J-0200000-07 Work Order Information.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
Multi-Function Support Services (MFSS) for Naval Air Station (NAS) Jacksonville, Florida Federal contract opportunity
Solicitation number
N6945024R0018
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document appears to be an interface specification for the submission of work order information from a service provider to the NAVFAC MAXIMO system. It provides detailed field definitions and formatting requirements for a pipe-delimited data file, including fields such as work type, customer reference number, location, status, priority, labor and material costs, and target/scheduled start and completion dates.

The related federal contract opportunity is a solicitation for Multi-Function Support Services at Naval Air Station (NAS) Jacksonville, Florida, including custodial, pest control, solid waste management, and grounds maintenance services. The contract will be a single award Facilities Support Indefinite-Quantity contract, with a base period of one year and four one-year option periods. The procurement is a competitive 8(a) set-aside, with award to be made to the offeror providing the best value to the government based on technical, past performance, and price factors. A site visit is scheduled for April 30, 2024, and the Government Pre-Award Inquiry deadline is May 7, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Multi-Function Support Services (MFSS) for Naval Air Station (NAS) Jacksonville, Florida, newest first.
File Type Posted
JL-1 Labor Hours JAX MFSS PROPOSAL Amend 0007.xlsx XLSX spreadsheet
N6945024R0018 Amend 0007.pdf PDF
J-0200000-13 ELINs Amend 0006.xlsx XLSX spreadsheet
N6945024R0018 Amend 0006.pdf PDF
N6945024R0018 Amend 0005.pdf PDF
J-0200000-13 ELINs Amend 0005.xlsx XLSX spreadsheet
N6945024R0018 Amend 0004.pdf PDF
JL-2_N6945024R0018_GPI Responses Amend 0004.pdf PDF
N6945024R0018 SECTION C Amend 0004.pdf PDF
N6945024R0018 SECTION J Amend 0003.pdf PDF
N6945024R0018 SECTION F Amend 0003.pdf PDF
N6945024R0018 Amend 0003.pdf PDF
JL-1 Labor Hours JAX MFSS Revised Amend 0003.xlsx XLSX spreadsheet
J-0200000-13 ELINs Amend 0003.xlsx XLSX spreadsheet
JL-2_N6945024R0018_GPI Responses Amend 0003.pdf PDF
JL-1 Labor Hours JAX MFSS PROPOSAL.xlsx XLSX spreadsheet
JL-8 Jax MFSS KTR Site Visit Attendees.pdf PDF
JL-7 Jax MFSS Site Visit Brief.pdf PDF
N6945024R0018 Amend 0002.pdf PDF
JL-6 Jax MFSS Site Visit Itinerary.pdf PDF
N6945024R0018 Amend 0001.pdf PDF
JL-3_N6945024R0018_AMAG.xls XLS spreadsheet
J-1503010-09 Custodial Inventory.xlsx XLSX spreadsheet
N6945024R0018 SECTION F.pdf PDF
N6945024R0018 SECTION J.pdf PDF
JL-5 PWD JAX Building 27 Location Map.pdf PDF
JL-2_N6945024R0018_GPIF.xls XLS spreadsheet
J-1503010-08 Floor Plans.pdf PDF
J-1503020-15 Mosquito Traps Location Map.pdf PDF
JL-1 Labor Hours JAX MFSS.xlsx XLSX spreadsheet
J-1503010-10 TJC Reporting Requirements.xlsx XLSX spreadsheet
J-0200000-08 Asset Information.xlsx XLSX spreadsheet
J-0200000-02 N6945024R0018_WD 2015-4539 (Rev.-22).pdf PDF
N6945024R0018 SECTION C.pdf PDF
JL-4_N6945024R0018_SECNAV5512.pdf PDF
JM-2_N6945024R0018_PPQ.docx DOCX document
JM-1_N6945024R0018_Corporate_Experience.docx DOCX document
J-1503020-14 WHMP NAS Jacksonville.pdf PDF
J-1503010-07 NAS Jacksonville Base Map.pdf PDF
N6945024R0018.pdf PDF
J-0200000-12 NAS JAX SPCC Plan.pdf PDF
J-0200000-11 CNRSEINST 4101.1.pdf PDF
J-1503050-05 Grounds Maintenance Maps.pdf PDF
J-1503020-13 IPMP NAS Jacksonville.pdf PDF
J-0200000-13 ELINs.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-Service Provider Info

