4 TYP

P-405

3 TYP

P-407

3 373 2

S1

S2

S3

S4

S5

S6 S6

S5

S7

S8

S9

S10

S11 S11

S13

S14

S12 S12S10

GUEST

STORAGE

STORAGE

507STORAGE

STORAGE

STORAGE

ELECTRICAL

SSK-1FS-1 50⌀ S WITH, 40

⌀ V TO SSK-150⌀ S WITH, 40

⌀ V TO FS-1

P-407

50ø S

50ø V

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS

INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING

MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:4

P

M

P-105

F

IF

T H

F L O

O R

D R

A

IN

W

A S

T E

A

N D

V E

N T

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

FIFTH FLOOR DRAIN, WASTE, AND VENT PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

2 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

3 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

4 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST FLOOR

CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED CONNECTIONS.

5 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST FLOOR

CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED CONNECTIONS.

6 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE SECOND

FLOOR CEILING.

7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

8 PROVIDE WITH DISHWASHER FITTING. DRAIN INTO SINK ABOVE TRAP.

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

100MM S DWN,

100MM V UP

100MM S DWN,

100MM V UP

(TYP.)

C

STAIR #1

FS1

FS1

FS2

FS2

ES

ES-ABA

FS2

ES

ES

ES

ES

GUEST

CORRIDOR

TELECOM

ES

ES

FS1

FS1

ES

ES

GUEST

ELEV

LOBBY

SERV

ELEV

LOBBY

GUEST

LAUNDRY

HSKP

CLOSET

STAIR #2

6 7 8 9 10

FS2

TYP

P-405

4 TYP

P-405

3 TYPTYP TYP TYPTYP TYP TYP

P-408

2 2

2 2

6 666

S1

S2

S3

S4

S5

S6 S6

S5

S7

S8

S9

S10

S11 S11

S13

S14

S12 S12S10

GUEST STORAGE

GUEST

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

P-407

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS

INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING

MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:0

P

M

P-106

S

IX

T H

F L O

O R

D R

A

IN

W

A S

T E

A

N D

V E

N T

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

SIXTH FLOOR DRAIN, WASTE, AND VENT PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

2 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

3 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE

SECOND FLOOR CEILING.

4 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST

FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED

CONNECTIONS.

5 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST

FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED

CONNECTIONS.

6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA

BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS. KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

100ø S DWN, 100ø V UP (TYP.)

100ø V UP 100ø S DOWN

SERV

ELEV

LOBBY

GUEST

ELEV

LOBBY

HSKP CLOSET

FS1

STAIR #2

GUEST

CORRIDOR

700TELECOM

C

FS1

FS2

ES-ABA

ES

FS2

ES

ES

DFS ABA

DFS

FS1

STAIR #1

GUEST

CORRIDOR

FS1

ES

ES

ES

ES

6 7 8 9 10

TYP

P-405

4 TYP

P-405

3 TYP

P-406

5 7 7 7 7

7 7

S1

S2

S3

S4

S5

S6 S6

S5

S7

S8

S9

S10

S11 S11

S13

S14

S12 S12S10

GUEST STORAGE

GUEST

STORAGE

STORAGE

STORAGE

P-407

SSK-1FS-1

50ø S WITH 40ø V TO FS-1 50ø S WITH 40ø

V TO SSK-1

FCO

4 50ø S

P-407

3 TYP

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS

INDICATED OTHERWISE.

4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.

DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.

5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING

MANUFACTURER'S WARRANTY.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:2

P

M

P-107

S E

V E

N T

H F

L O

O R

D R

A

IN

W

A S

T E

A

N D

V E

N T

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

SEVENTH FLOOR DRAIN, WASTE, AND VENT PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1 BATHROOM

LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

2 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST FLOOR

CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED CONNECTIONS.

3 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE SECOND

FLOOR CEILING.

