Amendment 0001 Drawings 3 of 3.pdf
PDF 30 MB Posted
- Attached to
- NAF MWR Army Lodging, Camp Zama, Japan
- Solicitation number
- NAFQJ3-23-B-0001
About this file
This file is an amendment to drawings related to the federal contract opportunity solicitation number NAFQJ3-23-B-0001 from the Department of the Army Corps of Engineers Engineering District Japan. The solicitation is for lodging services at Camp Zama in Japan to be provided by the NAF MWR Army. The amendment adds three additional drawings to the solicitation but does not specify the type of lodging services required, pricing terms, response dates, or any other salient details regarding the opportunity.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
MAIN
ENTRY
ADMIN OFFICE
LUGGAGE
COMM
CASH
ASST OFFICE
GM OFFICE
STAFF
MEN'S
STAFF WOMEN'S
SERVICE CORR
SERV ELEV
LOBBY
REAR
ENTRY
ELECTRICAL
ROOM
HSKP OFFICE
SOILED
LINEN
ARMP
MEN'S
WOMEN'S
PREP KITCHEN
DINING
RECV/MAINT
OFFICE
STORAGE
RECEIVING
MECH
STAIR #1
FIRE RISER
STAFF
ENTRY
BREAK ROOM
STAIR #2
PANTRY
ELEVATOR
LOBBY
HALLWAY 2
SERV
ENTRY
ELEVATOR
ELEVATOR
P101A
P101B
P101C
12.1
C
10.9
J
K
FRONT
DESK
RECEPTION
LOUNGE
6 7 8 9 10
LINEN
P-401
P-403
JAN
PREP
KITCHEN
BREAKFAST
BAR
STAFF
VEST
BOILER
VEST
JAN
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS
INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING
MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.
10. THE ACKNOWLEDGEMENT OF THE BURIED FIBER OPTIC CONDUIT ON THIS PROJECT SITE IS MISSION-CRITICAL. REFER TO G-003 GENERAL NOTES FOR COMMENTARY.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:2
P
M
P-101
F
IR
S T
F L O
O R
D R
A
IN
W
A S
T E
A N
D V
E N
T P
L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
FIRST FLOOR DRAIN, WASTE, AND VENT PLAN
0 800040002000
KEY PLAN
PLAN NORTH
NOT TO SCALE
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
11 12
B
D
E
H
MAIN ENTRY
ADMIN OFFICE
LUGGAGE
COMM
CASH
ASST OFFICE
GM OFFICE
STAFF MEN'S
SERVICE CORR
SERV ELEV
LOBBY
REAR
ENTRY
112ELECTRICAL
ROOM
HSKP
OFFICE
LINEN
BREAK ROOM
RECEPTION
PANTRY
FRONT
DESK
ELEVATOR
LOBBY
ELEVATOR
ELEVATOR
C
10.9
6 7 8 9 10
50ø S WITH 50ø V TO SK-1
100ø S DOWN FROM ABV 1ST
FLOOR CEILING TO BLW
FLOOR. CO AT BASE OF RISER.
SK-1
50ø V UP TO 2ND
FLOOR
SP-1
FD-1
100ø S
100ø S DOWN FROM 2ND FLOOR
TO ABV 1ST FLOOR CEILING;
OFFSET PIPE ABV CLG AS
REQUIRED TO DROP TO BLW
FLOOR WHERE SHOWN
100ø S DOWN FROM 2ND
FLOOR TO ABV 1ST FLOOR
CEILING; OFFSET PIPE ABV
CLG AS REQUIRED TO
DROP TO BLW FLOOR
WHERE SHOWN
100ø S DOWN
FROM ABV 1ST
FLOOR CEILING
TO BLW FLOOR
100ø S DOWN FROM
2ND FLOOR TO
UNDERFLOOR.
125ø S
125ø S
100ø S
50ø S
P-403
100ø S
100ø S DOWN FROM ABV
1ST FLOOR CEILING TO
BLW FLOOR. CO AT BASE
OF RISER.
100ø S DOWN FROM
2ND FLOOR TO ABV 1ST
FLOOR CEILING;
OFFSET PIPE ABV CLG
AS REQUIRED TO DROP
TO BLW FLOOR WHERE
SHOWN
SOILED LINEN
125ø S
100ø S
100ø S
P A
IN-LINE CO
50ø V
50ø V UP TO
2ND FLOOR
100ø S
100ø S
OFFSET DRAIN
UNDERGROUND AS
REQUIRED TO AVOID BEAM
125ø FCO
100ø S
100ø S
STAFF
WOMEN'S
VEST
130JAN
100ø ST SEE
P-102 FOR
CONTINUATION
100ø S DOWN FROM 2ND FLOOR TO
ABV 1ST FLOOR CEILING; OFFSET
PIPE ABV CLG AS REQUIRED TO DROP
TO BLW FLOOR WHERE SHOWN.
