This is an amendment (Amendment 0006) to a federal contract solicitation dated 03JUN2026 that modifies plan sheets and specification sections for a coating and surface preparation project.

The amendment removes and replaces ten specific plan sheets (A201, A401, A513, C202, C205, C206, C305, C405, C502, and C508) with updated versions. For Specification Section 09 67 23.16, Paragraph 1.3.5.5, the amendment modifies contractor certification requirements by removing references to specific SSPC certification types (SSPC QP 8 and SSPC QS 1) and replacing them with general certification requirements prior to contract award. The revised language clarifies that contractors performing surface preparation or coating application must maintain certification throughout project duration, with explicit language stating that requests for time extensions due to inactive certifications will not be considered. The amendment also adds a requirement that installation contractors must be certified by material manufacturers to install submitted coatings and sealants. Additionally, the amendment removes and replaces Specification Sections 07 19 00 and 07 42 13 with updated versions. The minimum qualifications for installation contractors remain unchanged, requiring completion of three or more jobs within the past two years on concrete surfaces exceeding 200,000 square feet total area, with supporting documentation of project locations, contacts, square footage, materials, equipment, and manufacturer validation of material quality.

View the file

Other files

File Type Posted
Electrical P683 Parking Structure.pdf PDF
26 12 19 Amendment 09 Rev 8.pdf PDF
Solicitation Amendment N6945026R00050009 SF 30.pdf PDF
FX001.pdf PDF
P683 Amendment 0008 Specs.pdf PDF
Solicitation Amendment N6945026R00050008 SF 30.pdf PDF
P683 Amendment 0008 Continuation Sheet.pdf PDF
Monitoring Well OU3E-MW4.pdf PDF
P683 Amendment 0008 Drawings.pdf PDF
P683 price_schedule.pdf PDF
P683 Amendment 0007 Specs.pdf PDF
P683 Amendment 0007 Drawings.pdf PDF
P683 Amendment 0007 Continuation Sheet.pdf PDF
Solicitation Amendment N6945026R00050007 SF 30.pdf PDF
AMEND 06 - CIVIL_638 Parking Structure.pdf PDF
Solicitation Amendment N6945026R00050006 SF 30.pdf PDF
P683 Amendment 0006 Drawings.pdf PDF
Solicitation Amendment N6945026R00050006 SF 30_PIEE CNFMN.pdf PDF
Amendment 0006 - ARCH Dwgs.pdf PDF
P683 Amendment 0006 Specs 07 42 13 23.pdf PDF
Section 07 19 00 - Water Repellents.pdf PDF
P683 Amendment 0006 Continuation Sheet.pdf PDF
07 42 13_Metal Wall Panels.pdf PDF
P683 Amendment 0005 Specs.pdf PDF
P683 Amendment 0005 Drawings.pdf PDF
AMEND 05 - CIVIL_638 Parking Structure.pdf PDF
Solicitation Amendment N6945026R00050005 SF 30.pdf PDF
P683 Amendment 0005 Continuation Sheet.pdf PDF
31 63 16.pdf PDF
AMENDMENT 0004 - ARCH sht A145.pdf PDF
P683 bid_schedule.docx DOCX document
07 19 00 - WATER REPELLENTS.pdf PDF
Solicitation Amendment N6945026R00050004 SF 30.pdf PDF
FDOT FY 2026-27 Ebook.pdf PDF
P683 Amendment 0003 Continuation Sheet.pdf PDF
P683 Amendment 0003 Specs.pdf PDF
Solicitation Amendment N6945026R00050003 SF 30.pdf PDF
649-030.pdf PDF
C003 OVERALL PROJECT MAP-REV.pdf PDF
649-031.pdf PDF
P683 Amendment 0003 Drawings.pdf PDF
41369201ET111_ET111.PDF PDF
M-111.pdf PDF
AMD posted in PIEE but failed SAM.pdf PDF
41369201S-101_S-101.PDF PDF
41369201-A110_A-110.PDF PDF
P-110.pdf PDF
41369201FA001_FA001.PDF PDF
41369201ET110_ET110.PDF PDF
41369201E-503_E-503.PDF PDF
Show 40 more

Latest 50 of 156 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03JUN2026

Amendment 0006 Attachments

Remove the following plan sheets from the solicitation

A201, A401, A513, C202, C205, C206, C305, C405, C502, and C508

Replace with the following plan sheets

A201, A401, A513, C202, C205, C206, C305, C405, C502, and C508

Specification Section 09 67 23.16, Paragraph 1.3.5.5

Remove:

All Contractors that perform surface preparation or coating application must be certified to SSPC QP 8 and should also be SSPC QS 1 certified prior to Contract award and must remain certified while accomplishing any surface preparation or coating application.

The painting Contractors must remain so certified for the duration of the project. If a Contractor’s certification expires, the firm will not be allowed to perform any work until the certification is reissued. Notify the Contracting Officer of any change in Contractor certification status. Notify the Contracting Officer of all schedule and unannounced on-site audits from SSPC and furnish a copy of all audit reports.

Minimum requirements for the installation Contractor are as follows: Completed three or more jobs within the past two years applying the specified materials to concrete surfaces in which the total area exceeds 200,000 square feet. Submit documentation listing location of work, point of contact at job site, total square footage of applied materials, listing of both materials and equipment used, and validation from coating manufacturer documenting quality of materials purchased per job for work totaling 200,000 square feet within the past two years. In addition to the above requirements, to install the submitted coatings and sealant. Submit cope of certificates.

Replace with:

All Contractors that perform surface preparation or coating application must be certified prior to Contract award and must remain certified while accomplishing any surface preparation or coating application. The painting Contractors must remain so certified for the duration of the project. If a Contractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered. Notify the Contracting Officer of any change in Contractor certification status. Notify the Contracting Officer of all scheduled and unannounced on-site audits from SSPC and furnish a copy of all audit reports.

Minimum requirements for the installation Contractor are as follows: Completed three or more jobs within the past two years applying the specified materials to concrete surfaces in which the total area exceeds 200,000 square feet. Submit documentation listing location of work, point of contact at job site, total square footage of applied materials, listing of both materials and equipment used, and validation from coating manufacturer documenting quality of materials purchased per job for work totaling

200,000 square feet within the past two years. In addition to the above requirements, installation Contractor must be certified by the material manufacturer(s) to install the submitted coatings and sealant. Submit copy of certificates.

Remove the following Specification from the solicitation

Section 07 19 00

Section 07 42 13

Replace with the following Specification

Section 07 19 00

Section 07 42 13