4 PROVIDE WITH DISHWASHER FITTING. DRAIN INTO SINK ABOVE TRAP.

5 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2 BATHROOM

LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES BATHROOM

LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA BATHROOM

LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

100MM VTR

100MM VTR 100MM VTR

100MM VTR

100MM VTR

100MM VTR

100MM VTR

100MM VTR

C

6 7 8 9 10

100MM VTR

RD (TYP. OF 16)

100MM VTR

100MM VTR

100MM VTR

100MM VTR

100MM VTR

100MM VTR

100MM VTR

100MM VTR

100MM VTR

RD-2

RD-2

RD-2

RD-2 RD-2RD-2RD-1RD-1

RD-1 RD-1 RD-2 RD-2RD-1 RD-1 RD-2

RD-2RD-2

RD-1

RD-1 RD-1

RD-2RD-2RD-2

RD-1

RD-1

RD-1 RD-1 RD-1

DISCHARGE TO MAIN ROOF

DISCHARGE TO MAIN ROOF

100MM VTR

DISCHARGE TO

MAIN ROOF

DISCHARGE TO

MAIN ROOF

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:5

P

M

P-109

R O

O F

P L U

M B

IN

G

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

ROOF PLUMBING PLAN

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

ELECTRICAL

TELECOM

GUEST

STORAGE

GUEST

STORAGE

STORAGE

STORAGE

STAIR #2

GUEST

ELEV

LOBBY

SERV

ELEV

LOBBY

HSKP

CLOSET

GUEST LAUNDRY

GUEST

CORRIDOR

ES

FS1

ES

FS2

FS1

FS2

12.1

C

10.9

J

K

FS2

ES-ABA

ES

FS2

ES

ES

6 7 8 9 10

P-407

P-405

P-405

P-408

ES

FS1

STAIR #1

FS1

P-407

2 3 2 4

2 4 4 2 4 4

20ø DHWR 32ø DHW

40ø DCW

50ø DCW, 40ø DHW, & 20ø

DHWR UP FROM FIRST

FLOOR. ROUTE TO ABOVE

2ND FLOOR CEILING.

40ø DCW, 32ø DHW, & 20ø DHWR UP TO

THIRD FLOOR

20ø DHWR 40ø DHW 50ø DCW

32ø DCW

32ø DHW

15ø DHWR

P1

P2

P3

P4

P5

P6 P6

P5

P7

P8

P9

P10

P12 P12

P13

P14

STORAGE

STORAGE

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE

DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS

INDICATED OTHERWISE.

4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT

REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON

PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:5

P

M

P-122

S E

C O

N D

F L O

O R

D O

M E

S T

IC

W

A T

E R

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

SECOND FLOOR DOMESTIC WATER PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES-ABA BATHROOM LAYOUTS.

4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR

PLANS.

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

HSKP

CLOSET

GUEST

ELEV.

LOBBY

SERV

ELEV

LOBBY

GUEST

CORRIDOR

STAIR #2

12.1

C

10.9

FS1

ES

ES

ES

ES

FS2

ES

ES

FS2

ES-ABA

ES

FS2

FS2

GUEST

STORAGE

GUEST

STORAGE

6 7 8 9 10

FS1

FS1

ES

ES

FS1

P-407

P-405

P-405

P-408

P-407

2 3 2 4

2 4 4 2 4 4

4 44

P1

P2

P3

P4

P5

P6 P6

P5

P7

P8

P9

P10

P12 P12

P13

P14

P10 P12 P12

STORAGE

STORAGE

TELECOM

ELECTRICAL

STORAGE

STORAGE

STAIR #1

JAN

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE

DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS

INDICATED OTHERWISE.

4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT

REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON

PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:1

P

M

P-123

T H

IR

D

F L O

O R

D O

M E

S T

IC

W

A T

E R

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

THIRD FLOOR DOMESTIC WATER PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES-ABA BATHROOM LAYOUTS.

4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR

PLANS.

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

STAIR #2

461GUEST

CORRIDOR

GUEST

ELEV

LOBBY

SERV

ELEV

LOBBY

HSKP

CLOSET

GUEST

LAUNDRY

STORAGE

C

FS1

ES

ES

ES

ES

ES

ES

FS1

ES

ES

ES-ABA

ES

FS2

FS2

FS2

FS1

FS1

STAIR #1

FS2

6 7 8 9 10

P-407

P-405

P-405

TELECOM

STORAGE

ELECTRICAL

STORAGE

STORAGE

GUEST

STORAGE

P-408

P-407

2 3 2 4

2 4 4 2 4 4

4 44

P1

P2

P3

P4

P5

P6 P6

P5

P7

P8

P9

P10

P12 P12

P13

P14

P10 P12 P12

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE

DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS

INDICATED OTHERWISE.