PROVIDE CO AT BASE OF RISER
200ø FCO
200ø FCO
200ø S
125ø S
100ø S 50ø S
40ø V
EWC-1
50ø S WITH 40ø V TO
EWC-1
50ø S
FD-1
WSB-1
SK-3
50ø S WITH 50ø V TO SK-3
50ø S TO
WSB-1
80ø S
TO FD-1
DROP OVERFLOW ALONG
WALL AND TERMINATE AT
EXTERIOR DISCHARGE
50ø S
50ø V RISE TO
ABV 1ST FLOOR
CEILING
WSB-1
50ø S TO FD-1
100ø S
100ø S
80ø V UP TO
2ND FLR
50ø V
100ø WCO
100ø WCO
P C
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE
DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS
AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING
SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS,
WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS
AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED
BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES;
EXCEPT AS INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE
APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM
SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 mm.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS
SHALL NOT INCLUDE THE USE OF QUARTER BENDS,
SHORT SWEEP QUARTER BENDS, AND UNLESS
ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL
NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND
ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR,
ELECTRICAL CONTRACTOR, AND SPRINKLER
CONTRACTOR PRIOR TO THE INSTALLATION OF
PLUMBING SYSTEM PIPING AND APPURTENANCES IN
ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP
FABRICATED AND FIELD FABRICATED DUCT AND PIPE
INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF
PENETRATION REQUIREMENTS AND PIPE SUPPORT
REQUIREMENTS TO ENSURE COMPLIANCE WITH THE
ROOFING MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING
AND INSTALLING ALL FIXTURES AND PIPING INDICATED
ON PLUMBING DRAWINGS, SCHEDULES AND IN
SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS
(mm).
GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:0
P
M
P101B
F
IR
S T
F L O
O R
P A
R T
IA
L D
R A
IN
W A
S T
E
A N
D V
E N
T P
L A
N
Z O
N E
B
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 501
FIRST FLOOR PARTIAL DRAIN, WASTE AND VENT PLAN - ZONE B
ZONE B
KEY PLAN
PLAN NORTH
NOT TO SCALE
PLUMBING KEYNOTES
# KEY NOTE
1 INSTALL SUMP PUMP UNDER ELEVATOR AT 1.5 METERS BELOW
GROUND. ROUTE PIPING FROM SUMP ABOVE FIRST FLOOR
CEILING TO SSK-1 IN JANITOR'S CLOSET RM. 108.
2 SEE CIVIL FOR SITE STORM DRAIN CONNECTION POINT
LOCATION.
0 400020001000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
HSKP
CLOSET
GUEST
LAUNDRY
FS1
FS1
FS2
FS2
GUEST
CORRIDOR
ES
FS1
STAIR #2
GUEST
ELEV
LOBBY
SERV
ELEV
LOBBY
GUEST
STORAGE
GUEST
STORAGE
STORAGE
STORAGE
12.1
C
10.9
J
K
ES
ES
FS1
TELECOM
ELECTRICAL
ES-ABA
ES
ES
ES
6 7 8 9 10
P-405
P-405
P-408
ROUTE TO BELOW
SECOND FLOOR
DROP STORM TO BELOW
SECOND FLOOR AND
ROUTE AS SHOWN
FS2
P-407
DROP 150MM ST
ALONG WALL ON
FIRST FLOOR
DROP STORM TO
BELOW SECOND FLOOR
AND ROUTE AS SHOWN
DROP FROM ABV FIRST FLOOR
CLG LVL TO BELOW GROUND
DROP TO BELOW
SECOND FLR
CONNECT TO STORM
RISER ABOVE
SECOND FLOOR CLG
200ø ST
100 ⌀ ST DROP IN
CAVITY ON FIRST FLOOR
100ø ST
80ø ST 100ø ST
100ø ST
3 4
200ø ST
FS2
RD-2RD-1RD-2RD-1
RD-2
RD-1
RD-2RD-1
RD-2 RD-1 RD-2 RD-1
RD-2RD-1 RD-2 RD-1
S1
S2
S3
S4
SEE P101C FOR
CONTINUATION
ENSURE SANITARY
PIPING IS ROUTED
OUTSIDE COMM
133 BELOW.
S5
S6 S6
S5
S7
S8
S9
S10
S11 S11
S13
S14
DROP FROM ABV FIRST FLOOR
CLG LVL TO BELOW GROUND
ROUTE 100ø S TO
UNDER 3RD FLOOR
P-407
100ø S
200ø ST
80ø ST
RD-1
RD-2
SEE P101B FOR
CONTINUATION
RD-1RD-2
100ø ST
100ø ST
100 ⌀ ST DROP IN
CAVITY ON FIRST FLOOR.
