N6945024R0018 SECTION F.pdf
PDF 243 KB Posted
- Attached to
- Multi-Function Support Services (MFSS) for Naval Air Station (NAS) Jacksonville, Florida Federal contract opportunity
- Solicitation number
- N6945024R0018
About this file
This document is a Section F - Deliverables list for a solicitation for Multi-Function Support Services (MFSS) for Naval Air Station (NAS) Jacksonville, Florida. The solicitation includes the following services: Custodial, Pest Control, Integrated Solid Waste Management, and Grounds Maintenance and Landscaping.
The contract is anticipated to be a single award Facilities Support Indefinite-Quantity contract with a base period of one-year plus four one-year option periods. It will be competitively procured as an 8(a) set-aside. The solicitation requires offerors to submit technical, past performance, and price proposals for evaluation. Award will be made to the offeror that provides the best value to the Government. The NAICS code is 561210 with a $47.0M annual small business size standard. The solicitation includes a detailed list of over 70 required deliverables with specific submission dates and distribution requirements. Key deliverables include work schedules, quality management plans, safety and environmental compliance documentation, and reporting on various performance metrics.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration
N6945024R0018
NAS Jacksonville MFSS
0200000 – Management and Administration
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies (including original)
0200000/ 2.2.1.2
N/A Request to Work Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and COR 2 As required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes for Review and Comments
Within two working days
KO, COR and all attendees
2 As Required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes Final Revision
Within two working days
KO, COR and all attendees
2+ As Required
0200000/ 2.3.4
N/A Permits and Licenses
Before work commences and as requested by the KO.
KO and COR 2 As specified
0200000/ 2.3.5
N/A Certificate of Insurance
Within 15 calendar days prior to contract start.
KO and COR 2 As specified
0200000/ 2.3.5
N/A Written Notice of cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and COR 2 As required
0200000/ 2.5
N/A Samples, Safety Data Sheets (SDS), or Manufacturer’s Data Cut Sheets of Materials
As specified KO and COR 2 At Any Time
0200000/ 2.6.3
N/A Scheduling and Work Status Updates
Within two hours of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and COR 2 As Specified
N6945024R0018
NAS Jacksonville MFSS
0200000 – Management and Administration
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies
2.6.3
N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performed, and within two calendar days of changes.
KO and COR 2 Monthly
0200000/ 2.6.4
N/A Notification of any Difficulty in Scheduling Work
By the end of each workday
KO and COR 2 As required
0200000/ 2.6.5
N/A Status of Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and COR 2 As required
0200000/ 2.6.6
N/A Service Interruptions
At least five working days in advance
KO, COR,
Affected
Tenants and Customers
2 As required
0200000/ 2.6.7.3
N/A List of personnel requiring access to Government’s Maximo
Within 30 calendar days prior to contract start.
KO and COR 2 As specified
0200000/ 2.6.8.1
N/A Quality Management Plan
Within 15 calendar days prior to contract start.
KO and COR 2 As specified
0200000/ 2.6.8.1
N/A Revised Quality Management Plan
Within seven calendar days of changes.
KO and COR 2 As specified
0200000/ 2.6.8.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO and COR 2 As specified
0200000/ 2.6.8.3
N/A Contractor Quality Inspection and Surveillance Report
First workday of each month.
KO and COR 2 Monthly
N6945024R0018
NAS Jacksonville MFSS
0200000 – Management and Administration
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies
2.6.9
N/A Property Management Plan
Within 45 calendar days after award.
KO and COR 2 As specified
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and COR 2 As specified
0200000/ 2.7.1
N/A Organizational Chart
Within 15 calendar days prior to contract start
KO and COR 2 As specified
0200000/ 2.7.2.1
N/A Employee Certification and Training Records
Within 4 hours of request
KO and COR 2
0200000/ 2.7.2.6
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO and COR 2 As specified
0200000/ 2.7.2.6
N/A Proof of United States of America Citizenship
Prior to be admitted to site of work.