4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT

REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON

PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:3

P

M

P-124

F O

U R

T H

F L O

O R

D O

M E

S T

IC

W

A T

E R

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

FOURTH FLOOR DOMESTIC WATER PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES-ABA BATHROOM LAYOUTS.

4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR

PLANS.

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

HSKP CLOSET

SERV

ELEV

LOBBY

GUEST

ELEV

LOBBY

TELECOM

STAIR #2

C

FS2

ES

ES

FS1

FS1

FS2

ES

ES-ABA

FS2

GUEST

CORRIDOR

ES

ES

ES

ES

FS1

FS1

ES

ES

6 7 8 9 10

FS2

ELECTRICAL

STORAGE

STORAGE

GUEST

STORAGE

GUEST

STORAGE

P-407

2 TYP

P-405

2 TYP

P-405

1 TYP

2 3

2 3 3 2 3 3

3 33

P-407

2 3

P1

P2

P3

P4

P5

P6 P6

P5

P7

P8

P9

P10

P12 P12

P13

P14

P10 P12 P12

STORAGE

STORAGE

SSK-1

15ø DCW &

DHW TO SSK-1

5 6

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE

DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS

INDICATED OTHERWISE.

4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT

REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON

PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:0

:5

P

M

P-125

F

IF

T H

F L O

O R

D O

M E

S T

IC

W

A T

E R

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

FIFTH FLOOR DOMESTIC WATER PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS

OF TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON

OVERALL FLOOR PLANS.

2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS

OF TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON

OVERALL FLOOR PLANS.

3 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS

OF TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

4 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS

OF TYPICAL ES-ABA BATHROOM LAYOUTS.

5 CONTRACTOR TO PROVIDE DHW NIPPLE TO DISHWASHER WITH

VACUUM BREAKER AND MAKE FINAL CONNECTION.

6 PROVIDE ISOLATION VALVE AT EACH TAP FROM DCW, DHW, AND

DHWR. PROVIDE ACCESS PANEL WHERE PIPES ENTER ROOM. REFER

TO ARCHITECTUAL PLANS FOR ACCESS PANEL LOCATION AND

DETAILS. (TYP.)

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

SERV

ELEV

LOBBY

GUEST

ELEV

LOBBY

GUEST

LAUNDRY

HSKP

CLOSET

STAIR #2

GUEST

CORRIDOR

TELECOM

C

FS1

FS1

FS2

FS2

FS2

ES

ES

ES

ES-ABA

FS2

ES

ES

ES

ES

ES

ES

FS1

FS1

6 7 8 9 10

P-407

2 TYP

P-405

2 TYP

P-405

1 TYP

P-408

P-407

1 2 3 2 4

2 4 4 2 4 4

4 44

P1

P2

P3

P4

P5

P6 P6

P5

P7

P8

P9

P10

P12 P12

P13

P14

P10 P12 P12

ELECTRICAL

STORAGE

613STORAGE

STORAGE

STORAGE

GUEST

STORAGE

GUEST

STORAGE

STAIR #1

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE

DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS

INDICATED OTHERWISE.

4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT

REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON

PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:1

:1

P

M

P-126

S

IX

T H

F L O

O R

D O

M E

S T

IC

W

A T

E R

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

SIXTH FLOOR DOMESTIC WATER PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES-ABA BATHROOM LAYOUTS.

4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR

PLANS.

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

A

2 3 4 5 11 12 13 14 15 16 17

B

D

E

H

C

DFS

FS1

STAIR #1

FS1

FS2

ES

ES-ABA

FS2

ES

ES

ES

ES

FS1

FS1

ES

ES

STAIR #2

GUEST

CORRIDOR

DFS ABA

HSKP CLOSET

SERV

ELEV

LOBBY

GUEST

ELEV

LOBBY

TELECOM

6 7 8 9 10

P-407

2 TYP

P-405

2 TYP

P-405

1 TYP

ELECTRICAL

STORAGE

GUEST

STORAGE

704 STORAGE

P-406

2 3

3 3

3 33

2 4

P1

P2

P3

P4

P5

P6 P6

P5

P7

P8

P9

P10

P12 P12

P13

P14

P10 P12 P12

P-405

TYP

5 5

15ø DCW &

DHW TO SSK-1

SSK-1

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE

DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.

3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS

INDICATED OTHERWISE.

4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.

5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT

REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON

PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.

7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).

8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

IS

O

A

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9 11 13 15 17 19

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

C

B

A

D

E

G

J

L

N

F

H

K

M

P

Q

AM-000

B

IM

/3

C

A M

P Z

A M

A L

O D

G

IN

G F

A C

IL

IT

Y /Z

A M

A L O

D G

E -P

-3 D v R

.r v t

/2

/2

:1

:4

P

M

P-127

S E

V E

N T

H F

L O

O R

D O

M E

S T

IC

W

A T

E R

P L A

N

J A

P A

N D

IS

T

R

IC

T U

N

IT

A

P O

A

P

-5

O T

IE

-R

S

H J

O

IN

T V

E N

T U

R E

N

O R

T H

M A

Y F

A

IR

R O

A D

S

U

IT

E

M

IL

W A

U K

E E

W

I

A M

A H

M O

O D

R C

L E

W E

T T

P V

A N

D E

N B

E R

G

K M

IL

L E

R

M A

Y

X X

X X

X X

-X X

-X -X

X X

X

X X

X X

X X

-X X

-X -X

X X

X

R E

A D

Y T

O A

D V

E R

T

IS

E S

U B

M

IT

T A

L

A R

M Y

L O

D G

IN

G

F A

C

IL

IT

Y

C

A M

P Z

A M

A J A

P A

N

1 : 1001

SEVENTH FLOOR DOMESTIC WATER PLAN

PLUMBING KEYNOTES

# KEY NOTE

1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL

FLOOR PLANS.

3 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR

PLANS.

4 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF

TYPICAL ES-ABA BATHROOM LAYOUTS.

5 PROVIDE CIRCUIT SETTER CONTROL VALVE AT 0.18 LPM.

6 CONTRACTOR TO PROVIDE DHW NIPPLE TO DISHWASHER WITH VACUUM

BREAKER AND MAKE FINAL CONNECTION.

7 PROVIDE ISOLATION VALVE AT EACH TAP FROM DCW, DHW, AND DHWR.

PROVIDE ACCESS PANEL WHERE PIPES ENTER ROOM. REFER TO

ARCHITECTUAL PLANS FOR ACCESS PANEL LOCATION AND DETAILS.

(TYP.)

KEY PLAN

PLAN NORTH

NOT TO SCALE

0 800040002000

PLAN NORTH

A

M E

N D

M E

N T

A D

D B

A T

H R

O O

M S

H E

L V

E S

A T

E S

-A B

A U

N

IT

J

U L

E

WC-1

WC-1

WC-2

100ø FCO

UR-1 UR-2WC-2

L-2L-2

100ø S

100ø S

50ø S

50ø V

50ø S

50ø V

100ø S

100ø CO

SSK-1

80ø S WITH 50ø V TO

SSK-1

80ø S W/ 50ø V

TO FS-1

100ø S TO

WC-1/WC-2

(TYP. OF 4)

50ø S WITH 50ø V TO L-2

(TYP. OF 3)

100ø S

40ø V

100ø WCO

50ø S W/ 40ø V TO L-2

(TYP. OF 2)

50ø S

50ø S W/ 40ø V

TO UR-1/UR-2

(TYP. OF 2)

100ø S DOWN FROM 2ND FLOOR

TO ABV 1ST FLOOR CEILING;

OFFSET PIPE ABV CLG AS

REQUIRED TO DROP TO BLW

FLOOR WHERE SHOWN

50 ø V UP TO

2ND FLOOR

100ø S DOWN TO

UNDERFLOOR

100ø S DOWN FROM 2ND FLOOR

TO ABV 1ST FLOOR CEILING;

OFFSET PIPE ABV CLG AS

REQUIRED TO DROP TO BLW

FLOOR WHERE SHOWN

GM OFFICE

STAFF WOMEN'S

JAN

VEST

STAFF

MEN'S

FD-1

FD-1

80ø S

TO FD-1

80ø S TO

FD-1

FS-1

50ø V

L-2

L-2

L-2

100ø S

100ø S DOWN

FROM 2ND

FLOOR

100ø WCO

PROVIDE 350mm x 450mm

ACCESS PANEL FOR PLUMBING

DROPS. SEE A121, A121B, & A446

FOR MORE INFORMATION.

50 ø V UP TO

2ND FLOOR

50ø S

GENERAL NOTES

1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE

DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS

AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING

SCHEDULES.

2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS,

WAL…