This amendment to solicitation N69450-21-R-0022 modifies the request for proposal for design-bid-build construction of an F-35A flight simulator facility and F-35A squadron operations facility at NAS Fort Worth JRB, Texas.

The amendment changes the proposal submission date from April 20, 2021 to April 29, 2021 at 2:00 PM EDT. It also revises specifications and drawings, adding sections for structural steel, sound retardant doors, and modifying sections for roofing, flooring, finishes, and equipment. The price and non-price proposals must now be submitted separately as PDFs under 10MB by email to the points of contact provided, with the subject line "N69450-21-R-0022." Evaluation will be based on technical approach, experience, past performance, safety, and small business utilization.

The projects include demolition of existing buildings and site work, followed by construction of a 20,000 square foot flight simulator building and 33,729 square foot squadron operations/aircraft maintenance building. The secured simulator portion will house four full mission simulators per intelligence community standards.

View the file

Other files

File Type Posted
Amendment 0004 05 12 00.pdf PDF
Volume IIA_Amendment 004.pdf PDF
Volume I_Amendment 004.pdf PDF
Volume IIB_Amendment 004.pdf PDF
Amendment 0004 23 05 48.00 40.pdf PDF
Volume III_Amendment 004.pdf PDF
POV_Parking_Lots.pdf PDF
Amendment 0004 08 15 00.pdf PDF
N6945021R0022_0003.pdf PDF
Attachment_k_N6945021R0022 Site Visit Roster.pdf PDF
N6945021R0022-0002.pdf PDF
Attachment_A_SECNAV_5512.pdf PDF
N6945021R0022 0001.pdf PDF
N6945021R0022 RFP.pdf PDF
Attachment_J_COVID-19 Screening Questionnaire.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume I of III.pdf PDF
F35 Squad Ops and Flt Sim Plans Volume IIA Squad Ops Bldg.pdf PDF
ACM and LBP Survey Report NASJRB Buildings 1604 1606 1608 1626 and 1632.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume III of III.pdf PDF
Attachment_H_Small_Business_Subcontracting_Plan.doc DOC document
F35 Squad Ops and Flt Sim Plans Volume IIB Squad Ops Bldg.pdf PDF
Attachment_D_HISTORICAL_SMALL_BUSINESS_UTILIZATION.docx DOCX document
Attachment_F_CONSTRUCTION_EXPERIENCE_PROJECT_DATA_SHEET.docx DOCX document
Attachment_I_NAS_FORT_WORTH_JRB_DARF_BLANK.pdf PDF
Attachment_E_SB_PARTICIPATION_COMMITMENT_DOCUMENT.docx DOCX document
Attachment_C_NAVFAC PPQ.docx DOCX document
F35 Squad Ops and Flt Sim Plans Volume I Site Work.pdf PDF
Attachment_B_ProjNet_How _to_Guide.pdf PDF
Attachment_G_Safety_Data_Sheet.docx DOCX document
F35 Squad Ops and Flt Sim Geotechnical Report.pdf PDF
F35 Squad Ops and Flt Sim Volume III Flt Sim Bldg.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume II of III.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DESIGN-BID-BUILD (DBB), FIRM-FIXED PRICE (FFP) CONSTRUCTION CONTRACT FOR F-35A FLIGHT SIMULATOR FACILITY AND F-35A

SQUADRON OPERATIONS FACILITY AT NAS FORT WORTH JRB, TX

See BLOCK 14 CONTINUATION on Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6945021R0022

X 9B. DATED (SEE ITEM 11)

18-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Apr-2021

CODE

NAVFAC ENGINEERING SYSTEMS COMMAND SE

CORE CONSTRUCTION

BLDG 903 YORKTOWN

PO BOX 0030

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945021R0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

The proposal submission date changed from 20 April 2021 by 2:00 PM (EDT) to 29 April 2021 by 2:00 PM (EDT).

The following has been modified:

SECTION 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

The following drawings, bearing revision date of 04/13/21, supersede drawings bearing the same number and title:

DRAWING NO. NAVFAC TITLE

DRAWING NO.

