NAFQJ3-23-B-0001-0004.pdf
PDF 196 KB Posted
- Attached to
- NAF MWR Army Lodging, Camp Zama, Japan
- Solicitation number
- NAFQJ3-23-B-0001
About this file
This document is an amendment to a solicitation for the construction of a new Army lodging facility at Camp Zama, Japan. The project involves building a seven-story building with 103 suites, support facilities including elevators, mechanical and electrical rooms, a heating system, fire protection and detection systems, and information technology infrastructure. Site work will include vehicle access areas, loading docks, parking for personal and government vehicles, pedestrian walkways, and a trash collection area. The amendment revises specification attachments and drawing sheets for the project and leaves the proposal due date unchanged.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE I PAGE OF PAGES 1 I 2 2. AMENDMENT/MODIFICATION NO. l. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO.(Ifapplicable)
6.ISSUEDBY CODE NAFQJ3 7. ADMINISTERED BY (If other than item 6) CODE I
CONTRACTING DIVISION
JAPAN DISTRICT, U.S. ARMY CORPS OF ENGINEERS See Item 6
RM 147, BLDG. 250
CAMPZAMA
ZAMA252-8511
JAPAN
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
9A. AMENDMENT OF SOLICITATION
NO. NAFQJ323B0001
X
9B. DATED (SEE ITEM 11)
1 0-Jul-2023 lOA. MOD. OF CONTRACT/ORDER NO.
l0B. DATED (SEE ITEM 13)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[K]Toe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer �is extended, D is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 8 and 15, and returning I copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
--or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor □ is not, □ is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation NAFQJ3-23-B-0001 for construction of a new, 7 story Army Lodging Facility is hereby modified as follows:
See Continuation pages.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or I 0A, as heretofore changed, remains unchanged and in full force and effect 15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
15C. DATE SIGNED
16A. NAME AND TI1LE OF CONTRACTING OFFICER (Type or print)
TEL:
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
30-105-04
EMAIL:
16C. DATE SIGNED
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
NAFQJ323B0001
SF 30 Continuation Page
AM-0004
14. DESCRIPTION OF AMENDMENT (continued)
A. CHANGES TO SPECIFICATIONS – The amendment mark “(AM-0004)” is shown on each page of the amended specification section(s).
(1) Revised Section Attachment(s) to Project Specifications. Attached hereto are the following revised section attachment(s) to the specifications. Revised attachment section attachment(s) replace like-numbered section(s) in the subject solicitation specifications. Changes are indicated by a red line in the left margin of revised areas. All portions of the revised section attachment(s) shall apply whether or not changes have been indicated.
Revised Attachment(s):
Attachment 01 33 29-B
B. CHANGES TO DRAWINGS (ISSUED) – The amendment mark “(AM-0004)” is shown on each sheet of the amended drawing sheet(s).
(1) Revised Sheet(s) to Drawings. Attached hereto are the following revised sheets to the drawings.
Revised sheets will replace like-numbered sheets in the subject solicitation drawings. Changes are indicated in revision clouds. All portions of the revised sheet(s) shall apply whether or not changes have been indicated.
Revised Sheet(s) to Drawing:
G-001 A-101 A-449
C. The proposal due date and time is unchanged.