SEE P101C FOR
CONTINUATION.
100ø S
SEE P101C FOR
CONTINUATION
100ø ST
DW
W W
ROUTE 200⌀ ST PIPING
BLW 2ND FLR AND ABV 1ST
FLR CEILING
100ø ST
100ø ST
100ø ST
100ø ST 100ø ST
RD-1RD-2
100 ⌀ ST DROP IN
CAVITY ON FIRST FLOOR.
SEE A-413 FOR
CONTINUATION
SEE P101C FOR
CONTINUATION. 100⌀
ST DOWN TO FIRST
FLOOR. ROUTE
OUTSIDE OF
BUILDING.
100ø ST
100 ⌀ ST DOWN
FROM 2ND FLR
CANOPY
4 4
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS
INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING
MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.
10. THE ACKNOWLEDGEMENT OF THE BURIED FIBER OPTIC CONDUIT ON THIS PROJECT SITE IS MISSION-CRITICAL. REFER TO G-003 GENERAL NOTES FOR COMMENTARY.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:5
P
M
P-102
S E
C O
N D
F L O
O R
D R
A
IN
W
A S
T E
A
N D
V E
N T
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
SECOND FLOOR DRAIN, WASTE AND VENT PLAN
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
PLUMBING KEYNOTES
# KEY NOTE
1 ROUTE 200 DIAMETER ST DRAIN BELOW GRADE AND TO BUILDING
EXTERIOR TO SITE STORM.
2 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR
TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON
OVERALL FLOOR PLANS.
3 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR
TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON
OVERALL FLOOR PLANS.
4 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR
TYPICAL ES BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON
OVERALL FLOOR PLANS.
5 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF
TYPICAL ES-ABA BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON
OVERALL FLOOR PLANS.
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
12.1
C
10.9
100⌀ S DWN,
100⌀ V UP
STAIR #1
FS1
FS1
FS2
FS2
ES
ES-ABA
FS2
ES
ES
FS2
ES
ES
GUEST
CORRIDOR
FS1
ES
ES
GUEST
ELEV.
LOBBY
SERV
ELEV
LOBBY
HSKP CLOSET
STAIR #2
6 7 8 9 10
RD-1
TYP
P-405
4 TYP
P-405
3 TYP
FS1
ES
ES
P-408
2 6 6 2
RD-2
P-407
JAN
S1
S2
S3
S4
S5
S6 S6
S5
S7
S8
S9
S10
S11 S11
S13
S14
S12 S12S10
ELECTRICAL
TELECOM
GUEST
STORAGE
GUEST STORAGE
STORAGE
307STORAGE
STORAGE
STORAGE
P-407
6 6 6 6
CONNECT TO STORM RISER
ABOVE SECOND FLOOR CLG
125ø ST 125ø ST
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS
INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING
MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:1
P
M
P-103
T H
IR
D
F L O
O R
D R
A
IN
W
A S
T E
A
N D
V E
N T
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
THIRD FLOOR DRAIN, WASTE, AND VENT PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST
FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED
CONNECTIONS.
2 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
3 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
4 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST
FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED
CONNECTIONS.
5 ROUTE 125MM STORM DRAIN AND OVERFLOW LEADERS FROM ABOVE ACROSS
CORRIDOR AND CONNECT TO STORM RISERS ON WEST SIDE.
6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS. KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
W W
DW
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
C
100ø S DWN, 100ø V UP
(TYP.)