VOLUME I

C-004 15154156 SITE SURVEY PLAN

CD101 15154157 OVERALL DEMOLITION SITE PLAN

C-101 15154159 SITE PLAN

C-104 15154162 UTILITY PLAN

C-504 15154174 PAVEMENT DETAILS

VOLUME IIA

A-101 15154258 OVERALL GROUND FLOOR PLAN

A-102 15154259 OVERALL SECOND FLOOR PLAN

A-106 15154263 AIR BARRIER PLAN FLOOR PLANS

A-107 15154264 AIR BARRIER SECTIONS

A-112 15154268 GROUND FLOOR PLAN -AREA B

A-121 15154269 SECOND FLOOR PLAN -AREA A

A-151 15154271 GROUND FLOOR REFLECTED CEILING

PLAN - AREA A

A-152 15154272 GROUND FLOOR REFLECTED CEILING

PLAN -AREA B

A-402 15154291 GROUND FLOOR TOILET ROOM ELEVATIONS

A-572 15154318 MILLWORK DETAILS

A-581 15154319 MISCELLANEOUS DETAILS

A-601 15154321 DOOR SCHEDULE, DOOR & FRAME TYPES

A-602 15154322 DOOR SCHEDULE

A-661 15154330 WINDOW & LOUVER DETAILS

A-681 15154331 STOREFRONT ELEVATIONS

A-685 15154333 STOREFRONT DETAILS

A-701 15154336 ROOM FINISH SCHEDULE

A-721 15154339 GROUND FLOOR WALL FINISH AND

SIGNAGE PLAN -AREA A

A-723 15154341 SECOND FLOOR WALL FINISH AND

SIGNAGE PLAN -AREA A

A-741 15154345 FLOOR FINISH PLAN GROUND FLOOR -AREA

A-751 15154349 SIGNAGE SCHEDULE

A-753 15154351 SIGNAGE DETAILS AND ELEVATIONS

A-761 15154352 INTERIOR ELEVATIONS

VOLUME IIB

M-601 15154441 MECHANICAL SCHEDULES – SHEET 1

VOLUME III

S-002 15154704 GENERAL STRUCTURAL NOTES

S-103 15154707 SLAB PLAN

S-501 15154708 FOUNDATION DETAILS

S-502 15154709 SLAB DETAILS

A-103 15154717 ROOF PLAN

A-106 15154720 ENLARGED COMPOSITE

COORDINATION PLAN

A-107 15154721 ENLARGED COMPOSITE

COORDINATION PLAN

A-114 15154728 AREA PLAN D

A-204 15154732 INTERIOR ELEVATIONS

A-311 15154737 WALL SECTIONS

A-312 15154738 WALL SECTIONS

A-604 15154747 DETAILS

A-606 15154749 ROOF DETAILS

A-607 15154750 ROOF DETAIL

A-701 15154753 ROOM FINISH SCHEDULE

A-751 15154758 SIGNAGE SCHEDULE

A-752 15154759 SIGNAGE DETAILS

I-010 15154775 OVERALL GROUND FLOOR FURNITURE

PLAN

M-001 15154815 ABBREVIATIONS AND SYMBOLS

LEGEND

M-401 15154826 ENLARGED PLANS

M-402 15154827 MECHANICAL SECTIONS

M-601 15154841 MECHANICAL SCHEDULES

E-505 15154879 ELECTRICAL DETAILS

EP301 15154901 CABLE TRAY PLAN

EP302 15154902 FMS CABLE ROUTING – AREA A

EP303 15154903 FMS CABLE ROUTING – AREA B

SPECIFICATION

In the “Project Table of Contents” under “DIVISION 05 – METALS”, add:

“05 12 00 STRUCTURAL STEEL”

This section is attached.

In the “Project Table of Contents” under “DIVISION 08 – OPENINGS”, add:

“08 15 00 SOUND RETARDANT SWINGING METAL DOOR ASSEMBLIES”

This section is attached.

SECTION 01 30 01.00 20 PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES, AND

EQUIPMENT

1.2.5 Interior Photography

Delete the fourth sentence: “"Before" and "After" photos are required for Building 2314.”

SECTION 07 61 14.00 20 STEEL STANDING SEAM ROOFING

1.6.5 Single Source

In line 1, add “fascia panels, soffits,” behind “closures,”.

2.4 ACCESSORIES

In line 1, add “fascia panels, soffits,” behind “downspouts,”.

PART 2 PRODUCTS

Add the following paragraphs:

“2.6 FASCIA PANELS

Provide fascia panels as indicated on Drawings. Fascia must be of the same material, thickness, and finish as roofing panels. Provide raised dimple and seams that allow for movement, or other manufacturer standard means of reducing oil-canning of fascia panel.

2.7 HORIZONTAL SOFFIT

Provide horizontal soffit panels as indicated on Drawings. Soffits must be of the same material, thickness, and finish as the roofing panels. Provide bug screen at soffit vents.”

SECTION 08 34 73 SOUND CONTROL DOOR ASSEMBLIES

3.3 FIELD QUALITY CONTROL

Delete the following paragraph:

“Provide third party testing in accordance with ASTM E336. Verify in writing that installed product performs no less than five (5) ASTC or NIC rating points below the specified laboratory STC rating. Examine, adjust, and retest any installation not meeting that criteria until compliance is obtained.”

SECTION 09 06 00 SCHEDULES FOR FINISHES

2.3.7.3 Solid Surfacing Material

Delete “SSF-1 - Dupont Corian, Color: Concrete” and substitute the following: “SSF-1 - Dupont Corian, Color: Neutral Concrete”

2.3.7.4 Window Sills (Solid Surfaces)

Delete “SSF-1 - Dupont Corian, Color: Concrete” and substitute the following: “SSF-3 - Dupont Corian, Color: Carbon Concrete”

SECTION 09 29 00 GYPSUM BOARD

3.4 FINISHING OF GYPSUM BOARD

Delete this paragraph complete with its subparagraphs and substitute the following:

“3.4 FINISHING OF GYPSUM BOARD

Tape and finish gypsum board in accordance with ASTM C840, GA 214 and GA 216. At areas outside secure boundaries, finish plenum areas above ceilings to Level 1 in accordance with GA 214. Finish water resistant gypsum backing board, ASTM C1396/C1396M, to receive ceramic tile to Level 2 in accordance with GA 214. Unless otherwise specified, finish all gypsum board walls, partitions and ceilings to Level 5 in accordance with GA 214. Provide joint, fastener depression, and corner treatment.

Tool joints as smoothly as possible to minimize sanding and dust. Do not use self-adhering fiber glass mesh tape with conventional drying type joint compounds; use setting or hardening type compounds only. Provide treatment for water-resistant gypsum board as recommended by the gypsum board manufacturer. Protect workers, building occupants, and HVAC systems from gypsum dust. At secure area boundary walls, walls within secure areas, and ceilings within secure areas, provide a level 5 finish to all surfaces, both in viewable areas and non-viewable/plenum areas.”

SECTION 09 67 23 RESINOUS FLOORING

2.1.1 Epoxy Primer

Delete the last sentence in the paragraph: “Basis of design: Sherwin Williams General Polymers 3460.”

2.1.2 Base Coat

Delete the last sentence in the paragraph: “Basis of design: Sherwin Williams General Polymers 3462 Water Based Epoxy.”

2.1.3 Top Coating

Add “(flat finish sheen)” to the end of the first sentence.

Delete the last sentence in the paragraph: “Basis of design: Sherwin Williams General Polymers 4411 Flat Sheen, Aliphatic Urethane.”

SECTION 09 90 00 PAINTS AND COATINGS

1.4.1 SSPC QP 1 Certification

“1.4.1 Coating Contractor's Qualification

Submit the name, address, telephone number, and e-mail address of the Contractor that will be performing all surface preparation and coating application. Submit evidence that key personnel have successfully performed surface preparation and application of coatings on steel structural members on a minimum of three similar projects within the past three years. List information by individual and include the following:

a. Name of individual and proposed position for this work.

b. Information about each previous assignment including:

Position or responsibility Employer (if other than the Contractor) Name of facility owner Mailing address and telephone number of facility owner Name of individual in facility owner's organization who can be contacted as a reference Location, size and description of structure Dates work was carried out Description of work carried out on structure”

SECTION 10 14 00.20 INTERIOR SIGNAGE

2.1 STANDARD

Delete paragraph: “Basis of Design Product or Equivalent Interior and Exterior Signs Manufacturer: ASI Signage Innovations, Style: InTac ADA Ready Sign System with requirements indicated for materials, thickness, finish colors, design, shapes, sizes and details as shown on the Contract Documents.”

