F35 Squad Ops and Flt Sim Plans Volume IIB Squad Ops Bldg.pdf
PDF 42 MB Posted
- Solicitation number
- N69450-21-R0022
About this file
This solicitation is for the design-build construction of a Flight Simulator Facility and Squadron Operations Facility at Naval Air Station Fort Worth Joint Reserve Base in Texas. The projects include demolishing existing buildings totaling 8,009 square feet, asbestos abatement, site utilities and pavement demolition, and construction of a new 20,000 square-foot Flight Simulator Facility and a 33,729 square-foot Squadron Operations/Aircraft Maintenance Unit Facility. The Simulator Facility will house four full mission simulators and include secure areas for simulators, computer equipment, debriefing rooms, and maintenance as well as unsecured office, break room, and restroom spaces. The Squadron Operations/Aircraft Maintenance Unit Facility will have Aircraft Maintenance Unit spaces on the first floor and secure Squadron Operations areas meeting Intelligence Community standards on the second floor, along with administrative offices and support spaces. The solicitation was issued by the Naval Facilities Engineering Command with responses due by the date specified in solicitation number N69450-21-R0022.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
NAVY AIR STATION JOINT RESERVE BASE - FORT WORTH, TEXAS
NAVAL FACILITIES ENGINEERING COMMAND SOUTHEAST
RTA SUBMITTAL
01/22/2021
P415 F-35A SQUADRON OPERATIONS/AMU FACILITY AND
P396 F35A FLIGHT SIMULATOR FACILITY
VOLUME IIB SQUADRON OPERATIONS/AMU FACILITY
15154699
C
U s e rs \m n b a x \O n e D ri v e
B u rn s
M c D o n n e ll\
D o c u m e n ts \B
L D
G P
-1
-G -O
P S
-C o o r d in a ti o n m n b a x b u rn s m c d
.c o m .r v t
/1
/2
:2
:2
A M
G-002
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
C O
V E
R
15154389
15154389
MB MB
05/07/2020
JR / SM
1651220
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
S U
B M
IT
T
A L
/2
2/
1.22.21
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \m n b a x \O n e D ri v e
B u rn s
M c D o n n e ll\
D o c u m e n ts \B
L D
G P
-1
-G -O
P S
-C o o r d in a ti o n m n b a x b u rn s m c d
.c o m .r v t
/1
/2
:3
:2
P M
G-004
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
S H
E E
T
IN
D E
X
15154390
15154390
MB MB
05/07/2020
JR / SM
1651220
ELECTRICAL SHEET LIST
SHEET NO. DESCRIPTION
E-001 ELECTRICAL SYMBOLS LEGEND
E-002 ELECTRICAL SYMBOLS LEGEND
EG101 GROUND FLOOR GROUNDING PLAN
EG102 SECOND FLOOR GROUNDING PLAN
EG103 LIGHTNING PROTECTION PLAN
EG501 TELECOMMUNICATIONS GROUNDING DETAILS
EG502 GROUNDING DETAILS
EG503 GROUNDING DETAILS
EG601 GROUNDING RISER DIAGAM
EG602 TELECOMMUNICATIONS GROUNDING RISER DIAGRAMS
EG603 EQUIPMENT GROUNDING RISER
EL101 LIGHTING PLAN - GROUND FLOOR - AREA A
EL102 LIGHTING PLAN - GROUND FLOOR - AREA B
EL103 LIGHTING PLAN - SECOND FLOOR - AREA A
EL104 LIGHTING PLAN - SECOND FLOOR - AREA B
EL201 LIGHTING SECTIONS
EL202 LIGHTING SECTIONS
EL501 LIGHTING CONTROLS SCHEDULE
EL502 LIGHTING CONTROLS DIAGRAMS
EL503 LIGHTING CONTACTOR DIAGRAM
EL506 LIGHTING DETAILS
EL507 LIGHTING DETAILS
EL601 LIGHTING FIXTURE SCHEDULE
EP101 POWER PLAN - GROUND FLOOR - AREA A
EP102 POWER PLAN - GROUND FLOOR - AREA B
EP103 POWER PLAN - SECOND FLOOR - AREA A
EP104 POWER PLAN - SECOND FLOOR - AREA B
EP401 POWER ENLARGED PLANS
EP402 POWER ELEVATIONS
EP501 POWER DETAILS
EP502 POWER DETAILS
EP601 ELECTRICAL ONE-LINE DIAGRAM
EP602 ONE-LINE CONDUCTOR TABLES
EP701 PANELBOARD SCHEDULE
EP702 PANELBOARD SCHEDULE
EP703 PANELBOARD SCHEDULE
EP704 PANELBOARD SCHEDULE
EP705 PANELBOARD SCHEDULE
EP706 PANELBOARD SCHEDULE
EP707 MECHANICAL EQUIPMENT SCHEDULE
MECHANICAL SHEET LIST
SHEET NO. DESCRIPTION
M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS
M-100 FIRST FLOOR - HVAC PLAN - OVERALL
M-101 FIRST FLOOR - HVAC PLAN - AREA A
M-102 FIRST FLOOR - HVAC PLAN - AREA B
M-103 FIRST FLOOR - MECH PIPING PLAN - AREA A
M-104 FIRST FLOOR - MECH PIPING PLAN - AREA B
M-105 SECOND FLOOR - HVAC PLAN - OVERALL
M-106 SECOND FLOOR - HVAC PLAN - AREA A
M-107 SECOND FLOOR - HVAC PLAN - AREA B
M-108 SECOND FLOOR - MECH PIPING PLAN - AREA A
M-109 SECOND FLOOR - MECH PIPING PLAN - AREA B
M-301 MECHANICAL SECTIONS - MECH ROOM
M-302 MECHANICAL SECTIONS - MECH ROOM
M-401 MECHANICAL PLAN - ENLARGED MECHANICAL ROOM
M-402 MECHANICAL PLAN - ENLARGED MECHANICAL ROOM -
PLATFORM
M-403 MECHANICAL PLAN - ALIS SERVER ENLARGED PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DETAILS
M-507 MECHANICAL DETAILS
M-508 MECHANICAL DETAILS
M-509 MECHANICAL DETAILS
M-510 MECHANICAL DETAILS
M-511 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES - SHEET 1
M-602 MECHANICAL SCHEDULES - SHEET 2
M-603 MECHANICAL SCHEDULES - SHEET 3
M-604 MECHANICAL SCHEDULES - SHEET 4
M-605 MECHANICAL SCHEDULES - SHEET 5
M-610 HEATING WATER FLOW DIAGRAM
M-611 HEATING WATER FLOW DIAGRAM
M-612 CHILLED WATER FLOW DIAGRAM
M-613 FIRST FLOOR AIRFLOW DIAGRAM (1/2)
M-614 FIRST FLOOR AIRFLOW DIAGRAM (2/2)
M-615 SECOND FLOOR AIRFLOW DIAGRAM (1/3)
M-616 SECOND FLOOR AIRFLOW DIAGRAM (2/3)
M-617 SECOND FLOOR AIRFLOW DIAGRAM (3/3)
M-701 CONTROLS LEGEND AND ABBREVIATIONS
M-702 SYSTEMS ARCHITECTURE AND MISCELLANEOUS CONTROLS
M-703 CONTROLS SCHEMATIC - VAV
M-704 CONTROLS POINTS LIST - VAV AHU
M-705 CONTROLS - SCHEMATIC VAV - TERMINAL UNIT
M-706 CONTROLS - SCHEMATIC VAV W/HOT WTAER REHEAT
M-707 CONTROLS - SCHEMATIC PARALLEL FAN POWERED VAV
TERMINAL W/HOT WATER REHEAT
M-708 CONTROLS - CRAC UNIT
M-709 CONTROLS - AIR COOLED CHILLED WATER W/PRIMARY ONLY
PUMPING
M-710 CONTROLS POINT LIST - AIR COOLED CHILLED WATER SYSTEM
PRIMARY ONLY PUMPING
M-711 CONTROLS - HEATING HOT WATER SYSTEM SCHEMATIC
M-712 CONTROLS POINTS LIST - HEATING HOT WATER SYSTEM
PRIMARY SECONDARY PUMPING
M-713 CONTROLS - DUCTLESS SPLIT SYSTEM
M-714 CONTROLS - HOT WATER UNIT HEATER
M-715 CONTROLS - FAN COIL UNIT HEATING AND COOLING
M-716 CONTROLS - TEMPERATURE CONTROLLED EXHAUST FAN
M-717 CONTROLS - CONTINUOUSLY OPERATED EXHAUST FAN
M-718 CONTROLS - INTERLOCKED EXHAUST FAN
M-901 MECHANICAL ROOM ISOMETRIC
PLUMBING SHEET LIST
SHEET NO. DESCRIPTION
P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS
P-100 FIRST FLOOR - PLUMBING PLAN - OVERALL
P-101 UNDER GROUND - PLUMBING PLAN - AREA A
P-102 UNDER GROUND - PLUMBING PLAN - AREA B
P-103 FIRST FLOOR - PLUMBING PLAN - AREA A
P-104 FIRST FLOOR - PLUMBING PLAN - AREA B
P-105 SECOND FLOOR - PLUMBING PLAN - OVERALL
P-106 SECOND FLOOR - PLUMBING PLAN - AREA A
P-107 SECOND FLOOR - PLUMBING PLAN - AREA B
P-401 FIRST FLOOR - ENLARGED PLUMBING PLAN
P-402 SECOND FLOOR - ENLARGED PLUMBING PLAN
P-501 PLUMBING DETAILS - SHEET 1
P-502 PLUMBING DETAILS - SHEET 2
P-503 PLUMBING DETAILS - SHEET 3
P-601 PLUMBING SCHEDULES
P-602 PLUMBING SCHEDULES
P-901 SANITARY RISER DIAGRAM
P-902 DOMESTIC WATER RISER DIAGRAM
TELECOMMUNICATIONS SHEET LIST
SHEET NO. DESCRIPTION
TN001 TELECOMMUNICATIONS LEGEND
TN101 TELECOMMUNICATIONS PLAN - GROUND FLOOR - AREA A
TN102 TELECOMMUNICATIONS PLAN - GROUND FLOOR - AREA B
TN103 TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA A
TN104 TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA B
TN401 COMM ROOM 112 - ENLARGED PLANS
TN402 COMM ROOM 212 - ENLARGED PLANS
TN403 ALIS SERVER ROOM 231 - ENLARGED PLAN
TN404 ALIS SERVER ROOM 231 - EQUIPMENT ELEVATION PLAN
TN405 INTEL COMM ROOM 238 - ENLARGED PLAN
TN406 ISSO/SECURE COMM 245 - ENLARGED PLANS
TN501 TELECOMMUNICATION DETAILS
TN502 TELECOMMUNICATION DETAILS
TN503 TELECOMMUNICATION DETAILS
TN504 TELECOMMUNICATION DETAILS
TN505 TELECOMMUNICATION DETAILS
TN506 TELECOMMUNICATION DETAILS
TN507 TELECOMMUNICATION DETAILS
TN508 TELECOMMUNICATION DETAILS
TN601 TELECOMMUNICATIONS BACKBONE RISER DIAGRAM
TY001 SECURITY LEGEND
TY002 SECURITY PLAN - OVERALL GROUND FLOOR
TY003 SECURITY PLAN - OVERALL SECOND FLOOR
TY101 SECURITY PLAN - GROUND FLOOR - AREA A
TY102 SECURITY PLAN - GROUND FLOOR - AREA B
TY103 SECURITY PLAN - SECOND FLOOR - AREA A
TY104 SECURITY PLAN - SECOND FLOOR - AREA B
TY501 SECURITY DETAILS
TY502 SECURITY DETAILS
TY503 SECURITY DETAILS
TY601 SECURITY RISER DIAGRAM
GENERAL SHEET INDEX - VOLUME IV
SHEET NO. DESCRIPTION
G-002 COVER
G-004 SHEET INDEX
AUDIO-VISUAL SHEET LIST
SHEET NO. DESCRIPTION
TA-001 AV EQUIPMENT GENERAL NOTES AND LEGENDS
TA-111 AV EQUIPMENT GROUND FLOOR PLAN - AREA A
TA-112 AV EQUIPMENT GROUND FLOOR PLAN - AREA B
TA-121 AV EQUIPMENT SECOND FLOOR PLAN - AREA A
TA-122 AV EQUIPMENT SECOND FLOOR PLAN - AREA B
TA-151 AV EQUIPMENT GROUND FLOOR REFLECTED CEILING PLAN -
AREA A
TA-152 AV EQUIPMENT GROUND FLOOR REFLECTED CEILING PLAN -
AREA B
TA-153 AV EQUIPMENT SECOND FLOOR REFLECTED CEILING PLAN -
AREA A
TA-154 AV EQUIPMENT SECOND FLOOR REFLECTED CEILING PLAN -
AREA B
TA-301 AV EQUIPMENT SECTIONS GROUND FLOOR
TA-302 AV EQUIPMENT SECTIONS SECOND FLOOR
TA-501 AV EQUIPMENT MOUNTING DETAILS
TA-502 AV EQUIPMENT RACK ELEVATIONS
TA-601 ONE-LINE DIAGRAMS
TA-602 ONE-LINE DIAGRAMS
TA-603 ONE-LINE DIAGRAMS
TA-604 ONE-LINE DIAGRAMS
TI-001 AV CONDUIT GENERAL NOTES AND LEGENDS
TI-111 AV CONDUIT GROUND FLOOR PLAN - AREA A
TI-112 AV CONDUIT GROUND FLOOR PLAN - AREA B
TI-121 AV CONDUIT SECOND FLOOR PLAN - AREA A
TI-122 AV CONDUIT SECOND FLOOR PLAN - AREA B
TI-151 AV CONDUIT GROUND FLOOR RCP - AREA A
TI-152 AV CONDUIT GROUND FLOOR RCP - AREA B
TI-153 AV CONDUIT SECOND FLOOR RCP - AREA A
TI-154 AV CONDUIT SECOND FLOOR RCP - AREA B
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
S U
B M
IT
T
A L
/2
2/
1.22.21
4" FD-A
EWC-1
JS-1
SK-1
U-2
U-1
WC-2
WC-1
LAV-1
PLUMBING SYMBOLS LEGEND
SIZE - FLOOR DRAIN
DUAL ELECTRIC WATER COOLER
JANITOR SINK
KITCHEN SINK
URINAL, ACCESSIBLE
URINAL
WATER CLOSET - ACCESSIBLE
WATER CLOSET
LAVATORY, COUNTER MOUNTED
PRESSURE/TEMPERATURE RELIEF VALVE
HB HOSE BIBB
WH WALL HYDRANT
LAV-2 LAVATORY, WALL MOUNTED
MB-1 MOP BASIN
SK-2 SINK
EEWS EMERGENCY EYEWASH / SHOWER
SH-1 SHOWER
SK-3 UNDER MOUNT SINK
EEW EMERGENCY EYEWASH
WCO
FLOOR DRAIN / EQUIPMENT DRAIN
PLUMBING FIXTURE TRAP
FLOOR OR WALL PENETRATION
VENT THRU ROOF (VTR)
CLEANOUT (CO) IN RISER
RISER DIAGRAM LEGEND
CO
FCO
CLEANOUT (FCO) IN FLOOR
WATER HAMMER ARRESTORWHA-A
WALL CLEANOUT (WCO)
ISOMETRIC DIRECTION ARROW
UP
DN
PIPE LINE ACCESSORIES
3-WAY VALVE
2-WAY VALVE
ANGLE VALVE
AV AUTOMATIC AIR VENT ASSEMBLY
BFP BACKFLOW PREVENTION ASSEMBLY
BALANCING VALVE / CIRCUIT SETTER
BALL VALVE
BLIND FLANGE
BUTTERFLY VALVE
CHECK VALVE
FLEX CONNECTION
FLOW ARROW
FM FLOW METER
GATE VALVE
GLOBE VALVE
HOSE GATE DRAIN VALVE
IF
INSULATING FLANGE
MV
MANUAL AIR VENT ASSEMBLY - SEE
SPECIFICATIONS FOR APPROPRIATE
VALVE TYPE
M METER
M MOTORIZED CONTROL VALVE
OS&Y
OUTSIDE SCREW & YOKE VALVE
PIPE WITH HEAT TRACE
PLUG VALVE
PRESSURE GUAGE
SELF CONTAINED PRESSURE REDUCING
(REGULATING) VALVE
PUMP
REDUCER (CONCENTRIC)
RELIEF, SAFETY OR THERMAL RELIEF
VALVE
REMOVABLE CAP
REMOVABLE PLUG
S STRAINER
SUCTION DIFFUSER
TEST CONNECTION
THERMOMETER
UNION
Y-TYPE STRAINER
SRC
SPRING RETURN CLOSED BALL VALVE
PIPE SYMBOLS
PIPE ELBOW
PIPE DOWN
PIPE UP
PIPE CONTINUATION
PIPE LINE DESIGNATIONS
VENT
STORM (ABOVE GRADE)
STORM (BELOW GRADE)
STORM OVERFLOW
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRCULATION
SANITARY SEWER (ABOVE GRADE)
SANITARY SEWER (BELOW GRADE)
CONDENSATE DRAIN
COMPRESSED AIR
NATURAL GAS
CLEANOUT IN RISER
CLEANOUT IN WALL
CLEANOUT IN FLOOR
SS
SS
COND
V
DCW
DHW
DHWR
CA
NG
OD
S
S
CO
WCO
FCO
PLUMBING ABBREVIATIONS GENERAL NOTES:
SECTION CUT SYMBOL
A
M-001
INDICATES PERSPECTIVE AND
LIMITS OF SECTION
SECTION
DESIGNATOR
DRAWING WHERE
SECTION IS SHOWN
AC AIR COCK
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AMSL ABOVE MEAN SEA LEVEL
ARV AIR RELEASE VALVE
BF BLIND FLANGE
BOP BOTTOM OF PIPE
BW BUTT WELD
CH OP CHAIN WHEEL OPERATOR
CONC CONCENTRIC
CORP STOP CORPORATION STOP
CPVC CHLORINATED POLYVINYL CHLORIDE
D DRAIN
DI DUCTILE IRON
DN DOWN
DWH DOMESTIC WATER HEATER
ELL ELBOW
EXIST EXISTING
FCA FLANGED COUPLING ADAPTER
FD FLOOR DRAIN
FE FLANGED END
FF FLAT FACED
FI FLOW INDICATOR
FLGD FLANGED
FM FLOW METER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FOV FLOAT OPERATED VALVE
FRP FIBERGLASS REINFORCED PIPE
FW FIELD WELD
HD HUB DRAIN
I.E. INVERT ELEVATION
IF INSULATED FLANGE
LC LOCK CLOSED
LO LOCK OPEN
LR LONG RADIUS
NPSH NET POSITIVE SUCTION HEAD
NRS NON-RISING STEM
NWL NORMAL WATER LEVEL
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
RED REDUCER-REDUCING
RS RISING STEM
SCH SCHEDULE
SCRD SCREWED
SR SHORT RADIUS
TD TRENCH DRAIN
TOC TOP OF CONCRETE
TOG TOP OF GRATING
TOP TOP OF PIPE
TOS TOP OF STEEL
TP TRAP PRIMER
VTR VENT THROUGH ROOF
1. UNLESS NOTED OTHERWISE, THE CIVIL AND MECHANICAL INTERFACE POINT IS 5 FEET OUTSIDE OF THE BUILDING WALL.
2. COORDINATE ALL PIPE SLEEVE REQUIREMENTS WITH FOUNDATION SUBCONTRACTOR.
3. COORDINATE MECHANICAL ROOM FLOOR DRAINS WITH ACTUAL EQUIPMENT LOCATIONS AND DRAINAGE REQUIREMENTS.
4. LEGEND IS GENERAL IN NATURE AND NOT ALL ITEMS SHOWN MAY BE USED ON THIS PROJECT.
5. INSTALL SANITARY PIPING WITH 2% SLOPE DOWNWARD IN DIRECTION OF FLOW FOR PIPING 3" AND SMALLER, 1% SLOPE FOR PIPING 4" AND
LARGER. INSTALL VENT PIPING WITH 1% SLOPE DOWNWARD TOWARD FIXTURE OR STACK.
6. ALL FIXTURES SHALL HAVE A P-TRAP INSTALLED.
7. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
8. INSTALL ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
9. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH STRUCTURAL, CIVIL, ELECTRICAL WORK ETC., SHOWN ON OTHER CONTRACT
DOCUMENT DRAWINGS.
10. MAINTAIN A MINIMUM OF 6' - 8 CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL
ROOMS.
11. LOCATE ALL PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
12. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.
13. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF PIPE UNLESS NOTED OTHERWISE.
14 INVERT ELEVATIONS GIVEN RELATIVE TO FINISH FLOOR ELEVATION OF 100'-0". ACTUAL FINISH FLOOR ELEVATION IS 606.64' AMSL.
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:4
:4
P M
P-001
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
P
LU
M B
IN
G
N O
TE
S
, L E
G E
N D
, S Y
M B
O
LS
A
B B
R E
V
IA
TI
O
N S
DAG
15154391
15154391
LJD CGM
05/07/2020
JM / SR
1651220
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
1/26/21
BFP
B F
P
1 2 3 4 5 6 7
F
D
C
B
A
101E1
141105
125122121
138-1
137-1
112 113
143 142
E
1 1/2" NG
1 1/2" NG UP
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:4
:4
P M
P-100
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
F
IR
S T
F
LO
O R
P
LU
M
B
IN
G P
LA
N
O
V E
R A
LL
DAG
15154392
15154392
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 3/32" = 1'-0"
B1
FIRST FLOOR - PLUMBING PLAN - OVERALL
4' 8' 16'0'
PLAN
NORTH
FIRST FLOOR ROOM SCHEDULE
Name Number
TECH ORDER LIBRARY 129
FLIGHT CHIEF 131
CHIEF OFFICE 132
SUPPORT OFFICE 133
BATTERY CHARGING 134
BATTERY STORAGE 135
COSO 136
MECHANICAL ROOM 137
ELECTRICAL ROOM 138
STORAGE 139
ELEVATOR MACHINE ROOM 141
RESTROOM 142
RESTROOM 143
FIRST FLOOR ROOM SCHEDULE
Name Number
RECEPTION 115
A/V CLOSET 116
HERITAGE ROOM 117
FITNESS / AFE TRAINING 118
HALL 119
VESTIBULE 121
FLIGHT CC 122
ADO 123
CORRIDOR 124
VESTIBULE 125
WORK CAFE 126
RESTROOM 127
SUPPORT EQUIPMENT / MAINTENANCE 128
FIRST FLOOR ROOM SCHEDULE
Name Number
VESTIBULE 101
CORRIDOR 102
LOBBY 103
MOTHER'S ROOM 104
STAIR 105
MEN'S RESTROOM 106
MEN'S LOCKERS 107
JANITOR 108
WOMEN'S RESTROOM 109
WOMEN'S LOCKERS 111
COMM ROOM 112
STORAGE 113
MASS BRIEFING 114
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
4" SS
3" SS UP
TO FD-B
4" SS UP
TO FCO-2
3" SS UP
TO FD-B
3" SS UP
TO FD-B
4" SS
4" SS
4" SS
4" SS
P-401
A1
1 2 3
F
D
C
B
A
SP-101
3" DCW
M A
T C
H
LI
N E
P -1
2" SS UP
TO EWC-1
2" SS UP
TO SK-2
95'-10" INV EL.
SEE C-104 FOR
CONTINUATION
3" DCW UP
3" SS
3" SS UP
TO FD-B
3" SS UP
TO FD-B
97'-3" INV EL.
137-1
117 121
104113
138-1
111 109
E1
1 1/2" NG
1 1/2" NG UP
3" SS UP
TO FCO-1
3" SS
3" SS
3" SS
4" SS4" SS
2" V UP
IN WALL
2" V UP
AT WALL
3" SS UP
3" SS UP
TO FD-B
3" SS
2" SS UP
3" SS UP
TO FS-A
2" S-FM UP
E
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:4
:4
P M
P-101
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
U N
D E
R G
R O
U N
D
P
LU
M B
IN
G
P
LA
N
A R
E A
A
DAG
15154393
15154393
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/8" = 1'-0"
A1
UNDER GROUND - PLUMBING PLAN - AREA A
4' 8' 16'0'
PLAN
NORTH
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME
SCHEDULE.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
4 5 6 7
F
D
C
B
A
4" SS UP
TO WC-2
2" SS UP
TO LAV-2
4" SS
4" SS
2" SS UP
TO FD-A
3" SS
2" V UP3" SS UP
TO TD-1
M A
T C
H
LI
N E
P -1
2" SS UP
TO EEW-1
3" SS UP
TO FCO-1
122 123
143 142
2" SS UP
TO FD-A
4" SS
4" SS
4" SS4" SS
3" SS UP
TO FD-C
2" SS UP
TO FD-A
4" SS UP
TO FCO-1
4" SS UP
2" SS UP
TO SK-1
2" SS UP
TO FCO-1
2" SS
4" SS UP
TO FCO-2
4" SS UP
TO FCO
2" V UP
E
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:4
:5
P M
P-102
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
U N
D E
R G
R O
U N
D
P
LU
M B
IN
G
P
LA
N
A R
E A
B
DAG
15154394
15154394
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/8" = 1'-0"
A1
UNDER GROUND - PLUMBING PLAN - AREA B
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME
SCHEDULE.
4' 8' 16'0'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
BFP
B F
P
WH-1
HB-1
RP-1
P-401
A3
1 2 3
F
D
C
B
A
WH-101
3"FD-B
3"FD-B
3"FD-B
3"FD-B
3/4" DCW
1 1/2" DCW
3/4" DHW
3/4" DHWR
3" DCW
1 1/2" DHW
3/4" DHWR
3/4" DCW
1/2" DHW
3/4" DCW
3/4" DHWR
3" DCW
2 1/2" DCW
1 1/2" DHW
3/4" DHWR
2" S-FM DN
TO SP-101
2" S-FM
FCO-2
SK-1
3" DCW DN
3" V UP
3" DCW
1 1/2" NG
GAS METER
SK-2
EWC-1
M A
T C
H
LI
N E
P -1
1/2" DHWR
1/2" DHW
1 1/2" DHW
HWB-101
HWB-102
1 1/4" NG DN
3/4" NG DN
2" S-FM
TP-101
3"FD-B
BFP-102
137-1
109111
E1
138-1
TMV-1
1 1/2" DHW
BFP-101
1 1/2" NG
3/4" DCW
1/2" SW
3" DCW
1/2" SW
WATER SOFTENER
3" SS
1 1/4" NG DN
3/4" DHW
3/4" DCW
WH-1
1/2" DCW
1/2" DHW
2" V
1 1/2" SS
1 1/2" V
1 1/2" V
3" FD-B
FCO-1
FS-A
2" SS DN
1/2" DCW
1/2" DHW
1/2" DCW DN
TO ICE MAKER
1/2" DHW DN
1 1/2" V
1/2" DCW DN
3/4" DCW
1 1/2" DCW
3/4" DHW
3/4" DHWR
1/2" DHW DN
1/2" DCW DN
2" S-FM
2" V UP
AT WALL
E
GENERAL NOTES
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:4
:5
P M
P-103
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
F
IR
S T
F
LO
O R
P
LU
M
B
IN
G P
LA
N
A
R E
A A
DAG
15154395
15154395
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR - PLUMBING PLAN - AREA A
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME
SCHEDULE.
ROUTE 2" SUMP PUMP PUMP DISCHARGE THROUGH WALL AT 36" AFF AND TERMINATE
WITH 45 DEG. ELBOW. PROVIDE SIGN AT DISCHARGE: "ELEVATOR SUMP PUMP
DISCHARGE, DO NOT PLUG." PROVIDE SPLASH BLOCK FOR DISCHARGE.
SUMP PUMP CONTROL PANEL.
1" MW TO HEATING AND CHILLED WATER SYSTEMS.
2" S-FM TO BE DISCHARGED OUTSIDE ONTO SPLASH BLOCK, 6" AFF.
PROVIDE DCW AND DHW VALVES AND SANITARY FOR FUTURE BAR CONNECTION. CAP
UTILITIES AT WALL, 12" AFF. PROVIDE ISOLATION VALVES.
1/2" DCW TEE FOR FUTURE DISHWASHER CONNECTION. CAP AND VALVE BELOW SINK.
PROVIDE LINE SIZE DOUBLE-CHECK BACKFLOW PREVENTER IN DCW LINE PRIOR TO
ICE MAKER CONNECTION.
PROVIDE 12" DIAMETER, 48,000 GRAIN WATER SOFTENER.
4' 8' 16'0'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
D
C
B
A
WH-1
FD-A
1 1/2" DCW
1/2" DCW
1/2" DHW
1 1/2" DCW
3/4" DHW
3/4" DHWR
FCO-2
TD-1
2" V DN
WH-1
3/4" DCW
FCO-1
3" VTR
1/2" DHW
1/2" DHWR
M A
T C
H
LI
N E
P -1
EEW-1
WC-2
LAV-2
CS-2
1/2" DHW DN
1/2" DCW DN
3/4" DHW
3/4" DHWR
SK-1
TP-103
FCO-2
1/2" DCW
TP-104
126125123122
118 129
TMV-2
3"FD-C
3" SS
2" SS UP
TO FCO-1
3" SS UP
TO FCO-1
3" SS UP
TO FD-A
3" SS
FCO-1
FD-A
CS-1
FD-A
1" DCW DN
1/2" DHW DN
1/2" DHW DN
1/2" DCW DN
(TYP 2)
FCO-1
CO
3/4" DCW
1 1/2" DCW
1/2" DHW
3/4" DCW
2" V DN
1 1/2" V DN WC-2
LAV-2
WC-2
LAV-2
2" V DN
2" V UP
IN WALL
2" V
E
3" SS
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:4
:5
P M
P-104
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
F
IR
S T
F
LO
O R
P
LU
M
B
IN
G P
LA
N
A
R E
A B
DAG
15154396
15154396
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR - PLUMBING PLAN - AREA B
4' 8' 16'0'
PLAN
NORTH
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME
SCHEDULE.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
1 2 3 4 5 6
D
C
B
A
E2
211201
226 227
225219
222 223
231 245 244
138-2
215 214
137-2
E
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:0
P M
P-105
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
S E
C O
N D
F
LO
O R
P
LU
M
B
IN
G P
LA
N
O
V E
R A
LL
DAG
15154397
15154397
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 3/32" = 1'-0"
B1
SECOND FLOOR - PLUMBING PLAN - OVERALL
4' 8' 16'0'
PLAN
NORTH
SECOND FLOOR ROOM SCHEDULE
Name Number
SMALL BRIEFING 249
LARGE BRIEFING 251
SECOND FLOOR ROOM SCHEDULE
Name Number
VESTIBULE 233
WEAPONS OIC 234
INTEL 235
OIC 236
SSR 237
INTEL COMM 238
VAULT CIRCULATION 239
MISSION PLANNING & WEAPONS 241
CSSO (CVN) 242
LARGE BRIEFING 243
ISSO (CVN) 244
ISSO / SECURE COMM 245
SMALL BRIEFING 246
SMALL BRIEFING 247
SMALL BRIEFING 248
SECOND FLOOR ROOM SCHEDULE
Name Number
OPS ADMIN 217
ACTIVE DUTY 218
OPS DESK 219
HALL 220
TRAINING / STAN EVAL 221
SCHEDULE 222
DO 223
CORRIDOR 224
CC 225
CONFERENCE ROOM 226
CSS 227
VESTIBULE 228
ALIS ADMIN 229
ALIS SERVER ROOM 231
MAIN BRIEFING 232
SECOND FLOOR ROOM SCHEDULE
Name Number
STAIR 201
LOBBY 202
MEN'S RESTROOM 203
MEN'S LOCKERS 204
WOMEN'S RESTROOM 205
WOMEN'S LOCKERS 206
JANITOR 207
ELECTRICAL ROOM 208
MISSION PLANNING & ALIS ADMIN 209
STORAGE 211
COMM ROOM 212
FIRST SGT 213
CORRIDOR 214
MULTI-FUNCTION WORK AREA 215
OPS ADMIN 216
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
1 2 3
D
C
B
A
P-402
A1
P-402
A3
1 1/2" SS UP
TO EWC-1
1/2" DCW
1/2" DCW DN
2" V UP
TO VTR
EWC-1
3" V UP
TO VTR
M A
T C
H
LI
N E
P -1
137-2 222 223 219
217 221
216 218
212 213
138-2 208
205206
201 211
E2
1/2" SW
1 1/2" V
1/2" SW
1/2" DCW
E
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:0
P M
P-106
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
S E
C O
N D
F
LO
O R
P
LU
M
B
IN
G P
LA
N
A
R E
A A
DAG
15154398
15154398
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/8" = 1'-0"
A1
SECOND FLOOR - PLUMBING PLAN - AREA A
4' 8' 16'0'
PLAN
NORTH
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
3. SEE SHEET P-105 FOR SECOND FLOOR ROOM NUMBER AND NAME
SCHEDULE.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
4 5 6
D
C
B
A
1/2" DCW
TP-106
M A
T C
H
LI
N E
P -1
225 226 227
234233232
229 242 241
245 244 243
1/2" SW1/2" SW
1/2" SW
FCO-1
FCO-1
2"FD-A 2"FD-A
CRAC-201
CRAC-202
2" V DN
2" V DN
IN WALL
2" V UP
TO 3' VTR
E
GENERAL NOTES
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
KEY PLAN
A B
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:0
P M
P-107
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
S E
C O
N D
F
LO
O R
P
LU
M
B
IN
G P
LA
N
A
R E
A B
DAG
15154399
15154399
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/8" = 1'-0"
A1
SECOND FLOOR - PLUMBING PLAN - AREA B
4' 8' 16'0'
PLAN
NORTH
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
3. REFER TO ARCHITECTURAL DETAIL B1/A-352 FOR MOUNTING OVERHEAD
UTILITIES IN THE SECURE AREA.
4. SEE SHEET P-105 FOR SECOND FLOOR ROOM NUMBER AND NAME
SCHEDULE.
SECURE WALL PENETRATION. SEE DETAIL B1, SHEET P-503.1
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
2" SS UP
2" SS UP
TO FD-A
2" SS UP
TO FD-A
2" SS UP
TO FD-A
3" SS UP
TO FCO-1
2" SS UP
3" SS
3" SS
3" SS
3" SS
4" SS UP
TO FCO-1
4" SS
4" SS
4" SS
3" SS UP
TO SH-2
3" SS UP
TO SH-1
3" SS UP
TO SH-2
3" SS UP
TO MB-1
4" SS UP
1 2
C
B
A
3" SS UP
TO FD-A
4" SS
2" SS
4" SS
4" SS
109111
108 4" SS
3" SS UP
TO FD-A
3" SS UP
TO FD-A
4" SS UP
TO WC
(TYP 5)
4" SS UP/DN
FD-A
FD-A
FD-A
1 2
C
B
A
LAV-1
SH-2
LAV-1
SH-1
SH-2
MB-1
1 1/2" DHW1 1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW 3/4" DCW
2 1/2" DCW
1 1/2" DHW
3/4" DHWR
1" DCW
1/2" DCW
1/2" DCW
1/2" DHW
FCO-1
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DCW
1/2" DHW
3/4" DCW
3/4" DHWR
1 1/4" DHW
1/2" DCW
1/2" DHW
3/4" DHWR UP
1 1/4" DHW UP
2 1/2" DCW UP
1/2" DCW
1/2" DHW
2" V
3/4" DHW
1 1/4" DHW
FCO-1
CS-3
2" V UP
1/2" SW
1/2" SW UP
FD-A
FD-A
(TYP 3)
FD-A
3" S
S
3" SS
2" SS UP
(TYP 3)
(TYP 3)
2" S
S
2" V
1 1/4" DCW
(TYP 5) 1" DCW
(TYP 3)
2" SS UP
(TYP 4)
2" SS UP
TO FD-A
1/2" DHW
1/2" DCW
3" SS UP
WC-2 WC-1 WC-1
WC-2 WC-1
U-2 U-1 U-1
TP-102
4" SS UP
(TYP 5)
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:1
P M
P-401
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
F
IR
S T
F
LO
O R
E
N
LA
R G
E D
P
LU
M B
IN
G
P
LA
N
DAG
15154400
15154400
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/4" = 1'-0" (P-101)
A1
UNDER GROUND - ENLARGED PLUMBING PLAN
SCALE: 1/4" = 1'-0" (P-103)
A3
FIRST FLOOR - ENLARGED PLUMBING PLAN
2' 4' 8'0'
PLAN
NORTH
2' 4' 8'0'
PLAN
NORTH
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME
SCHEDULE.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
1 2
C
B
A
WC-2 WC-1 WC-1
WC-2
WC-1
WC-1
U-2 U-1
LAV-1 LAV-1 LAV-1
FD-A
FD-A
LAV-1 LAV-1LAV-1
SH-2
SH-1
SH-2
WCO-1
FCO-1
2" SS
206 205
FD-A
MB-1
WCO-1
FD-A
FD-A
FCO-1
FD-A
2" SS DN
2" V DN
4" V UP
2" V
(TYP 6) 2" SS 1 1/2" V
(TYP 2)
2" SS DN
2" V
(TYP 3)
2" V
(TYP 3)
2" V
2" V
4" SS TO WC
(TYP 6)
WCO-1
1 2
C
B
A
WC-2 WC-1 WC-1
WC-2
WC-1
WC-1
U-2 U-1
LAV-1
FD-A FD-A
LAV-1
SH-2
SH-1
SH-2
WCO-1
1/2" DCW
3/4" DCW
1 1/4" DHW
1" DHW
3/4" DHW
3/4" DCW
3/4" DCW
3/4" DHWR
FD-A
1 1/2" DCW
1/2" DCW
1/2" DHW
1/2" DHW
1 1/4" DHW
1 1/4" DHW
3/4" DHW
CS-4
1 1/4" DHW
TP-105
205 202
1/2" SW
3/4" DHWR DN
1/2" SW DN
1 1/4" DHW DN
2 1/2" DCW DN
1 1/2" DCW
FD-A
FD-A
FD-A
(TYP 3)
(TYP 3)
1/2" DCW
1/2" DHW
1 1/4" DCW
(TYP 6)
1" DCW
(TYP 2)
1/2" DCW
1/2" DHW
1/2" DHW
1/2" DCW
MB-1
1 1/4" DHW
2" DCW
2" DCW
2" DCW
2" DCW
1/2" DCW
1/2" DCW
1/2" DHW
GENERAL NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:1
P M
P-402
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
S E
C O
N D
F
LO
O R
E
N
LA
R G
E D
P
LU
M B
IN
G
P
LA
N
DAG
15154401
15154401
LJD CGM
05/07/2020
JM / SR
1651220
SCALE: 1/4" = 1'-0" (P-106)
A1
SECOND FLOOR - ENLARGED WASTE & VENT PLAN
SCALE: 1/4" = 1'-0" (P-106)
A3
SECOND FLOOR - ENLARGED PLUMBING PLAN
2' 4' 8'0'
PLAN
NORTH
2' 4' 8'0'
PLAN
NORTH
1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS.
2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO
MATCH ROOF COLOR.
3. SEE SHEET P-105 FOR SECOND FLOOR ROOM NUMBER AND NAME
SCHEDULE.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
GAS COCK
GAS COCK
GAS
METER
PRESSURE REGULATOR,
25 PSIG INLET, 14 IN. W.C. OUTLET,
1048 CFH DEMAND
BUILDING WALL
SEE PLANS FOR SIZES
GRADE
TO EMCS
FL
O
W
CHECK VALVE
FOR CONTINUATION
& SIZE, SEE FLOOR PLAN
GATE (OR BALL)VALVE
DIAL TYPE PRESSURE
GAUGE (0-100 PSIG)
IN-LINE CIRCULATING
PUMP (SEE PUMP
SCHEDULE)
GAUGE COCK
UNION
AQUASTAT FOR CONTROL
OF PUMP
A
1. FOR PIPE SIZES SEE FLOOR PLAN.
2.
NOTES:
HOT WATER PIPED TO NORMALLY CLOSED PORT OF MIXING VALVE
4.
3.
FOR HEATER SELECTION SEE SCHEDULE AND SPECIFICATIONS.
VALVE TO OPEN TO COLD WATER FLOW ON THERMOSTAT FAILURE.
DRAIN PIPE TO NEAREST
FLOOR DRAIN (SEE PLANS FOR
DRAIN LOCATION)
110° F HOT WATER
TO SYSTEM
THERMOMETER
THERMOSTATIC MIXING VALVE
TMV-1
UNION
CHECK VALVE
STRAINER
DHWR FROM
RECIRC. PUMP
DCW
PRESSURE
GAGE
BALL
VALVE
DCW
140° F HOT
WATER FROM HEATER
DHWR (SEE
PLANS FOR SIZE)
FLOOR
AQUASTAT
RECIRC. PUMP
DCW
FULL SIZE OF
P&T RELIEF
VALVE OUTLET
EXPANSION TANK
(4 GALLON VOLUME,
0.9 GALLON ACCEPTANCE)
COMBINATION GAS
VALVE AND PRESSURE
REGULATOR (14" W.C.
IN AND 8" W.C. OUT)
FULL SIZE DIRT LEG
GAS COCK
NATURAL GAS
DHW
WH-101
5. RECIRCULATION PUMP SHALL OPERATE DURING OCCUPIED HOURS. SEE
M-702 FOR POINTS THAT ARE CONTROLLED AND MONITORED BY THE DDC
SYSTEM.
CONDENSATE
NEUTRALIZATION KIT
FLUE EXHAUST
INTAKE
CONCRETE EQUIPMENT
PAD. SEE S-501
30" MINIMUM
FINISHED FLOOR
SUPPORT
STAND (TYP)
ANCHOR TO FLR (TYP)
CIVIL
INTERFACE PVC PIPE
3' -6
M
IN
IM
U
M C
O V
E R
5'-0"
12"
PVC IRON PIPE FLANGED
COPPER PIPE
SLEEVE PENETRATION.
FILL SPACE AROUND PIPE
WITH FIREPROOF MASTIC
GRADE
CONCRETE THRUST BLOCK (TYP)
BACKFLOW PREVENTION
DEVICE (TYP)
DOUBLE CHECK VALVE
ASSEMBLY BACKFLOW
PREVENTER (SEE PLANS
FOR SIZE)
1' -0
M
IN
PLAN VIEW
ELEVATION VIEW
OS&Y VALVE WITH PRESSURE
GAUGE CONNECTION (TYP)
STRAINER
FLANGE
TO EMCS
BYPASS - FULL SIZE
WATER METER
PROVIDE SPOOL PIECE
BETWEEN STRAINER AND
METER
BACKFLOW
PREVENTER
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:1
P M
P-501
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
P
LU
M B
IN
G
D E
T A
IL
S
S
H E
E T
DAG
15154402
15154402
LJD CGM
05/07/2020
JM / SR
1651220
NOT TO SCALE
A1
NATURAL GAS PRESSURE REGULATOR WITH METER
NOT TO SCALE
C4
DOMESTIC WATER CIRCULATING PUMP
NOT TO SCALE
A2
GAS-FIRED WATER HEATER WITH MIXING VALVE
NOT TO SCALE
B1
DOMESTIC WATER SERVICE ENTRANCE
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
NOTE:B
C
D
F
E
2" 154-330
1-1/4"
1-1/2"
3/4"
1"
61-113
114-154
12-32
33-60
SHOWER
SINK
JANITOR'S SINK
LAVATORY
1.5
0.75 0.75
A
SIZE
SINGLE FIXTURE
PDI
PDI SIZE "A"
1/2"
SIZE
PIPE
1-11
UNIT LOAD
FIXTURE
STANDARDS AND
INSTALL PER PDI
INSTRUCTIONS
MANUFACTURER'S
HOT OR COLD WATER SUPPLY
VALVE WATER CLOSET
MULTIPLE FIXTURES
FIXTURE UNIT TABULATION
IF HORIZONTAL BRANCH IS LESS THAN 20' LONG, PROVIDE ONE
WHA AT END OF LINE. IF BRANCH IS GREATER THAN 20' LONG,
PROVIDE ANOTHER WHA IN MIDDLE, EACH SIZED FOR HALF THE
FIXTURE UNITS.
FIXTURE
COLD
HOT
URINAL * --
1.5 1.5
DISHWASHER 1.125
1.5
1.125
2.25 2.25
* REFER TO IPC
PROVIDE WATER HAMMER ARRESTERS. INSTALL IN
HORIZONTAL OR VERTICAL POSITION, BUT NEVER UPSIDE
DOWN. INSTALL IN LINE WITH WATER FLOW DIRECTION IF
POSSIBLE. SIZE THE UNITS AS SHOWN ON THE DRAWINGS
AND/OR PER THE TABLES SHOWN.
ELECTRONIC
CONTROL MODULE
S
3/4" SUPPLY, EXTEND TO
CONNECT TO MAIN
UNION
ATMOSPHERIC VACUUM
BREAKER
STRAINER
SOLENOID CONTROL VALVE
TRAP PRIMER DISTRIBUTION
MANIFOLD
CAP UNUSED OUTLETS
1/2" PEX, EXTEND AND CONNECT
TO FLOOR DRAIN BODY (TYP)
INSTALL TRAP PRIMER ASSEMBLY A MINIMUM OF 12" ABOVE
FLOOR RIM ELEVATION OF HIGHEST DRAIN CONNECTED.
EACH OUTLET SHALL BE CONNECTED ONLY TO ONE FLOOR
DRAIN OR FLOOR SINK.
TRAP PRIMER DISTRIBUTION PIPING SHALL BE BUBBLE
TIGHT AND SEALED.
PROGRAM CONTROL MODULE TO OPEN SOLENOID
CONTROL VALVE AT MANUFACTURER'S RECOMMENDED
FREQUENCY AND DURATION.
GALVANIZED WALL BOX AND COVER PROVIDED BY TRAP
PRIMER MANUFACTURER.
POWER CONNECTION, PROVIDED BY OTHERS.
NOTES:
1.
2.
3.
KEYED NOTES:
TRAP PRIMER VALVE SHOULD BE MOUNTED ONE FOOT ABOVE THE FINISHED FLOOR FOR
EVERY 20 FOOT OF PRIME LINE.
A METERED AMOUNT OF WATER FROM THE FLOOR DRAIN TRAP PRIMER IS DISTRIBUTED TO
AS MANY AS (8) INDIVIDUAL FLOOR DRAIN TRAPS.
INSTALL ASSEMBLY WITH ACCESS FOR PERIODIC INSPECTION.
NOTES:
1.
2.
3.
DISTRIBUTION
UNIT
DCW SUPPLY
IN
ST
AL
LA
TI
O
N D
IM
EN
SI
O
N
1/
4" M
IN
IM
U M
" M
IN
IM
U M
(N O
TE
FINISHED FLOOR
ISOLATION VALVE
UNION
TRAP PRIMER
VALVE
COPPER TYPE L
(TYP.)
TRANSITION TO TYPE
K COPPER (TYP.)
PLASTIC TUBING (PEX EQUIVALENT) (TYP.)
MIN 1/2" FLOOR DRAIN
TRAP MAKE-UP WATER LINE. (TYP.)
VE
N
T
EX
TE
N
SI
O
N A
S R
EQ
U
IR
ED
VENT PIPE 3" MIN.
MASTIC
STAINLESS STEEL
CLAMPING RING
EPDM PREMOLDED
PIPE SEAL
SPLICING CEMENT
LAP SEALANT
METAL ROOF
METAL DECK
ROOF PENETRATION
BY ROOF MFGR.
INCREASER
IF REQUIRED
VENT
SANITARY / VENT
IN WALL
1/2" TEMPERED WATER
PUSH HANDLE
DOUBLE POLE SINGLE
THROW NORMALLY OPEN
FLOW SWITCHF S
THERMOSTATIC MIXING
VALVE (85° F OUTLET)
TEMPERATURE GAUGE
ALARM HORN
AND STROBE1/2" DCW
1/2" DHW
WALL
BRACKET
EYEWASH WITH
STAINLESS
STEEL BOWL
SILENCING SWITCH FOR TESTING
NOZZLE
" M
IN
8" MIN.
WALL
1 1/2" VENT
WHA
1 1/2" WASTE
1/2" DCW
1/2" DCW
SHUT-OFF
VALVE
FLOOR
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:2
P M
P-502
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
P
LU
M B
IN
G
D E
T A
IL
S
S
H E
E T
DAG
15154403
15154403
LJD CGM
05/07/2020
JM / SR
1651220
NOT TO SCALE
A1
WATER HAMMER ARRESTORS
NOT TO SCALE
C1
ELECTRONIC TRAP PRIMER
NOT TO SCALE
C3
TRAP PRIMER
NOT TO SCALE
A3
VENT FLASHING
NOT TO SCALE
A4
EMERGENCY EYEWASH
NOT TO SCALE
C4
ELECTRIC WATER COOLER CONNECTION DIAGRAM - ADA
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
COVER
CLEANOUT PLUG
MAIN LINE
FINISHED FLOOR
OR CONCRETE PAD
CAULK, BUNA-N
OR VITON SEAL
RISER EXTENSION
UP TO CLEANOUT.
NEED NOT BE
LARGER SIZE THAN 4"
WALL SURFACE
CLEANOUT PLUG
ROUND POLISHED STAINLESS
STEEL WALL COVER PLATE
(NOT REQUIRED UNLESS
LOCATED IN WALLS)
COUNTERSUNK SCREW
SCREWED COUNTERSUNK PLUG
OPENING CUT-OUT IN WALL
HORIZONTAL LINE
OR CLEANOUT TEE
SLOPE
(SEE DETAIL B3, S-502)
SYMMETRICAL
ABOUT
STRAINER
CAULKED OUTLET
SEE PLANS FOR
TYPE REQUIRED
C L
SLOPE
(SEE DETAIL B3, S-502)
SYMMETRICAL
ABOUT
STRAINER
CAULKED OUTLET
SEE PLANS FOR
TYPE REQUIRED
STEEL PIPE SLEEVE
ANCHOR
LUGS (4 REQ'D)
C L
OPEN STEEL GRATE COVER FOR SUMP
PIT. SET TOP FLUSH WITH ELEVATOR PIT
PUMP
SUMP PIT
SEE STRUCTURAL
DRAWINGS
UNION
PUMP DISCHARGE-UP
CHECK VALVE
BALL VALVE (NORMALLY OPEN)
GROUND FLOORTO DISCONNECT,
SEE ELEC DRAWINGS
DISCHARGE TO
OUTSIDE
FLOAT
3/8"
1/4"
3/8"
BACKUP MATERIAL
SEALANT
INSULATION
CENTER OF PIPE
INSULATION
SEALANT
BACKUP MATERIAL
FLOOR
PIPE SLEEVE (SEE STRUCTURAL
DRAWINGS FOR DETAIL)
PROVIDE SLEEVE FOR FLOOR
PENETRATION WITH 2" MORE
CLEARANCE. FILL CLEARANCE
WITH FIREPROOF MASTIC.
CENTER OF PIPE
PIPE
3/8"
PIPE
ESCUTCHEON
INTERIOR SIDE OF
EXTERIOR WALL
PIPE SLEEVE (SEE STRUCTURAL
DRAWINGS FOR DETAIL)
#4 AWG THHN/THWN INSULATED
GROUND CABLE, (TYP)
COORDINATE WITH ELECTRICAL CONTRACTOR NEW HARD CEILING
FASTENED TO BOTTOM CEILING SUPPORT ANGLE REFER TO
ARCHITECTURAL DWGS. FOR ADD. INFO.
NOTES:
SECURED AREA REQUIRES THAT PENETRATIONS SUCH AS THE DETAIL SHOWN BE ACCESSIBLE FOR INSPECTION BY PROGRAM SECURITY. COORDINATE WITH CONTRACTING OFFICER DURING INSTALLATION AND BONDING OF PIPES CROSSING BETWEEN SECURED AREAS.
CONTRACTOR SHALL KEEP A LOG OF ALL PIPE PENETRATIONS INDICATING LOCATION, PURPOSE AND INDICATION THAT THE INSTALLATION HAS BEEN
COORDINATED WITH CONTRACTING OFFICER AND PROGRAM SECURITY.
LABEL SHALL BE PERMANENTLY AFFIXED. LABEL PIPE FUNCTION.
INSULATION SHOULD BE CUT UP TO THE EDGE OF PIPE CLAMP TO ENSURE THAT GROUNDING IS PROPERLY CONNECTED.
DO NOT MECHANICALLY TIE PIPE TO WALL CONSTRUCTION IN ANY WAY.
SPACE BETWEEN PIPE AND SLEEVE TO BE FREE OF FOREIGN MATERIAL. WEDGES SHALL NOT BE USED TO MAINTAIN PIPE POSITION.
PIPE SHALL NOT CONTACT SLEEVE AT ANY TIME. PIPE MUST BE CENTERED IN WALL OPENING. PROVIDE ADDITIONAL CLEARANCE FOR POSITIONAL CHANGE OF PIPE
DUE TO LOADING OF PIPE OR SYSTEM OPERATION.
SECURE AREA
ACOUSTICAL PIPE
WRAPPING (TYP)
PIPE INSULATION, (TYP)
PIPE LABEL, SEE NOTE 3
COPPER GROUND PIPE
CLAMP LOCATED WITHIN 6" OF
WALL OR FLOOR, SEE NOTE 4
STEEL DECK.
STRUCT. STEEL
SEE STRUCT. DWG.
BEAM CLAMP (TYP)
PIPING (TYP)
FILL GAP WITH SOUND ATTENUATING FOAM
FOR NON-FIRE RATED PARTITIONS. FILL GAP
WITH FIRE-STOP FOR RATED PARTITIONS.
WALL, SEE ARCHITECTURAL
AND STRUCTURAL PLANS
1.
2.
3.
4.
5.
6.
7.
25 GA. MINIMUM METAL SLEEVE
3" 3"
NON-SECURE AREA
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/2
/2
:0
:5
A
M
P-503
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
P
LU
M B
IN
G
D E
T A
IL
S
S
H E
E T
DAG
15154404
15154404
LJD CGM
05/07/2020
JM / SR
1651220
NOT TO SCALE
C3
FLOOR CLEANOUT
NOT TO SCALE
A1
WALL CLEANOUT
NOT TO SCALE
A3
FLOOR DRAIN IN GROUND FLOOR
NOT TO SCALE
B3
FLOOR DRAIN IN UPPER FLOORS
NOT TO SCALE
A4
ELEVATOR PIT SUMP PUMP DETAIL
NOT TO SCALE
B4
PIPE PENETRATIONS
NOT TO SCALE
B1
SECURE AREA PIPING PENETRATION
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:2
P M
P-601
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
P
LU
M B
IN
G
S C
H E
D U
LE
S
DAG
15154405
15154405
LJD CGM
05/07/2020
JM / SR
1651220
PLUMBING FIXTURE SCHEDULE
TAG DESCRIPTION
FIXTURE FITTING
TRAP CARRIER MOUNTING HEIGHT
CONNECTION SIZE
REMARKSTYPE SIZE TYPE C.W. H.W. WASTE VENT
EEW-1 EMERGENCY EYE WASH DRENCH EYE/FACE WASH N/A 11" STAINLESS STEEL BOWL WITH FLIP TOP SPRAY HEADS, FULL FLOW
STAY-OPEN BALL VALVE, 3 GPM EYE/FACE WASH
N/A N/A N/A 1/2" * N/A 2" N/A WALL MOUNTED, PROVIDE WITH OPTIONAL HORN AND
STROBE & EMERGENCY FIXTURE THERMOSTATIC MIXING
VALVE
EWC-1 ADA ELECTRIC WATER COOLER RECESSED BI-LEVEL, WALL HUNG, BARRIER-FREE UNIT 38" W X 41" H X 31" D LEAD-FREE BUBBLER WITH FRONT, EASY TOUCH CONTROLS 1-1/2" N/A ORIFICE HT. 40" AFF & ACCESSIBLE
ORIFICE HT. 34" AFF
1/2" N/A 1-1/2" 1-1/4" STAINLESS STEEL
HB-1 HOSE BIBB INTERIOR HOSE BIBB N/A BRASS W/ANTI-SIPHON VACUUM BREAKER, TEE KEY HANDLE, AND HOSE
CONNECTION
N/A N/A 48" AFF 3/4" N/A N/A N/A WALL MOUNTED WITH POLISHED CHROME FINISH
LAV-1 COUNTER MOUNTED LAVATORY
(ACCESSIBLE)
TOP MOUNTED VITREOUS CHINA 19" x 17" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL 0.5 GPM FAUCET AND
PERFORATED GRID STRAINER
2" W/CLEANOUT
PLUG
N/A 1/2" 1/2" 2" 1-1/2" PROVIDE WITH OVERFLOW
LAV-2 ADA WALL MOUNTED LAVATORY WALL MOUNTED VITREOUS CHINA 18" x 13" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL 0.5 GPM FAUCET AND
PERFORATED GRID STRAINER
2" W/CLEANOUT
PLUG
N/A 34" AFF 1/2" 1/2" 2" 1-1/2" PROVIDE WITH OVERFLOW
MB-1 SQUARE MOP BASIN PRECAST TERRAZO, MOLDED MARBLE CHIPS AND PORTLAND CEMENT
BASIN WITH DROPPED THRESHOLD AND SS SPLASH PANELS
24" X 24" X 12" DEEP WALL-MOUNTED FAUCET, 8" CENTERS, VACCUUM BREAKER SPOUT, PAIL HOOK
WALL BRACE, AND 3/4" MALE THREAD HOSE CONNECTION, 36" HOSE, AND SS
WALL HOOK
3" N/A FAUCET: 36" AFF & BASIN - FLOOR
MOUNTED
3/4" 3/4" 3" 1-1/2" INTEGRAL CORROSION-RESISTANT METAL DRAIN WITH
REMOVABLE STRAINER AND 3" BOTTOM OUTLET
SH-1 SHOWER INTEGRAL FLOOR/SHOWER BASE WITH PRESSURE BALANCING SHOWER
VALVE
N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL SERVICE STOPS,
ADJUSTABLE STOP SCREW, 1.5 GPM HAND SHOWER HEAD, 60" FLEXIBLE HOSE,
30" ADJUSTABLE MOUNTING BAR, FLANGE, AND ESCUTCHEON
2" N/A HEAD: 75" AFF & CONTROL VALVE 48"
AFF
1/2" 1/2" 2" 1-1/2" PROVIDE CAST IRON DRAIN WITH TWO PIECE BODY,
INTEGRAL CLAMPING COLLAR, AND STAINLESS STEEL
DRAIN STRAINER PLATE
SH-2 ADA SHOWER INTEGRAL FLOOR/SHOWER BASE WITH PRESSURE BALANCING SHOWER
VALVE
N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL SERVICE STOPS,
ADJUSTABLE STOP SCREW, 1.5 GPM HAND SHOWER HEAD, 60" FLEXIBLE HOSE,
30" ADJUSTABLE MOUNTING BAR, FLANGE, AND ESCUTCHEON
2" N/A HEAD: 75" AFF & CONTROL VALVE 48"
AFF
1/2" 1/2" 2" 1-1/2" PROVIDE CAST IRON DRAIN WITH TWO PIECE BODY,
INTEGRAL CLAMPING COLLAR, AND STAINLESS STEEL
DRAIN STRAINER PLATE
SK-1 DOUBLE BOWL SINK EQUAL DOUBLE BOWL SINK, TYPE 304 20 GA. SS, SURFACE MOUNTED, WITH
SOUND DEADENING
33" X 22" X 9" DEEP THREE FAUCET HOLES, 8" SWIVEL SPOUT, SINGLE LEVER HANDLE, 1.5 GPM
AERATOR, HOSE SPRAY, GARBAGE DISPOSAL
1-1/2" N/A HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2" PROVIDE SS BASKET STRAINER AND 1/2 HP, 120V
GARBAGE DISPOSAL
SK-2 SINGLE SINK SINGLE BOWL SINK, TYPE 304 20 GA. SS, SURFACE MOUNTED, WITH SOUND
DEADENING
14" x 16" x 8" DEEP THREE FAUCET HOLES, 8" SWIVEL SPOUT, SINGLE LEVER HANDLE, 1.5 GPM
AERATOR
1-1/2" N/A HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2" PROVIDE SS BASKET STRAINER
U-1 URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER RIM 24" AFF 3/4" N/A 2" 1-1/2" NONE
U-2 ADA URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER RIM 17" AFF 3/4" N/A 2" 1-1/2" NONE
WC-1 FLOOR MOUNT WATER CLOSET 1.28 GPF, ELONGATED BOWL, FLOOR MOUNT WHITE, VITREOUS CHINA 1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET
CARRIER
RIM 15" AFF 1-1/4" N/A 4" 2" PROVIDE SOLID PLASTIC, OPEN FRONT SEAT (LESS
COVER)
WC-2 ADA WATER CLOSET 1.28 GPF, ELONGATED BOWL, FLOOR MOUNT WHITE, VITREOUS CHINA 1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET
CARRIER
RIM 17" AFF 1-1/4" N/A 4" 2" PROVIDE SOLID PLASTIC, OPEN FRONT SEAT (LESS
COVER)
WH-1 WALL HYDRANT EXTERIOR WALL HYDRANT N/A BRASS AUTOMATIC DRAINING, FREEZELESS, WITH ANTI-SIPHON VACUUM
BREAKER, TEE KEY HANDLE, AND HOSE CONNECTION
N/A N/A 24" AFF 3/4" N/A N/A N/A WALL MOUNTED W/BRASS FINISH BOX AND DOOR
* TEPID WATER.
THERMOSTATIC MIXING VALVE SCHEDULE (TMV)
TAG LOCATION
INLET - DCW INLET - DHW OUTLET
DESIGN MAXIMUM PRESSURE
DROP (PSI) NOTESCONNECTION SIZE TEMP (°F) CONNECTION SIZE TEMP (°F) CONNECTION SIZE TEMP (°F)
MAXIMUM
DESIGN FLOW
(GPM)
MINIMUM
DESIGN FLOW
(GPM)
TMV-1 RM 137-1 1 1/2" 60 1 1/2" 140 1 1/2" 110 28 0.5 5
TMV-2 RM 134 1/2" 60 1/2" 140 1/2" 110 28 0.5 5
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
R
T A
/2
2/
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
N A
S J
R B
F
O R
T W
O R
T H
T
X
N A
V Y
A
IR
S T
A T
IO
N
J O
IN
T
R E
S E
R V
E B
A S
E F
O R
T W
O R
T H
T
E X
A S
AS NOTED
U N
C L A
S S
IF
IE
D
The Johnson-McAdams Firm P.A.
F
IL
E P
A T
H
P
LO
T T
E D
15154699
C
U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts
\B L
D G
P
-1
-M
-O P
S -C
E N
T R
A L c h a rl e s .m c a fe e b u rn s m c d
. c o m .r v t
/1
/2
:5
:3
P M
P-602
F A
S Q
U A
D R
O N
O P
E R
A T
IO
N
S /A
M U
F A
C
IL
IT
Y
P
LU
M B
IN
G
S C
H E
D U
LE
S
DAG
15154406
15154406
LJD CGM
05/07/2020
JM / SR
1651220
DOMESTIC WATER HEATER SCHEDULE (DWH)
TAG LOCATION TYPE
CAPACITY
(GAL)
ALTITUDE
(FT.)
PRESSURE RATING
(PSIG)
LVG. WATER TEMP
(°F)
ENT. WATER TEMP
(°F) FUEL SOURCE
BURNER INPUT
(BTU/H)
RECOVERY
(GAL/HR AT 100F
RISE)
MIN. EFFICIENCY
FORCED DRAFT MOTOR
(HP) VOLTS PHASE NOTES
WH-101 MECH ROOM CONDENSING GAS
FIRED
100 650 125 140 40 NATURAL GAS 250,000 290 95 0.5 120 1
NOTES:
1. PROVIDE CONDENSATE NEUTRALIZATION KIT, VENT AND FLUE KIT.
2. PROVIDE WITH MANUFACTURER'S DISCONNECT PER DIVISION 26 SPECIFICATIONS.
FLOOR DRAIN SCHEDULE
TAG DESCRIPTION TYPE STRAINER NOTES
FD-A CAST IRON, TWO PIECE BODY, INTEGRAL CLAMPING COLLAR, TRAP PRIMER
CONNECTION
1, 2, 3
FD-B CAST IRON, TWO PIECE BODY, INTEGRAL CLAMPING COLLAR, TRAP PRIMER
CONNECTION
FLOOR DRAIN - ROUND 9"ø CAST IRON TRACTOR GRATE, HEAVY DUTY 1, 2, 3
FD-C CAST IRON, TWO PIECE BODY, INTEGRAL CLAMPING COLLAR, TRAP PRIMER
CONNECTION WITH FUNNEL
SIGHT DRAIN 9"ø CAST IRON TRACTOR GRATE, HEAVY DUTY WITH FUNNEL 1, 2, 3
FS-A CAST IRON, TWO PIECE BODY, ACID RESISTANT, INTEGRAL CLAMPING COLLAR FLOOR SINK - 1/2 GRATE 12" SQUARE 1/2 GRATE, NICKEL-BRONZE 1, 2, 3
TD-1 8' LONG x 6" WIDE CAST IRON TRENCH DRAIN HEAVY DUTY - LOAD CLASS C 8' LONG x 6" WIDE CAST IRON TRENCH GRATE 2, 3
NOTES:
1.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .