N6945023R0075_SectionF_0006.pdf
PDF 2 MB Posted
- Attached to
- Multi-Function Support Services (MFSS) at Naval Submarine Base (NSB) Kings Bay, Georgia Federal contract opportunity
- Solicitation number
- N6945023R0075
About this file
This document outlines the deliverables required under a multi-function support services contract to provide custodial, pest control, waste management, grounds maintenance, and pavement services at Naval Submarine Base Kings Bay in Georgia. Key deliverables include quality management, safety, and environmental plans due before start of work; recurring monthly reports for service calls, work schedules and quantities; and notices for issues like accidents, spills or citations. The contractor must submit certifications, licenses, permits and schedules for pesticides and herbicides in advance of use. Waste management requires revenue and tonnage reports, while grounds maintenance includes soil analyses and landscape schedules. The contract term is for one year with four option years and has a place of performance in Kings Bay, Georgia and associated outlying areas.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multi-Function Support Services Contract
“FOR OFFICIAL USE ONLY”
Kings Bay MFSS N69450-23-R-0075
Section F - 0200000
DELIVERIES OR PERFORMANCE
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes for Review and Comments
Within two working days
KO, COR
and all attendees
1 As Required
2.3.1 N/A Sign-in Sheets and
Minutes Final Revision
Within two working days
KO, COR
and all attendees
1 As Required
2.3.3 N/A Phase-In Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As Required
2.3.3 N/A Phase-Out Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.5.1 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.6.1 N/A Plans of Action
and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command Security Manager
1 As required
Amendment 0006 Page 1 of 17
Kings Bay MFSS N69450-23-R-0075
Section F - 0200000
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command Security Manager
1 As required
2.6.4 N/A Scheduling and
Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As Specified
2.6.5 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
2.6.5 N/A Notification of any
Difficulty in Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
Amendment 0006 Page 2 of 17
Kings Bay MFSS N69450-23-R-0075
Section F - 0200000
DELIVERABLES
Spec Item
Form
Attachment Number
Deliverable Title
Date (s) of Submission
Distribution
Frequency
Original
Copies (including original)
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.8.1 N/A Asset and
Specification Data
When an asset is repaired, replaced, installed, or otherwise affected
KO or a representat ive designated by the KO
1 As required
2.6.8.3 J-0200000-09 List of personnel
requiring access to Government’s Maximo
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.9.3 N/A Contractor Quality
Inspection and Surveillance Report
First work day of each month.
KO and
COR
1 Monthly
2.6.10 N/A Property
Management Plan
Within 45 calendar days after contract startaward.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
Amendment 0006 Page 3 of 17
(including original)
2.7.2.6 N/A Proof of United
States of America Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As required
2.8.8 N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
and
Security Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.7 N/A Control of
Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
Amendment 0006 Page 4 of 17
(including original)
2.9.6 J-0200000-06 NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-06 Weight Handling
Equipment Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-06 Crane and Rigging
Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.10 N/A Safety Inspection
and Monitoring Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy Measurement Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water
Conservation Plan
Within 15 calendar days after contract start award and for changes.
KO and
COR
1 As specified
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 J-0200000-06 Solid Waste
Management and Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
2.10.2.1 J-0200000-06 Summary Solid
Waste Management and Recycling Report
By October 10th KO and
COR
1 Annually
Amendment 0006 Page 5 of 17
(including original)
2.10.2.3 N/A Waste Stream
Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
1 As required
2.10.2.5 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.5 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
1 As required
2.10.2.6 N/A Emergency
Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.6 J-0200000-06 Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.10 N/A Asbestos
Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
1 As
Amendment 0006 Page 6 of 17
(including original)
2.10.2.11 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation Environme ntal Division, City, State, and EPA
1 Semi-annually
2.10.2.11 N/A Hazardous Air
Pollutants Monthly Data
First workday of each month.
