About this file

This document contains mechanical schedules and specifications for a federal construction project. The project involves demolishing existing buildings and constructing a new 20,000 square foot Flight Simulator Facility and 33,729 square foot Squadron Operations/Aircraft Maintenance Unit Facility at NAS Fort Worth JRB in Texas. Mechanical systems for the new buildings include chilled water and hot water pumps, air handling units with cooling coils, air cooled chillers, hot water boilers, tanks, and other supporting equipment. The schedules provide details on the sizes, capacities, and technical requirements for this mechanical equipment.

The related federal contract opportunity is solicitation number N69450-21-R0022 issued by the Naval Facilities Engineering Command seeking design-bid-build construction services for the Flight Simulator Facility and Squadron Operations Facility project at NAS Fort Worth JRB. Proposals are due on an unspecified date. Construction is to include site demolition, utilities installation, and building of the two new facilities. The Simulator Facility will house four full mission simulators, while the Squadron Operations Facility will provide spaces for aircraft maintenance and squadron operations.

View the file

Other files

File Type Posted
Amendment 0004 05 12 00.pdf PDF
Volume IIA_Amendment 004.pdf PDF
N6945021R0022 0004.pdf PDF
Volume I_Amendment 004.pdf PDF
Amendment 0004 23 05 48.00 40.pdf PDF
Volume III_Amendment 004.pdf PDF
POV_Parking_Lots.pdf PDF
Amendment 0004 08 15 00.pdf PDF
N6945021R0022_0003.pdf PDF
Attachment_k_N6945021R0022 Site Visit Roster.pdf PDF
N6945021R0022-0002.pdf PDF
Attachment_A_SECNAV_5512.pdf PDF
N6945021R0022 0001.pdf PDF
N6945021R0022 RFP.pdf PDF
Attachment_J_COVID-19 Screening Questionnaire.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume I of III.pdf PDF
F35 Squad Ops and Flt Sim Plans Volume IIA Squad Ops Bldg.pdf PDF
ACM and LBP Survey Report NASJRB Buildings 1604 1606 1608 1626 and 1632.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume III of III.pdf PDF
Attachment_H_Small_Business_Subcontracting_Plan.doc DOC document
F35 Squad Ops and Flt Sim Plans Volume IIB Squad Ops Bldg.pdf PDF
Attachment_D_HISTORICAL_SMALL_BUSINESS_UTILIZATION.docx DOCX document
Attachment_F_CONSTRUCTION_EXPERIENCE_PROJECT_DATA_SHEET.docx DOCX document
Attachment_I_NAS_FORT_WORTH_JRB_DARF_BLANK.pdf PDF
Attachment_E_SB_PARTICIPATION_COMMITMENT_DOCUMENT.docx DOCX document
Attachment_C_NAVFAC PPQ.docx DOCX document
F35 Squad Ops and Flt Sim Plans Volume I Site Work.pdf PDF
Attachment_B_ProjNet_How _to_Guide.pdf PDF
Attachment_G_Safety_Data_Sheet.docx DOCX document
F35 Squad Ops and Flt Sim Geotechnical Report.pdf PDF
F35 Squad Ops and Flt Sim Volume III Flt Sim Bldg.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume II of III.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \O n e

D ri v e

B u rn s

M c D o n n e ll\ D o c u m e n ts \B

L D

G P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d .c o m

.r v t

/1

/2

:3

:5

A

M

M-601

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

M E

C H

A N

IC

A

L S

C H

E D

U

LE

S

S H

E E

T

DAG

15154441

15154441

LJD CGM

05/07/2020

JM / SR

1651220

HVAC PUMP SCHEDULE (CHWP & HWP)

TAG TYPE SERVICE FLUID TYPE CAPACITY (GPM)

TOTAL HEAD

( FT W.G.)

SUCTION SIZE

(IN.)

DISCHARGE SIZE

(IN.)

