F35 SQ OPS AMU-SIM RTA Specifications Volume I of III.pdf

PDF 5 MB Posted

Attached to
DESIGN BID BUILD CONSTRUCTION PROJECT F-35A FLIGHT SIMULATOR FACILITY AND F-35A SQUADRON OPERATIONS FACILITY AT NAS FORT WORTH JRB, TX
Solicitation number
N69450-21-R0022
Issued by

About this file

This solicitation is for a design-bid-build construction project to build a 20,000 square foot Flight Simulator Facility and a 33,729 square foot Squadron Operations/Aircraft Maintenance Unit Facility at NAS Fort Worth JRB in Texas. The work includes demolishing existing buildings totaling 8,009 square feet, site utilities and pavements. The one-story Simulator building will house four full mission simulators, with secured and unsecured portions. The two-story Squadron Operations/Aircraft Maintenance Unit building will provide spaces for aircraft maintenance on the first floor and secure and unsecured administrative offices on the second floor. The closing date for proposals in response to solicitation number N69450-21-R0022 is TBD.

View the file

Other files

File Type Posted
Amendment 0004 05 12 00.pdf PDF
Volume IIA_Amendment 004.pdf PDF
N6945021R0022 0004.pdf PDF
Volume I_Amendment 004.pdf PDF
Volume IIB_Amendment 004.pdf PDF
Amendment 0004 23 05 48.00 40.pdf PDF
Volume III_Amendment 004.pdf PDF
POV_Parking_Lots.pdf PDF
Amendment 0004 08 15 00.pdf PDF
N6945021R0022_0003.pdf PDF
Attachment_k_N6945021R0022 Site Visit Roster.pdf PDF
N6945021R0022-0002.pdf PDF
Attachment_A_SECNAV_5512.pdf PDF
N6945021R0022 0001.pdf PDF
N6945021R0022 RFP.pdf PDF
Attachment_J_COVID-19 Screening Questionnaire.pdf PDF
F35 Squad Ops and Flt Sim Plans Volume IIA Squad Ops Bldg.pdf PDF
ACM and LBP Survey Report NASJRB Buildings 1604 1606 1608 1626 and 1632.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume III of III.pdf PDF
Attachment_H_Small_Business_Subcontracting_Plan.doc DOC document
F35 Squad Ops and Flt Sim Plans Volume IIB Squad Ops Bldg.pdf PDF
Attachment_D_HISTORICAL_SMALL_BUSINESS_UTILIZATION.docx DOCX document
Attachment_F_CONSTRUCTION_EXPERIENCE_PROJECT_DATA_SHEET.docx DOCX document
Attachment_I_NAS_FORT_WORTH_JRB_DARF_BLANK.pdf PDF
Attachment_E_SB_PARTICIPATION_COMMITMENT_DOCUMENT.docx DOCX document
Attachment_C_NAVFAC PPQ.docx DOCX document
F35 Squad Ops and Flt Sim Plans Volume I Site Work.pdf PDF
Attachment_B_ProjNet_How _to_Guide.pdf PDF
Attachment_G_Safety_Data_Sheet.docx DOCX document
F35 Squad Ops and Flt Sim Geotechnical Report.pdf PDF
F35 Squad Ops and Flt Sim Volume III Flt Sim Bldg.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume II of III.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO. N69450-19-D-0123

TASK ORDER NO. N6945020F0106 / N6945020F0102

EPROJECT NO. 1651220 / 1651221

SPECIFICATIONS

P415 F-35A SQUADRON OPERATIONS / AMU FACILITY AND

P396 F-35A FLIGHT SIMULATOR FACILITY

NAVY AIR STATION JOINT RESERVE BASE

FORT WORTH, TEXAS

RTA SUBMITTAL

VOLUME I OF III

DIVISION 00 THRU DIVISION 08

PREPARED BY:

January 22, 2021

P415 F-35A SQUADRON OPERATIONS/AMU FACILITY AND EPROJECT NO: 1651220

P396 F-35A FLIGHT SIMULATOR FACILITY EPROJECT NO: 1651221

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00.00 25 SUMMARY OF WORK

01 14 00.00 25 WORK RESTRICTIONS

01 20 00.00 25 PRICE AND PAYMENT PROCEDURES

01 30 00.00 25 ADMINISTRATIVE REQUIREMENTS

01 30 01.00 20 PROCURMENT AND INSTALLATION OF FURNITURE, FIXTURES AND

EQUIPMENT

01 31 23.13 25 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 25 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29.00 25 SUSTAINABILITY REPORTING

01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 25 QUALITY CONTROL

01 45 35.00 25 SPECIAL INSPECTIONS

01 50 00.00 25 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00.00 25 PROJECT IDENTIFICATION

01 74 19.00 25 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00.00 25 CLOSEOUT SUBMITTALS

01 78 23.00 25 OPERATION AND MAINTENANCE DATA

01 78 24.00 25 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 91 00.15 25 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 82 00 ASBESTOS REMEDIATION

DI VI SI ON 03 - CONCRETE

03 11 31 VOID FORMS

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

PROJECT TABLE OF CONTENTS Page 1

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 11 13 BITUMINOUS DAMPPROOFING

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 24 00 SOFFIT STUCCO COATING SYSTEM

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 36 SPRAY FOAM AIR BARRIERS

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 34 19.10 20 ROLLING SERVICE DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 65 66 RESILIENT ATHLETIC FLOORING

09 67 23 RESINOUS FLOORING

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 39 FOLDING PANEL PARTITIONS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

PROJECT TABLE OF CONTENTS Page 2

10 53 13.00 25 OVERHEAD SUPPORTED CANOPIES

10 56 13 STEEL SHELVING

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

12 61 13 UPHOLSTERED AUDIENCE SEATING

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 METAL BUILDING SYSTEMS

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

22 67 19.16 REVERSE-OSMOSIS WATER EQUIPMENT

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93.00 25 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 52 33.00 25 HOT WATER BOILERS, CONDENSING TYPE

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00.00 20 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS ENERGY

MANAGEMENT CONTROL SYSTEM (EMCS) BUILDING LEVEL ONLY

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE

ALARM REPORTING SYSTEM/MASS NOTIFICATION SYSTEM BUILDING

LEVEL ONLY

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL

SYSTEMS

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

PROJECT TABLE OF CONTENTS Page 3

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 75.00 25 POWER SYSTEM STUDY FOR EXISTING INSTALLATION AND NEW

CONSTRUCTION PROJECTS

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 41 00 AUDIO VISUAL SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 05 21 GEOGRID SOIL REINFORCEMENT

31 23 00.00 20 EXCAVATION AND FILL

31 31 16.13 CHEMICAL TERMITE CONTROL

31 63 29 DRILLED CONCRETE PIERS AND SHAFTS

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK GATES

32 92 19 SEEDING

32 92 23 SODDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 12 33.00 30 WATER UTILITY METERING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 51 13.00 30 NATURAL-GAS METERING

33 51 15 NATURAL-GAS DISTRIBUTION PIPELINES

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

DRAWING NAVFAC TITLE

NO. DWG NO.

