Amendment 0006 Attachment.pdf

PDF 74 KB Posted

Attached to
P683 Aircraft Engine Repair Facility, NAS Jacksonville, FL
Solicitation number
N6945026R0005
Issued by

About this file

This is an amendment (Amendment 0006) to a federal contract solicitation dated 03JUN2026 that modifies plan sheets and specification sections for a coating and surface preparation project.

The amendment removes and replaces ten specific plan sheets (A201, A401, A513, C202, C205, C206, C305, C405, C502, and C508) with updated versions. For Specification Section 09 67 23.16, Paragraph 1.3.5.5, the amendment modifies contractor certification requirements by removing references to specific SSPC certification types (SSPC QP 8 and SSPC QS 1) and replacing them with general certification requirements prior to contract award. The revised language clarifies that contractors performing surface preparation or coating application must maintain certification throughout project duration, with explicit language stating that requests for time extensions due to inactive certifications will not be considered. The amendment also adds a requirement that installation contractors must be certified by material manufacturers to install submitted coatings and sealants. Additionally, the amendment removes and replaces Specification Sections 07 19 00 and 07 42 13 with updated versions. The minimum qualifications for installation contractors remain unchanged, requiring completion of three or more jobs within the past two years on concrete surfaces exceeding 200,000 square feet total area, with supporting documentation of project locations, contacts, square footage, materials, equipment, and manufacturer validation of material quality.

View the file

Other files

File Type Posted
Solicitation Amendment N6945026R00050009 SF 30.pdf PDF
FX001.pdf PDF
P683 Amendment 0005 Continuation Sheet.pdf PDF
P683 Amendment 0003 Drawings.pdf PDF
FDOT FY 2026-27 Ebook.pdf PDF
C003 OVERALL PROJECT MAP-REV.pdf PDF
649-031.pdf PDF
649-030.pdf PDF
41369201S-501_S-501.PDF PDF
P-601.pdf PDF
P-501.pdf PDF
M-111.pdf PDF
M-401.pdf PDF
41369201E-502_E-502.PDF PDF
41369201E-503_E-503.PDF PDF
41369201EL110_EL110.PDF PDF
41369201E-001_E-002.PDF PDF
41369201E-501_E-501.PDF PDF
41369201EP111_EP111.PDF PDF
41369201EG110_EG110.PDF PDF
41369201E-601_E-601.PDF PDF
41369201ES101_ES101.PDF PDF
41369201G-001_G-001.PDF PDF
41369201-A201_A-201.PDF PDF
41369201-A401_A-401.PDF PDF
41369201-A121_A-121.PDF PDF
41369201-A302_A-302.PDF PDF
CIVIL - Amend 02.pdf PDF
09 65 00.pdf PDF
AMD posted in PIEE but failed SAM.pdf PDF
P-402.pdf PDF
AMD 0001 Attachment 1.pdf PDF
Attachment F - Small Business Subcontracting Plan (SBSP).docx DOCX document
Solicitation Amendment N6945026R00050001 SF 30.pdf PDF
Solicitation - N6945026R0005.pdf PDF
EXHIBIT M - P683 Parking Garage_Final Specifications.pdf PDF
EXHIBIT K - P683 FacilityFinal Submission - Specs.pdf PDF
EXHIBIT I - P683 - Engine-Drawings-VOL4b.pdf PDF
EXHIBIT G - P683 - Engine-Drawings-VOL2c.pdf PDF
EXHIBIT G - P683 - Engine-Drawings-VOL2b.pdf PDF
EXHIBIT G - P683 - Engine-Drawings-VOL2a.pdf PDF
Attachment F - Small Business Subcontracting Plan (SBSP) Template(rev_1.17.24).docx DOCX document
Attachment C - Safety Data Sheet.docx DOCX document
EXHIBIT L - P683 Parking Garage_Final Drawings.pdf PDF
EXHIBIT F - P683 - Engine-Drawings-VOL1.pdf PDF
EXHIBIT C - G-003 - COVER SHEET VOLUME 2.pdf PDF
EXHIBIT D - G-006 - COVER SHEET VOLUME 3.pdf PDF
EXHIBIT A - Construction Schedule.pdf PDF
Attachment J - P683 Site Visit Map.pptx PPTX presentation
Attachment D- Historical Small Business Utilization.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03JUN2026

Amendment 0006 Attachments

Remove the following plan sheets from the solicitation

A201, A401, A513, C202, C205, C206, C305, C405, C502, and C508

Replace with the following plan sheets

A201, A401, A513, C202, C205, C206, C305, C405, C502, and C508

Specification Section 09 67 23.16, Paragraph 1.3.5.5

Remove:

All Contractors that perform surface preparation or coating application must be certified to SSPC QP 8 and should also be SSPC QS 1 certified prior to Contract award and must remain certified while accomplishing any surface preparation or coating application.

The painting Contractors must remain so certified for the duration of the project. If a Contractor’s certification expires, the firm will not be allowed to perform any work until the certification is reissued. Notify the Contracting Officer of any change in Contractor certification status. Notify the Contracting Officer of all schedule and unannounced on-site audits from SSPC and furnish a copy of all audit reports.

Minimum requirements for the installation Contractor are as follows: Completed three or more jobs within the past two years applying the specified materials to concrete surfaces in which the total area exceeds 200,000 square feet. Submit documentation listing location of work, point of contact at job site, total square footage of applied materials, listing of both materials and equipment used, and validation from coating manufacturer documenting quality of materials purchased per job for work totaling 200,000 square feet within the past two years. In addition to the above requirements, to install the submitted coatings and sealant. Submit cope of certificates.

Replace with:

All Contractors that perform surface preparation or coating application must be certified prior to Contract award and must remain certified while accomplishing any surface preparation or coating application. The painting Contractors must remain so certified for the duration of the project. If a Contractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered. Notify the Contracting Officer of any change in Contractor certification status. Notify the Contracting Officer of all scheduled and unannounced on-site audits from SSPC and furnish a copy of all audit reports.

Minimum requirements for the installation Contractor are as follows: Completed three or more jobs within the past two years applying the specified materials to concrete surfaces in which the total area exceeds 200,000 square feet. Submit documentation listing location of work, point of contact at job site, total square footage of applied materials, listing of both materials and equipment used, and validation from coating manufacturer documenting quality of materials purchased per job for work totaling

200,000 square feet within the past two years. In addition to the above requirements, installation Contractor must be certified by the material manufacturer(s) to install the submitted coatings and sealant. Submit copy of certificates.

Remove the following Specification from the solicitation

Section 07 19 00

Section 07 42 13

Replace with the following Specification

Section 07 19 00

Section 07 42 13