PUMP EFFICIENCY

MOTOR SPEED CONTROL

TYPE

ELECTRICAL

NOTES

RPM HP BHP TYPE VOLTS PHASE

CHWP-101 VERTICAL INLINE CHILLED WATER WATER 154 94 2 2 78.3 3450 5 4.7 ODP VFD 480 3 1

CHWP-102 VERTICAL INLINE CHILLED WATER WATER 154 94 2 2 78.3 3450 5 4.7 ODP VFD 480 3 1

HWP-101 VERTICAL INLINE HEATING HOT WATER WATER 17 7 2 2 37.5 1800 0.33 0.1 ODP CONSTANT 120 1 1

HWP-102 VERTICAL INLINE HEATING HOT WATER WATER 17 7 2 2 37.5 1800 0.33 0.1 ODP CONSTANT 120 1 1

HWP-103 VERTICAL INLINE HEATING HOT WATER WATER 34 24 1.25 1.25 63.9 1800 0.5 0.3 ODP VFD 480 3 1

HWP-104 VERTICAL INLINE HEATING HOT WATER WATER 34 24 1.25 1.25 63.9 1800 0.5 0.3 ODP VFD 480 3 1

AIR COOLED CHILLER SCHEDULE (CH)

TAG

ALTITUDE

(FT) REF. TYPE

COMPRESSOR COOLING CAPACITY

(TONS)

FULL LOAD EER

(AT AHRI)

PART LOAD IPLV

(AT AHRI) FLUID TYPE

FLOW

(GPM)

EWT

(°F)

LWT

(°F)

WATER PD

(FT W.C.) FOULING FACTOR

DESIGN AMBIENT

(°F) VOLTS PHASE

FREQUENCY

(HZ) MCA

WEIGHT

(LBS) NOTESQTY TYPE

CH-101 650 R-134A OR R-410A 4 SCROLL 40 10.58 14.48 WATER 77 42 54 12.1 0.0001 105 480 3 60 95 3845 1, 2, 3

CH-102 650 R-134A OR R-410A 4 SCROLL 40 10.58 14.48 WATER 77 42 54 12.1 0.0001 105 480 3 60 95 3845 1, 2, 3

AIR HANDLING UNIT SCHEDULE 2/2

TAG

COOLING COIL PRE-FILTER FILTER

NOTESTYPE

CAPACITY AIRSIDE WATERSIDE

TYPE THICKNESS MERV

CLEAN

PRESSURE DROP

(IN-WG) TYPE THICKNESS MERV

CLEAN PRESSURE

DROP (IN-WG)

DIRTY PRESSURE

DROP (IN-WG)TOTAL (MBH) SENSIBLE (MBH)

DESIGN FLOW

(CFM) EAT DB (°F) EAT WB (°F) LAT DB (°F) LAT WB (°F)

MAX FACE VELOCITY

(FPM)

CHW FLOW

(GPM) EWT (°F) LWT (°F) WPD (FT WG) MIN ROWS MAX FPI

AHU-101 CHILLED WATER 362.4 259.0 7100 86.3 68.5 53.0 52.2 500 60 42 54 4.51 6 12 PLEATED 2" 8 0.2 CARTRIDGE 4" 13 0.3 1.0 1, 2, 3, 4

AHU-201 CHILLED WATER 410.2 293.6 8665 83.9 67.5 53.0 52.2 500 68 42 54 6.63 6 12 PLEATED 2" 8 0.2 CARTRIDGE 4" 13 0.3 1.0 1, 2, 3, 4

AIR HANDLING UNIT SCHEDULE 1/2

TAG

LOCATION MAXIMUM EXTERNAL CABINET DIMENSIONS

ALTITUDE

(FT)

SUPPLY AIR OUTSIDE AIR FAN PREHEAT COIL

NAME NO.