KO, COR,
Installation Environme ntal Division
1 Monthly
2.10.3 N/A Sustainable
Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
2.10.3.1 N/A Sustainable
Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
2.10.3.2 N/A Recovered
Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Mission Essential
Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
2.11 N/A Mission
Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As
Amendment 0006 Page 7 of 17
(including original)
2.12.1 Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.12.2 N/A Notification to the
Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
1 As required
2.14.1.1 N/A Non-Recurring
Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
2.14.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
Amendment 0006 Page 8 of 17
Multi-Function Supports Services Contract
Section F-1503010
DELIVERIES OR PERFORMANCE
Annex/
/ Copies
Number of Copies
(including original)
1503010/ 2.2.1
N/A Pathogen Training Certificates
Upon request KO 1 Upon request
1503010/ 3.1
N/A Annual Work Schedule
1 each year KO 1 Within 15 days after award and annually thereafter
1503010/ 3.1
N/A Monthly Work Plan First work day of each month
KO 2 Monthly
1503010/ 3.2
N/A Monthly Service Call Services Report
First work day of each month
KO 2 Monthly
1503010/ 3.2
N/A Non-recurring services exceeding Contractor’s limit
As required KO As specified
Upon identification
Amendment 0006 Page 9 of 17
Multi-Function Services Support Contract
Section F 1503020
Number of
Form Copies
Annex/ Attachment Date(s) of Original/ (including
Spec Item Number Deliverable Title Submission Copies original) Frequency 1503020/ N/A Copy of State 15 calendar days KOCOR 2 As required
2.2.1 Certification for prior to start of work.
Contractor Copies of renewed
Personnel certifications shall also be submitted.
1503020/ N/A Copy of Prior to contract KO COR 2 1 per state
2.3.1 Local/State award. Copies of
Business License renewed licenses shall also be submitted.
1503020/ N/A Permits 5 days prior to the KOCOR 2 As required
2.3.2 start of work requiring permits.
1503020/ N/A Ultra-Low 15 days prior to the KOCOR 2 As required
2.3.4 Volume (ULV) start of work and
Equipment thereafter every 50
Calibration and hours of ULV
Droplet Analysis equipment use.
Report
1503020/ J-1503020-02 Planned Pesticide With the Contractor’s KO COR 3 1 for each
2.3.5 Use Sheets Work Plan. pesticide
including Note: Any proposed per pest as Pesticide Labels changes in pesticide required and Safety Data usage shall be
Sheets (SDS) submitted for KO approval at least 5 business days in advance of pesticide use.
1503020/ J-1503020-05 Contractor's Work Within 15 days after KOCOR 2 1 per 3 Plan Contract start award. proposal 1503020/ N/A Report of 1 working day after KO COR 2 As required 3 Conditions citing conditions.
Conducive to Pest
Infestation
1503020/ N/A Five-year Termite 10 days following the KO COR 2 As required 3, 4 Treatment treatment.
Warranties
Amendment 0006 Page 10 of 17
Number of
Form Copies
Annex/ Attachment Date(s) of Original/ (including
Spec Item Number Deliverable Title Submission Copies original) Frequency 1503020/ J-1503020-09 Termite and 10 working days after KO, COR 2 As required 3.1.3, 4 Wood Decay inspection completed.
Inspection (DD
Form 1070) (per the appropriate
Pest Group Sheet)
1503020/ J-1503020-08 Adult Mosquito The same day as Installation 2 As required 3.1.2, 4 Catch (per the collected in a labeled, Preventive appropriate Pest re-sealable plastic Medicine
Group Sheet) bag. Department
1503020/ J-1503020-08 Larval Mosquito Within 1 day of the KO, COR 2 As required 3.1.2, 4 Survey Report survey.
(per the appropriate Pest
Group Sheet)
1503020/ J-1503020-07 Stored Product Within 1 day of the KO, COR 2 As required 3.1.1, 4 Pest Survey (per survey.
the appropriate
Pest Group Sheet)
1503020/ J-1503020-07 Pharaoh Ant 2 calendar days prior KO, COR 2 As required 3.1.2, 4 Treatment: Floor to beginning the
Plan Diagram (per treatment.
the appropriate
Pest Group Sheet)
1503020/ J-1503020-08 Tick Survey Within 1 day of the KO, COR 2 As required 3.1.2, 4 Report (per the survey.
appropriate Pest
Group Sheet)
1503020/ J-1503020-10 Mole Cricket Within 1 day of the KO, COR 2 As required 3.1.4, 4 Survey Report survey.
(per the appropriate Pest
Group Sheet)
1503020/ J-1503020-08 Aerial Spray 24 hours prior to KO, COR 2 As required 3.1.2, 4 Operations - FAA performing aerial
Approval (per the operations.
appropriate Pest
Group Sheet)
1503020/ J-1503020-14 Report of Pest Electronically within KO, COR 2 As required 3, 4 Management 1 day of pest
Record management operation.
Amendment 0006 Page 11 of 17
Date(s) of
Original/
Number of Copies
(including original)
1503020/
3.2 N/A Report of Pest
Control Service Calls
Electronically once per month by the 15th of the following month (Example:
July data must be submitted by August 15).
KO, COR 2 Monthly
1503020/ 3, 4
N/A Report of Pest Management Operations
Electronically once per month by the 15th of the following month (Example:
July data must be submitted by August 15).
KO COR 2 Monthly
Amendment 0006 Page 12 of 17
Section F 1503030
Original/
Number of Copies
(including original)
1503030 / 2.3.1
N/A Revenue Receipts As specified KO 12 With invoice/Monthly
1503030 / 2.3.2
N/A Weight Tickets As specified KO 12 With invoice/Monthly
1503030 / 2.3.2
N/A Monthly Tonnage As specified KO 12 With invoice/Monthly
1503030 / 2.3.3
N/A Disposal Permits As specified KO 1 15 days after award
1503030 / 2.3.3
N/A Permit-by-Rule Letter from Georgia Dept. of Natural Resources
As specified KO 1 15 days after award
1503030 / 3.1
N/A Solid Waste Collection Schedule
As specified KO 1 15 days after award/Annually
1503030 / 3.2.2
N/A Revenue Sharing Receipts Report
As specified KO 12 With invoice/Monthly
1503030 / 3.4
N/A Recommended Changes to Size and Location
As specified KO As specified As specified
1503030 / 3.4.2
N/A Recycling Plan Within 15 calendar days after award and within 7 calendar of changes
KO 1 As specified
1503030 / 3.4.2
J-1503030-
Recycling Report Form
As specified KO 12 With invoice/Monthly
1503030 / 3.6
N/A Inert Landfill operations
As specified KO 1 Within 15 calendar days after award and within 7 calendar of changes
1503030 / 3.6
N/A Landfill Operations Report
As specified KO 12 With invoice/Monthly
1503030 / 3.7
N/A Monthly ISWM Service Calls
As specified KO 12 With invoice/Monthly
Amendment 0006 Page 13 of 17
Section F 1503050
Deliverable Title
/Copies
Number of Copies
(including original)
2.2.1 N/A Certification, Training, and Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO/COR 2 Annually and as required by Section H – Special Contract Requirements, FAC 5252.237-
Substitutions of Key Personnel
(JUN 1994)
2.3.1.1 N/A Business
Licensing
Within 15calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO/COR 2 As required
2.3.1.4 N/A Planned
Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO,
COR,
PPMC
3 Annually for each pesticide/herbic ide, as required.
2.3.1.5 N/A Pest
Management Operations Report
Electronically by the 15th of the following month (Example: July data must be submitted by August 15) on the format approved by
PMC.
KO,
COR,
PPMC
2 Monthly
2.3.2 N/A Permits Within 15 calendar KO/COR 2 As required
Amendment 0006 Page 14 of 17
Number of Copies
(including original) days prior to start of work.
2.3.9.1 N/A Water
Conservation Plan
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3 N/A Weight Tickets
With Invoice KO/COR 2 As Specified
3 J-1503050-
Recycling Reporting Form
As specified KO/COR 2 With each invoice
3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch
Prior to bringing on-board installation and prior to use
KO/COR 2 As Required
3 N/A Contractor Work Schedules
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
3.1.1.3 N/A Soil Analysis Within 15 days
after receipt of the test results by the Contractor
KO/COR 2 As Required
3.1.1.3 N/A Top Dressing
and Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3.2.6 Assessment
Report of
By the fifth day of each month
KO/COR 2 Quarterly
Amendment 0006 Page 15 of 17
Number of Copies
(including original) completed Recurring and Non-Recurring Work
3.2.8 N/A Equipment for
Dredge Spoil Berms
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO/COR 2 As Required
3.2.8 N/A Crab Island
Response and Evacuation Plan
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO/COR 2 As required
3.3 N/A Grounds
Maintenance Service Order Summary of Completion Report
By the fifth day of each month
KO/COR 2 Monthly
Amendment 0006 Page 16 of 17
Section F 1503060
Number of Copies (including original)
1503060 / 3.1.1
N/A Pavement Sweeping Schedule
15 working days after award, 15 working days after the start of each option year, and 7 days before any changes
KO,
COR
2 Annually
Amendment 0006 Page 17 of 17
File details come from the government source that posted it. Updated .