2.2.1 Standard Room Signs

“2.2.1 Standard Room Signs Signs shall consist of acrylic plastic 0.25 inch thickness minimum conforming to ANSI Z97.1 and shall conform to the following:

a. Units shall be frameless. Corners of signs shall be squared.

SECTION 13 34 19 METAL BUILDING SYSTEMS

1.6.4 Qualification of Erection Contractor

Add the following to the end of the paragraph: “Erector shall be AISC certified as required by Section 01 45 35.00 25 of these specifications.”

SECTION 23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT DELETE “Section 23 05 48.00 40, Vibration and Seismic Controls for HVAC Piping and Equipment” and substitute attached “Section 23 05 48.00 40, Vibration and Seismic Controls for HVAC Piping and Equipment”.

SECTION 23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

2.3.1.4 Filters

“2.3.1.4 Filters

Provide filters of the sectional or panel type and capable of filtering the entire air supply. Mount filter(s) integral within the unit and make accessible by hinged access panel(s). Provide factory supplied 2.0 inch thick, throwaway filters on all units, with MERV rating as indicated on the drawings. Provide UL Class 1 filters.”

2.4.4.2 High Efficiency Filters

Delete the first sentence and substitute the following: “Provide filters with a MERV rating as specified on the contract drawings when tested in accordance with AHSRAE 52.2.”

All other terms and conditions remain unchanged. Acknowledgement of this amendment is required with your proposal submission.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 20-Apr-2021 02:00 PM to 29-Apr-2021 02:00 PM.

The following have been modified:

ATTACHMENTS

Attachment A – SECNAV 5512 Attachment B – PROJNET How to Guide Attachment C – NAVFAC/USACE PPQ Attachment D – Historical Small Business Utilization Attachment E – Small Business Participation/Commitment Document Attachment F – Construction/Design Experience Project Data Sheet Attachment G – Safety Data Sheet Attachment H – Small Business Subcontracting Plan

Attachment I – NAS Fort Worth JRB DARF form Attachment J - CUSFF/NAVNORTH COVID-19 Screening Questionnaire Attachment K - N6945021R0022 Site Visit Roster

The following drawings and specification files have been posted on beta.SAM.gov:

ACM and LNP Survey Report NASJRB Buildings 1604, 1606, 1608, 1626 and 1632 F35 SQ OPS AMU - SIM RTA Specifications Volume I of III F35 SQ OPS AMU - SIM RTA Specifications Volume II of III F35 SQ OPS AMU - SIM RTA Specifications Volume III of III F35 Squad Ops & Flt Sim Geotechnical Report F35 Squad Ops & Flt Sim Plans Volume I Site Work F35 Squad Ops & Flt Sim Plans Volume IIA Squad Ops Bldg F35 Squad Ops & Flt Sim Plans Volume IIB Squad Ops Bldg F35 Squad Ops & Flt Sim Volume III Flt Sim Bldg Amendment 0004 05 12 00 Amendment 0004 08 15 00 Amendment 0004 23 05 48.00 40 Volume I Amendment 0004 Volume IIA Amendment 0004 Volume IIB Amendment 0004 Volume III Amendment 0004 POV Parking Lots

SECTION 00 21 00 - INSTRUCTIONS

PROPOSAL SUBMISSION

PROPOSAL SUBMISSION INSTRUCTIONS

In response to this request for proposal, the complete proposal shall include both the Price Proposal and the Non- Price Proposal, submitted as follows:

The Price Proposal and the Non-Price Proposal shall be shall be emailed to john.mack@navy.mil with copy to rebecca.m.jones@navy.mil and contain “N69450-21-R-0022” in the subject line no later than 2:00 PM EDT on April 29, 2021. Price Proposal and Non-Price Proposal shall be separate attached files and shall be labeled “Price Proposal” and “Non-Price Proposal” accordingly. File shall be Adobe PDF formatted and under 10MB. Proposals must be received by electronic mail (e-mail) no later than the date and time stated above. Hard copies will not be accepted. Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 "Instructions to Offerors – Competitive Acquisitions" and may be rejected. You are highly advised to submit at least one day prior to avoid late submission (See FAR 15.208(b)(1)(i)). The Offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions.