VOLUME I

G-101 15154151 COVER SHEET

G-102 15154152 DRAWING INDEX SHEET

C-001 15154153 BASE MAP WITH PROJECT LOCATION

C-002 15154154 CIVIL NOTES

C-003 15154155 ABBREVIATIONS AND LEGEND

C-004 15154156 SITE SURVEY PLAN

CD101 15154157 OVERALL DEMOLITION SITE PLAN

CD102 15154158 DEMOLITION PHOTO GRAPHICS

C-101 15154159 SITE PLAN

C-102 15154160 SIDEWALK/EQUIPMENT LAYOUT PLAN

C-103 15154161 PARKING LAYOUT PLAN

C-104 15154162 UTILITY PLAN

C-105 15154163 GRADING AND DRAINAGE PLAN

C-106 15154164 EROSION CONTROL PLAN

C-401 15154165 SANITARY SEWER PROFILE

C-402 15154166 STORM PROFILE 1

C-403 15154167 STORM PROFILE 1.A

C-404 15154168 STORM PROFILE 2

C-405 15154169 STORM PROFILE 3

C-406 15154170 DRIVE AND RAMP PROFILES

C-501 15154171 SIDEWALK DETAILS

C-502 15154172 EQUIPMENT DETAILS

C-503 15154173 PARKING DETAILS

C-504 15154174 PAVEMENT DETAILS

C-505 15154175 UTILITY DETAILS

C-506 15154176 GRADING DETAILS

C-507 15154177 DRAINAGE DETAILS

C-508 15154178 SANITARY SEWER DETAILS

C-509 15154179 FIRE/WATER DETAILS

C-510 15154180 SITE CONSTRUCTION DETAILS

C-511 15154181 EROSION CONTROL DETAILS

C-601 15154182 SOIL BORINGS

C-602 15154183 SOIL BORINGS

VOLUME I I A

G-001 15154191 COVER

G-003 15154192 SHEET INDEX

DOCUMENT 00 01 15 Page 1

S-001 15154193 GENERAL NOTES

S-002 15154194 GENERAL NOTES

S-003 15154195 LEGEND & ABBREVIATIONS

S-004 15154196 WIND ISOMETRICS

S-005 15154197 SNOW LOADING DIAGRAM

S-100 15154198 FOUNDATION PLAN - OVERALL

S-101 15154199 FOUNDATION PLAN - AREA A

S-102 15154200 FOUNDATION PLAN - AREA B

S-110 15154201 SLAB PLAN - OVERALL

S-111 15154202 SLAB PLAN - AREA A

S-112 15154203 SLAB PLAN - AREA B

S-115 15154204 SLAB JOINTING PLAN - OVERALL

S-116 15154205 SLAB JOINTING PLAN - AREA A

S-117 15154206 SLAB JOINTING PLAN - AREA B

S-120 15154207 SECOND FLOOR FRAMING PLAN - OVERALL

S-121 15154208 SECOND FLOOR FRAMING PLAN - AREA A

S-122 15154209 SECOND FLOOR FRAMING PLAN - AREA B

S-130 15154210 ROOF FRAMING PLAN - OVERALL

S-131 15154211 ROOF FRAMING PLAN - AREA A

S-132 15154212 ROOF FRAMING PLAN - AREA B

S-140 15154213 MASONRY WALL ELEVATIONS PLAN

S-200 15154214 FRAMING ELEVATIONS

S-210 15154215 MASONRY WALL ELEVATIONS

S-211 15154216 MASONRY WALL ELEVATIONS

S-212 15154217 MASONRY WALL ELEVATIONS

S-400 15154218 ENLARGED MEZZANINE FRAMING PLAN

S-401 15154219 ELEVATOR PIT ENLARGED PLANS

S-402 15154220 ELEVATOR PIT ENLARGED PLANS

S-403 15154221 ENLARGED PARTITION SUPPORT FRAMING PLAN

S-500 15154222 STANDARD CONCRETE DETAILS

S-501 15154223 STANDARD CONCRETE DETAILS

S-502 15154224 STANDARD CONCRETE DETAILS

S-503 15154225 STANDARD CONCRETE DETAILS

S-504 15154226 STANDARD MASONRY DETAILS

S-505 15154227 STANDARD MASONRY DETAILS

S-506 15154228 STANDARD MASONRY DETAILS

S-507 15154229 STANDARD STEEL DETAILS

S-508 15154230 STANDARD ROOF DECK & JOIST DETAILS

S-509 15154231 STANDARD ROOF DECK & JOIST DETAILS

S-510 15154232 FOUNDATION DETAILS

S-511 15154233 FOUNDATION DETAILS

S-520 15154234 VERTICAL BRACING CONNECTION DETAILS

S-530 15154235 FRAMING DETAILS

S-531 15154236 FRAMING DETAILS

S-532 15154237 FRAMING DETAILS

S-533 15154238 FRAMING DETAILS

S-534 15154239 FRAMING DETAILS

S-590 15154240 COLUMN DETAILS

S-600 15154241 STRUCTURAL SCHEDULES

AG001 15154252 ARCHITECTURAL LEGEND AND ABBREVIATIONS

AG002 15154253 ARCHITECTURAL GENERAL NOTES

AG003 15154254 ACCESSIBILITY INFORMATION

F-001 15154255 LIFE SAFETY CODE AND CRITERIA

F-101 15154256 GROUND FLOOR LIFE SAFETY PLAN

F-102 15154257 SECOND FLOOR LIFE SAFETY PLAN

A-101 15154258 OVERALL GROUND FLOOR PLAN

A-102 15154259 OVERALL SECOND FLOOR PLAN

A-103 15154260 OVERALL ROOF PLAN

DOCUMENT 00 01 15 Page 2

A-104 15154261 OVERALL GROUND FLOOR REFLECTED CEILING PLAN

A-105 15154262 OVERALL SECOND FLOOR REFLECTED CEILING PLAN

A-106 15154263 AIR BARRIER PLAN FLOOR PLANS

