This is a Bid Schedule for the P683 Aircraft Engine Repair Facility construction project at Naval Air Station Jacksonville, Florida. The bid schedule outlines pricing line items for a Design-Bid-Build, Firm-Fixed-Price construction contract managed by the Department of the Navy Naval Facilities Engineering Command.

The base price (Line Item 001) covers the entire Aircraft Engine Repair Facility project and is subdivided into five components: the primary 300,000 gross-square-foot engine repair facility (001A), a 300,000 gross-square-foot parking structure (001B), sitework including temporary and permanent parking lots and utilities (001C), electrical distribution (001D), and specialized tasks including foundation piling at 23,595 vertical linear feet (001E-F), asbestos removal from pipe insulation (100 linear feet) and floor tile (5,000 cubic yards) (001G-H), contaminated soil removal and replacement (10,000 and 5,000 cubic yards respectively) (001I-J), demolition of two existing administration buildings and covered walkway (001K), and swing space with utilities (001L). Additional base bid items include pricing for Vertical Build Platforms/CFCI structures (Line Item 002) and main facility cranes (Line Item 003), both with non-MILCON funding. Two option items are included: Option Item No. 1 for Audio/Visual system equipment, testing, and training (government estimated price of $955,979 with NTE 5% Hawaiian-American Resident percent markup), and Option Item No. 2 for Furniture, Fixtures, and Equipment (government estimated price of $6,543,186 with NTE 5% HAR markup), both to be exercised within 365 days of contract Notice to Proceed. All contractors must provide unit and subtotal pricing for each line item as indicated.

View the file

Other files

File Type Posted
P683 Amendment 0007 Drawings.pdf PDF
P683 Amendment 0007 Specs.pdf PDF
P683 Amendment 0007 Continuation Sheet.pdf PDF
Solicitation Amendment N6945026R00050006 SF 30.pdf PDF
P683 Amendment 0006 Specs 07 42 13 23.pdf PDF
Solicitation Amendment N6945026R00050006 SF 30_PIEE CNFMN.pdf PDF
AMEND 05 - CIVIL_638 Parking Structure.pdf PDF
Solicitation Amendment N6945026R00050005 SF 30.pdf PDF
P683 Amendment 0003 Continuation Sheet.pdf PDF
P-402.pdf PDF
41369201FA001_FA001.PDF PDF
41369201FA111_FA111.PDF PDF
41369201ET111_ET111.PDF PDF
41369201ET110_ET110.PDF PDF
41369201E-001_E-001.PDF PDF
41369201E-605_E-605.PDF PDF
41369201LP110_LP111.PDF PDF
41369201LP110_LP110.PDF PDF
41369201-A601_A-601.PDF PDF
41369201-A112_A-112.PDF PDF
41369201-A130_A-130.PDF PDF
32 31 13.53 Amend 02.pdf PDF
41369201S-501_S-501.PDF PDF
P-601.pdf PDF
P-501.pdf PDF
M-111.pdf PDF
M-401.pdf PDF
41369201E-502_E-502.PDF PDF
41369201E-503_E-503.PDF PDF
41369201EL110_EL110.PDF PDF
41369201E-001_E-002.PDF PDF
Solicitation Amendment N6945026R00050001 SF 30.pdf PDF
AMD 0001 Attachment 1.pdf PDF
Attachment F - Small Business Subcontracting Plan (SBSP).docx DOCX document
EXHIBIT L - P683 Parking Garage_Final Drawings.pdf PDF
EXHIBIT F - P683 - Engine-Drawings-VOL1.pdf PDF
EXHIBIT C - G-003 - COVER SHEET VOLUME 2.pdf PDF
EXHIBIT D - G-006 - COVER SHEET VOLUME 3.pdf PDF
EXHIBIT A - Construction Schedule.pdf PDF
Attachment J - P683 Site Visit Map.pptx PPTX presentation
Attachment D- Historical Small Business Utilization.docx DOCX document
Solicitation - N6945026R0005.pdf PDF
EXHIBIT M - P683 Parking Garage_Final Specifications.pdf PDF
EXHIBIT K - P683 FacilityFinal Submission - Specs.pdf PDF
EXHIBIT I - P683 - Engine-Drawings-VOL4b.pdf PDF
EXHIBIT G - P683 - Engine-Drawings-VOL2c.pdf PDF
EXHIBIT G - P683 - Engine-Drawings-VOL2b.pdf PDF
EXHIBIT G - P683 - Engine-Drawings-VOL2a.pdf PDF
Attachment F - Small Business Subcontracting Plan (SBSP) Template(rev_1.17.24).docx DOCX document
Attachment C - Safety Data Sheet.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Item

Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
001
BASE PRICE: Total Price for the entire work for Aircraft Engine Repair Facility P683 in accordance with the drawings and specifications complete but excluding work provided in another Priced Line Item. Source funding is a MILCON.
1
EA
001A
Subtotal of Base Price for the entire work for the Aircraft Engine Repair Facility primary facility (CC21125) complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
001B
Subtotal of Base Price for the entire work for Parking Structure (CC85310) complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
001C
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for including a 1.34-acre temporary gravel parking

lot , 3.24-acre asphalt paved parking lot , utilities, storm drainage, walks, signalization, etc., complete in accordance with the [drawings and specifications, but excluding work described in another line item.

1
EA
001D
Subtotal of Base Price for the Electrical Distribution Line, complete in accordance with the drawings and specifications but excluding work described in another line Item.
1
EA
001E
Unit Price for providing Foundation Piling for the Parking Garage facility complete in accordance with the drawings and specifications but excluding work provided in another line item.
23,595
VLF
$______
$_______
001F
Unit Price for providing Pile Load Test for the Parking Garage facility, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
23,595
VLF
$______
$_______
001G
Unit Price for removal and disposal of asbestos containing pipe insulation (by pipe diameter ranges complete in accordance with the drawings and specifications but excluding work provided in another line item.
100
LF
$______
$_______
001H
Unit Price for removal and disposal of asbestos containing floor tile complete in accordance with the drawings and specifications but excluding work provided in another line item.
5,000
CY
$______
$_______
001I
Unit Price for removal and disposal of contaminated stockpiled soils complete in accordance with the drawings and specifications, but excluding work provided in another line item.
10,000
CY
$______
$_______
001J
Unit Price for provision and compaction of fill in place of removed contaminated soil, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
5,000
CY
$______
$_______
001K
Unit Price for Demolition of Buildings 6F and 6G and covered walkway, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1
EA
001L
Subtotal of Base Price for providing Swing Space and all utilities (including end of project disassembly and restoration of the site) complete in accordance with the drawings and the specifications but excluding work provided in another Priced line item
1
EA
002
Base Bid: Price for providing all work in connection with Vertical Build Platforms (CFCI) excluding utilities (cost for the structure and lifting elevators only), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. Source of funding is NON-MILCON
1
EA
003
Base Bid: Price for providing Main Facility cranes, excluding structure, complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
1
EA
004
Option Item No. 1: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications but excluding work provided in another Priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, and communication cabling connecting these devices together.

Include the price for supporting permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections. The source of funding is NON-MILCON. Option to be executed withing 365 days of contract Notice to Proceed in accordance with FAR 52.217-7 Government Estimated Price:

$955,979 HAR Percent (NTE 5%)

HAR Subtotal Total AV System Estimated Price

005
Option Item No. 2: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. The source of funding is NON-MILCON. Option to be executed withing 365 days of contract Notice to Proceed in accordance with FAR 52.217-7
Government Estimated Price:

$6,543,186 HAR Percent (NTE 5%)

HAR Subtotal Total FF&E Estimated Price