ATTACHMENT J-0200000-07

WORK ORDER INFORMATION

Interface: Service Provider
VERSION #:v3
Current as of:3 December 2015
Version History
v1 - Updated to reflect current interface in MAXIMO
v2 - Update to reflect addition of Utility Outage Reporting information & Support GL Account Import
v3 - Update to reflect addition of additional remarks field.[In sync with NITC R2 Interface Document]
TABS
1-Service Provider InfoThis Sheet
2-Service Provider Field ListService Provider Template Data Format Information
3-Service Provider - TemplateSample Excel Format

2-Service Provider Field List

ATTACHMENT J-0200000-07

WORK ORDER INFORMATION

Interface: Service Provider
VERSION #: v3
Current as of: 3 December 2015
Service Provider (BOSC1) is a pipe delimited file.
PositionNameRequiredLength
LimitData Format NoteField DefinitionContent Notes
<<Note to Spec Writer: Only the "Content Notes" field should be modified on this TAB, Delete this text box prior to publising, no other changes to this document should be made.>>NAVFAC

MAXIMO_FIELD

(WORKORDER.)

1Approved DateN10MM/DD/YYYY hh:mm:ssThe Date on which the Work Order was last approved. If the file contains an Approved Date, then this date will be pulled over to the record.
If the Approved Date in the file is null, then the Reported Date plus one minute will be displayed in the record.APPROVEDDATE
2Work TypeY15

Must match Value List in Maximo.

(Cross-walked field.). Must match CrosswalkIdentifies the work order's type.
Example types are: preventive maintenance, corrective maintenance, emergency maintenance, capital project, and event report.Value list in REFERENCE SPREADSHEET -or-

For this contract the following are valid work types:

CLIN XXXXXX use "XXXX"WORKTYPE
3Customer Reference NumberY10Contractors internal work order tracking number. Will update Record if Value is found in Maximo otherwise new record (Work order) will be created.SERVPRVREFCODE
4DescriptionY150Describes the work order.
If the Description is null, in the inbound file, then this field is defaulted to CROSSWALK value.DESCRIPTION
5LocationY30Must match Value List in MaximoIdentifies the work order's location. This is not necessarily the asset's location, however, if an asset is entered, its location will default here.
- If the Location is null, in the inbound file, then this field is defaulted to the site's base location.Value list in REFERENCE SPREADSHEETLOCATION
6Reported ByN62Must match Value List in MaximoIdentifies the person reporting the work order.Value list in REFERENCE SPREADSHEET -or-

For this contract:

- use the following identifier "XXXX"REPORTEDBY
7Master SystemNN/ANot usedN/A
8StatusY16(Cross-walked field.)
Must match CrosswalkStatus of the work order, for example, in progress, waiting on material, waiting for approval, completed, or closed.Value list in REFERENCE SPREADSHEET -or-

For this contract:

- use the following identifier "XXXX"STATUS
9Status DateY10MM/DD/YYYY hh:mm:ssSTATUSDATE
10PriorityY12(Cross-walked field.)
Must match CrosswalkIdentifies the importance of the work order, from 0-999, where 0 is the lowest priority and 999 is the highest. If the Priority is null, in the inbound file, then this field is defaulted.Value list in REFERENCE SPREADSHEETWOPRIORITY
11Actual StartN10MM/DD/YYYY hh:mm:ssACTSTART
12Actual FinishN10MM/DD/YYYY hh:mm:ssACTFINISH
13SupervisorN30Must match Value List in MaximoValue list in REFERENCE SPREADSHEET -or-