The front of the Proposals should clearly state:

Type of Proposal (Price Proposal or Non-Price Proposal) RFP Number and Title of Project Offeror’s Name

Offerors shall include the following information with their proposals:

Authorized negotiator’s Point of Contact (POC) POC telephone number POC email address DUNS Number (offeror and any team members) CAGE Code TIN (Federal Tax ID Number) Indicate Small Business Type *It is recommended to also include an additional POC including contact information.

Price Proposal

The Price Proposal shall be submitted as an Adobe PDF file and organized as follows:

Tab 1 – Executed SF1442 and acknowledgment of all amendments Tab 2 – Section 00 10 00 CLIN Pricing

Tab 3 - Original Bid Bond (SF-24) Tab 4 – Representations & Certifications required by Section 00 45 00 of the RFP Tab 5 – FAPIIS Certification Tab 6 – Copy of VETS-4212 registration (or statement that offeror is not required to submit a report) Tab 7 – Subcontracting Plan (Attachment H) Tab 8 – Responsibility Determination Information

Note: The SAM, FAPIIS and VETS-4212 registration must be in the name and address, CAGE, and DUNS of the Offeror identified on the SF 1442.

Non-Price Proposal

The Non-Price Proposal shall be submitted electronically as an Adobe PDF file. Page limits, if stipulated, must be adhered to. The entire Non-Price Proposal shall not exceed 50 pages in length utilizing a minimum Arial Font of 12 with pages numbered. Joint Venture Agreement, CPARS Evaluations, and/or Past Performance Questionnaires are specifically excluded under each factor do not count towards the total page count and should not be numbered. If page count exceeds 50 pages, only the first 50 pages will be reviewed. Submissions related to the Factors shall be tabbed, labeled, and organized as follows:

Section 1 – Factor 1, Technical Approach

Section 2 – Factor 2, Experience Section 3 – Factor 3, Past Performance Section 4 – Factor 4, Safety Section 5 – Factor 5, Small Business Utilization

The Offeror’s proposal must include all data and information required by the solicitation and must be submitted in accordance with these instructions. The Offeror shall be compliant with the requirements as stated herein.

Nonconformance may result in an unfavorable proposal evaluation. The above list is provided for the offerors’ convenience and is not exhaustive. Offerors shall refer to Section 002200 of the solicitation (“Evaluation Factors for Award”) for details regarding each submittal requirement.

Incurred Expenses - The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

No Alternate or Multiple Proposals - Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by reference:

52.229-3 Federal, State And Local Taxes FEB 2013

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

ACM and LNP Survey Report NASJRB Buildings 1604, 1606, 1608, 1626 and 1632 F35 SQ OPS AMU – SIM RTA Specifications Volume I of III F35 SQ OPS AMU – SIM RTA Specifications Volume II of III F35 SQ OPS AMU – SIM RTA Specifications Volume III of III F35 Squad Ops & Flt Sim Geotechnical Report F35 Squad Ops & Flt Sim Plans Volume I Site Work F35 Squad Ops & Flt Sim Plans Volume IIA Squad Ops Bldg F35 Squad Ops & Flt Sim Plans Volume IIB Squad Ops Bldg F35 Squad Ops & Flt Sim Volume III Flt Sim Bldg

Amendment 0004 05 12 00 Amendment 0004 08 15 00 Amendment 0004 23 05 48.00 40 Volume I Amendment 0004 Volume IIA Amendment 0004 Volume IIB Amendment 0004 Volume III Amendment 0004

(End of clause)

The following have been deleted:

52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013

(End of Summary of Changes)

File details come from the government source that posted it. Updated .