STAIR #1
FS1
FS1
FS2
FS2
ES
ES-ABA
FS2
ES
ES
FS2
ES
ES
GUEST
CORRIDOR
ES
ES
FS1
FS1
ES
ES
GUEST
ELEV
LOBBY
SERV
ELEV
LOBBY
GUEST
LAUNDRY
HSKP
CLOSET
STAIR #2
6 7 8 9 10
TYP TYP TYPTYP
P-405
4 TYP
P-405
3 TYP
P-408
P-407
2 2
6 6 6 6
TELECOM
ELECTRICAL
GUEST
STORAGE
GUEST
STORAGE
S1
S2
S3
S4
S5
S6
S6
S5
S7
S8
S9
S10
S11 S11
S13
S14
S12 S12S10
STORAGE
STORAGE
STORAGE
STORAGE
P-405
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS
INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING
MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:2
P
M
P-104
F O
U R
T H
F L O
O R
D R
A
IN
W
A S
T E
A
N D
V E
N T
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
FOURTH FLOOR DRAIN, WASTE, AND VENT PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
2 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
3 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE
SECOND FLOOR CEILING.
4 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST
FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED
CONNECTIONS.
5 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST
FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED
CONNECTIONS.
6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
C
100MM S DWN,
100MM V UP
100⌀ S DWN,
100⌀ V UP
100MM S DWN,
100MM V UP (TYP.)
STAIR #1
FS1
FS1
FS2
FS2
ES
ES-ABA
FS2
ES
ES
FS2
GUEST STORAGE
ES
ES
GUEST
CORRIDOR
TELECOM
ES
ES
FS1
FS1
ES
ES
GUEST
ELEV
LOBBY
SERV
ELEV
LOBBY
HSKP CLOSET
STAIR #2
100MM S DWN,
100MM V UP
6 7 8 9 10
TYP
P-405
4 TYP
P-405
3 TYP
P-407
3 373 2
S1
S2
S3
S4
S5
S6 S6
S5
S7
S8
S9
S10
S11 S11
S13
S14
S12 S12S10
GUEST
STORAGE
STORAGE
507STORAGE
STORAGE
STORAGE
ELECTRICAL
SSK-1FS-1 50⌀ S WITH, 40
⌀ V TO SSK-150⌀ S WITH, 40
⌀ V TO FS-1
P-407
50ø S
50ø V
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS
INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING
MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:4
P
M
P-105
F
IF
T H
F L O
O R
D R
A
IN
W
A S
T E
A
N D
V E
N T
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
FIFTH FLOOR DRAIN, WASTE, AND VENT PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
2 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
3 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
4 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST FLOOR
CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED CONNECTIONS.
5 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST FLOOR
CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED CONNECTIONS.
6 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE SECOND
FLOOR CEILING.
7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
8 PROVIDE WITH DISHWASHER FITTING. DRAIN INTO SINK ABOVE TRAP.
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
100MM S DWN,
100MM V UP
100MM S DWN,
100MM V UP
(TYP.)
C
STAIR #1
FS1
FS1
FS2
FS2
ES
ES-ABA
FS2
ES
ES
ES
ES
GUEST
CORRIDOR
TELECOM
ES
ES
FS1
FS1
ES
ES
GUEST
ELEV
LOBBY
SERV
ELEV
LOBBY
GUEST
LAUNDRY
HSKP
CLOSET
STAIR #2
6 7 8 9 10
FS2
TYP
P-405
4 TYP
P-405
3 TYPTYP TYP TYPTYP TYP TYP
P-408
2 2
2 2
6 666
S1
S2
S3
S4
S5
S6 S6
S5
S7
S8
S9
S10
S11 S11
S13
S14
S12 S12S10
GUEST STORAGE
GUEST
STORAGE
STORAGE
STORAGE
STORAGE
STORAGE
P-407
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS
INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING
MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:0
P
M
P-106
S
IX
T H
F L O
O R
D R
A
IN
W
A S
T E
A
N D
V E
N T
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
SIXTH FLOOR DRAIN, WASTE, AND VENT PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
2 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
3 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE
SECOND FLOOR CEILING.
4 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST
FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED
CONNECTIONS.
5 ROUTE 150 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST
FLOOR CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED
CONNECTIONS.
6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA
BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS. KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
100ø S DWN, 100ø V UP (TYP.)
100ø V UP 100ø S DOWN
SERV
ELEV
LOBBY
GUEST
ELEV
LOBBY
HSKP CLOSET
FS1
STAIR #2
GUEST
CORRIDOR
700TELECOM
C
FS1
FS2
ES-ABA
ES
FS2
ES
ES
DFS ABA
DFS
FS1
STAIR #1
GUEST
CORRIDOR
FS1
ES
ES
ES
ES
6 7 8 9 10
TYP
P-405
4 TYP
P-405
3 TYP
P-406
5 7 7 7 7
7 7
S1
S2
S3
S4
S5
S6 S6
S5
S7
S8
S9
S10
S11 S11
S13
S14
S12 S12S10
GUEST STORAGE
GUEST
STORAGE
STORAGE
STORAGE
P-407
SSK-1FS-1
50ø S WITH 40ø V TO FS-1 50ø S WITH 40ø
V TO SSK-1
FCO
4 50ø S
P-407
3 TYP
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, VENT PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS; SANITARY PIPING IS LOCATED BELOW FLOOR SLABS AND IN WALL CAVITIES/CHASES; EXCEPT AS
INDICATED OTHERWISE.