A-107 15154264 AIR BARRIER SECTIONS

A-108 15154265 GROUND FLOOR SECURITY PLAN

A-109 15154266 SECOND FLOOR SECURITY PLAN

A-111 15154267 GROUND FLOOR PLAN - AREA A

A-112 15154268 GROUND FLOOR PLAN - AREA B

A-121 15154269 SECOND FLOOR PLAN - AREA A

A-122 15154270 SECOND FLOOR PLAN - AREA B

A-151 15154271 GROUND FLOOR REFLECTED CEILING PLAN - AREA A

A-152 15154272 GROUND FLOOR REFLECTED CEILING PLAN - AREA B

A-153 15154273 SECOND FLOOR REFLECTED CEILING PLAN - AREA A

A-154 15154274 SECOND FLOOR REFLECTED CEILING PLAN - AREA B

A-155 15154275 SECOND FLOOR REFLECTED CEILING PLAN - STC RATED ASSEMBLY

A-201 15154276 EXTERIOR BUILDING ELEVATIONS

A-202 15154277 EXTERIOR BUILDING ELEVATIONS

A-203 15154278 ENLARGED EXTERIOR ELEVATIONS

A-301 15154279 BUILDING SECTIONS

A-302 15154280 BUILDING SECTIONS

A-311 15154281 WALL SECTIONS

A-312 15154282 WALL SECTIONS

A-313 15154283 WALL SECTIONS

A-351 15154284 SECTION DETAILS

A-352 15154285 SECTION DETAILS

A-353 15154286 SECTION DETAILS

A-354 15154287 SECTION DETAILS

A-355 15154288 SECTION DETAILS

A-356 15154289 SECTION DETAILS

A-401 15154290 GROUND FLOOR TOILET ROOM PLANS & ELEVATIONS

A-402 15154291 GROUND FLOOR TOILET ROOM ELEVATIONS

A-403 15154292 GROUND FLOOR PLAN AND ELEVATIONS

A-404 15154293 GROUND FLOOR ELEVATIONS

A-405 15154294 GROUND FLOOR ENLARGED FLOOR PLAN AND ELEVATIONS

A-406 15154295 GROUND FLOOR ENLARGED FLOOR PLAN AND ELEVATIONS

A-407 15154296 SECOND FLOOR TOILET ROOM PLANS & ELEVATIONS

A-408 15154297 TOILET ROOM ELEVATIONS

A-409 15154298 SECOND FLOOR ENLARGED FLOOR PLANS AND ELEVATIONS

A-410 15154299 SECOND FLOOR ENLARGED FLOOR PLANS AND ELEVATIONS

A-411 15154300 ENLARGED PLANS, ELEVATIONS AND SECTIONS

A-412 15154301 STAIR PLANS AND SECTIONS

A-413 15154302 ELEVATOR SECTION AND DETAILS

A-414 15154303 STAIR PLANS AND SECTIONS

A-415 15154304 SCREEN WALL ENLARGED PLAN, ELEVATIONS, SECTION & DETAILS

A-451 15154305 PLAN DETAILS

A-452 15154306 PLAN DETAILS

A-501 15154307 PARTITION TYPES

A-511 15154308 PARTITION TYPE DETAILS

A-512 15154309 PARTITION TYPE DETAILS

A-521 15154310 PENETRATION DETAILS

A-522 15154311 PENETRATION DETAILS

A-523 15154312 PENETRATION DETAILS

A-551 15154313 INTERIOR STAIR DETAILS

A-552 15154314 INTERIOR STAIR DETAILS

A-553 15154315 EXTERIOR STAIR DETAILS

A-561 15154316 CEILING DETAILS

A-571 15154317 MILLWORK DETAILS

A-572 15154318 MILLWORK DETAILS

A-581 15154319 MISCELLANEOUS DETAILS

DOCUMENT 00 01 15 Page 3

A-582 15154320 FLOORING TRANSITIONS

A-601 15154321 DOOR SCHEDULE, DOOR & FRAME TYPES

A-602 15154322 DOOR SCHEDULE

A-611 15154323 DOOR DETAILS

A-612 15154324 DOOR DETAILS

A-613 15154325 DOOR DETAILS

A-614 15154326 DOOR DETAILS

A-615 15154327 DOOR DETAILS

A-616 15154328 DOOR DETAILS

A-651 15154329 WINDOW SCHEDULE AND TYPES & LOUVER SCHEDULE AND TYPES

A-661 15154330 WINDOW & LOUVER DETAILS

A-681 15154331 STOREFRONT ELEVATIONS

A-682 15154332 STOREFRONT ELEVATIONS

A-685 15154333 STOREFRONT DETAILS

A-686 15154334 STOREFRONT DETAILS

A-687 15154335 STOREFRONT DETAILS

A-701 15154336 ROOM FINISH SCHEDULE

A-711 15154337 OVERALL GROUND FLOOR WALL FINISH AND SIGNAGE PLAN

A-712 15154338 OVERALL SECOND FLOOR WALL FINISH AND SIGNAGE PLAN

A-721 15154339 GROUND FLOOR WALL FINISH AND SIGNAGE PLAN - AREA A

A-722 15154340 GROUND FLOOR WALL FINISH AND SIGNAGE PLAN - AREA B

A-723 15154341 SECOND FLOOR WALL FINISH AND SIGNAGE PLAN - AREA A

A-724 15154342 SECOND FLOOR WALL FINISH AND SIGNAGE PLAN - AREA B

A-731 15154343 OVERALL GROUND FLOOR FINISH PLAN

A-732 15154344 OVERALL SECOND FLOOR FINISH PLAN

A-741 15154345 FLOOR FINISH PLAN GROUND FLOOR - AREA A

A-742 15154346 FLOOR FINISH PLAN GROUND FLOOR - AREA B

A-743 15154347 FLOOR FINISH PLAN SECOND FLOOR - AREA A

A-744 15154348 FLOOR FINISH PLAN SECOND FLOOR - AREA B

A-751 15154349 SIGNAGE SCHEDULE

A-752 15154350 SIGNAGE DETAILS

A-753 15154351 SIGNAGE DETAILS AND ELEVATIONS

A-761 15154352 INTERIOR ELEVATIONS

A-762 15154353 INTERIOR ELEVATIONS

I-101 15154361 OVERALL GROUND FLOOR FURNITURE PLAN

I-102 15154362 OVERALL SECOND FLOOR FURNITURE PLAN

I-111 15154363 GROUND FLOOR FURNITURE PLAN - AREA A

I-112 15154364 GROUND FLOOR FURNITURE PLAN - AREA B

I-121 15154365 SECOND FLOOR FURNITURE PLAN - AREA A

I-122 15154366 SECOND FLOOR FURNITURE PLAN - AREA B

FA001 15154372 FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS

FA101 15154373 FIRE ALARM PLAN A - LEVEL 1

FA102 15154374 FIRE ALARM PLAN B - LEVEL 1

FA103 15154375 FIRE ALARM PLAN A - LEVEL 2

FA104 15154376 FIRE ALARM PLAN B - LEVEL 2

FA501 15154377 FIRE ALARM DETAILS

FA601 15154378 FIRE ALARM ONE-LINE DIAGRAM

FA602 15154379 FIRE ALARM MATRIX

FX001 15154380 FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS

FX101 15154381 FIRE SUPPRESSION PLAN - LEVEL 1

FX102 15154382 FIRE SUPPRESSION PLAN - LEVEL 2

FX501 15154383 FIRE SUPPRESSION DETAILS

VOLUME I I B

G-002 15154389 COVER

G-004 15154390 SHEET INDEX

DOCUMENT 00 01 15 Page 4

P-001 15154391 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

P-100 15154392 FIRST FLOOR - PLUMBING PLAN - OVERALL

P-101 15154393 UNDER GROUND - PLUMBING PLAN - AREA A

P-102 15154394 UNDER GROUND - PLUMBING PLAN - AREA B

P-103 15154395 FIRST FLOOR - PLUMBING PLAN - AREA A

P-104 15154396 FIRST FLOOR - PLUMBING PLAN - AREA B

P-105 15154397 SECOND FLOOR - PLUMBING PLAN - OVERALL

P-106 15154398 SECOND FLOOR - PLUMBING PLAN - AREA A

P-107 15154399 SECOND FLOOR - PLUMBING PLAN - AREA B

P-401 15154400 FIRST FLOOR - ENLARGED PLUMBING PLAN

P-402 15154401 SECOND FLOOR - ENLARGED PLUMBING PLAN

P-501 15154402 PLUMBING DETAILS - SHEET 1

P-502 15154403 PLUMBING DETAILS - SHEET 2

P-503 15154404 PLUMBING DETAILS - SHEET 3

P-601 15154405 PLUMBING SCHEDULES

P-602 15154406 PLUMBING SCHEDULES

P-901 15154407 SANITARY RISER DIAGRAM

P-902 15154408 DOMESTIC WATER RISER DIAGRAM

M-001 15154414 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

M-100 15154415 FIRST FLOOR - HVAC PLAN - OVERALL

M-101 15154416 FIRST FLOOR - HVAC PLAN - AREA A

M-102 15154417 FIRST FLOOR - HVAC PLAN - AREA B

M-103 15154418 FIRST FLOOR - MECH PIPING PLAN - AREA A

M-104 15154419 FIRST FLOOR - MECH PIPING PLAN - AREA B

M-105 15154420 SECOND FLOOR - HVAC PLAN - OVERALL

M-106 15154421 SECOND FLOOR - HVAC PLAN - AREA A

M-107 15154422 SECOND FLOOR - HVAC PLAN - AREA B

M-108 15154423 SECOND FLOOR - MECH PIPING PLAN - AREA A

M-109 15154424 SECOND FLOOR - MECH PIPING PLAN - AREA B

M-301 15154425 MECHANICAL SECTIONS - MECH ROOM

M-302 15154426 MECHANICAL SECTIONS - MECH ROOM

M-401 15154427 MECHANICAL PLAN - ENLARGED MECHANICAL ROOM

M-402 15154428 MECHANICAL PLAN - ENLARGED MECHANICAL ROOM - PLATFORM

M-403 15154429 MECHANICAL PLAN - ALIS SERVER ENLARGED PLAN

M-501 15154430 MECHANICAL DETAILS

M-502 15154431 MECHANICAL DETAILS

M-503 15154432 MECHANICAL DETAILS

M-504 15154433 MECHANICAL DETAILS

M-505 15154434 MECHANICAL DETAILS

M-506 15154435 MECHANICAL DETAILS

M-507 15154436 MECHANICAL DETAILS

M-508 15154437 MECHANICAL DETAILS

M-509 15154438 MECHANICAL DETAILS

M-510 15154439 MECHANICAL DETAILS

M-511 15154440 MECHANICAL DETAILS

M-601 15154441 MECHANICAL SCHEDULES - SHEET 1

M-602 15154442 MECHANICAL SCHEDULES - SHEET 2

M-603 15154443 MECHANICAL SCHEDULES - SHEET 3

M-604 15154444 MECHANICAL SCHEDULES - SHEET 4

M-605 15154445 MECHANICAL SCHEDULES - SHEET 5

M-610 15154446 HEATING WATER FLOW DIAGRAM

M-611 15154447 HEATING WATER FLOW DIAGRAM

M-612 15154448 CHILLED WATER FLOW DIAGRAM

M-613 15154449 FIRST FLOOR AIRFLOW DIAGRAM (1/2)

M-614 15154450 FIRST FLOOR AIRFLOW DIAGRAM (2/2)

M-615 15154451 SECOND FLOOR AIRFLOW DIAGRAM (1/3)

M-616 15154452 SECOND FLOOR AIRFLOW DIAGRAM (2/3)

M-617 15154453 SECOND FLOOR AIRFLOW DIAGRAM (3/3)

DOCUMENT 00 01 15 Page 5

M-701 15154454 CONTROLS LEGEND AND ABBREVIATIONS

M-702 15154455 SYSTEMS ARCHITECTURE AND MISCELLANEOUS CONTROLS

M-703 15154456 CONTROLS SCHEMATIC - VAV

M-704 15154457 CONTROLS POINTS LIST - VAV AHU

M-705 15154458 CONTROLS - SCHEMATIC VAV - TERMINAL UNIT

M-706 15154459 CONTROLS - SCHEMATIC VAV W/HOT WATER REHEAT

M-707 15154460 CONTROLS - SCHEMATIC PARALLEL FAN POWERED VAV

TERMINAL W/HOT WATER REHEAT

M-708 15154461 CONTROLS - CRAC UNIT

M-709 15154462 CONTROLS - AIR COOLED CHILLED WATER W/PRIMARY

ONLY PUMPING

M-710 15154463 CONTROLS POINT LIST - AIR COOLED CHILLED WATER

SYSTEM PRIMARY ONLY PUMPING

M-711 15154464 CONTROLS - HEATING HOT WATER SYSTEM SCHEMATIC

M-712 15154465 CONTROLS POINTS LIST - HEATING HOT WATER SYSTEM

PRIMARY SECONDARY PUMPING

M-713 15154466 CONTROLS - DUCTLESS SPLIT SYSTEM

M-714 15154467 CONTROLS - HOT WATER UNIT HEATER

M-715 15154468 CONTROLS - FAN COIL UNIT HEATING AND COOLING

M-716 15154469 CONTROLS - TEMPERATURE CONTROLLED EXHAUST FAN

M-717 15154470 CONTROLS - CONTINUOUSLY OPERATED EXHAUST FAN

M-718 15154471 CONTROLS - INTERLOCKED EXHAUST FAN

M-901 15154472 MECHANICAL ROOM ISOMETRIC

E-001 15154483 ELECTRICAL SYMBOLS LEGEND

E-002 15154484 ELECTRICAL SYMBOLS LEGEND

EG101 15154485 GROUND FLOOR GROUNDING PLAN

EG102 15154486 SECOND FLOOR GROUNDING PLAN

EG103 15154487 LIGHTNING PROTECTION PLAN

EG501 15154488 TELECOMMUNICATIONS GROUNDING DETAILS

EG502 15154489 GROUNDING DETAILS

EG503 15154490 GROUNDING DETAILS

EG601 15154491 GROUNDING RISER DIAGRAM

EG602 15154492 TELECOMMUNICATIONS GROUNDING RISER DIAGRAMS

EG603 15154493 EQUIPMENT GROUNDING RISER

EL101 15154494 LIGHTING PLAN - GROUND FLOOR - AREA A

EL102 15154495 LIGHTING PLAN - GROUND FLOOR - AREA B

EL103 15154496 LIGHTING PLAN - SECOND FLOOR - AREA A

EL104 15154497 LIGHTING PLAN - SECOND FLOOR - AREA B

EL201 15154498 LIGHTING SECTIONS

EL202 15154499 LIGHTING SECTIONS

EL501 15154500 LIGHTING CONTROLS SCHEDULE

EL502 15154501 LIGHTING CONTROLS DIAGRAMS

EL503 15154502 LIGHTING CONTACTOR DIAGRAM

EL506 15154503 LIGHTING DETAILS

EL507 15154504 LIGHTING DETAILS

EL601 15154505 LIGHTING FIXTURE SCHEDULE

EP101 15154506 POWER PLAN - GROUND FLOOR - AREA A

EP102 15154507 POWER PLAN - GROUND FLOOR - AREA B

EP103 15154508 POWER PLAN - SECOND FLOOR - AREA A

EP104 15154509 POWER PLAN - SECOND FLOOR - AREA B

EP401 15154510 POWER ENLARGED PLANS

EP402 15154511 POWER ELEVATIONS

EP501 15154512 POWER DETAILS

EP502 15154513 POWER DETAILS

EP601 15154514 ELECTRICAL ONE-LINE DIAGRAM

EP602 15154515 ONE-LINE CONDUCTOR TABLES

EP701 15154516 PANELBOARD SCHEDULE

EP702 15154517 PANELBOARD SCHEDULE

DOCUMENT 00 01 15 Page 6

EP703 15154518 PANELBOARD SCHEDULE

EP704 15154519 PANELBOARD SCHEDULE

EP705 15154520 PANELBOARD SCHEDULE

EP706 15154521 PANELBOARD SCHEDULE

EP707 15154522 MECHANICAL EQUIPMENT SCHEDULE

TN001 15154533 TELECOMMUNICATIONS LEGEND

TN101 15154534 TELECOMMUNICATIONS PLAN - GROUND FLOOR - AREA A

TN102 15154535 TELECOMMUNICATIONS PLAN - GROUND FLOOR - AREA B

TN103 15154536 TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA A

TN104 15154537 TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA B

TN401 15154538 COMM ROOM 112 - ENLARGED PLANS

TN402 15154539 COMM ROOM 212 - ENLARGED PLANS

TN403 15154540 ALIS SERVER ROOM 231 - ENLARGED PLAN

TN404 15154541 ALIS SERVER ROOM 231 - EQUIPMENT ELEVATION PLAN

TN405 15154542 INTEL COMM ROOM 238 - ENLARGED PLAN

TN406 15154543 ISSO/SECURE COMM 245 - ENLARGED PLANS

TN501 15154544 TELECOMMUNICATION DETAILS

TN502 15154545 TELECOMMUNICATION DETAILS

TN503 15154546 TELECOMMUNICATION DETAILS

TN504 15154547 TELECOMMUNICATION DETAILS

TN505 15154548 TELECOMMUNICATION DETAILS

TN506 15154549 TELECOMMUNICATION DETAILS

TN507 15154550 TELECOMMUNICATION DETAILS

TN508 15154551 TELECOMMUNICATION DETAILS

TN601 15154552 TELECOMMUNICATIONS BACKBONE RISER DIAGRAM

TY001 15154553 SECURITY LEGEND

TY002 15154554 SECURITY PLAN - OVERALL GROUND FLOOR

TY003 15154555 SECURITY PLAN - OVERALL SECOND FLOOR

TY101 15154556 SECURITY PLAN - GROUND FLOOR - AREA A

TY102 15154557 SECURITY PLAN - GROUND FLOOR - AREA B

TY103 15154558 SECURITY PLAN - SECOND FLOOR - AREA A

TY104 15154559 SECURITY PLAN - SECOND FLOOR - AREA B

TY501 15154560 SECURITY DETAILS

TY502 15154561 SECURITY DETAILS

TY503 15154562 SECURITY DETAILS

TY601 15154563 SECURITY RISER DIAGRAM

TA001 15154568 AV EQUIPMENT GENERAL NOTES AND LEGENDS

TA111 15154569 AV EQUIPMENT GROUND FLOOR PLAN - AREA A

TA112 15154570 AV EQUIPMENT GROUND FLOOR PLAN - AREA B

TA121 15154571 AV EQUIPMENT SECOND FLOOR PLAN - AREA A

TA122 15154572 AV EQUIPMENT SECOND FLOOR PLAN - AREA B

TA151 15154573 AV EQUIPMENT GROUND FLOOR REFLECTED CEILING

PLAN - AREA A

TA152 15154574 AV EQUIPMENT GROUND FLOOR REFLECTED CEILING

PLAN - AREA B

TA153 15154575 AV EQUIPMENT SECOND FLOOR REFLECTED CEILING

PLAN - AREA A

TA154 15154576 AV EQUIPMENT SECOND FLOOR REFLECTED CEILING

PLAN - AREA B

TA301 15154577 AV EQUIPMENT SECTIONS GROUND FLOOR

TA302 15154578 AV EQUIPMENT SECTIONS SECOND FLOOR

TA501 15154579 AV EQUIPMENT MOUNTING DETAILS

TA502 15154580 AV EQUIPMENT RACK ELEVATIONS

TA601 15154581 ONE-LINE DIAGRAMS

TA602 15154582 ONE-LINE DIAGRAMS

TA603 15154583 ONE-LINE DIAGRAMS

TA604 15154584 ONE-LINE DIAGRAMS

DOCUMENT 00 01 15 Page 7

TI001 15154585 AV CONDUIT GENERAL NOTES AND LEGENDS

TI111 15154586 AV CONDUIT GROUND FLOOR RCP - AREA A

TI112 15154587 AV CONDUIT GROUND FLOOR RCP - AREA B

TI121 15154588 AV CONDUIT SECOND FLOOR RCP - AREA A

TI122 15154589 AV CONDUIT SECOND FLOOR RCP - AREA B

TI151 15154590 AV CONDUIT GROUND FLOOR RCP - AREA A

TI152 15154591 AV CONDUIT GROUND FLOOR RCP - AREA B

TI153 15154592 AV CONDUIT SECOND FLOOR RCP - AREA A

TI154 15154593 AV CONDUIT SECOND FLOOR RCP - AREA B

VOLUME I I I

G-101 15154700 COVER SHEET

G-102 15154701 SHEET LIST

S-001 15154703 ABBREVIATIONS AND DESIGN WIND PRESSURES

S-002 15154704 GENERAL STRUCTURAL NOTES

S-101 15154705 PIER PLAN

S-102 15154706 `

S-103 15154707 SLAB PLAN

S-501 15154708 FOUNDATION DETAILS

S-502 15154709 SLAB DETAILS

S-503 15154710 MASONRY DETAILS

A-001 15154711 ABBREVIATIONS AND LEGENDS

F-001 15154712 LIFE SAFETY CODE AND CRITERIA

F-100 15154713 LIFE SAFETY SITE PLAN

F-101 15154714 LIFE SAFETY PLAN - OVERALL

A-101 15154715 FLOOR PLAN

A-102 15154716 PARTITION PLAN

A-103 15154717 ROOF PLAN

A-104 15154718 REFLECTED CEILING PLAN

A-105 15154719 STC REFLECTED CEILING PLAN

A-106 15154720 ENLARGED COMPOSITE COORDINATION PLAN

A-107 15154721 ENLARGED COMPOSITE COORDINATION PLAN

A-108 15154722 SECURITY PLAN

A-109 15154723 AIR BARRIER PLAN

A-110 15154724 AIR BARRIER SECTIONS

A-111 15154725 AREA PLAN A

A-112 15154726 AREA PLAN B

A-113 15154727 AREA PLAN C

A-114 15154728 AREA PLAN D

A-201 15154729 EXTERIOR ELEVATIONS

A-202 15154730 EXTERIOR ELEVATIONS

A-203 15154731 INTERIOR ELEVATIONS

A-204 15154732 INTERIOR ELEVATIONS

A-205 15154733 SCHEDULE AND DETAILS

A-301 15154734 BUILDING SECTIONS

A-302 15154735 BUILDING SECTIONS

A-303 15154736 BUILDING SECTIONS

A-311 15154737 WALL SECTIONS

A-312 15154738 WALL SECTIONS

A-401 15154739 ENLARGED PLANS

A-501 15154740 PARTITION TYPES

A-502 15154741 PARTITION TYPES

A-511 15154742 PARTITION HEAD DETAILS

A-512 15154743 PARTITION BASE DETAILS

A-601 15154744 PLAN DETAILS

A-602 15154745 PLAN DETAILS

A-603 15154746 DETAILS

DOCUMENT 00 01 15 Page 8

A-604 15154747 DETAILS

A-605 15154748 DETAILS

A-606 15154749 ROOF DETAILS

A-607 15154750 ROOF DETAIL

A-611 15154751 EXTERIOR DOOR DETAILS

A-612 15154752 INTERIOR DOOR DETAILS

A-701 15154753 ROOM FINISH SCHEDULE

A-702 15154754 DOOR SCHEDULE

A-703 15154755 WINDOW SCHEDULE AND DETAILS

A-711 15154756 OVERALL GROUND FLOOR WALL FINISH AND SIGNAGE PLAN

A-731 15154757 OVERALL FLOOR FINISH PLAN GROUND FLOOR

A-751 15154758 SIGNAGE SCHEDULE

A-752 15154759 SIGNAGE DETAILS

A-753 15154760 SIGNAGE ELEVATIONS

A-761 15154761 FLOOR TRANSITIONS

I-010 15154775 OVERALL GROUND FLOOR FURNITURE PLAN

I-101 15154776 GROUND FLOOR FURNITURE PLAN - AREA A

I-102 15154777 GROUND FLOOR FURNITURE PLAN - AREA B

I-103 15154778 GROUND FLOOR FURNITURE PLAN - AREA C

I-104 15154779 GROUND FLOOR FURNITURE PLAN - AREA D

FA001 15154785 FIRE ALARM NOTES & LEGEND

FA101 15154786 FIRE ALARM PLAN - OVERALL

FA600 15154787 FIRE MNS PANELS

FA601 15154788 FIRE MNS MATRIX

FP101 15154789 FIRE PROTECTION SECURITY ZONES - OVERALL

FS001 15154790 FIRE SPRINKLER NOTES

FS101 15154791 FIRE SPRINKLER ZONES & DENSITY - OVERALL

FS701 15154792 FIRE SPRINLER REMOTE AREA - OVERALL

P-001 15154798 ABBREVIATIONS AND SYMBOLS LEGEND

P-101 15154799 FLOOR PLAN - SANITARY SEWER

P-102 15154800 FLOOR PLAN - DOMESTIC WATER

P-401 15154801 ENLARGED PLAN - SANITARY SEWER

P-402 15154802 ENLARGED PLAN - DOMESTIC WATER

P-501 15154803 PLUMBING DETAILS

P-502 15154804 PLUMBING DETAILS

P-503 15154805 PLUMBING DETAILS

P-601 15154806 PLUMBING FIXTURE SCHEDULE

P-701 15154807 SANITARY SEWER RISER DIAGRAM

P-702 15154808 DOMESTIC WATER RISER DIAGRAM

M-001 15154815 ABBREVIATIONS AND SYMBOLS LEGEND

M-100 15154816 HVAC PLAN - OVERALL

M-101 15154817 HVAC PLAN - AREA A

M-102 15154818 HVAC PLAN - AREA B

M-103 15154819 HVAC PLAN - AREA C

M-104 15154820 HVAC PLAN - AREA D

M-105 15154821 PIPING PLAN - OVERALL

M-106 15154822 PIPING PLAN - AREA A

M-107 15154823 PIPING PLAN - AREA B

M-108 15154824 PIPING PLAN - AREA C

M-109 15154825 PIPING PLAN - AREA D

M-401 15154826 ENLARGED PLANS

M-402 15154827 MECHANICAL SECTIONS

M-403 15154828 MECHANICAL SECTIONS

M-404 15154829 MECHANICAL SECTIONS

M-501 15154830 MECHANICAL DETAILS

DOCUMENT 00 01 15 Page 9

M-502 15154831 MECHANICAL DETAILS

M-503 15154832 MECHANICAL DETAILS

M-504 15154833 MECHANICAL DETAILS

M-505 15154834 MECHANICAL DETAILS

M-506 15154835 MECHANICAL DETAILS

M-507 15154836 MECHANICAL DETAILS

M-508 15154837 MECHANICAL DETAILS

M-509 15154838 MECHANICAL DETAILS

M-510 15154840 MECHANICAL DETAILS

M-601 15154841 MECHANICAL SCHEDULES

M-602 15154842 MECHANICAL SCHEDULES

M-603 15154843 MECHANICAL SCHEDULES

M-604 15154844 MECHANICAL SCHEDULES

M-610 15154845 HEATING WATER FLOW DIAGRAM 1 OF 2

M-611 15154846 HEATING WATER FLOW DIAGRAM 2 OF 2

M-612 15154847 CHILLED WATER FLOW DIAGRAM

M-701 15154848 CONTROLS LEGEND AND ABBREVIATIONS

M-702 15154849 SYSTEMS ARCHITECTURE AND MISCELLANOUS CONTROLS

M-703 15154850 CONTROLS SCHEMATIC - VAV AHU

M-704 15154851 CONTROLS POINTS LIST - VAV AHU

M-705 15154852 CONTROLS - VAV TERMINAL W/HOT WATER REHEAT

M-706 15154853 CONTROLS - CRAC UNIT

M-707 15154854 CONTROLS - AIR COOLED CHILLED WATER W/PRIMARY

ONLY PUMPING

M-708 15154855 CONTROLS POINTS LIST - AIR COOLED CHILLED WATER

SYSTEM PRIMARY ONLY PUMPING

M-709 15154856 CONTROLS SCHEMATIC - HEATING WATER SYSTEM W/PRIMARY

ONLY PUMPING

M-710 15154857 CONTROLS POINTS LIST - HEATING WATER SYSTEM PRIMARY

ONLY PUMPING

M-711 15154858 CONTROLS - DUCTLESS SPLIT SYSTEM

M-712 15154859 CONTROLS - HOT WATER UNIT HEATER

M-713 15154860 CONTROLS - CONTINUOUSLY OPERATED EXHAUST FAN

M-714 15154861 CONTROLS - INTERLOCKED EXHAUSTED FAN

M-715 15154862 CONTROLS - BOOSTER FAN

E-001 15154870 ELECTRICAL NOTES AND ABBREVIATIONS

E-002 15154871 ELECTRICAL LEGEND

ED101 15154872 ELECTRICAL DEMOLITION SITE PLAN

ES101 15154873 POWER SITE PLAN

ES102 15154874 SITE LIGHTING PLAN

E-501 15154875 ELECTRICAL DETAILS

E-502 15154876 ELECTRICAL DETAILS

E-503 15154877 ELECTRICAL DETAILS

E-504 15154878 ELECTRICAL DETAILS

E-505 15154879 ELECTRICAL DETAILS

E-506 15154880 ELECTRICAL DETAILS

E-507 15154881 ELECTRICAL DETAILS

E-601 15154882 DEMOLITION POWER ONELINE

E-602 15154883 POWER ONELINE

E-603 15154884 SINGLE LINE DIAGRAM

E-604 15154885 SINGLE LINE DIAGRAM

E-701 15154886 PANEL SCHEDULE

E-702 15154887 PANEL SCHEDULE

E-703 15154889 PANEL SCHEDULE

E-704 15154890 PANEL SCHEDULES

EL101 15154891 LIGHTING PLAN

EL102 15154892 LIGHTING PLAN

EL501 15154893 LIGHTING FIXTURES DETAILS

DOCUMENT 00 01 15 Page 10

EL502 15154894 LIGHTING DETAILS

EL601 15154895 LIGHTING CONTROLS SCHEDULE

EL701 15154896 LIGHTING FIXTURE SCHEDULE

EP101 15154897 POWER PLAN

EP102 15154898 POWER PLAN

EP201 15154899 MECHANICAL POWER

EP202 15154900 MECHANICAL POWER

EP301 15154901 CABLE TRAY PLAN

EP302 15154902 FMS CABLE ROUTING - AREA A

EP303 15154903 FMS CABLE ROUTING - AREA B

EP401 15154904 ENLARGED POWER PLAN

EP402 15154905 ENLARGED POWER PLAN

EG101 15154906 LIGHTNING PROTECTION

EG102 15154907 GROUNDING PLAN

EG501 15154908 LIGHTNING PROTECTION DETAILS

EG502 15154909 LIGHTNING PROTECTION DETAILS

EG503 15154910 GROUNDING DETAILS

EG504 15154911 GROUNDING DETAILS

EG601 15154912 GROUNDING RISER DIAGRAM

TN001 15154920 TELECOMMUNICATION LEGEND

TD101 15154921 TELECOMMUNICATION DEMOLITION SITE PLAN

TS101 15154922 TELECOMMUNICATION SITE PLAN

TS102 15154923 TELECOMMUNICATION SITE PLAN

TN101 15154924 TELECOMMUNICATION PLAN

TN401 15154925 COMM. ROOM 110 - ENLARGED TELECOMMUNICATIONS PLAN

TN402 15154926 SECURE COMM. ROOM 127 - ENLARGED TELECOMMUNICATION PLAN

TN403 15154927 PATCH PANEL 113 - ENLARGED TELECOMMUNICATION PLAN

TN404 15154928 ENLARGED TELECOMMUNICATION PLAN

TN501 15154929 TELECOMMUNICATIONS DETAILS

TN601 15154930 TELECOMMUNICATIONS RISER

TN602 15154931 TELECOMMUNICATIONS RISER

TN603 15154932 TELECOMMUNICATION RISER

TY001 15154933 SPECIAL SYSTEMS LEGEND

TY101 15154934 AUXILIARY SYSTEMS

TY102 15154935 AUXILIARY SYSTEMS

TY103 15154936 DOOR CONTROL SCHEDULE

TY501 15154937 ACCESS CONTROLS DETAILS

TY502 15154938 ACCESS CONTROL DETAILS

TY503 15154939 ACCESS CONTROLS DETAILS

TA-001 15154940 AV EQUIPMENT GENERAL NOTES AND LEGENDS

TA-111 15154941 AV EQUIPMENT - AREA PLAN A

TA-121 15154942 AV EQUIPMENT - REFLECTED CEILING PLAN A

TA-301 15154943 AV EQUIPMENT SECTIONS

TA-501 15154944 AV EQUIPMENT DETAILS

TA-502 15154945 AV EQUIPMENT RACK ELEVATIONS

TA-601 15154946 AV EQUIPMENT ONE-LINE DIAGRAMS

TI-001 15154947 AV CONDUIT GENERAL NOTES AND LEGENDS

TI-111 15154948 AV CONDUIT - AREA PLAN A

TI-112 15154949 AV CONDUIT - REFLECTED CEILING PLAN A

-- End of Document --

DOCUMENT 00 01 15 Page 11

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 01 15 Page 12

SECTION 01 11 00.00 25

SUMMARY OF WORK

01/17

NAVFAC SE VERSI ON

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes site building demolition, asbestos abatement, site pavement and utility demolition, utilities, pavement, site drainage, construction of 33,729 square-foot Squad OPS/AMU building and 20,000 square-foot Flight Simulator building and incidental related work.

1.1.2 Location

The work is located at the NAS JRB Fort Worth, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.3 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.3.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting

SECTION 01 11 00.00 25 Page 1 excavation work.

1.4 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the storage area located within 10 miles of the construction site.

Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00.00 25 Page 2

SECTION 01 14 00.00 25

WORK RESTRICTIONS

03/20

NAVFAC SE VERSI ON

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 25 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

1.2 CONTRACTOR ACCESS AND USE OF PREMISES

1.2.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.2.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.2.1.2 NCACS Identification Badges and Installation Access

Application for and use of badges will be as directed. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.

Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.

a. NCACS Program: NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.

The Government performs background screening and credentialing.

SECTION 01 14 00.00 25 Page 1

Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling 1-877-727-4342. Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.

b. One-Day Passes: Participation in the NCACS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation.

The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the NCACS.

1.2.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.2.2 Working Hours

Regular working hours will consist of an 8 1/2 hour period, between 8 a.m.

and 4:30 p.m., Monday through Friday, excluding Government holidays.

1.2.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.2.4 Exclusionary Period

No work may be performed during the period December 26 to December 31, inclusive, without prior written approval of the Contracting Officer.

This period has not been considered in computing the time allowed for the performance of this contract.

SECTION 01 14 00.00 25 Page 2

1.2.5 Occupied and Existing Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

1.2.6 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and Security systems are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to 6 hours. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00.00 25 Page 3

SECTION 01 14 00.00 25 Page 4

SECTION 01 20 00.00 25

PRICE AND PAYMENT PROCEDURES

03/20

NAVFAC SE VERSI ON

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 25 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report; G

1.3 EARNED VALUE REPORT

1.3.1 Data Required

This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer a Schedule of Prices (construction contract) as directed by the Contracting Officer. Schedule of Prices must have cost summarized and totals provided for each construction category.

1.3.2 Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Schedule of Prices must identify the cost for site work, and include incidental work to the 5 ft line. Identify costs for the building(s), and include work out to the 5 ft line. Work out to the 5 ft line shall include construction encompassed within a theoretical line 5 ft from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 ft line.

SECTION 01 20 00.00 25 Page 1

1.3.3 Real Property Assets

The Government will provide the Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The Contractor shall meet with the Contracting Officer and the Real Property Accounting Officer during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the DD Form 1354. The Contractor shall provide the Interim DD Form 1354 that uses the appropriate division of the RPUIDs/ Category Codes to represent the final constructed facility and include all associated cost.

Coordinate the Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes.

Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work.

Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer.

Cost data accumulated under this section are required in the preparation of DD Form 1354.

1.3.4 Schedule Requirements for HVAC TAB

The field work Section 23 05 93.00 25 TESTING, ADJUSTING, AND BALANCING FOR HVAC shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field

SECTION 01 20 00.00 25 Page 2 work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. This data shall be compiled into a report and submitted to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the EP 1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. The requests for payment shall include the documents listed below.

a. Updated Project Schedule and reports required by the contract.

b. Contractor Safety Self Evaluation Checklist.

c. Other supporting documents as requested.

d. Updated copy of submittal register.

e. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.

f. Contractor's Subcontractor and supplier payment certification.

g. Materials on Site.

1.5.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area Work Flow Payment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .