This document includes "As-Built" drawings and details for a federal construction contract opportunity to build a new Army Lodging Facility at Camp Zama, Japan. The project scope involves constructing a 7-story, 103-suite building with separate bedroom and living areas, support facilities including all required utilities, guest and service elevators, mechanical/electrical/communication rooms, a heating system, fire protection and detection systems, and information systems. Site work will include a controlled vehicle approach with canopy and bus parking, a controlled paved loading area, parking for personal and government vehicles, pedestrian walkways, and a trash area. The contract will be awarded by the Department of the Army Corps of Engineers Engineering District Japan.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-20-112
FUTURE ARMY LODGING SITE PREPARATION
CAMP ZAMA, JAPAN
S COPE OF W ORK GENERAL NOT ES
MECHANICAL 1. tlCIDENTAL DAMAGE TO THE GOVERNMENT PROPERTY SHALL BE RESTORED TO MATCH EXISTING BY THE CONTRACTOR
1. EXCAVATE, CUT, DISCONNECT, PLUG AND/OR REMOVE EXISTING SANITARY/SEWER AND STORM PIPING, AND MPl-lHOL.ES WITH STEEL COVERS. AT NO ADDITIONAL COST TO THE GOVERNMENT.
2. EXCAVATE, CUT AND PLUG EXISTING POTABLE WATER BRANCH PIPING UNDER PRESSURE rFUOANSUI METHOO"� 2 IF NOT INDICATED OTHERWISE, ALl EXISTING OBJECTS, ACCESSORIES AND I OR FIXTURES ON EXISTING SURFACES SCHEDULED
REMOVE UG PIPING ANO V.AJ.VES WITH VALVE BOXES. FOR MODIFICATION SHALL BE REMOVED ANO ADJUSTED PRIOR TO SUCH WORK ANO REINSTALLED AFTER WORK COMPLETION.
3. REMOVE EXISTING ABANDONED STEAM PITS, STEEL PIT COVERS, PIPING, VALVES, PIPE INSULATION AND OTHER RELATED ACCESSORES. l THE CONTRACTOR SHALL BRING TO THE ATTENTION OF THE CONTRACTING OFFICER 00 DISCREPPl-lCIES BETWEEN THE DRAWINGS ANO
4. REMOVE EXISTING ASPHALT CONCRETE PAVING, CONCRElE CURBS, VEHICLE 'MiEEL STOPS, EXISTING CONDITIONS OR UNFORESEEN DESIGN CONFLICTS ON THE SITE PRIOR TO PERFORMING WORK.
CONCRETE STRUCTURE 'MTH STEB. GUARD PIPE moM THE WA PR0\1SION OF SHOP DRAWINGS TO RESOLVE CONFLICTS SHALL BE PROVIDED BY THE CONTRACTOR.
5. BACKFILL ALL EXCAVATED AREA WITH EXCAVATED EXCESS MATERIAL, NEW GRA.\IEL (C-40) AND/OR NEW HILL SAND ("YAMAZUNA'i 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIACATION OF ALL DIMENSIONS AND EXISTING CONDITIONS PRJOR TO STARTING
6. THE CONTRACTOR SHALL DISPOSE OF ALL REMOVED MATERIALS OFF POST IN ACCORDANCE WITH THE LOCAL REGULATIONS, ACTUAL CONSTRUCTION WORK.
B.ECTRICAL
1. REMOVE EXISTING POLE MOUNT AIR INSULATED S'MTCH, TRANSFORMERS, CONCRETE POLES, HIGHA.OWVOLTAGE CABLES, B.ECTRICAL PANELS, LIGHTING AXTURES, HANDHOLES AND UNDERGROUND CONDUIT PIPES.
2. REMOVE EXISTING SWITCH STATION "2505/S".
3. INSTALL NEW TRANSFORMER STATIONS, ELECTRICAL PANELS, HIGHA.OW VOLTAGE CABLES, STREET LIGHTS, HANDHOLES AND UNDERGROUND CONDUIT Pl'ES.
4. PERFORM CABLE WITHSTAND VOLTAGE TEST.
5. REMOVE EXISTING FIBER OPTICAL CABLES, TB.EPHONE CABLES, TV CABLES, HANDHOLES, MANHOLES AND UNDERGROUND CONDUIT PIPES.
6. INSTALL NEW FIBER OP11CAL CABLES, TELEPHONE CABLES, TV CPBI...ES, MANHOLES AND UNOERGROVND CONDUIT PIPES.
7, PERFORM OPERATIONAL TEST,
CITY BOUNDARY
TO SOUBUDAISHITA STATION
(SAGA.MIHARA CITY)
�(ZAMACITY)
,. GYOUKOUROAD \o""
ZAMAPARKQ
L OCATION MAP
O
MINEYAMA
MEMORIAL
PARK
r PROJECT CONTRUCTION SITE
LIS T OF DRAWINGS
T-01
M-01
TITLESHEET
MECH UTIUTIES REMOVAL PLAN
REMOVAL WIRING Pl.AN
NEWWIRINGPLAN
E-01 E-02 E-03 E-04 E-05
NEW SINGLE LINE DIAGRAM 1 AND DETAI.S
NEW SINGLE LINE DIAGRAM 2 AND DETAI.S
REMOVAL ANO NEW 'MRING PLAN FOR COMMUNICATION CABLES
ABBREVIATIONS
SEE M-01AND E-01
T ARGET DESIGNATIONS 6-MBERNICAlES
H.L SECTION
1£ETNUMBERWHERE
StEETNUMBERWHERE �ISIR'WN
SECTION IS TAKEN
1£ETNUMBERWHERE
SE�ISTWN
BLDG SECTION WALL SECTION
LETTEROOM.MIERINDlr.ATES
NUMBERINCDTESB.EVA
BUI..CtiGSECTION, ELEVATIOOS�OETMLS
�1�MBERWHEREELEVATION SHEETMJt.l!ER\'llEREDRAWN
�A,LNBERv,J
��;;;�:QN
StEETNLMBERWHERETAA.EN
TITLE
NUMBERIOCATES
2 DETl'L
DETAIL
@---f=
DETAIL
DETAIL
SUZUKI.TOSHIYU
Kl.1289721289
Digitally signed by SUZUKI.TOSHIYUKl.1289721289 Date: 2020.05.14 13:33:00 +09'00'
O RI GI N A L
FINAL DRAWING
Ill [ft(:l'l)AAT'E�Pl.a.JC
IJNTEDfl�TE9-..... _
I i � a.
w 0::
a.
w
C!) z oN u 0
0::
.;i 1!
w 0::
0 8" :::, ih u.
T-01 SHEET 1 of 7
"As-Built" drawings are provided for informational purposes only (FIO). These "As-Built" drawings are not part of the solicitation (and will not become part of the contract) and do not amend the solicitation (specifications, drawings, etc.). "As-Built" drawings may not be complete or depict existing conditions. The Contractor will be responsible for verifying actual conditions at the site.
FOR INFORMATION ONLY