4. DRAINAGE (SANITARY) PIPE SHALL BE STANDARD, CODE APPROVED, DWV PATTERN FITTINGS WITH THE MINIMUM SIZE DRAINAGE PIPING BELOW FLOOR BEING 50 MM.
DIRECTIONAL CHANGES IN DRAINAGE PIPING SYSTEMS SHALL NOT INCLUDE THE USE OF QUARTER BENDS, SHORT SWEEP QUARTER BENDS, AND UNLESS ACCOMPANIED BY AN APPROPRIATE CLEANOUT, SHALL NOT EXCEED A 45 DEGREE BEND. SEE PLANS AND ISOMETRICS FOR ADDITIONAL PIPE SIZE INFORMATION.
5. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
6. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING
MANUFACTURER'S WARRANTY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
8. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
9. REFER TO ELONGATED CALLOUTS (S#) FOR CORRESPONDING RISER DIAGRAMS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:2
P
M
P-107
S E
V E
N T
H F
L O
O R
D R
A
IN
W
A S
T E
A
N D
V E
N T
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
SEVENTH FLOOR DRAIN, WASTE, AND VENT PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 3/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS1 BATHROOM
LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
2 ROUTE 125 DIAMETER ST DRAIN AND OVERFLOW DOWN TO ABOVE FIRST FLOOR
CEILING. SEE SECOND FLOOR DWV PLAN FOR CONTINUED CONNECTIONS.
3 ROUTE 125 DIAMETER STORM DRAIN AND OVERFLOW DOWN TO ABOVE SECOND
FLOOR CEILING.
4 PROVIDE WITH DISHWASHER FITTING. DRAIN INTO SINK ABOVE TRAP.
5 REFER TO DETAIL 4/P-404 FOR ENLARGED DWV PLANS FOR TYPICAL FS2 BATHROOM
LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
6 REFER TO DETAIL 4/P-402 FOR ENLARGED DWV PLANS FOR TYPICAL ES BATHROOM
LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
7 REFER TO DETAIL 3/P-402 FOR ENLARGED DWV PLANS OF TYPICAL ES-ABA BATHROOM
LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR PLANS.
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
100MM VTR
100MM VTR 100MM VTR
100MM VTR
100MM VTR
100MM VTR
100MM VTR
100MM VTR
C
6 7 8 9 10
100MM VTR
RD (TYP. OF 16)
100MM VTR
100MM VTR
100MM VTR
100MM VTR
100MM VTR
100MM VTR
100MM VTR
100MM VTR
100MM VTR
RD-2
RD-2
RD-2
RD-2 RD-2RD-2RD-1RD-1
RD-1 RD-1 RD-2 RD-2RD-1 RD-1 RD-2
RD-2RD-2
RD-1
RD-1 RD-1
RD-2RD-2RD-2
RD-1
RD-1
RD-1 RD-1 RD-1
DISCHARGE TO MAIN ROOF
DISCHARGE TO MAIN ROOF
100MM VTR
DISCHARGE TO
MAIN ROOF
DISCHARGE TO
MAIN ROOF
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:5
P
M
P-109
R O
O F
P L U
M B
IN
G
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
ROOF PLUMBING PLAN
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
ELECTRICAL
TELECOM
GUEST
STORAGE
GUEST
STORAGE
STORAGE
STORAGE
STAIR #2
GUEST
ELEV
LOBBY
SERV
ELEV
LOBBY
HSKP
CLOSET
GUEST LAUNDRY
GUEST
CORRIDOR
ES
FS1
ES
FS2
FS1
FS2
12.1
C
10.9
J
K
FS2
ES-ABA
ES
FS2
ES
ES
6 7 8 9 10
P-407
P-405
P-405
P-408
ES
FS1
STAIR #1
FS1
P-407
2 3 2 4
2 4 4 2 4 4
20ø DHWR 32ø DHW
40ø DCW
50ø DCW, 40ø DHW, & 20ø
DHWR UP FROM FIRST
FLOOR. ROUTE TO ABOVE
2ND FLOOR CEILING.
40ø DCW, 32ø DHW, & 20ø DHWR UP TO
THIRD FLOOR
20ø DHWR 40ø DHW 50ø DCW
32ø DCW
32ø DHW
15ø DHWR
P1
P2
P3
P4
P5
P6 P6
P5
P7
P8
P9
P10
P12 P12
P13
P14
STORAGE
STORAGE
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE
DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS
INDICATED OTHERWISE.
4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT
REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON
PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.
GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:5
P
M
P-122
S E
C O
N D
F L O
O R
D O
M E
S T
IC
W
A T
E R
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
SECOND FLOOR DOMESTIC WATER PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES-ABA BATHROOM LAYOUTS.
4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR
PLANS.
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
HSKP
CLOSET
GUEST
ELEV.
LOBBY
SERV
ELEV
LOBBY
GUEST
CORRIDOR
STAIR #2
12.1
C
10.9
FS1
ES
ES
ES
ES
FS2
ES
ES
FS2
ES-ABA
ES
FS2
FS2
GUEST
STORAGE
GUEST
STORAGE
6 7 8 9 10
FS1
FS1
ES
ES
FS1
P-407
P-405
P-405
P-408
P-407
2 3 2 4
2 4 4 2 4 4
4 44
P1
P2
P3
P4
P5
P6 P6
P5
P7
P8
P9
P10
P12 P12
P13
P14
P10 P12 P12
STORAGE
STORAGE
TELECOM
ELECTRICAL
STORAGE
STORAGE
STAIR #1
JAN
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE
DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS
INDICATED OTHERWISE.
4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT
REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON
PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.
GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:1
P
M
P-123
T H
IR
D
F L O
O R
D O
M E
S T
IC
W
A T
E R
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
THIRD FLOOR DOMESTIC WATER PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES-ABA BATHROOM LAYOUTS.
4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR
PLANS.
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
STAIR #2
461GUEST
CORRIDOR
GUEST
ELEV
LOBBY
SERV
ELEV
LOBBY
HSKP
CLOSET
GUEST
LAUNDRY
STORAGE
C
FS1
ES
ES
ES
ES
ES
ES
FS1
ES
ES
ES-ABA
ES
FS2
FS2
FS2
FS1
FS1
STAIR #1
FS2
6 7 8 9 10
P-407
P-405
P-405
TELECOM
STORAGE
ELECTRICAL
STORAGE
STORAGE
GUEST
STORAGE
P-408
P-407
2 3 2 4
2 4 4 2 4 4
4 44
P1
P2
P3
P4
P5
P6 P6
P5
P7
P8
P9
P10
P12 P12
P13
P14
P10 P12 P12
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE
DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS
INDICATED OTHERWISE.
4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT
REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON
PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.
GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:3
P
M
P-124
F O
U R
T H
F L O
O R
D O
M E
S T
IC
W
A T
E R
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
FOURTH FLOOR DOMESTIC WATER PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES-ABA BATHROOM LAYOUTS.
4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR
PLANS.
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
HSKP CLOSET
SERV
ELEV
LOBBY
GUEST
ELEV
LOBBY
TELECOM
STAIR #2
C
FS2
ES
ES
FS1
FS1
FS2
ES
ES-ABA
FS2
GUEST
CORRIDOR
ES
ES
ES
ES
FS1
FS1
ES
ES
6 7 8 9 10
FS2
ELECTRICAL
STORAGE
STORAGE
GUEST
STORAGE
GUEST
STORAGE
P-407
2 TYP
P-405
2 TYP
P-405
1 TYP
2 3
2 3 3 2 3 3
3 33
P-407
2 3
P1
P2
P3
P4
P5
P6 P6
P5
P7
P8
P9
P10
P12 P12
P13
P14
P10 P12 P12
STORAGE
STORAGE
SSK-1
15ø DCW &
DHW TO SSK-1
5 6
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE
DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS
INDICATED OTHERWISE.
4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT
REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON
PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.
GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:0
:5
P
M
P-125
F
IF
T H
F L O
O R
D O
M E
S T
IC
W
A T
E R
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
FIFTH FLOOR DOMESTIC WATER PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS
OF TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON
OVERALL FLOOR PLANS.
2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS
OF TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON
OVERALL FLOOR PLANS.
3 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS
OF TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
4 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS
OF TYPICAL ES-ABA BATHROOM LAYOUTS.
5 CONTRACTOR TO PROVIDE DHW NIPPLE TO DISHWASHER WITH
VACUUM BREAKER AND MAKE FINAL CONNECTION.
6 PROVIDE ISOLATION VALVE AT EACH TAP FROM DCW, DHW, AND
DHWR. PROVIDE ACCESS PANEL WHERE PIPES ENTER ROOM. REFER
TO ARCHITECTUAL PLANS FOR ACCESS PANEL LOCATION AND
DETAILS. (TYP.)
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
SERV
ELEV
LOBBY
GUEST
ELEV
LOBBY
GUEST
LAUNDRY
HSKP
CLOSET
STAIR #2
GUEST
CORRIDOR
TELECOM
C
FS1
FS1
FS2
FS2
FS2
ES
ES
ES
ES-ABA
FS2
ES
ES
ES
ES
ES
ES
FS1
FS1
6 7 8 9 10
P-407
2 TYP
P-405
2 TYP
P-405
1 TYP
P-408
P-407
1 2 3 2 4
2 4 4 2 4 4
4 44
P1
P2
P3
P4
P5
P6 P6
P5
P7
P8
P9
P10
P12 P12
P13
P14
P10 P12 P12
ELECTRICAL
STORAGE
613STORAGE
STORAGE
STORAGE
GUEST
STORAGE
GUEST
STORAGE
STAIR #1
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE
DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS
INDICATED OTHERWISE.
4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT
REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON
PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.
GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:1
:1
P
M
P-126
S
IX
T H
F L O
O R
D O
M E
S T
IC
W
A T
E R
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
SIXTH FLOOR DOMESTIC WATER PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
3 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES-ABA BATHROOM LAYOUTS.
4 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR
PLANS.
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
A
2 3 4 5 11 12 13 14 15 16 17
B
D
E
H
C
DFS
FS1
STAIR #1
FS1
FS2
ES
ES-ABA
FS2
ES
ES
ES
ES
FS1
FS1
ES
ES
STAIR #2
GUEST
CORRIDOR
DFS ABA
HSKP CLOSET
SERV
ELEV
LOBBY
GUEST
ELEV
LOBBY
TELECOM
6 7 8 9 10
P-407
2 TYP
P-405
2 TYP
P-405
1 TYP
ELECTRICAL
STORAGE
GUEST
STORAGE
704 STORAGE
P-406
2 3
3 3
3 33
2 4
P1
P2
P3
P4
P5
P6 P6
P5
P7
P8
P9
P10
P12 P12
P13
P14
P10 P12 P12
P-405
TYP
5 5
15ø DCW &
DHW TO SSK-1
SSK-1
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS AND SEE
DRAWINGS P-601 THRU P-602 FOR DRAWING SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS, WALL AND PARTITION RATINGS, AND CEILING HEIGHTS.
3. IN GENERAL, DOMESTIC COLD AND HOT WATER PIPING IS LOCATED ABOVE CEILINGS AND IN CHASES/WALLS EXCEPT AS
INDICATED OTHERWISE.
4. COORDINATE WITH MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, AND SPRINKLER CONTRACTOR PRIOR TO THE INSTALLATION OF PLUMBING SYSTEM PIPING AND APPURTENANCES IN ORDER TO AVOID POTENTIAL CONFICTS WITH SHOP FABRICATED AND FIELD FABRICATED DUCT AND PIPE INSTALLATIONS AND CABLE TRAYS.
5. COORDINATE WITH ROOFING CONTRACTOR FOR ROOF PENETRATION REQUIREMENTS AND PIPE SUPPORT
REQUIREMENTS TO ENSURE COMPLIANCE WITH THE ROOFING MANUFACTURER'S WARRANTY.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL FIXTURES AND PIPING INDICATED ON
PLUMBING DRAWINGS, SCHEDULES AND IN SPECIFICATIONS.
7. ALL PIPE SIZES SHOWN ON PLAN ARE IN MILLIMETERS (mm).
8. REFER TO ELONGATED CALLOUTS (P#) FOR CORRESPONDING RISER DIAGRAMS.
GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
O
A
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 3 5 7 9 11 13 15 17 19
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
C
B
A
D
E
G
J
L
N
F
H
K
M
P
Q
AM-000
B
IM
/3
C
A M
P Z
A M
A L
O D
G
IN
G F
A C
IL
IT
Y /Z
A M
A L O
D G
E -P
-3 D v R
.r v t
/2
/2
:1
:4
P
M
P-127
S E
V E
N T
H F
L O
O R
D O
M E
S T
IC
W
A T
E R
P L A
N
J A
P A
N D
IS
T
R
IC
T U
N
IT
A
P O
A
P
-5
O T
IE
-R
S
H J
O
IN
T V
E N
T U
R E
N
O R
T H
M A
Y F
A
IR
R O
A D
S
U
IT
E
M
IL
W A
U K
E E
W
I
A M
A H
M O
O D
R C
L E
W E
T T
P V
A N
D E
N B
E R
G
K M
IL
L E
R
M A
Y
X X
X X
X X
-X X
-X -X
X X
X
X X
X X
X X
-X X
-X -X
X X
X
R E
A D
Y T
O A
D V
E R
T
IS
E S
U B
M
IT
T A
L
A R
M Y
L O
D G
IN
G
F A
C
IL
IT
Y
C
A M
P Z
A M
A J A
P A
N
1 : 1001
SEVENTH FLOOR DOMESTIC WATER PLAN
PLUMBING KEYNOTES
# KEY NOTE
1 REFER TO DETAIL 1/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS1 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
2 REFER TO DETAIL 2/P-404 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL FS2 BATHROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL
FLOOR PLANS.
3 REFER TO DETAIL 2/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES ROOM LAYOUTS. ROUTE AS SPECIFIED ON OVERALL FLOOR
PLANS.
4 REFER TO DETAIL 1/P-402 FOR ENLARGED DOMESTIC WATER PLANS OF
TYPICAL ES-ABA BATHROOM LAYOUTS.
5 PROVIDE CIRCUIT SETTER CONTROL VALVE AT 0.18 LPM.
6 CONTRACTOR TO PROVIDE DHW NIPPLE TO DISHWASHER WITH VACUUM
BREAKER AND MAKE FINAL CONNECTION.
7 PROVIDE ISOLATION VALVE AT EACH TAP FROM DCW, DHW, AND DHWR.
PROVIDE ACCESS PANEL WHERE PIPES ENTER ROOM. REFER TO
ARCHITECTUAL PLANS FOR ACCESS PANEL LOCATION AND DETAILS.
(TYP.)
KEY PLAN
PLAN NORTH
NOT TO SCALE
0 800040002000
PLAN NORTH
A
M E
N D
M E
N T
A D
D B
A T
H R
O O
M S
H E
L V
E S
A T
E S
-A B
A U
N
IT
J
U L
E
WC-1
WC-1
WC-2
100ø FCO
UR-1 UR-2WC-2
L-2L-2
100ø S
100ø S
50ø S
50ø V
50ø S
50ø V
100ø S
100ø CO
SSK-1
80ø S WITH 50ø V TO
SSK-1
80ø S W/ 50ø V
TO FS-1
100ø S TO
WC-1/WC-2
(TYP. OF 4)
50ø S WITH 50ø V TO L-2
(TYP. OF 3)
100ø S
40ø V
100ø WCO
50ø S W/ 40ø V TO L-2
(TYP. OF 2)
50ø S
50ø S W/ 40ø V
TO UR-1/UR-2
(TYP. OF 2)
100ø S DOWN FROM 2ND FLOOR
TO ABV 1ST FLOOR CEILING;
OFFSET PIPE ABV CLG AS
REQUIRED TO DROP TO BLW
FLOOR WHERE SHOWN
50 ø V UP TO
2ND FLOOR
100ø S DOWN TO
UNDERFLOOR
100ø S DOWN FROM 2ND FLOOR
TO ABV 1ST FLOOR CEILING;
OFFSET PIPE ABV CLG AS
REQUIRED TO DROP TO BLW
FLOOR WHERE SHOWN
GM OFFICE
STAFF WOMEN'S
JAN
VEST
STAFF
MEN'S
FD-1
FD-1
80ø S
TO FD-1
80ø S TO
FD-1
FS-1
50ø V
L-2
L-2
L-2
100ø S
100ø S DOWN
FROM 2ND
FLOOR
100ø WCO
PROVIDE 350mm x 450mm
ACCESS PANEL FOR PLUMBING
DROPS. SEE A121, A121B, & A446
FOR MORE INFORMATION.
50 ø V UP TO
2ND FLOOR
50ø S
GENERAL NOTES
1. SEE DRAWING P-001 FOR PROJECT NOTES; SEE
DRAWINGS P-501 THRU P-503 FOR DRAWING DETAILS
AND SEE DRAWINGS P-601 THRU P-602 FOR DRAWING
SCHEDULES.
2. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE HEIGHTS,
WAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .