F35 Squad Ops and Flt Sim Plans Volume IIB Squad Ops Bldg.pdf

PDF 42 MB Posted

Attached to
DESIGN BID BUILD CONSTRUCTION PROJECT F-35A FLIGHT SIMULATOR FACILITY AND F-35A SQUADRON OPERATIONS FACILITY AT NAS FORT WORTH JRB, TX
Solicitation number
N69450-21-R0022
Issued by

About this file

This solicitation is for the design-build construction of a Flight Simulator Facility and Squadron Operations Facility at Naval Air Station Fort Worth Joint Reserve Base in Texas. The projects include demolishing existing buildings totaling 8,009 square feet, asbestos abatement, site utilities and pavement demolition, and construction of a new 20,000 square-foot Flight Simulator Facility and a 33,729 square-foot Squadron Operations/Aircraft Maintenance Unit Facility. The Simulator Facility will house four full mission simulators and include secure areas for simulators, computer equipment, debriefing rooms, and maintenance as well as unsecured office, break room, and restroom spaces. The Squadron Operations/Aircraft Maintenance Unit Facility will have Aircraft Maintenance Unit spaces on the first floor and secure Squadron Operations areas meeting Intelligence Community standards on the second floor, along with administrative offices and support spaces. The solicitation was issued by the Naval Facilities Engineering Command with responses due by the date specified in solicitation number N69450-21-R0022.

View the file

Other files

File Type Posted
Amendment 0004 05 12 00.pdf PDF
Volume IIA_Amendment 004.pdf PDF
N6945021R0022 0004.pdf PDF
Volume I_Amendment 004.pdf PDF
Volume IIB_Amendment 004.pdf PDF
Amendment 0004 23 05 48.00 40.pdf PDF
Volume III_Amendment 004.pdf PDF
POV_Parking_Lots.pdf PDF
Amendment 0004 08 15 00.pdf PDF
N6945021R0022_0003.pdf PDF
Attachment_k_N6945021R0022 Site Visit Roster.pdf PDF
N6945021R0022-0002.pdf PDF
Attachment_A_SECNAV_5512.pdf PDF
N6945021R0022 0001.pdf PDF
N6945021R0022 RFP.pdf PDF
Attachment_J_COVID-19 Screening Questionnaire.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume I of III.pdf PDF
F35 Squad Ops and Flt Sim Plans Volume IIA Squad Ops Bldg.pdf PDF
ACM and LBP Survey Report NASJRB Buildings 1604 1606 1608 1626 and 1632.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume III of III.pdf PDF
Attachment_H_Small_Business_Subcontracting_Plan.doc DOC document
Attachment_D_HISTORICAL_SMALL_BUSINESS_UTILIZATION.docx DOCX document
Attachment_F_CONSTRUCTION_EXPERIENCE_PROJECT_DATA_SHEET.docx DOCX document
Attachment_I_NAS_FORT_WORTH_JRB_DARF_BLANK.pdf PDF
Attachment_E_SB_PARTICIPATION_COMMITMENT_DOCUMENT.docx DOCX document
Attachment_C_NAVFAC PPQ.docx DOCX document
F35 Squad Ops and Flt Sim Plans Volume I Site Work.pdf PDF
Attachment_B_ProjNet_How _to_Guide.pdf PDF
Attachment_G_Safety_Data_Sheet.docx DOCX document
F35 Squad Ops and Flt Sim Geotechnical Report.pdf PDF
F35 Squad Ops and Flt Sim Volume III Flt Sim Bldg.pdf PDF
F35 SQ OPS AMU-SIM RTA Specifications Volume II of III.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

NAVY AIR STATION JOINT RESERVE BASE - FORT WORTH, TEXAS

NAVAL FACILITIES ENGINEERING COMMAND SOUTHEAST

RTA SUBMITTAL

01/22/2021

P415 F-35A SQUADRON OPERATIONS/AMU FACILITY AND

P396 F35A FLIGHT SIMULATOR FACILITY

VOLUME IIB SQUADRON OPERATIONS/AMU FACILITY

15154699

C

U s e rs \m n b a x \O n e D ri v e

B u rn s

M c D o n n e ll\

D o c u m e n ts \B

L D

G P

-1

-G -O

P S

-C o o r d in a ti o n m n b a x b u rn s m c d

.c o m .r v t

/1

/2

:2

:2

A M

G-002

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

C O

V E

R

15154389

15154389

MB MB

05/07/2020

JR / SM

1651220

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

S U

B M

IT

T

A L

/2

2/

1.22.21

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \m n b a x \O n e D ri v e

B u rn s

M c D o n n e ll\

D o c u m e n ts \B

L D

G P

-1

-G -O

P S

-C o o r d in a ti o n m n b a x b u rn s m c d

.c o m .r v t

/1

/2

:3

:2

P M

G-004

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

S H

E E

T

IN

D E

X

15154390

15154390

MB MB

05/07/2020

JR / SM

1651220

ELECTRICAL SHEET LIST

SHEET NO. DESCRIPTION

E-001 ELECTRICAL SYMBOLS LEGEND

E-002 ELECTRICAL SYMBOLS LEGEND

EG101 GROUND FLOOR GROUNDING PLAN

EG102 SECOND FLOOR GROUNDING PLAN

EG103 LIGHTNING PROTECTION PLAN

EG501 TELECOMMUNICATIONS GROUNDING DETAILS

EG502 GROUNDING DETAILS

EG503 GROUNDING DETAILS

EG601 GROUNDING RISER DIAGAM

EG602 TELECOMMUNICATIONS GROUNDING RISER DIAGRAMS

EG603 EQUIPMENT GROUNDING RISER

EL101 LIGHTING PLAN - GROUND FLOOR - AREA A

EL102 LIGHTING PLAN - GROUND FLOOR - AREA B

EL103 LIGHTING PLAN - SECOND FLOOR - AREA A

EL104 LIGHTING PLAN - SECOND FLOOR - AREA B

EL201 LIGHTING SECTIONS

EL202 LIGHTING SECTIONS

EL501 LIGHTING CONTROLS SCHEDULE

EL502 LIGHTING CONTROLS DIAGRAMS

EL503 LIGHTING CONTACTOR DIAGRAM

EL506 LIGHTING DETAILS

EL507 LIGHTING DETAILS

EL601 LIGHTING FIXTURE SCHEDULE

EP101 POWER PLAN - GROUND FLOOR - AREA A

EP102 POWER PLAN - GROUND FLOOR - AREA B

EP103 POWER PLAN - SECOND FLOOR - AREA A

EP104 POWER PLAN - SECOND FLOOR - AREA B

EP401 POWER ENLARGED PLANS

EP402 POWER ELEVATIONS

EP501 POWER DETAILS

EP502 POWER DETAILS

EP601 ELECTRICAL ONE-LINE DIAGRAM

EP602 ONE-LINE CONDUCTOR TABLES

EP701 PANELBOARD SCHEDULE

EP702 PANELBOARD SCHEDULE

EP703 PANELBOARD SCHEDULE

EP704 PANELBOARD SCHEDULE

EP705 PANELBOARD SCHEDULE

EP706 PANELBOARD SCHEDULE

EP707 MECHANICAL EQUIPMENT SCHEDULE

MECHANICAL SHEET LIST

SHEET NO. DESCRIPTION

M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

M-100 FIRST FLOOR - HVAC PLAN - OVERALL

M-101 FIRST FLOOR - HVAC PLAN - AREA A

M-102 FIRST FLOOR - HVAC PLAN - AREA B

M-103 FIRST FLOOR - MECH PIPING PLAN - AREA A

M-104 FIRST FLOOR - MECH PIPING PLAN - AREA B

M-105 SECOND FLOOR - HVAC PLAN - OVERALL

M-106 SECOND FLOOR - HVAC PLAN - AREA A

M-107 SECOND FLOOR - HVAC PLAN - AREA B

M-108 SECOND FLOOR - MECH PIPING PLAN - AREA A

M-109 SECOND FLOOR - MECH PIPING PLAN - AREA B

M-301 MECHANICAL SECTIONS - MECH ROOM

M-302 MECHANICAL SECTIONS - MECH ROOM

M-401 MECHANICAL PLAN - ENLARGED MECHANICAL ROOM

M-402 MECHANICAL PLAN - ENLARGED MECHANICAL ROOM -

PLATFORM

M-403 MECHANICAL PLAN - ALIS SERVER ENLARGED PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-507 MECHANICAL DETAILS

M-508 MECHANICAL DETAILS

M-509 MECHANICAL DETAILS

M-510 MECHANICAL DETAILS

M-511 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES - SHEET 1

M-602 MECHANICAL SCHEDULES - SHEET 2

M-603 MECHANICAL SCHEDULES - SHEET 3

M-604 MECHANICAL SCHEDULES - SHEET 4

M-605 MECHANICAL SCHEDULES - SHEET 5

M-610 HEATING WATER FLOW DIAGRAM

M-611 HEATING WATER FLOW DIAGRAM

M-612 CHILLED WATER FLOW DIAGRAM

M-613 FIRST FLOOR AIRFLOW DIAGRAM (1/2)

M-614 FIRST FLOOR AIRFLOW DIAGRAM (2/2)

M-615 SECOND FLOOR AIRFLOW DIAGRAM (1/3)

M-616 SECOND FLOOR AIRFLOW DIAGRAM (2/3)

M-617 SECOND FLOOR AIRFLOW DIAGRAM (3/3)

M-701 CONTROLS LEGEND AND ABBREVIATIONS

M-702 SYSTEMS ARCHITECTURE AND MISCELLANEOUS CONTROLS

M-703 CONTROLS SCHEMATIC - VAV

M-704 CONTROLS POINTS LIST - VAV AHU

M-705 CONTROLS - SCHEMATIC VAV - TERMINAL UNIT

M-706 CONTROLS - SCHEMATIC VAV W/HOT WTAER REHEAT

M-707 CONTROLS - SCHEMATIC PARALLEL FAN POWERED VAV

TERMINAL W/HOT WATER REHEAT

M-708 CONTROLS - CRAC UNIT

M-709 CONTROLS - AIR COOLED CHILLED WATER W/PRIMARY ONLY

PUMPING

M-710 CONTROLS POINT LIST - AIR COOLED CHILLED WATER SYSTEM

PRIMARY ONLY PUMPING

M-711 CONTROLS - HEATING HOT WATER SYSTEM SCHEMATIC

M-712 CONTROLS POINTS LIST - HEATING HOT WATER SYSTEM

PRIMARY SECONDARY PUMPING

M-713 CONTROLS - DUCTLESS SPLIT SYSTEM

M-714 CONTROLS - HOT WATER UNIT HEATER

M-715 CONTROLS - FAN COIL UNIT HEATING AND COOLING

M-716 CONTROLS - TEMPERATURE CONTROLLED EXHAUST FAN

M-717 CONTROLS - CONTINUOUSLY OPERATED EXHAUST FAN

M-718 CONTROLS - INTERLOCKED EXHAUST FAN

M-901 MECHANICAL ROOM ISOMETRIC

PLUMBING SHEET LIST

SHEET NO. DESCRIPTION

P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

P-100 FIRST FLOOR - PLUMBING PLAN - OVERALL

P-101 UNDER GROUND - PLUMBING PLAN - AREA A

P-102 UNDER GROUND - PLUMBING PLAN - AREA B

P-103 FIRST FLOOR - PLUMBING PLAN - AREA A

P-104 FIRST FLOOR - PLUMBING PLAN - AREA B

P-105 SECOND FLOOR - PLUMBING PLAN - OVERALL

P-106 SECOND FLOOR - PLUMBING PLAN - AREA A

P-107 SECOND FLOOR - PLUMBING PLAN - AREA B

P-401 FIRST FLOOR - ENLARGED PLUMBING PLAN

P-402 SECOND FLOOR - ENLARGED PLUMBING PLAN

P-501 PLUMBING DETAILS - SHEET 1

P-502 PLUMBING DETAILS - SHEET 2

P-503 PLUMBING DETAILS - SHEET 3

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULES

P-901 SANITARY RISER DIAGRAM

P-902 DOMESTIC WATER RISER DIAGRAM

TELECOMMUNICATIONS SHEET LIST

SHEET NO. DESCRIPTION

TN001 TELECOMMUNICATIONS LEGEND

TN101 TELECOMMUNICATIONS PLAN - GROUND FLOOR - AREA A

TN102 TELECOMMUNICATIONS PLAN - GROUND FLOOR - AREA B

TN103 TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA A

TN104 TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA B

TN401 COMM ROOM 112 - ENLARGED PLANS

TN402 COMM ROOM 212 - ENLARGED PLANS

TN403 ALIS SERVER ROOM 231 - ENLARGED PLAN

TN404 ALIS SERVER ROOM 231 - EQUIPMENT ELEVATION PLAN

TN405 INTEL COMM ROOM 238 - ENLARGED PLAN

TN406 ISSO/SECURE COMM 245 - ENLARGED PLANS

TN501 TELECOMMUNICATION DETAILS

TN502 TELECOMMUNICATION DETAILS

TN503 TELECOMMUNICATION DETAILS

TN504 TELECOMMUNICATION DETAILS

TN505 TELECOMMUNICATION DETAILS

TN506 TELECOMMUNICATION DETAILS

TN507 TELECOMMUNICATION DETAILS

TN508 TELECOMMUNICATION DETAILS

TN601 TELECOMMUNICATIONS BACKBONE RISER DIAGRAM

TY001 SECURITY LEGEND

TY002 SECURITY PLAN - OVERALL GROUND FLOOR

TY003 SECURITY PLAN - OVERALL SECOND FLOOR

TY101 SECURITY PLAN - GROUND FLOOR - AREA A

TY102 SECURITY PLAN - GROUND FLOOR - AREA B

TY103 SECURITY PLAN - SECOND FLOOR - AREA A

TY104 SECURITY PLAN - SECOND FLOOR - AREA B

TY501 SECURITY DETAILS

TY502 SECURITY DETAILS

TY503 SECURITY DETAILS

TY601 SECURITY RISER DIAGRAM

GENERAL SHEET INDEX - VOLUME IV

SHEET NO. DESCRIPTION

G-002 COVER

G-004 SHEET INDEX

AUDIO-VISUAL SHEET LIST

SHEET NO. DESCRIPTION

TA-001 AV EQUIPMENT GENERAL NOTES AND LEGENDS

TA-111 AV EQUIPMENT GROUND FLOOR PLAN - AREA A

TA-112 AV EQUIPMENT GROUND FLOOR PLAN - AREA B

TA-121 AV EQUIPMENT SECOND FLOOR PLAN - AREA A

TA-122 AV EQUIPMENT SECOND FLOOR PLAN - AREA B

TA-151 AV EQUIPMENT GROUND FLOOR REFLECTED CEILING PLAN -

AREA A

TA-152 AV EQUIPMENT GROUND FLOOR REFLECTED CEILING PLAN -

AREA B

TA-153 AV EQUIPMENT SECOND FLOOR REFLECTED CEILING PLAN -

AREA A

TA-154 AV EQUIPMENT SECOND FLOOR REFLECTED CEILING PLAN -

AREA B

TA-301 AV EQUIPMENT SECTIONS GROUND FLOOR

TA-302 AV EQUIPMENT SECTIONS SECOND FLOOR

TA-501 AV EQUIPMENT MOUNTING DETAILS

TA-502 AV EQUIPMENT RACK ELEVATIONS

TA-601 ONE-LINE DIAGRAMS

TA-602 ONE-LINE DIAGRAMS

TA-603 ONE-LINE DIAGRAMS

TA-604 ONE-LINE DIAGRAMS

TI-001 AV CONDUIT GENERAL NOTES AND LEGENDS

TI-111 AV CONDUIT GROUND FLOOR PLAN - AREA A

TI-112 AV CONDUIT GROUND FLOOR PLAN - AREA B

TI-121 AV CONDUIT SECOND FLOOR PLAN - AREA A

TI-122 AV CONDUIT SECOND FLOOR PLAN - AREA B

TI-151 AV CONDUIT GROUND FLOOR RCP - AREA A

TI-152 AV CONDUIT GROUND FLOOR RCP - AREA B

TI-153 AV CONDUIT SECOND FLOOR RCP - AREA A

TI-154 AV CONDUIT SECOND FLOOR RCP - AREA B

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

S U

B M

IT

T

A L

/2

2/

1.22.21

4" FD-A

EWC-1

JS-1

SK-1

U-2

U-1

WC-2

WC-1

LAV-1

PLUMBING SYMBOLS LEGEND

SIZE - FLOOR DRAIN

DUAL ELECTRIC WATER COOLER

JANITOR SINK

KITCHEN SINK

URINAL, ACCESSIBLE

URINAL

WATER CLOSET - ACCESSIBLE

WATER CLOSET

LAVATORY, COUNTER MOUNTED

PRESSURE/TEMPERATURE RELIEF VALVE

HB HOSE BIBB

WH WALL HYDRANT

LAV-2 LAVATORY, WALL MOUNTED

MB-1 MOP BASIN

SK-2 SINK

EEWS EMERGENCY EYEWASH / SHOWER

SH-1 SHOWER

SK-3 UNDER MOUNT SINK

EEW EMERGENCY EYEWASH

WCO

FLOOR DRAIN / EQUIPMENT DRAIN

PLUMBING FIXTURE TRAP

FLOOR OR WALL PENETRATION

VENT THRU ROOF (VTR)

CLEANOUT (CO) IN RISER

RISER DIAGRAM LEGEND

CO

FCO

CLEANOUT (FCO) IN FLOOR

WATER HAMMER ARRESTORWHA-A

WALL CLEANOUT (WCO)

ISOMETRIC DIRECTION ARROW

UP

DN

PIPE LINE ACCESSORIES

3-WAY VALVE

2-WAY VALVE

ANGLE VALVE

AV AUTOMATIC AIR VENT ASSEMBLY

BFP BACKFLOW PREVENTION ASSEMBLY

BALANCING VALVE / CIRCUIT SETTER

BALL VALVE

BLIND FLANGE

BUTTERFLY VALVE

CHECK VALVE

FLEX CONNECTION

FLOW ARROW

FM FLOW METER

GATE VALVE

GLOBE VALVE

HOSE GATE DRAIN VALVE

IF

INSULATING FLANGE

MV

MANUAL AIR VENT ASSEMBLY - SEE

SPECIFICATIONS FOR APPROPRIATE

VALVE TYPE

M METER

M MOTORIZED CONTROL VALVE

OS&Y

OUTSIDE SCREW & YOKE VALVE

PIPE WITH HEAT TRACE

PLUG VALVE

PRESSURE GUAGE

SELF CONTAINED PRESSURE REDUCING

(REGULATING) VALVE

PUMP

REDUCER (CONCENTRIC)

RELIEF, SAFETY OR THERMAL RELIEF

VALVE

REMOVABLE CAP

REMOVABLE PLUG

S STRAINER

SUCTION DIFFUSER

TEST CONNECTION

THERMOMETER

UNION

Y-TYPE STRAINER

SRC

SPRING RETURN CLOSED BALL VALVE

PIPE SYMBOLS

PIPE ELBOW

PIPE DOWN

PIPE UP

PIPE CONTINUATION

PIPE LINE DESIGNATIONS

VENT

STORM (ABOVE GRADE)

