Attachment_G_Safety_Data_Sheet.docx

DOCX document 20 KB Posted

Attached to
DESIGN BID BUILD CONSTRUCTION PROJECT F-35A FLIGHT SIMULATOR FACILITY AND F-35A SQUADRON OPERATIONS FACILITY AT NAS FORT WORTH JRB, TX
Solicitation number
N69450-21-R0022
Issued by

About this file

This document contains a safety data sheet template and details of a federal solicitation for construction projects at Naval Air Station Fort Worth Joint Reserve Base in Texas. The solicitation seeks design-build construction of a 20,000 square foot Flight Simulator Facility building and a 33,729 square foot Squadron Operations/Aircraft Maintenance Unit building. The projects include site demolition, utilities installation, construction of the two buildings, and associated site work. The Flight Simulator Facility will house four full mission simulators, computer rooms, and secure storage. The Squadron Operations/Aircraft Maintenance Unit building will provide spaces for aircraft maintenance on the first floor and secure administration areas on the second floor. Offerors must submit safety data sheets including OSHA recordable incident rates for the past five years and descriptions of safety management systems and subcontractor oversight. The solicitation was issued by the Naval Facilities Engineering Command Southeast and responses are due by the date specified in the document.

View the file

Other files

File Type Posted
Amendment 0004 05 12 00.pdf PDF
Volume IIA_Amendment 004.pdf PDF
N6945021R0022 0004.pdf PDF
Volume I_Amendment 004.pdf PDF
Volume IIB_Amendment 004.pdf PDF
Amendment 0004 23 05 48.00 40.pdf PDF
Volume III_Amendment 004.pdf PDF
POV_Parking_Lots.pdf PDF
Amendment 0004 08 15 00.pdf PDF
N6945021R0022_0003.pdf PDF
Attachment_k_N6945021R0022 Site Visit Roster.pdf PDF
N6945021R0022-0002.pdf PDF
Attachment_A_SECNAV_5512.pdf PDF
N6945021R0022 0001.pdf PDF
N6945021R0022 RFP.pdf PDF
Attachment_J_COVID-19 Screening Questionnaire.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume I of III.pdf PDF
F35 Squad Ops and Flt Sim Plans Volume IIA Squad Ops Bldg.pdf PDF
ACM and LBP Survey Report NASJRB Buildings 1604 1606 1608 1626 and 1632.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume III of III.pdf PDF
Attachment_H_Small_Business_Subcontracting_Plan.doc DOC document
F35 Squad Ops and Flt Sim Plans Volume IIB Squad Ops Bldg.pdf PDF
Attachment_D_HISTORICAL_SMALL_BUSINESS_UTILIZATION.docx DOCX document
Attachment_F_CONSTRUCTION_EXPERIENCE_PROJECT_DATA_SHEET.docx DOCX document
Attachment_I_NAS_FORT_WORTH_JRB_DARF_BLANK.pdf PDF
Attachment_E_SB_PARTICIPATION_COMMITMENT_DOCUMENT.docx DOCX document
Attachment_C_NAVFAC PPQ.docx DOCX document
F35 Squad Ops and Flt Sim Plans Volume I Site Work.pdf PDF
Attachment_B_ProjNet_How _to_Guide.pdf PDF
F35 Squad Ops and Flt Sim Geotechnical Report.pdf PDF
F35 Squad Ops and Flt Sim Volume III Flt Sim Bldg.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume II of III.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

SAFETY DATA SHEET

This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. DART and TRC rates shall not be submitted for subcontractors.

Joint Venture (JV) or Partnership: Provide a Safety Data Sheet for each contractor who is part of the JV or partnership; however, only one safety narrative is required.

1. Offeror Name:

Name of JV partner providing the information below (if applicable):

2. Insurance Carrier Information:

Insurance Carrier Name:

Agent’s name:

Phone No.:

Email:

Offeror’s Five Previous Complete Calendar Years of Reported Safety Data:

Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.

3. OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rates.

2020
2019
2018
2017
2016

3a. If you do not have a DART Rate for a given year, affirmatively state so here and explain why:

3b. Explain any negative trend above moderate risk (DART Rates of 3.0 or greater), an acceptable/detailed explanation is required that includes any corrective actions taken for improvement:

4. Total Recordable Case (TCR) Rates

2020
2019
2018
2017
2016

4a. If you do not have a TCR Rate for a given year, affirmatively state so here and explain why:

4b. Explain any negative trend above moderate risk (TCR Rates of 4.5 or greater), an acceptable/detailed explanation is required that includes any corrective actions taken for improvement:

Exhibit B (Continuation)

SAFETY NARRATIVE

6. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed 2 single-sided pages. Any additional pages will not be considered.

a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).