This is a pricing template for a military construction (MILCON) contract for an Aircraft Engine Repair Facility (P683) project.
The base contract consists of seven primary line items totaling approximately $7.5 million in government estimated costs. Line Item 1 encompasses the entire Aircraft Engine Repair Facility project, subdivided into: 1A—primary facility construction (CC21125) to the 5-foot line; 1B—parking structure construction (CC85310) to the 5-foot line; 1C—sitework including 1.34-acre temporary gravel parking lot, 3.24-acre asphalt paved parking lot, utilities, storm drainage, walks, and signalization; 1D—electrical distribution line; 1E—foundation piling for the parking garage (23,595 VLF); 1F—pile load testing (23,595 VLF); 1G—asbestos-containing pipe insulation removal (770 LF); 1H—contaminated soil removal (10,000 CY); 1I—fill provision and compaction (5,000 CY); 1J—demolition of Buildings 6F and 6G and covered walkway; and 1K—swing space and utilities provision. Line Items 2 and 3 cover vertical build platforms (CFCI) and main facility cranes, respectively, funded through non-MILCON sources. Four option items are included: Option 1 ($955,979 government estimated price) for audio-visual system equipment with a not-to-exceed 5% handling and adjustment rate; Option 2 ($6,543,186 government estimated price) for furniture, fixtures, and equipment with a not-to-exceed 5% handling and adjustment rate; Option 3 for unsatisfactory soil material removal (200 CY); and Option 4 for contaminated groundwater treatment (5,000 GAL). Options 1 and 2 must be executed within 365 days of contract notice to proceed per FAR 52.217-7.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Item
Description Quantity Unit Unit Price
Sub-Total Total Price
1 BASE PRICE: Total Price for the entire work for Aircraft Engine Repair Facility P683 in accordance with the drawings and specifications complete but excluding work provided in another Priced Line Item.
Source funding is a
MILCON.
1 EA $_______
1A Subtotal of Base Price for the entire work for the Aircraft Engine Repair Facility primary facility (CC21125) complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $_______
1B Subtotal of Base Price for the entire work for Parking Structure (CC85310) complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $_______
1C Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for including a 1.34-acre temporary gravel parking lot , 3.24-acre asphalt paved parking lot , utilities, storm drainage, walks, signalization, etc., complete in accordance with the [drawings and specifications, but excluding work described in another line item.
1 EA $_______
1D Subtotal of Base Price for the Electrical Distribution Line, complete in accordance with the drawings and specifications but excluding
1 EA $_______
work described in another line Item.
1E Unit Price for providing Foundation Piling for the Parking Garage facility complete in accordance with the drawings and specifications but excluding work provided in another line item.
23,595 VLF $______ $_______
1F Unit Price for providing Pile Load Test for the Parking Garage facility, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
23,595 VLF $______ $_______
1G Unit Price for removal and disposal of less than 24” diameter asbestos containing pipe insulation complete in accordance with the drawings and specifications but excluding work provided in another line item.
770 LF $______ $_______
1H Unit Price for removal and disposal of contaminated stockpiled soils complete in accordance with the drawings and specifications, but excluding work provided in another line item.
10,000 CY $______ $_______
1I Unit Price for provision and compaction of fill in place of removed contaminated soil, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
5,000 CY $______ $_______
1J Unit Price for Demolition of Buildings 6F and 6G and covered walkway, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_______
1K Subtotal of Base Price for providing Swing Space and all utilities (including end of
1 EA $_______
project disassembly and restoration of the site) complete in accordance with the drawings and the specifications but excluding work provided in another Priced line item
2 Base Bid: Price for providing all work in connection with Vertical Build Platforms (CFCI) excluding utilities (cost for the structure and lifting elevators only), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. Source of funding is NON-MILCON
1 EA $________
3 Base Bid: Price for providing Main Facility cranes, excluding structure, complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
1 EA $________
4 Option Item No. 1: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications but excluding work provided in another Priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, and communication cabling connecting these devices together.
Include the price for supporting permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections. The source of funding is NON- MILCON. Option to be
Governme nt Estimated Price:
$955,979
HAR
Percent
(NTE
5%)
HAR
Subtotal
Total AV System Estimated Price executed withing 365 days of contract Notice to Proceed in accordance with FAR 52.217-7
5 Option Item No. 2: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
The source of funding is NON-MILCON. Option to be executed withing 365 days of contract Notice to Proceed in accordance with FAR 52.217-7
Governme nt Estimated Price:
$6,543,186
HAR
Percent
(NTE
5%)
HAR
Subtotal
Total
FF&E
Estimated Price
6 Option Item No. 3: Price for removal and disposal of unsatisfactory soil material, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
200 CY $______ $______
7 Option Item No. 4: Price (if required) for treatment of contaminated dewatered ground water, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
5,000 GAL $______ $______