NAFQJ3-23-B-0001 Amend 0011 AS-BUILTS A-20-112.pdf
PDF 3 MB Posted
- Attached to
- NAF MWR Army Lodging, Camp Zama, Japan
- Solicitation number
- NAFQJ3-23-B-0001
About this file
This document appears to be a set of as-built drawings for utility removals and new installations related to the future Army Lodging site preparation at Camp Zama in Japan. The key details are:
The scope of work includes excavating, cutting, disconnecting, plugging, and removing existing sanitary/sewer, storm, potable water, steam, and electrical/communication utilities. This involves removing underground piping, manholes, pits, poles, transformers, cables, and other related accessories. New utility infrastructure will be installed, including transformer stations, electrical panels, cables, street lights, fiber optic cables, telephone cables, and underground conduits. The contractor will be responsible for backfilling excavated areas, disposing of removed materials, and performing testing and operational checks. The drawings provide detailed plans and diagrams for the utility removals and new installations.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T-01
TI
TL
E
SH
EE
T
KQ
-0
-9 J
A
B
C
D
5 4 3 12
SHEET of
SI
TE
PR
OJ
EC
T
NO
FE
W R
NO
PR
OJ
EC
T
TI
TL
E:
DR
AW
IN
G
TI
TL
E:
DA
TE
AP
PR
MA
RK
DE
SC
RI
PT
IO
N
DIRECTORATE OF PUBLIC
WORKS
UNITED STATES ARMY
GARRISON JAPAN
A-
-1
CA
MP
ZA
MA
FU
TU
RE
A
RM
Y
LO
DG
IN
G
SI
TE
P
RE
PA
RA
TI
ON
A-20-112
T - 01
M - 01
TITLE SHEET
FOR MODIFICATION SHALL BE REMOVED AND ADJUSTED PRIOR TO SUCH WORK AND REINSTALLED AFTER WORK COMPLETION.
EXISTING CONDITIONS OR UNFORESEEN DESIGN CONFLICTS ON THE SITE PRIOR TO PERFORMING WORK.
PROVISION OF SHOP DRAWINGS TO RESOLVE CONFLICTS SHALL BE PROVIDED BY THE CONTRACTOR.
ACTUAL CONSTRUCTION WORK.
2. IF NOT INDICATED OTHERWISE, ALL EXISTING OBJECTS, ACCESSORIES AND / OR FIXTURES ON EXISTING SURFACES SCHEDULED
3. THE CONTRACTOR SHALL BRING TO THE ATTENTION OF THE CONTRACTING OFFICER ANY DISCREPANCIES BETWEEN THE DRAWINGS AND
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION OF ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING
AT NO ADDITIONAL COST TO THE GOVERNMENT.
1. INCIDENTAL DAMAGE TO THE GOVERNMENT PROPERTY SHALL BE RESTORED TO MATCH EXISTING BY THE CONTRACTOR
CAMP ZAMA, JAPAN
MECHANICAL
ELECTRICAL
ORIGINAL DRAWING FINALIZED BY:
TARGET DESIGNATIONS
ABBREVIATIONSLOCATION MAP
SCOPE OF WORK LIST OF DRAWINGSGENERAL NOTES
NUMBER INDICATES
INDICATES DIRECTION OF
CUTTING PLANE
LETTER INDICATES
BLDG. SECTION
SHEET NUMBER WHERE
SECTION IS TAKEN
NUMBER INDICATES ELEVATION
SHEET NUMBER WHERE ELEVATION
IS TAKEN
SHEET NUMBER WHERE
SECTION IS DRAWN
NUMBER INDICATES
WALL SECTION
SHEET NUMBER WHERE
SECTION IS DRAWN
SHEET NUMBER WHERE
SECTION IS TAKEN
LETTER OR NUMBER INDICATES
BUILDING SECTION,
ELEVATIONS OR DETAILS
SHEET NUMBER WHERE DRAWN
SHEET NUMBER WHERE TAKEN
DETAIL2
A3A3
A3 A3
A3 A3
DETAIL
DETAIL
DETAIL
WALL SECTION
TITLE
BLDG SECTION
ELEVATION
A A1 A1
A3 A3
A1
A2
A A1 A1
SHEET NUMBER WHERE ELEVATION
IS DRAWN
FUTURE ARMY LODGING SITE PREPARATION
MECH UTILITIES REMOVAL PLAN
E - 01 E - 02 E - 03 E - 04
REMOVAL WIRING PLAN
NEW WIRING PLAN
NEW SINGLE LINE DIAGRAM 1 AND DETAILS
NEW SINGLE LINE DIAGRAM 2 AND DETAILS
1. EXCAVATE, CUT, DISCONNECT, PLUG AND/OR REMOVE EXISTING SANITARY/SEWER AND STORM PIPING, AND MANHOLES WITH STEEL COVERS.
REMOVE UG PIPING AND VALVES WITH VALVE BOXES.
2. EXCAVATE, CUT AND PLUG EXISTING POTABLE WATER BRANCH PIPING UNDER PRESSURE ("FUDANSUI METHOD").
3. REMOVE EXISTING ABANDONED STEAM PITS, STEEL PIT COVERS, PIPING, VALVES, PIPE INSULATION AND OTHER RELATED ACCESSORIES.
5. BACKFILL ALL EXCAVATED AREA WITH EXCAVATED EXCESS MATERIAL, NEW GRAVEL (C-40) AND/OR NEW HILL SAND ("YAMAZUNA").
6. THE CONTRACTOR SHALL DISPOSE OF ALL REMOVED MATERIALS OFF POST IN ACCORDANCE WITH THE LOCAL REGULATIONS.
ELECTRICAL PANELS, LIGHTING FIXTURES, HANDHOLES AND UNDERGROUND CONDUIT PIPES.
1. REMOVE EXISTING POLE MOUNT AIR INSULATED SWITCH, TRANSFORMERS, CONCRETE POLES, HIGH/LOW VOLTAGE CABLES,
2. REMOVE EXISTING SWITCH STATION "250S/S".
HANDHOLES AND UNDERGROUND CONDUIT PIPES.
3. INSTALL NEW TRANSFORMER STATIONS, ELECTRICAL PANELS, HIGH/LOW VOLTAGE CABLES, STREET LIGHTS,
4. PERFORM CABLE WITHSTAND VOLTAGE TEST.
CONCRETE STRUCTURE WITH STEEL GUARD PIPE FROM THE AREA.
4. REMOVE EXISTING ASPHALT CONCRETE PAVING, CONCRETE CURBS, VEHICLE WHEEL STOPS,
SEE M-01 AND E-01
E - 05
5. REMOVE EXISTING FIBER OPTICAL CABLES, TELEPHONE CABLES, TV CABLES, HANDHOLES, MANHOLES AND UNDERGROUND CONDUIT PIPES.
7. PERFORM OPERATIONAL TEST.
REMOVAL AND NEW WIRING PLAN FOR COMMUNICATION CABLES
6. INSTALL NEW FIBER OPTICAL CABLES, TELEPHONE CABLES, TV CABLES, MANHOLES AND UNDERGROUND CONDUIT PIPES.
CITY BOUNDARY
TO SOUBUDAISHITA STATION
GYOUKOU ROAD
(ZAMA CITY)
(SAGAMIHARA CITY)
GATE-1
TO SOUBUDAIMAE STATION
(ZAMA CITY)
CITY BOUNDARY
(SAGAMIHARA CITY)
GATE-4
GATE-7
1/10,000
N
SOUBUDAI
SECONDARY
SCHOOL
ZAMA
CITIZEN
GYMNASIUM
ZAMA
GENERAL
HOSPITAL
ZAMA PARK
ZAMA SHRINE
MINEYAMA
MEMORIAL
PARK
PROJECT CONTRUCTION SITE
1/2,500
SUBMITTED BY: AS-BUILT
UN
ITE
D
ST
AT
ES
A
RM
Y
GA
RR
IS
ON
JA
PA
N
DI
RE
CT
OR
AT
E
OF
P
UB
LIC
W
OR
KS
EN
GI
NE
ER
IN
G
DI
VI
SI
ON
EN
GI
NE
ER
S
ER
VI
CE
S
BR
AN
CH
TH
E
AG
EN
CY
PR
OJ
EC
T
MA
NA
GE
D
BY
CO
NT
RA
CT
ED
MA
NA
GE
D
BY
RE
VE
W
ED
B Y:
CH
EC
KE
D
BY
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SC
AL
E:
DA
TE
AS
S
HO
W N
NI
PP
I K
OS
AN
C
O.
, L
TD
YO
SH
IN
OB
U
HA
MA
DA
SE
IJI
H
OR
I
SE
IJI
H
OR
I
YO
SH
IN
OB
U
HA
MA
DA
TA
KE
O
IIJ
IM
A
TO
SH
IY
UK
I S
UZ
UK
I
RECEIVED BY:
Yoshiobu Hamada
電⼦署名者 : Yoshiobu Hamada ⽇付 : 2021.11.18 10:47:19 +09'00'
SUZUKI.TOSHIY
UKI.128972128
Digitally signed by
SUZUKI.TOSHIYUKI.1289
721289 Date: 2021.11.18 13:22:46 +09'00'
FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED
FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS
ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND THE
SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE
OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE
RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.
GRAPHIC SCALE M-01
LEGEND
EXISTING DESCRIPTION
EXIST : EXISTING
ABBREVIATION
: DISCONNECTION POINTDCP
MECH : MECHANICAL
: UNDERGROUND
SANITARY/SEWER PIPING
GATE WITH VALVE BOX
MECH SCOPE OF WORK
CIP
H
UG
WF : WATER FOUNTAIN
MECH NOTE
REMOVAL
SM
RC
SANITARY/SEWER INLET
6. THE CONTRACTOR SHALL DISPOSE OF ALL REMOVED MATERIALS OFF POST IN
ACCORDANCE WITH THE LOCAL REGULATIONS.
ME
CH
U
TI
LIT
IE
S
RE
MO
VA
L P
LA
N
1/300
STORM (RAIN WATER) PIPING
POTABLE WATER PIPING
S STEAM PIPING
3. REMOVE EXISTING ABANDONED STEAM PITS, STEEL PIT COVERS, PIPING, VALVES,
PIPE INSULATION AND OTHER RELATED ACCESSORIES.
4. REMOVE EXISTING ASPHALT CONCRETE PAVING, CONCRETE CURBS, VEHICLE
WHEEL STOPS, CONCRETE STRUCTURE WITH STEEL GUARD PIPE FROM THE AREA.
AVE : AVENUE
BLDG : BUILDING
: CAST IRON PIPE
CONC : CONCRETE
A : AUTOMATIC AIR VALVE
GV
GL
GR
: GROUND LEVEL
: GRATING
: GATE VALVE
: FIRE HYDRANT
: RE-INFORCED CONCRETE PIPE
: RAIN (STORM) MANHOLERM
: SANITARY/SEWER MANHOLE
SS
2. EXCAVATE, CUT AND PLUG EXISTING POTABLE WATER BRANCH PIPING UNDER
PRESSURE ("FUDANSUI METHOD"). REMOVE UG PIPING AND VALVES WITH VALVE
BOXES.
1. EXCAVATE, CUT, DISCONNECT, PLUG AND/OR REMOVE EXISTING
SANITARY/SEWER AND STORM PIPING, AND MANHOLES WITH STEEL COVERS.
5. BACKFILL ALL EXCAVATED AREA WITH EXCAVATED EXCESS MATERIAL, NEW
GRAVEL (C-40) AND/OR NEW HILL SAND ("YAMAZUNA").
DHW / HHW PIPING
HHW : HEATING HOT WATER
DHW : DOMESTIC HOT WATER
1. ALL DAMAGES AS RESULT OF THE WORK SHALL BE RESTORED TO THEIR ORIGINAL OR BETTER CONDITION.
2. THE MATERIAL USED FOR BACK FILLING SHALL NOT CONTAIN STONES, ROCKS, CONCRETE AND OTHER MATERIALS. THE MATERIALS ARE NOT LARGER THAN 75mm AND
SHALL NOT CONTAIN ORGANIC MATERIAL AND DEBRIS OF ANY KINDS.
3. THE CONTRACTOR SHALL PERFORM JIS A-1210 SOIL COMPACTION TEST AND JIS A-1214 SOIL DENSITY TEST FOR SUITABLE BACK FILL MATERIAL COMPACTION.
4. THE EXCAVATED EXCESS MATERIALS SHALL BE TREATED AND DISPOSED TO THE OUTSIDE OF THE FACILITY IN ACCORDANCE WITH THE JAPANESE LAWS.
5. THE GOVERNMENT REQUEST THE CONTRACTOR TO USE THE LOCAL SEED, SODDING AND SOIL AS MUCH AS POSSIBLE SINCE THE CONSTRUCTION SITE ARE LOCATED
NEAR/ADJACENT TO ECOLOGICAL ASSETS, SUCH AS HABITATS OF THREATENED AND ENDANGERED SPECIES AND NEAR THREATENED SPECIES.
THE CONTRACTOR SHALL FOLLOW THE GOVERNMENT INSTRUCTIONS TO KEEP THE LOCAL ENVIRONMENT.
6. EXISTING UNDERGROUND PIPING AROUND THE STEAM PITS SHALL BE CUT, DISCONNECTED, PLUGGED AND/OR ABANDONED AT ONE (1) METER AWAY FROM PIT SURFACES.
7. EXISTING FLANGE GASKET FOR STEAM SUPPLY AND RETURN PIPING ARE CONTAINING ASBESTOS. THE CONTRACTOR SHALL ABATE THEM IN ACCORDANCE WITH
THE LOCAL/BASE REGULATIONS AND CONTRACT SPECIFICATIONS.
APPROX : APPROXIMATELY
KQ
-0
-9 J
A
B
C
D
5 4 3 12
SHEET of
SI
TE
PR
OJ
EC
T
NO
FE
W R
NO
PR
OJ
EC
T
TI
TL
E:
DR
AW
IN
G
TI
TL
E:
DA
TE
AP
PR
MA
RK
DE
SC
RI
PT
IO
N
DIRECTORATE OF PUBLIC
WORKS
UNITED STATES ARMY
GARRISON JAPAN
A-
-1
CA
MP
ZA
MA
FU
TU
RE
A
RM
Y
LO
DG
IN
G
SI
TE
P
RE
PA
RA
TI
ON
N
BLDG. 332
BLDG. 425
RC200
RC
RC
CI
P2
CIP200
CI
P2
CI
P3
CI
P3
CI
P1
CI
P1
CI
P1
CIP75
RC200
RC200
RC200
H
H
IS
HI
NO
MA
KI
A
VE
2N D
AV
E
2N D
AV
E
RC200
"B" STREET"B" STREET
"B" STREET
4T H
AV
E
4T H
AV
E
A
SM-1
SM-2
SM-3
SM-3A
SM-4
SM-6
SM-5
SM-6A
D1
D1300 Ø600xD2200
DCP/PLUG (GL-1300)
DCP/PLUG
(GL-1400)
ABANDONE
CP 9"
CP 8"
Ø600(INV950)RM-3
RM-1
RM-2
GR-1
GR-2
700xD1600
DCP
D1200
D1
GR-1A
500xD800
650xD1500
750xD1500
EXIST UG POTABLE WATER
PIPING (CIP150) TO REMAIN
EXIST
STEAM
PIT
SS
S
S S
S S
S
S
S
REMOVE SANITARY/SEWER
PIPING W/ MANHOLE
M01M01
UTILITIES REMOVAL PLAN
SCALE: 1/300
REMOVE 1200mm WIDTH CONC SIDEWALK (100mm THK) AND BASE COURSE (100mm THK)
(RESTORATION: HILL SAND)
EXIST UG STEAM CONDUIT PIPE
(80Ax30t, 50A / 350A) TO REMAIN
DCP/PLUG (PERFORM DISCONNECTION OF EXIST UG
POTABLE WATER BRANCH PIPING (CIP75) )
REMOVE EXIST ABANDONED STEAM PIT W/ STEEL COVER,
PIPING, PIPE INSULATION (W2000xL2000xD2500)
(RESTORATION: HILL SAND)
REMOVE EXIST UG STORM PIPING W/ GRATE INLETS,
BACKFILL W/ EXCAVATED EXCESS MATERIALS AND
HILL SAND
EXIST PIT TO REMAIN
DCP/PLUG
(GL-1300)
EXIST HHW SUPPLY AND RETURN PIPING
(100A/200A x 2-PIPES) TO REMAIN
REMOVE ABANDONED DHW SUPPLY AND
RETURN PIPING (40A/100A, 25A/75A)
REMOVE ABANDONED DHW SUPPLY AND RETURN
PIPING (40A/100A, 20A/75A), AND HHW SUPPLY
AND RETURN PIPING (100A/200A x 2-PIPES)
REMOVE ASPHALT CONC PAVING, PRECAST CONC CURB
AND PARKING BUMPERS, CONC STRUCTURE W/ GUARD
PIPE AND OTHER RELATED MATERIALS
(RESTORATION: GRAVEL, C-40)
REMOVE ASPHALT CONC PAVING, PRECAST CONC CURB
AND PARKING BUMPERS, CONC STRUCTURE W/ GUARD
PIPE AND OTHER RELATED MATERIALS
(RESTORATION: GRAVEL, C-40)
(S)3", (R)1-1/2"
(S)1-1/2"
(S )2
(R
)1 -1
/4" (S)5", (R)5"
(S)1-1/2"
(S )3
(R
)1 -1
/2"
(S)3", (R)3"
(S)5", (R)5"
(S )2
(R
)2
S-264
REMOVE ABANDONED DHW SUPPLY AND RETURN
PIPING AND HHW SUPPLY AND RETURN PIPING
REMOVE EXIST ABANDONED STEAM PIT W/ STEEL COVER,
PIPING AND ACCESSORIES (W600xL600xD700)
(RESTRATION: HILL SAND)
REMOVE EXIST CONC STRUCTURE
W/ STEEL GUARD PIPE
REMOVE SANITARY/SEWER PIPING W/ MANHOLE
(RESTORATION: EXCAVATED SOIL AND HILL SAND)
REMOVE EXIST ABANDONED STEAM PIT, STEEL
COVER AND PIPING (W1500xL1500xD1300)
(RESTORATION: HILL SAND)
EXIST TREES TO REMAIN
THIS DOTS AREA WHERE A BUILDING
ONCE STOOD
(NEW) (NEW)
M01M01
BACKFILLING AND RESTORATION PLANS
NOT TO SCALE
ASPHALT CONC PAVEMENT AREA SODDING AREA
EXIST SODDING
SUBGRADE
0~
(A
PP
RO
X)
0~
(A
PP
RO
X)
SUBGRADE
BASE COURSE
(EXIST) (EXIST)
REMOVE EXIST
SODDING
REMOVE 50mm THICKNESS
ASPHALT CONC PAVING
GRAVEL (C-40):
50mm THICKNESS
COMPACTED SUITABLE BACKFILL
MATERIAL (EXCAVATED
AND NEW SAND) COMPACT
TO 95% OF JIS A-1210
MAXIMUM DENSITY
REMOVE EXIST
PIPES
REMOVE EXIST
PIPES
COMPACTED SUITABLE BACKFILL
MATERIAL COMPACT TO 95% OF
JIS A-1210 MAXIMUM DENSITY
AS-BUILT
UN
ITE
D
ST
AT
ES
A
RM
Y
GA
RR
IS
ON
JA
PA
N
DI
RE
CT
OR
AT
E
OF
P
UB
LIC
W
OR
KS
EN
GI
NE
ER
IN
G
DI
VI
SI
ON
EN
GI
NE
ER
S
ER
VI
CE
S
BR
AN
CH
TH
E
AG
EN
CY
PR
OJ
EC
T
MA
NA
GE
D
BY
CO
NT
RA
CT
ED
MA
NA
GE
D
BY
RE
VE
W
ED
B Y:
CH
EC
KE
D
BY
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SC
AL
E:
DA
TE
AS
S
HO
W N
NI
PP
I K
OS
AN
C
O.
, L
TD
YO
SH
IN
OB
U
HA
MA
DA
SE
IJI
H
OR
I
SE
IJI
H
OR
I
YO
SH
IN
OB
U
HA
MA
DA
TE
RU
JI
HI
RA
TA
TO
SH
IY
UK
I S
UZ
UK
I
FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED
FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS
ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND THE
SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE
E-01
RE
MO
VA
L W
IR
IN
G
PL
AN
GRAPHIC SCALE
1/300
ABBREVIATION
PH
POC
POD
sq
TYP
UG
V W W/
WP
XFMR
AC
BLDG
CONC
DWG
EA
ELEC
EXST
G
GL
Hz
MIN
PHASE
POINT OF CONNECTION
POINT OF DISCONNECTION
SQUARE MILLIMETER
TYPICAL
UNDERGROUND
VOLTAGE
WIRE
WITH
WEATHERPROOF
TRANSFORMER
ALTERNATING CURRENT
BUILDING
CONCRETE
DRAWING
EACH
ELECTRICAL
EXISTING
GROUND
GROUND LEVEL
HERTZ
MINIMUM
LEGEND
EXST NEW
UNDERGROUND CONDUIT WIRING
POLE MOUNT AIR INSULATED SWITCH (PAS)PAS
XFMR STATION
GROUNDING
HANDHOLEH H
< REMOVAL AREA >
< WIRING >
< EQUIPMENT >
CONCRETE POLE
S/S SWITCH STATION
NOTE
STREET LIGHT
SCOPE OF WORK
1. REMOVE EXISTING POLE MOUNT AIR INSULATED SWITCH, TRANSFORMERS,
CONCRETE POLES, HIGH/LOW VOLTAGE CABLES, ELECTRICAL PANELS, LIGHTING FIXTURES,
HANDHOLES AND UNDERGROUND CONDUIT PIPES.
2. REMOVE EXISTING SWITCH STATION "250S/S".
3. INSTALL NEW TRANSFORMER STATIONS, ELECTRICAL PANELS, HIGH/LOW VOLTAGE CABLES,
STREET LIGHTS, HANDHOLES AND UNDERGROUND CONDUIT PIPES.
4. PERFORM CABLE WITHSTAND VOLTAGE TEST.
SCALE 1/300E01 E01
1 REMOVAL WIRING PLAN
XFMR (CONCRETE POLE MOUNTED)
LIGHTING PANEL
POWER PANEL
OVERHEAD WIRING
UNDERGROUND CONDUIT WIRING FOR EVENT PANELS
THE CONTRACTOR SHALL PROVIDE TWO BACK UP GENERATORS, TEMPORARILY
ELECTRICAL CABLES AND ACCESSORIES.
- 3 PHASE 4WIRES, 500KVA FOR THE POWER OUTAGE OF CB250
- 3 PHASE 4WIRES, 30KVA FOR EXISTING PANEL "P-A" AND STREET LIGHTS
THE CONTRACTOR SHALL CUT AND REMOVE TREES AND ROOTS IF IT IS REQUIRED.
THE CONTRACTOR SHALL COORDINATE WITH THE GOVERNMENT TO MINIMIZE
THE POWER OUTAGE OF BLDG. 250.
UNLESS OTHERWISE INDICATED, NEW CONDUIT WIRING SHALL BE AS FOLLOW;
1.
2.
3.
4.
2C-3.5sq "CV"(EXST CONDUIT)
KQ
-0
-9 J
A
B
C
D
5 4 3 12
SHEET of
SI
TE
PR
OJ
EC
T
NO
FE
W R
NO
PR
OJ
EC
T
TI
TL
E:
DR
AW
IN
G
TI
TL
E:
DA
TE
AP
PR
MA
RK
DE
SC
RI
PT
IO
N
DIRECTORATE OF PUBLIC
WORKS
UNITED STATES ARMY
GARRISON JAPAN
A-
-1
CA
MP
ZA
MA
FU
TU
RE
A
RM
Y
LO
DG
IN
G
SI
TE
P
RE
PA
RA
TI
ON
H H
250-16
250-14
250-1
212-4
201-1
H
EXST "P-A"
POD FOR CONDUIT
POD FOR CABLE
EXST V-12
POD
POD
EXST
6KV 38sq "CVT", 2- [6KV 100sq "CVT"]
EXST
250 S/S
EXST
6KV 38sq "OE"
EXST
3-5.0 "OW"
EXST
6kV 38sq "CVT"
EXST V-10
EXST
14sq "DV"EXST
14sq "OW"
H
N
EXST
253-1
S/S
S/S
EXST
201 S/S H
H
H
EXST
6KV 100sq "CVT"
H
EXST
6KV 325sq "CVT", 6KV 200sq "CVT"
H
H
H
H
H
EXST
100sq "CVQ"
EXST
"MAIN"
PAS
H
H
H
H
SOD
AREA
SOD
AREA
ASPHALT
AREA
ASPHALT
AREA
EXST V-13,
XFMR
1PH 75KVA
3PH 30KVA
EXST V-14,
XFMR
1PH 15KVA x2
EXST V-11,
XFMR
3PH 50KVA
EXST
4-[6KV 100sq "CVT"]
EXST CB250
REMOVE
EXST 6kV 100sq "CVT"
REMOVE
EXST 6kV 100sq "CVT"
REMAIN
EXST 6kV 100sq "CVT"
REMAIN
EXST 6kV 100sq "CVT"
REMOVE
EXST 6kV 100sq "CVT"
EXST
6kV 100sq "CVT"
H
POD
AS-BUILT
UN
ITE
D
ST
AT
ES
A
RM
Y
GA
RR
IS
ON
JA
PA
N
DI
RE
CT
OR
AT
E
OF
P
UB
LIC
W
OR
KS
EN
GI
NE
ER
IN
G
DI
VI
SI
ON
EN
GI
NE
ER
S
ER
VI
CE
S
BR
AN
CH
TH
E
AG
EN
CY
PR
OJ
EC
T
MA
NA
GE
D
BY
CO
NT
RA
CT
ED
MA
NA
GE
D
BY
RE
VE
W
ED
B Y:
CH
EC
KE
D
BY
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SC
AL
E:
DA
TE
AS
S
HO
W N
NI
PP
I K
OS
AN
C
O.
, L
TD
YO
SH
IN
OB
U
HA
MA
DA
SE
IJI
H
OR
I
SE
IJI
H
OR
I
YO
SH
IN
OB
U
HA
MA
DA
TA
KE
O
IIJ
IM
A
TO
SH
IY
UK
I S
UZ
UK
I
FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED
FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS
ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND THE
SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE
E-02
NE
W
W
IR
IN
G
PL
AN
GRAPHIC SCALE
1/300
SCALE 1/300E02
E02
NEW WIRING PLAN
E02E03
E02E04 1-3
1,2
KQ
-0
-9 J
A
B
C
D
5 4 3 12
SHEET of
SI
TE
PR
OJ
EC
T
NO
FE
W R
NO
PR
OJ
EC
T
TI
TL
E:
DR
AW
IN
G
TI
TL
E:
DA
TE
AP
PR
MA
RK
DE
SC
RI
PT
IO
N
DIRECTORATE OF PUBLIC
WORKS
UNITED STATES ARMY
GARRISON JAPAN
A-
-1
CA
MP
ZA
MA
FU
TU
RE
A
RM
Y
LO
DG
IN
G
SI
TE
P
RE
PA
RA
TI
ON
H H
250-16
250-15
201-1
H
EXST "P-A"
POC FOR CONDUIT
POC FOR CABLE
POC
H
EXST
6kV 100sq "CVT"
H
H
N
EXST
253-1
POC
*STRAIGHT JOINT
EXST
6kV 100sq "CVT"
EXST
201 S/S
S/S
H
H
H
EXST
6KV 325sq "CVT", 6KV 200sq "CVT"
H
2-[6kV 100sq "CVT"(HIVE 100)]
H
H
H H
H
EXST
100sq "CVQ"
EXST
"MAIN"
H
H
H
H
NEW XFMR STATION, SEE
NEW
CB250 S/S
SEE
100sq "600V CVQ"(HIVE 100)
H
60sq "CVT"(HIVE 70)
60sq "CVT"(EXST CONDUIT)
H
H
5 - [EMPTY CONDUIT(HIVE 100)]
NEW HANDHOLE 1200x1200x1200
POC
NEW HANDHOLE 1200x1200x1200
*STRAIGHT JOINT
H
3C-3.5sq "CV"(HIVE28)
3C-3.5sq "CV"(HIVE28)
EMPTY CONDUIT(HIVE28)
3C-3.5sq "CV"(HIVE28)
3C-3.5sq "CV"(HIVE28)
H
H
SOD
AREA
SOD
AREA
NEW STREET LIGHT,
STRAIGHT TYPE
NEW STREET LIGHT,
CROSS ROAD TYPE
BLDG. 250
NEW STREET LIGHT,
CROSS ROAD TYPE
POC
*STRAIGHT JOINT
NEW 2- [6kV 100sq "CVT"(HIVE 100)]
H
6kV 100sq "CVT"(HIVE 100) 6kV 100sq "CVT"(HIVE 100)
EXST
6kV 100sq "CVT"
EXST
6kV 100sq "CVT"
EXST CB250
POC
AS-BUILT
UN
ITE
D
ST
AT
ES
A
RM
Y
GA
RR
IS
ON
JA
PA
N
DI
RE
CT
OR
AT
E
OF
P
UB
LIC
W
OR
KS
EN
GI
NE
ER
IN
G
DI
VI
SI
ON
EN
GI
NE
ER
S
ER
VI
CE
S
BR
AN
CH
TH
E
AG
EN
CY
PR
OJ
EC
T
MA
NA
GE
D
BY
CO
NT
RA
CT
ED
MA
NA
GE
D
BY
RE
VE
W
ED
B Y:
CH
EC
KE
D
BY
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SC
AL
E:
DA
TE
AS
S
HO
W N
NI
PP
I K
OS
AN
C
O.
, L
TD
YO
SH
IN
OB
U
HA
MA
DA
SE
IJI
H
OR
I
SE
IJI
H
OR
I
YO
SH
IN
OB
U
HA
MA
DA
TA
KE
O
IIJ
IM
A
TO
SH
IY
UK
I S
UZ
UK
I
FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED
FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS
ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND THE
SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE
E-03
NOT TO SCALEE03E02
NOT TO SCALEE02E03
MCCB 3P
225AF/200AT
ELCB 2P
50AF/20AT
ELCB 2P
50AF/20AT
NEW WIRING DIAGRAM FOR NEW XFMR STATION "CB250 S/S"
FROM EXST 278 S/S,
3PH-3W, 6.6kV, 50Hz
NE
W
S
IN
GL
E
LIN
E
DI
AG
RA
M
1 A
ND
D
ET
AI
LS
TO EXST CB250,
3PH-3W, 6.6kV, 50Hz
XFMR
3PH-4W, 50kVA 6.6kV / 208-120V, 50Hz
EXST100sq
"600V CVQ"
MCCB 3P
100AF/20AT
SPARE
NEW XFMR STATION
"CB 250 S/S"
DETAIL OF NEW XFMR STATION "CB250 S/S"
LDS, 3P
7.2kV, 200A
LDS, 3P
7.2kV, 200A
NOT TO SCALEE03E03
CONDUIT WIRING (TYP)
SOD AREA
SAND
BACKFILL W/ EXST SOIL
EXCEPT ROCK AND DEBRIS
(100mm OR MORE)
GL
TYPICAL SECTION FOR
UNDERGROUND CONDUIT WIRING
SOLID SOD
DETECTABLE WARNING TAPE
(FOLD 1m / EACH 5m)
LAMP :
POWER :
GENERAL :
5°
5±
536±
0±
Ø60.5
1PH, AC100-265V, 50Hz
ALUMINUM DIE-CASTING MADE FIXTURE (GRAY) W/ TEMPERED GLASS COVER (CLEAR),
BUILT-IN POWER UNIT, WEATHERPROOF, STRAIGHT POLE TYPE
NOT TO SCALEE03
NEW STREET LIGHT
ROUNDED CONCRETE FOUNDATION (600 DIA x H100mm)
CONCRETE FOUNDATION
GL
1,6
8,0
ROUNDED STEEL MADE TAPER (1/100) POLE
WITH HOT DIPPED GALVANIZED COATING FINISH
LED LIGHTING FIXTURE
E03
DETECTABLE WARNING TAPE, t0.5 x W150mm
HPOC
*STRAIGHT JOINT
TO
EXST "MAIN"
100sq "600V CVQ"(HIVE 100)
LBS, 3P,
7.2kV, 200A
PF G75A
(40kA)
GL
CONCRETE,fc=21N/mm sq
STEEL BAR,SD13 @ 200mm
LEVELING CONCRETE,fc=16N/mm sq
BASE COURSE,C-40
HIGH VOLTAGE
KEEP AWAY
PROVIDE
POLYCARBONATE
DESIGN SIGN
FOUNDATION BOLT, M12-60mm (TYP)
W/ CAULKING COVER
WH
DIGITAL
MULTI-METER
FIGURE :
SPECIFICATION FOR CUBICLE TYPE TRANSFORMER STATION :
EQUIPMENT :
GL
B G
B
BONDING CONDUCTOR (TYP)
22sq BARE COPPER WIRE
WELD CABLE LUG (TYP)
GROUNDING ELECTRODES, (TYP)
COPPER CLAD STEEL ROD, 19 Ø x 3000 L, RESISTANCE = 10 OHM OR LESS
NEW XFMR STATION
G-22sq "IV"
(VE 16)
PRECAST CONC RINGCAST IRON COVER
GL
PRECAST CONC
HANDHOLE BLOCKS
GROUNDING SYSTEM
LEVELING CONC
SEALING COMPOUND
WATERPROOF CEMENT MORTAR
BASE COURSE, C-40
GTB
GROUNDING WIRE, G-14sq "IV" (TYP)
UG CONDUIT
Ø600
CABLE SUPPORTS AND BRACKETS
100 70 70 100
NOT TO SCALE
(LESS THAN 10 OHM)
"T-6", W/FRAME
SPARE
MCCB 2P
50AF/15AT
R1, N1
MCCB 2P
50AF/15AT
MCCB 2P
50AF/15AT
LIGHTING,
RECEPTACLE
THERMOSTAT
AND
VENTILATION FAN
MC
MCCB 3P
100AF/100AT
EVENT PANEL
E-B *GROUNDING RODS, 19Ø x 3000L
E-A
TO NEW
STREET LIGHTSEXST HANDHOLE
EVENT
PANEL
HOLES FOR TEMPORARY CABLE
WITH WEATHERPROOF SCREW CAP
(54) x4
EVENT
PANEL
3C-3.5sq "CV"(HIVE 28)
LIGHT EMITTING DIODE (LED), 70W, 11,600lm, CROSS ROAD TYPE AND STRAIGHT TYPE, DAYLIGHT COLOR (5,000K)
3C-3.5sq "CV" (HIVE 28)
MI
N
900/1200
MCTM
AUTO MANU
TM
MC
OL
SOLARN1
R1
0V
ELCB 3P
100AF/60AT
ELCB 2P
50AF/30AT
TYPICAL DETAIL FOR NEW HANDHOLE
POC, EXST HANDHOLE
*STRAIGHT JOINT
EXST 6.6kV 100sq "CVT"
(EXST CONDUIT) (TYP FOR 2)
6.6kV 100sq "CVT"
(HIVE 100) (TYP FOR 3)
ELCB 2P
50AF/20AT
x5
LDS, 3P
7.2kV, 200A
FROM NEW XFMR STATION,
3PH-3W, 6.6kV, 50Hz
NEW HANDHOLE
E03E03
OFF
GTB NTB
E-D
NTB AND GTB SHALL HAVE SUFFICIENT
TERMINALS FOR ALL CIRCUITS IN EVENT PANEL
NTB
*NOTE: ALL LDS AND LBS SHALL HAVE BARRIERS
BETWEEN POLES AND BOTH ENDS
HEIGHT 150mm OR ABOVE
RAIN DRAINAGE SLOPE
1, TRANSFORMER, 3PH-4W, 6600V/208-120V, 50kVA, 50Hz, 2, DIGITAL MULTI METERS
3, VENTILATION FAN AND THERMOSTAT W/ RAIN PROOF CONSTRUCTION
4, LIGHTING FIXTURE AND RECEPTACLE OUTLET (120V)
SHEET STEEL ENCLOSURE FACTORY BAKED ENAMEL FINISHED
WITH STAINLESS MADE L-STYLE LATCH AND LOCK SYSTEM,
WITH WIRE MESH REINFORCED GLASS WINDOW,
WITH HOT-DIPPED GALVANIZED CHANNEL BASE AND DRAIN HOLES.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
NOTE FOR NEW XFMR STATIONS CB 250 S/S AND NEW LODGING :
THE METAL NET SHALL BE INSTALLED AT HOLE OF CHANNEL BASE FOR NEW XFMR STATION.
NEW STEEL CHANNEL BASE AND INSIDE BASE PLATES SHALL BE GALVANIZED PAINTING.
THE NEW XFMR STATION SHALL BE INSTALLED BY STAINLESS STEEL ANCHOR BOLTS
ON THE NEW CONC FOUNDATION.
GROUNDING OF NEW XFMR STATION SHALL BE SUBJECT TO NEC REGULATION.
THE LOCATION OF VENTILATION FAN SHALL BE CONSIDERED TO PREVENT RAINWATER TROUBLES.
NOT ABOVE LBS, TRANSFORMER, MCCB AND OTHER EQUIPMENTS.
UPPER SIDE OF VENTILATION SHALL HAVE RAIN PROOF CONSTRUCTION.
THE MAIN KEY FOR CUBICLE SHALL BE HL-60(A-312), TAKIGEN Co. TYPE.
THE ACLIC CLEAR PROTECTION PLATES AROUND HIGH VOLTAGE AREA SHALL BE ABLE
TO BE REMOVED AND INSTALLED JUST BY LOOSEN BOLTS TYPE, NOT UNSCREW BOLT TYPE.
EACH CUBICLE DOOR SHALL HAVE DUSTPROOF PACKING AND AUTO MATIC DOOR HOLD SYSTEM.
AND WHEN DOOR TO BE CLOSED, THE LOCK SHALL BE RELEASED ONLY BY OPERATOR'S HAND.
EACH CUBICLE SECTION SHALL HAVE AUTOMATIC LIGHTING SYSTEM.
THE LETTERS OF PLATES FOR THE CUBICLES SHALL BE CONFIRMED TO E1 SHOP DPW
THROUGH GOVERNMENT REPRESENTATIVE.
*DETAIL OF EVENT PANEL
ELCB 3P 100AF/60AT(3PHASE / 208V) x1, ELCB 3P 50AF/30AT(3PHASE / 208V) x1, ELCB 2P 50AF/20AT(1PHASE / 208V) x2, ELCB 2P 50AF/20AT(1PHASE / 120V) x3
KQ
-0
-9 J
A
B
C
D
5 4 3 12
SHEET of
SI
TE
PR
OJ
EC
T
NO
FE
W R
NO
PR
OJ
EC
T
TI
TL
E:
DR
AW
IN
G
TI
TL
E:
DA
TE
AP
PR
MA
RK
DE
SC
RI
PT
IO
N
DIRECTORATE OF PUBLIC
WORKS
UNITED STATES ARMY
GARRISON JAPAN
A-
-1
CA
MP
ZA
MA
FU
TU
RE
A
RM
Y
LO
DG
IN
G
SI
TE
P
RE
PA
RA
TI
ON
AS-BUILT
UN
ITE
D
ST
AT
ES
A
RM
Y
GA
RR
IS
ON
JA
PA
N
DI
RE
CT
OR
AT
E
OF
P
UB
LIC
W
OR
KS
EN
GI
NE
ER
IN
G
DI
VI
SI
ON
EN
GI
NE
ER
S
ER
VI
CE
S
BR
AN
CH
TH
E
AG
EN
CY
PR
OJ
EC
T
MA
NA
GE
D
BY
CO
NT
RA
CT
ED
MA
NA
GE
D
BY
RE
VE
W
ED
B Y:
CH
EC
KE
D
BY
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SC
AL
E:
DA
TE
AS
S
HO
W N
NI
PP
I K
OS
AN
C
O.
, L
TD
YO
SH
IN
OB
U
HA
MA
DA
SE
IJI
H
OR
I
SE
IJI
H
OR
I
YO
SH
IN
OB
U
HA
MA
DA
TA
KE
O
IIJ
IM
A
TO
SH
IY
UK
I S
UZ
UK
I
FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED
FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS
ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND THE
SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE
E-04
GL
CONCRETE,fc=21N/mm sq
STEEL BAR,SD13 @ 200mm
LEVELING CONCRETE,fc=16N/mm sq
BASE COURSE,C-40
HIGH VOLTAGE
KEEP AWAY
PROVIDE
POLYCARBONATE
DESIGN SIGN
FOUNDATION BOLT, M12-60mm (TYP)
W/ CAULKING COVER
HIGH VOLTAGE
KEEP AWAY
NE
W
S
IN
GL
E
LIN
E
DI
AG
RA
M
2 A
ND
D
ET
AI
LS
MCCB 2P
50AF/20AT
LIGHTING,
RECEPTACLE
WH
E04E02
TO EXST 201 S/S,
3PH-3W, 6.6kV, 50Hz
MCCB 3P
2000AF/2000AT
XFMR
3PH-4W, 750kVA 6.6KV / 208-120V, 50Hz
V
AI >
DS
7.2kV, 200A
VCB
7.2kV, 400A, 8kA
DIGITAL
MULTI-METERWh
DIGITAL
MULTI-METER
INTER LOCK
LDS
7.2kV, 200A
LDS
7.2kV, 200A
E-B
*GROUNDING RODS, 19Ø x 3000L
H
GL
G
BONDING CONDUCTOR (TYP)
22sq BARE COPPER WIRE
NEW XFMR STATION
G-22sq "IV"
(VE 16)
E04
GROUNDING ELECTRODES, (TYP)
COPPER CLAD STEEL ROD, 19 Ø x 3000 L, RESISTANCE = 10 OHM OR LESS
WELD CABLE LUG (TYP)
FIGURE :
SPECIFICATION FOR CUBICLE TYPE TRANSFORMER STATION :
EQUIPMENT :
E04
MCCB 2P
50AF/20AT
THERMOSTAT AND
VENTILATION FAN
LBS, 3P,
7.2kV, 200A
PF G75A
(40kA)
WH
XFMR
3PH-4W, 30kVA 6.6KV / 208-120V, 50Hz
DIGITAL
MULTI-METER
LBS, 3P,
7.2kV, 200A
PF G75A
(40kA)
MCCB 3P
225AF/150AT
SPARE
ELCB 2P
50AF/20AT
TO EXST
STREET LIGHTS
H
60sq "CVT"(HIVP 70)
HEXST HANDHOLE
POC FOR CONDUIT
60sq "CVT"(EXST CONDUIT)
POC FOR CABLE
3C-3.5sq "CV"(HIVE 28)
3C-3.5sq "CV"(HIVE 28)
POC FOR CONDUIT AND CABLE
EXST STREET LIGHT
NEW HANDHOLE
1200x1200x1200
NEW HANDHOLE, 900x900x900
5- [EMPTY CONDUIT(HIVE 100)]
ELCB 2P
50AF/20AT
SPARE
R1, N1
MCCB 2P
50AF/15AT
EVENT PANEL
MCCB 3P
100AF/100AT
MCCB 2P
100AF/100AT
MC
EVENT
PANEL
EVENT
PANEL
HOLES FOR TEMPORARY CABLE
WITH WEATHERPROOF SCREW CAP
(54) x4
GL
ELCB 3P
100AF/60AT
MCTM
AUTO MANU MC
OL
SOLARN1
R1
0V
TM
DETAIL OF NEW TRANSFORMER STATION "CB 261 S/S"
NOT TO SCALE
E02NOT TO SCALE
TYPICAL DETAIL FOR GROUNDING
NOT TO SCALEE04
NEW DIAGRAM FOR TRANSFORMER STATION "CB 261 S/S"1
ELCB 2P
50AF/30AT
ELCB 2P
50AF/20AT
x5
TO NEW CB 250 S/S,
3PH-3W, 6.6kV, 50Hz
6.6kV 100sq "CVT"
(HIVP 100)
6.6kV 100sq "CVT"
(HIVP 100)
EXST
6.6kV 100sq "CVT"
(EXST CONDUIT)
NEW HANDHOLE 1200x1200x1200POC, *STRAIGHT JOINT
OFF
E-A E-D
GTB NTB
NTB AND GTB SHALL HAVE SUFFICIENT
TERMINALS FOR ALL CIRCUITS IN EVENT PANEL
NTB
*NOTE: ALL LBS SHALL HAVE BARRIERS
BETWEEN POLES AND BOTH ENDS
*NOTE: ALL LDS SHALL HAVE BARRIERS
BETWEEN POLES AND BOTH ENDS
*NOTE: DS SHALL HAVE BARRIERS
BETWEEN POLES AND BOTH ENDS
HEIGHT 150mm OR ABOVE
RAIN DRAINAGE SLOPE
1, TRANSFORMER, 3PH-4W, 6600V/208-120V, 600KVA AND 30KVA, 50Hz, 2, DIGITAL MULTI METERS
3, VENTILATION FAN AND THERMOSTAT W/ RAIN PROOF CONSTRUCTION
4, LIGHTING FIXTURE AND RECEPTACLE OUTLET (120V)
SHEET STEEL ENCLOSURE FACTORY BAKED ENAMEL FINISHED
WITH STAINLESS MADE L-STYLE LATCH AND LOCK SYSTEM, WIRE MESH REINFORCED GLASS WINDOW, HOT-DIPPED GALVANIZED CHANNEL BASE, DRAIN HOLES AND EVENT PANEL ON THE SURFACE.
*NOTE FOR NEW XFMR STATION "CB 261" : SEE E-03
NEW XFMR STATION "CB 261S/S"
*DETAIL OF EVENT PANEL
ELCB 3P 100AF/60AT(3PHASE / 208V) x1, ELCB 3P 50AF/30AT(3PHASE / 208V) x1, ELCB 2P 50AF/20AT(1PHASE / 208V) x2, ELCB 2P 50AF/20AT(1PHASE / 120V) x3
KQ
-0
-9 J
A
B
C
D
5 4 3 12
SHEET of
SI
TE
PR
OJ
EC
T
NO
FE
W R
NO
PR
OJ
EC
T
TI
TL
E:
DR
AW
IN
G
TI
TL
E:
DA
TE
AP
PR
MA
RK
DE
SC
RI
PT
IO
N
DIRECTORATE OF PUBLIC
WORKS
UNITED STATES ARMY
GARRISON JAPAN
A-
-1
CA
MP
ZA
MA
FU
TU
RE
A
RM
Y
LO
DG
IN
G
SI
TE
P
RE
PA
RA
TI
ON
AS-BUILT
UN
ITE
D
ST
AT
ES
A
RM
Y
GA
RR
IS
ON
JA
PA
N
DI
RE
CT
OR
AT
E
OF
P
UB
LIC
W
OR
KS
EN
GI
NE
ER
IN
G
DI
VI
SI
ON
EN
GI
NE
ER
S
ER
VI
CE
S
BR
AN
CH
TH
E
AG
EN
CY
PR
OJ
EC
T
MA
NA
GE
D
BY
CO
NT
RA
CT
ED
MA
NA
GE
D
BY
RE
VE
W
ED
B Y:
CH
EC
KE
D
BY
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SC
AL
E:
DA
TE
AS
S
HO
W N
NI
PP
I K
OS
AN
C
O.
, L
TD
YO
SH
IN
OB
U
HA
MA
DA
SE
IJI
H
OR
I
SE
IJI
H
OR
I
YO
SH
IN
OB
U
HA
MA
DA
TA
KE
O
IIJ
IM
A
TO
SH
IY
UK
I S
UZ
UK
I
FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED
FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS
ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND THE
SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE
E-05
7SCALE 1/300E05
E05
GRAPHIC SCALE
1/300
SCALE 1/300
E05 E05
NEW WIRING PLAN FOR COMMUNICATION CABLES
REMOVAL WIRING PLAN FOR COMMUNICATION CABLES
RE
MO
VA
L A
ND
N
EW
W
IR
IN
G
PL
AN
F
OR
C
OM
MU
NI
CA
TI
ON
C
AB
LE
S
NOT TO SCALE
CAST IRON COVER
CONDUIT WIRING (TYP)
SOD AREA
SAND
BACKFILL W/ EXST SOIL
EXCEPT ROCK AND DEBRIS
(100mm OR MORE)
GL
SOLID SOD
DETECTABLE WARNING TAPE
(FOLD 1m / EACH 5m)
NOT TO SCALE
TYPICAL SECTION FOR
UNDERGROUND CONDUIT WIRING
E05E05
E05E05
NOTE
SCOPE OF WORK
TYPICAL DETAIL FOR NEW MANHOLE
"T-20", W/FRAME
HH420
MH332-1
MH260
MH260-2
MH260-3
MH332
MH332-1
HH420
HH260-3
MH260-2
MH260-3
NEW
MH332-2
NEW
MH420
MH260
NOT TO SCALE
E05E05
NEWEXISTING
2-[12SM]
12SM12SM
12SM
12SM
12SM
MH332
EXST TEL CABLE
2-[12SM]2-[12SM]
48SM48SM
MECHANICAL CLOSURE
12SM
2-[12SM]
SINGLE LINE DIAGRAM FOR CONNECTION OF COMMUNICATION CABLES
2-[12SM]
REMOVAL AREA
3M CONNECTION
EXST FIBER OPTIC CABLE
2-[TEL-100P]
TEL-200P
TEL-200P
2-[TEL-100P]
TEL-200P
TEL-200P
630130 85
NOTE: NEW MANHOLE SHALL BE "L-3R TYPE, SUNREC Co.,Ltd." OR EQUIVALENT.
1. REMOVE EXISTING FIBER OPTICAL CABLES, TELEPHONE CABLES, TV CABLES, HANDHOLES, MANHOLES
AND UNDERGROUND CONDUIT PIPES.
2. INSTALL NEW FIBER OPTICAL CABLES, TELEPHONE CABLES,MAN HOLES AND UNDERGROUND CONDUIT PIPES.
3. PERFORM OPERATIONAL TEST.
1.
2.
3.
MI
N
FMD: FIBER MESH DUCT SHALL BE A MAXCELL PACK WITH THREE (3) INNER DUCTS.
TELEPHONE CABLE SHALL BE CCP-AP 0.5-200P OR APPROVED EQUAL.
THE CONTRACTOR SHALL CONSIDER THAT THE OUTAGE OF TV CABLE SHALL BE MINIMUM FOR THIS CONSTRUCTION.
KQ
-0
-9 J
A
B
C
D
5 4 3 12
SHEET of
SI
TE
PR
OJ
EC
T
NO
FE
W R
NO
PR
OJ
EC
T
TI
TL
E:
DR
AW
IN
G
TI
TL
E:
DA
TE
AP
PR
MA
RK
DE
SC
RI
PT
IO
N
DIRECTORATE OF PUBLIC
WORKS
UNITED STATES ARMY
GARRISON JAPAN
A-
-1
CA
MP
ZA
MA
FU
TU
RE
A
RM
Y
LO
DG
IN
G
SI
TE
P
RE
PA
RA
TI
ON
SOD
AREA
M
M H
M
M
M
M M
N
EXST
MH 260
BLDG. 332
EXST HH 420
EXST MH 332-1
EXST
MH 260-3
(EXST VP50)
(EXST VP50)
EXST MH 332,
1-MECHANICAL CLOSURE,
1-3M
EXST CCP-AP 0.5-100P(VP50),
EXST CCP-AP 0.5-100P, (VP50)
EXST 48SM FIBER OPTIC CABLE
EXST EMPTY CONDUIT(VP50)
EXST CCP-AP 0.5-200P(VP100),
EXST 2SM NTT(VP100)
(VP50)
(VP50)
(VP50)
(VP50)
EXST CCP-AP 0.5-200P(VP 50)
EXST FMD x1, FD: EXST 12SM FIBER OPTIC CABLE, FD: EXST 12SM FIBER OPTIC CABLE, FD: EMPTY
EXST 10C-HFL(VP50),
EXST EMPTY CONDUIT(VP50)
EXST MH 260-2,
2-MECHANICAL CLOSURES
POC
POC
ASPHALT
AREA
ASPHALT
AREA
EXST 4-EMPTY CONDUIT(VP50)
NEW MH332-2
SEE
NEW MH420,
1-3M, SEE
E05E05
E05E05
EXST CCP-AP 0.5-100P(VP50)
EXST FMD x1 (VP50)
FD: EXST 48SM FIBER OPTIC CABLE,
; CCP-AP 0.5-100P,
; NO TAG x1
FD: EMPTY
FD: EMPTY
EXST EMPTY CONDUIT(VP50)
EXST FMD x1, FD: EXST 12SM FIBER OPTIC CABLE,(KDDI)
FD: EMPTY,
FD: EMPTY
EXST 2SM NTT / EXST 10C-HFL(VP 50)
EXST FMD x1
FD: EXST 12SM FIBER OPTIC CABLE,(KDDI)
FD: EMPTY,
FD: EMPTY
EXST 2SM NTT / EXST 10C-HFL(VP50),
EXST EMPTY CONDUIT(VP50)
EXST FMD x1
FD: 12SM FIBER OPTIC CABLE, EXST 10C-HFL
FD: EMPTY,
FD: EMPTY
EXST CCP-AP 0.5-30P(VP50),
EXST EMPTY CONDUIT(VP50)
EXST CCP-AP 0.5-100P(VP50),
EXST 1-EMPTY CONDUIT(VP50)
EXST 10C-HFL(VP50),
10C-HFL(EXST VP50)
(EXST VP50)
EXST FMD x1, FD: EXST 12SM FIBER OPTIC CABLE, FD: 12SM FIBER OPTIC CABLE, FD: EMPTY, CCP-AP 0.5-200P(EXST VP50), FMD x1, FD: 10C-HFL, FD: EMPTY, FD: EMPTY
EXST 1-EMPTY CONDUIT(EXST VP50)
(VP100)
FMD x1, FD: CCP-AP 0.5-200P, FD: EMPTY, FD: EMPTY
FMD x1, FD: 12SM FIBER OPTIC CABLE, FD: 12SM FIBER OPTIC CABLE,(KDDI)
FD: EMPTY,
FMD x1, FD: 10C-HFL, FD: EMPTY, FD: EMPTY
FMD x1 (VP100), EMPTY CONDUIT(VP100)
EMPTY CONDUIT(EXST VP50),
EXST FMD x1
FD: EXST 48SM FIBER OPTIC CABLE,
; EXST NO TAG x1 , FD: 12SM FIBER OPTIC CABLE, FD: 12SM FIBER OPTIC CABLE(KDDI)
FMD x1, FD: 10C-HFL
FD: EMPTY,
FD: EMPTY
(EXST VP50)
EXST CATV TERMINAL BOX
SOD
AREA
ASPHALT
AREA
H
M
M
M
H
M
POD
POD
POD
M
HH 420
N
INSTALL NEW MANHOLE
INSTALL NEW MANHOLE
EXST
MH 260-3
BLDG. 332
FMD x1
FD: 12SM FIBER OPTIC CABLE,
FD: EMPTY,
FD: EMPTY
2SM NTT / 10C-HFL(EXST VP50),
EMPTY CONDUIT(EXST VP50)
(EXST VP50)
(VP50 REMAIN)
(VP50)
(VP50)
(VP50)
FMD x1
FD: 12SM FIBER OPTIC CABLE,10C-HFL
FD: EMPTY,
FD: EMPTY
CCP-AP 0.5-30P(VP50),
EMPTY CONDUIT(VP50)
CCP-AP 0.5-200P(VP100),
2SM NTT(VP100)
MH 332
MH 332-1
FMD x1, FD: 12SM FIBER OPTIC CABLE, FD: EMPTY, FD: EMPTY
2SM NTT / 10C-HFL(VP 50)
CCP-AP 0.5-100P(VP50),
CCP-AP 0.5-100P, (VP50)
48SM FIBER OPTIC CABLE
EMPTY CONDUIT(VP50)
CCP-AP 0.5-100P(VP50)
FMD x1 (VP50)
FD: 48SM FIBER OPTIC CABLE,
; CCP-AP 0.5-100P,
; NO TAG x1
FD: EMPTY,
FD: EMPTY
EMPTY CONDUIT(VP50)
MH 260
MH 260-2
CCP-AP 0.5-100P(VP50 REMAIN),
FMD x1 REMAIN, FD: 48SM FIBER OPTIC CABLE REMAIN, ; CCP-AP 0.5-100P, ; NO TAG x1 REMAIN, FD: EMPTY REMAIN, FD: EMPTY REMAIN
EMPTY CONDUIT(VP 50 REMAIN)
(VP50)
CCP-AP 0.5-200P(VP50),
EMPTY CONDUIT(VP50)
CCP-AP 0.5-200P(VP50)
REMOVE
HH 260-3
(VP50 REMAIN)
(VP50 REMAIN)
FMD x1, FD: 12SM FIBER OPTIC CABLE, FD: 12SM FIBER OPTIC CABLE, FD: EMPTY
10C-HFL(VP50),
4-EMPTY CONDUIT(VP50)
CCP-AP 0.5-200P(VP 50)
FMD x1, FD: 12SM FIBER OPTIC CABLE, FD: 12SM FIBER OPTIC CABLE, FD: EMPTY
10C-HFL(VP50),
EMPTY CONDUIT(VP50)
ASPHALT
AREA
ASPHALT
AREA
SOD
AREA
CCP-AP 0.5-100P(VP50),
1-EMPTY CONDUIT(VP50)
FMD x1 REMAIN, FD: 12SM FIBER OPTIC CABLE, FD: 12SM FIBER OPTIC CABLE, FD: EMPTY REMAIN, 10C-HFL(VP50 REMAIN), 2-EMPTY CONDUIT REMAIN(VP50 REMAIN)
FMD x1 REMAIN, FD: 12SM FIBER OPTIC CABLE REMAIN, FD: 12SM FIBER OPTIC CABLE, FD: EMPTY REMAIN, 10C-HFL(VP50 REMAIN), 2-EMPTY CONDUIT REMAIN(VP50 REMAIN)
10C-HFL REMAIN(VP50 REMAIN),
10C-HFL(VP50 REMAIN)
EXST CATV TERMINAL BOX
AS-BUILT
UN
ITE
D
ST
AT
ES
A
RM
Y
GA
RR
IS
ON
JA
PA
N
DI
RE
CT
OR
AT
E
OF
P
UB
LIC
W
OR
KS
EN
GI
NE
ER
IN
G
DI
VI
SI
ON
EN
GI
NE
ER
S
ER
VI
CE
S
BR
AN
CH
TH
E
AG
EN
CY
PR
OJ
EC
T
MA
NA
GE
D
BY
CO
NT
RA
CT
ED
MA
NA
GE
D
BY
RE
VE
W
ED
B Y:
CH
EC
KE
D
BY
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SC
AL
E:
DA
TE
AS
S
HO
W N
NI
PP
I K
OS
AN
C
O.
, L
TD
YO
SH
IN
OB
U
HA
MA
DA
SE
IJI
H
OR
I
SE
IJI
H
OR
I
YO
SH
IN
OB
U
HA
MA
DA
TA
KE
O
IIJ
IM
A
TO
SH
IY
UK
I S
UZ
UK
I
POD
M
EXST MH 333,
(VP100)
TO BLDG,333
CABINET
TO BLDG,333
CABINET
FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED
FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS
ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND THE
SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE
File details come from the government source that posted it. Updated .