HEIGHT

(IN)

WIDTH

(IN) LENGTH (FT-IN)

MAX FLOW

(CFM)

MIN FLOW

(CFM)

MAX FLOW

(CFM)

MIN FLOW

(CFM) TYPE

ESP

(IN-WG)

TSP

(IN-WG) MAX BHP RPM DRIVE TYPE

VOLUME

CONTROL

MOTOR

TYPE

DESIGN

AIRFLOW

(CFM)

CAPACITY

(MBH) EAT (°F) LAT (°F)

HW FLOW

(GPM)

PREHEAT COIL

EWT

PREHEAT COIL

LWT WPD (FT. H2O) ROWS

MAX

FPIMIN HP RPM VOLTS PH

AHU-101 MECHANICAL ROOM 137 53 72 12' - 6" 650 7100 3655 2660 2660 AIR FOIL 2.10 4.98 7.5 1890 DIRECT VFD 7.5 1800 460 3 HEATING

WATER

3575 62.5 39.6 55.0 4.2 130 100 4.50 1 6

AHU-201 MECHANICAL ROOM PLATFORM 137 56 80 13' - 2" 650 8665 4480 2315 2315 AIR FOIL 2.30 5.37 12.0 2211 DIRECT VFD 15.0 1800 460 3 HEATING

WATER

4080 36.5 47.6 55.0 2.5 130 100 6.60 1 6

HOT WATER BOILER SCHEDULE (HWB)

TAG LOCATION TYPE

ALTITUDE

(FT.) FLUID

FLOW

(GPM)

LVG. WATER TEMP

(°F)

ENT. WATER TEMP

(°F)

MINIMUM GROSS OUTPUT

(MBH) FUEL SOURCE

BURNER INPUT

(CFH @ 1000 BTU/CF)

MIN. EFFICIENCY

(%) VOLTS PHASE

NOTES

HWB-101 MECHANICAL ROOM CONDENSING 650 WATER 17 130 100 379 NATURAL GAS 399 95 120 1 1, 2

HWB-102 MECHANICAL ROOM CONDENSING 650 WATER 17 130 100 379 NATURAL GAS 399 95 120 1 1, 2

TANK SCHEDULE

TAG TYPE ORIENTATION LOCATION SYSTEM

MIN. TANK VOLUME

(GAL)

MIN. TANK ACCEPTANCE VOLUME

(GAL)

RELIEF VALVE

SETPOINT

(PSI)

DESIGN TEMP.

(°F)

MAX. WORKING PRESS.

(PSI) NOTES

BT-101 CHILLED WATER VERTICAL MECHANICAL ROOM CHILLED WATER 145 145 125 130 125 1,2

ET-101 BLADDER VERTICAL MECHANICAL ROOM HEATING WATER 22 12 125 130 125 1

ET-102 BLADDER VERTICAL MECHANICAL ROOM CHILLED WATER 4 2.5 125 42 125 1

NOTES:

1. ASME RATED CONSTRUCTION.

2. PROVIDE WITH CENTER BAFFLE.

NOTES:

1. MINIMUM 10:1 TURN DOWN

2. PROVIDE WITH MANUFACTURER'S SINGLE POINT POWER CONNECTION AND DISCONNECT PER DIVISION 26.

NOTES:

1. MANUFACTURER TO PROVIDE VFD.

2. DIRTY FILTER PRESSURE DROP IS IN ADDITION TO THE CLEAN FILTER PRESSURE DROP AND IS INCLUDED IN THE INTERNAL STATIC PRESSURE.

3. PROVIDE UV LIGHT DOWNSTREAM OF COOLING COILS.

4. PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION.

NOTES:

1. PROVIDE WITH MANUFACTURER'S SINGLE POINT POWER CONNECTION AND DISCONNECT PER DIVISION 26.

NOTES:

1. PROVIDE WITH MANUFACTURER'S VFD, SINGLE POINT POWER CONNECTION, AND DISCONNECT PER DIVISION 26.

2 HEAT TRACE THE EVAPORATOR BUNDLE.

2. PROVIDE FACTORY MOUNTED HAIL GUARD AND WIND BAFFLES LOUVERS FOR ENTIRE CHILLER (UPPER/LOWER/ENDS). WIRE GUARDS ARE NOT ACCEPTABLE.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

A

M E

N D

M E

N T

/1

3/

Sheets
M-601 - MECHANICAL SCHEDULES - SHEET 1

File details come from the government source that posted it. Updated .