KO and COR 2 As specified
0200000/ 2.8.1
N/A Employee List Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and COR 2 As required
0200000/ 2.8.8
N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR, and Security Manager
3 As required
0200000/ 2.8.9
N/A List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR, and Security Manager
3 As required
0200000/ 2.9.2
N/A Accident Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
specified
N6945024R0018
NAS Jacksonville MFSS
0200000 – Management and Administration
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies
2.9.2/2.9.3
N/A Activity Hazard Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and COR 2 As specified
0200000/ 2.9.2/2.9.4
N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and COR 2 As specified
0200000/ 2.9.4.9
N/A Control of Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and COR 2 Annually
0200000/ 2.9.6
J-0200000-05 NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and COR 2 As required
0200000/ 2.9.6
J-0200000-05 Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO and COR 2 As required
0200000/ 2.9.6
J-0200000-05 Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO and COR 2 As required
0200000/ 2.9.8
N/A Monthly On-Site Labor Report
First workday of each month.
KO and COR 2 Monthly
0200000/ 2.9.9
N/A OSHA Citations and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and COR 2 As required
0200000/ 2.9.10
N/A Safety Inspection and Monitoring Report
Upon request. KO and COR 2 As required
0200000/ 2.9.11
N/A Safety Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and COR 2 As specified
0200000/ 2.10
N/A EMS Goals and Policy Measurement Information
Upon request. KO and COR 2 As required
0200000/ 2.10.1.1
N/A Water Conservation Plan
Within 15 calendar days after award and for changes.
N6945024R0018
NAS Jacksonville MFSS
0200000 – Management and Administration
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies
2.10.2
N/A Environmental Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and COR 2 As specified
0200000/ 2.10.2.1
N/A Sampling Plan Prior to Sampling KO and COR 2 As required
0200000/ 2.10.2.1
N/A Laboratory Analysis
Upon Request KO and COR 2 As specified
0200000/ 2.10.2.2
N/A Class I and II ODS Report
Within 24 hours following delivery of refrigerant to
DLA
KO and COR 2 As required
0200000/ 2.10.2.3
J-0200000-05 Solid Waste Management and Recycling Reports
First workday of each month.
KO and COR 2 Monthly
0200000/ 2.10.2.3
J-0200000-05 Summary Solid Waste Management and Recycling Report
By October 15th KO and COR 2 Annually
0200000/ 2.10.2.5
N/A Waste Stream Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and COR 2 As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
2 As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill notification
As soon as possible but not more 24 hours of discovery
KO and COR 2 As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and COR 2 As required
0200000/ 2.10.2.8
N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
N6945024R0018
NAS Jacksonville MFSS
0200000 – Management and Administration
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies
2.10.2.8
J-0200000-05 Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and COR 2 Annually
0200000/ 2.10.2.12
N/A Asbestos Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and COR 2 As specified
0200000/ 2.10.2.13
N/A Hazardous Air Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation
Environmental Division, City, State, and EPA
6 Semi-annually
0200000/ 2.10.2.13
N/A Hazardous Air Pollutants Monthly Data
First workday of each month.
KO, COR, and Installation
Environmental Division
3 Monthly
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and COR 2 Annually
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO and COR 2 Annually
0200000/ 2.10.3.2
N/A Recovered Material Certification
As specified KO and COR 2 When a product containing recovered materials is equal to or better than the original and could be used.
0200000/ 2.10.4
N/A
Used Oil Test Analysis
Within five calendar days after each contract period.
KO and COR 2 Annually
N6945024R0018
NAS Jacksonville MFSS
0200000 – Management and Administration
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies
2.10.4
N/A Used Oil Disposal and Recycling Summary
Within five calendar days after each contract period.
KO and COR 2 Annually
0200000/ 2.11
N/A Mission Essential Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and COR 2 As Required
0200000/ 2.11
N/A Mission Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and COR 2 As specified
0200000/ 2.13.1
N/A Recurring Work Proposals
Within five calendar days following receipt of request
KO and COR 2 As required
0200000/ 2.14.1.1
N/A Non-Recurring Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and COR 2 Monthly
0200000/ 2.14.2.1
N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO 2 As required
0200000/ 2.15
N/A Phase-In Plan Within 5 days after award or as requested by the
KO
KO and COR 2 As specified
0200000/ 2.15
N/A Phase-Out Plan Within 5 days after award or as requested by the
KO
Section F – 1503010 Custodial
N6945024R0018
NAS Jacksonville MFSS
1503010 - Custodial
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original/ Copies
Copies (including original)
1503010/ 2.2.1
N/A Pathogen Training Certificates
Within 15 calendar days after award and five calendar days of changes
KO and
COR
2 As required
1503010/ 3.1
N/A Annual Work Schedule
Within 15 calendar days prior to contract start
KO and
COR
2 Annually and five calendar days prior to implementing any changes to the schedule
1503010/ 3.1
N/A Monthly Work Plan
First work day of each month and five calendar days prior to implementing any changes to the schedule
KO and
COR
2 Monthly
1503010/ 3.1
N/A The Joint Commission Services Report
First work day of each month
KO and
COR
2 Monthly
1503010/ 3.2
N/A Custodial Service Order Report
First work day of each month
KO and
COR
2 Monthly
Section F – 1503020 Pest Control
N6945024R0018
NAS Jacksonville MFSS
1503020 - Pest Control
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number
Deliverable Title Date(s) of
Submission
Distribution Frequency
Original/ Copies
Copies (including original)
1503020/ 2.2.1
N/A Copy of State Certification for Contractor Personnel
15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO, COR,
and PMC
3 As required
1503020/ 2.3.1
N/A Copy of Local/State Business License
Prior to contract award. Copies of renewed licenses shall also be submitted.
KO and
PAR
2 1 per state
1503020/ 2.3.2
N/A Permits 5 days prior to the start of work requiring permits.
KO and
COR
2 As required
1503020/ 2.3.4
N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO and
COR
2 As required
1503020/ 2.3.5
J-1503020-
Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets
(SDS)
With the proposal.
Note: Any proposed changes in pesticide usage shall be submitted for approval at least 10 business days in advance of pesticide use.
KO, COR,
and PMC
3 1 for each pesticide per pest as required
1503020/ 2.3.7
N/A Pesticide Spill Report Within 30 minutes of occurrence
KO, COR,
Fire
Department, and PWD
Environmen tal
4 As Required
1503020/
Contractor's Work Plan
With the proposal and within seven calendar days of changes.
KO and
COR
2 1 per proposal
1503020/
N/A Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO and
COR
2 As required
1503020/ 3, 4
N/A Five-year Termite Treatment Warranties
10 days following the treatment.
KO and
COR
2 As required
1503020/ 3, 4
J-1503020-
Termite and Wood Decay Inspection (DD Form 1070) (per the appropriate Pest Group Sheet)
10 working days after inspection completed.
KO and
2 As required
N6945024R0018
NAS Jacksonville MFSS
1503020 - Pest Control
DELIVERABLES
Annex/ Spec Item
Form
Submission
Distribution Frequency
Original/ Copies
Copies (including original)
1503020/ 3, 4
N/A Adult Mosquito Catch (per the appropriate Pest Group Sheet)
The same day as collected in a labeled, resealable plastic bag.
Installation Preventive Medicine
Department, KO, and
COR
3 As required
1503020/ 3, 4
N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO and
COR
2 As required
1503020/ 3, 4
N/A Stored Product Pest Survey (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO and
COR
2 As required
1503020/ 3, 4
N/A Pharaoh Ant Treatment: Floor Plan Diagram (per the appropriate Pest Group Sheet)
2 calendar days prior to beginning the treatment.
KO and
COR
2 As required
1503020/ 3, 4
N/A Tick Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
Installation Preventive Medicine
Department, KO and
COR
3 As required
1503020/ 3, 4
N/A Mole Cricket Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO and
COR
2 As required
1503020/ 3.1
N/A Annual Work Schedule
Within 15 calendar days prior to contract start
KO and
COR
2 Annually and five calendar days prior to implementi ng any changes to the schedule 1503020/
3.1 N/A Monthly Work Plan First work day of
each month and five calendar days prior to implementing any changes to the schedule
KO and
N6945024R0018
NAS Jacksonville MFSS
1503020 - Pest Control
DELIVERABLES
Annex/ Spec Item
Form
Submission
Distribution Frequency
Original/ Copies
Copies (including original)
1503020/ 3.2
N/A Monthly Summary of Completed Pest Control Service Orders
First work day of each month
KO and
COR
2 Monthly
1503020/ 3.4
J-1503020-
Report of Pest Management Operations
Electronically once per month by the 15th of the following month (Example: July data must be submitted by August 15) in the format approved by PPMC.
NOPRS 1 Monthly
Section F – 1503030 Integrated Solid Waste Management
N6945024R0018
NAS Jacksonville MFSS
1503030 Integrated Solid Waste Management
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original/ Copies
Copies (including original)
1503030 / 2.3.1
N/A Weight Tickets As specified
KO and
COR
2 Monthly
1503030 / 2.3.2
N/A Permits and Licenses
Within 15 calendar days after contract award
KO and
COR
2 15 days after award/ Annually
1503030 / 3.1
N/A Solid Waste Collection Schedule
Within 15 calendar days after contract award
KO and
COR
2 15 days after award / Annually
1503030/ 3.1
N/A Changes to Solid Waste Collection Schedule
Within 5 working days of change.
KO and
COR
2 As Required
1503030/ 3.4
N/A Recommended Changes to the Size and Location of Solid Waste Containers
As Required
KO and
COR
2 As Required
1503030/ 3.7
N/A Used Tire Pick- Up and Disposal Report
Within 15 calendar days after each month
KO and
Section F – 1503050 Grounds Maintenance and Landscaping
N6945024R0018
NAS Jacksonville MFSS
1503050 - Grounds Maintenance and Landscaping
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies (including original)
2.2.1 N/A Certification, Training, and Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO and
COR
2 Annually and as required by Section H –
Special Contract Requirements, FAC 5252.237-
Substitutions of Key Personnel
(JUN 1994)
2.3.1.1 N/A Business
Licensing Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO and
COR
2 As required
2.3.1.4 N/A Planned
Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO, COR,
and
PPMC
3 Annually for each pesticide/herbici de, as required.
2.3.1.5 N/A Report of Pest
Management Operations
Electronically by the 15th of the following month (Example: July data must be submitted by
August 15) on the format approved by
PPMC.
NOPRS 1 Monthly
2.3.1.7 N/A Herbicide/
Pesticide Spill Report
Within 30 minutes of occurrence
KO, Fire Department, PWD
Environmen tal, KO and
COR
4 As required
2.3.2 N/A Permits Within 15
calendar days prior to start of work.
KO and
COR
2 As required
2.3.4 N/a Proposed
Equipment for Ammunition
Within 15 calendar days prior to start of
KO and
COR
2 Annually and as required
Section F – 1503050 Grounds Maintenance and Landscaping
N6945024R0018
NAS Jacksonville MFSS
1503050 - Grounds Maintenance and Landscaping
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution Frequency
Original
Copies (including original)
Storage Areas work.
2.3.9.1 N/A Water
Conservation Plan
Within 15 calendar days prior to contract start
KO and
COR
2 Annually and five calendar days prior to implementing changes to the schedule 3 N/A Weight Tickets With Invoice KO and
COR
2 As Specified
3 J-0200000-
Solid Waste Management Report
As specified KO and
COR
2 With each invoice
3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch
Prior to bringing on-board installation and prior to use
KO and
COR
2 As Required
3 N/A Contractor Work Schedules
Within 15 calendar days prior to contract start
KO and
COR
2 Annually and five calendar days prior to implementing any changes to the schedule
3.1.1.3 N/A Soil Analysis and
Proposed Fertilizer
Within 15 days after receipt of the test results by the Contractor
KO and
COR
2 As Required
3.1.1.3 N/A Top Dressing and
Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO and
COR
2 Annually and five calendar days prior to implementing changes to the schedule
3.4 N/A Preventive
Maintenance (PM) Program – Irrigation Equipment and Systems
Within 15 calendar days prior to contract start
KO and
COR
2 Annually and five calendar days prior to implementing changes to the program
3.5 N/A Grounds
Maintenance Service Order Summary of Completion Report
By the fifth day of each month
KO and