For this contract:

- use the following identifier "XXXX"SUPERVISOR
14Labor Hours(Actual)Y8Number (2 decimal places)ACTLABHRS

15 Labor Cost(Actual) Y 10 Number (2 decimal places) ACTLABCOST

16 Material Cost(Actual) Y 10 Number (2 decimal places) ACTMATCOST

17DurationN8Number (2 decimal places)Estimated remaining number of hours needed to complete the work.ESTDUR
18AssetN25Must match an existing ASSETNUM in MaximoThe asset number used must exist in NAVFAC MAXIMO prior to submission, or the record will be rejected.Value list in REFERENCE SPREADSHEET
ASSETNUM
19Target FinishN10MM/DD/YYYY hh:mm:ssFor contractor scheduled work Target Finish is calculated using the Frequency of Service in J-0200000-xx.

For IMP system breakdowns the Target Finish is 2 days from the date the work was reported to the Contractor

For E/U/R the Target Finish date is calculated from the date the work was reported to the Contractor.TARGCOMPDATE
20Target StartN10MM/DD/YYYY hh:mm:ssFor contractor scheduled work Target Start is calculated using the Frequency of Service in J-0200000-xx.

For IMP system breakdowns the Target Start is the date the work was reported to the Contractor

For E/U/R the Target Start date is calculated from the date the work was reported to the Contractor.TARGSTARTDATE
21Reported DateY10MM/DD/YYYY hh:mm:ssREPORTDATE
22LeadN30Must match Value List in MaximoLead person responsible for the work.Value list in REFERENCE SPREADSHEETLEAD
23Scheduled StartN10MM/DD/YYYY hh:mm:ssScheduled start should be between the target start and target completion dateSCHEDSTART
24Scheduled FinishN10MM/DD/YYYY hh:mm:ssScheduled finish should be between the target start and target completion dateSCHEDFINISH
25Modified DateY10LEAVE BLANKLeave blank/Do Not UseLeave blank/Do Not UseCHANGEDATE
26Modified ByY30LEAVE BLANKLeave blank/Do Not UseLeave blank/Do Not UseCHANGEBY
27N/AN4MM/DD/YYYY hh:mm:ssN a should be between the target start and target completion datePlaceholder for WORKORDER.PMNEXTDUEDATE. Value is not presently imported.PMNEXTDUEDATE
28N/AN1Yes or NoISTASK
29N/AN10Length Limit: 250Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.PARENT
30Work OrderN10Must match Value List in MaximoUsed in updating record status on existing records.WONUM
31Detail LocationN250Detail location should be between the target start and target completion dateDETAILLOC
32CLINN30Contract Line Item NumberCLIN
33Customer Ref CodeN8Must match Value List in MaximoCustomer code should be between the target start and target completion dateValue list in REFERENCE SPREADSHEETCUSTOMERCODE
34Sub Work TypeN15(Cross-walked field).
Must match CrosswalkDefaulted field based on the value of worktypeSUBWORKTYPE
35Work CenterN8Must match Value List in MaximoWork center should be between the target start and target completion dateValue list in REFERENCE SPREADSHEET -or-

For this contract:

- use the following identifier "XXXX"PERSONGROUP
36GL AccountY27Must be a complete GL account or will imported as NULLOnly full GL Account, including delimiters, values can be imported.Format is “X.XXXXXXXX.XX.XXXXXXXXXXXX” (Example: T.N4425500.ZZ.ZZZZBOSCACCT). Only full GL Account, including delimiters, values can be imported.GLACCOUNT
37Outage TypeN50ALNType of utility outageThe “Outage Type” value must be a valid value available in the “OUTTYPE” domain.OUTAGETYPE
38Outage CauseN50ALNCause of utility outageThe “Outage Cause” value must be a valid value available in the “OUTCAUSE” domain.OUTAGEREASON
39Num of Bldgs AffectedN12IntegerNumber of Building affected (whole number)NUMBLDSAFFECTED
40Outage Start DateN10MM/DD/YYYY hh:mm:ssOutage Start (Date/Time)OUTAGESTARTDATE
41Outage End DateN10MM/DD/YYYY hh:mm:ssOutage End (Date/Time)OUTAGEENDDATE
42RemarksN150ALNAdditional remarks. At each submission the remarks are appended to the END of previous remarks. /// Use and Style is a CONTRACT SPECIFIC USE ///Each remark submission is restricted to 150 characters, and the DATE will be appended in Maximo prior saving. This can be used (local/contract specific guidance) to provide a chronology to the work order. Resulting format would be: DATE1 - Remark1; DATE2 - Remark2; etc.

The total field length is restricted to <2000 characters - or a maximum of 11-12 remarks on a single Work Order.

The following information shall be provided if it is relevant:

1. Name and phone number of all Government personnel with whom the work was coordinated or provided clarificaiton to the technician, and date KO was notified of any problems scheduling the work or accessing the location.

2. A narrative of work performed and technicians observations.

3. The estimated cost and date notification of work exceeding LOL was submitted to the KO. LONGDESCRIPTION

3-Service Provider-Template

ATTACHMENT J-0200000-07
WORK ORDER INFORMATIONATTACHMENT J-0200000-XX

SERVICE PROVIDER INFORMATION

Interface: Service Provider
VERSION #: v3
Current as of: 3 December 2015
Position123456789101112131415161718192021222324252627282930313233343536373839404142
NameApproved DateWork TypeCustomer Reference NumberDescriptionLocationReported ByMaster SystemStatusStatus DatePriorityActual StartActual FinishSupervisorLabor Hours
(Actual)Labor Cost
(Actual)Material Cost
(Actual)DurationAssetTarget FinishTarget StartReported DateLeadScheduled StartScheduled FinishModified DateModified ByPMNEXTDUEDATEIs Task?Parent WOWork OrderDetail LocationCLINCustomer Ref CodeSub Work TypeWork CenterGL AccountOutage TypeOutage CauseNum of Bldgs AffectedOutage Start DateOutage End DateRemarks
Validation toolYYYYY
will default when upload*Use PM for scheduled maint and PROJECT for IMP repairs*Will delete if left blankwill create a default entry if left blank on update

"Entered by SP FlatFile BOSC interface. No description provided."

Include contractor job plan number in the description * Location is not required if you have an asset # will default when upload will pull from asset will default on upload format #.## will not show in front end of MAXIMO but does show in TABLEAU use 0.00 for fixed price work will not show in front end of MAXIMO but does show in TABLEAU format #.##

will not show in front end of MAXIMO but does show in TABLEAUmust be included with all records or will reject at validaton.will default when upload*req if status inprog or approv* req if status inprog or approvwill default when uploadwill default when uploadUse Nif bogus work order is provided, the record will pass validation and error during upload.*use FACILITY or UTILITY for planned maintenance and FPCT for repairs under the LOLwill assign to CHR_CTR if blank*work notes
REQUIRED TO CREATE WONY*YYY*NNYNNNNNNNNNYYYNNNNNNNNNNNYNY*YYNNNNNN*
REQUIRED TO UPDATE WONNY*YNNNNNNNNNNNNNYNNNNY*Y*NNNNNNNNNNYNNNNNNN*
REQUIRED TO COMP WONNY*YNNNYNNYYNY*Y*Y*NYNNNNNNNNNNNNNNNNYNNNNNNY*

NOTES:

• ONLY POSITION/COLUMN 1-42, and rows containing data should be be included in the FLAT-FILE SUBMISSION;

• Pipe Delimited (.txt) - | (Pipe is at the end of the column. Must have 42 PIPEs per row.)

• If the column to the right of the last column is selected (the "43rd" column) this will provide the 42nd PIPE

File details come from the government source that posted it. Updated .