STORM (BELOW GRADE)

STORM OVERFLOW

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRCULATION

SANITARY SEWER (ABOVE GRADE)

SANITARY SEWER (BELOW GRADE)

CONDENSATE DRAIN

COMPRESSED AIR

NATURAL GAS

CLEANOUT IN RISER

CLEANOUT IN WALL

CLEANOUT IN FLOOR

SS

SS

COND

V

DCW

DHW

DHWR

CA

NG

OD

S

S

CO

WCO

FCO

PLUMBING ABBREVIATIONS GENERAL NOTES:

SECTION CUT SYMBOL

A

M-001

INDICATES PERSPECTIVE AND

LIMITS OF SECTION

SECTION

DESIGNATOR

DRAWING WHERE

SECTION IS SHOWN

AC AIR COCK

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AMSL ABOVE MEAN SEA LEVEL

ARV AIR RELEASE VALVE

BF BLIND FLANGE

BOP BOTTOM OF PIPE

BW BUTT WELD

CH OP CHAIN WHEEL OPERATOR

CONC CONCENTRIC

CORP STOP CORPORATION STOP

CPVC CHLORINATED POLYVINYL CHLORIDE

D DRAIN

DI DUCTILE IRON

DN DOWN

DWH DOMESTIC WATER HEATER

ELL ELBOW

EXIST EXISTING

FCA FLANGED COUPLING ADAPTER

FD FLOOR DRAIN

FE FLANGED END

FF FLAT FACED

FI FLOW INDICATOR

FLGD FLANGED

FM FLOW METER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FOV FLOAT OPERATED VALVE

FRP FIBERGLASS REINFORCED PIPE

FW FIELD WELD

HD HUB DRAIN

I.E. INVERT ELEVATION

IF INSULATED FLANGE

LC LOCK CLOSED

LO LOCK OPEN

LR LONG RADIUS

NPSH NET POSITIVE SUCTION HEAD

NRS NON-RISING STEM

NWL NORMAL WATER LEVEL

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PVC POLYVINYL CHLORIDE

RED REDUCER-REDUCING

RS RISING STEM

SCH SCHEDULE

SCRD SCREWED

SR SHORT RADIUS

TD TRENCH DRAIN

TOC TOP OF CONCRETE

TOG TOP OF GRATING

TOP TOP OF PIPE

TOS TOP OF STEEL

TP TRAP PRIMER

VTR VENT THROUGH ROOF

1. UNLESS NOTED OTHERWISE, THE CIVIL AND MECHANICAL INTERFACE POINT IS 5 FEET OUTSIDE OF THE BUILDING WALL.

2. COORDINATE ALL PIPE SLEEVE REQUIREMENTS WITH FOUNDATION SUBCONTRACTOR.

3. COORDINATE MECHANICAL ROOM FLOOR DRAINS WITH ACTUAL EQUIPMENT LOCATIONS AND DRAINAGE REQUIREMENTS.

4. LEGEND IS GENERAL IN NATURE AND NOT ALL ITEMS SHOWN MAY BE USED ON THIS PROJECT.

5. INSTALL SANITARY PIPING WITH 2% SLOPE DOWNWARD IN DIRECTION OF FLOW FOR PIPING 3" AND SMALLER, 1% SLOPE FOR PIPING 4" AND

LARGER. INSTALL VENT PIPING WITH 1% SLOPE DOWNWARD TOWARD FIXTURE OR STACK.

6. ALL FIXTURES SHALL HAVE A P-TRAP INSTALLED.

7. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.

8. INSTALL ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.

9. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH STRUCTURAL, CIVIL, ELECTRICAL WORK ETC., SHOWN ON OTHER CONTRACT

DOCUMENT DRAWINGS.

10. MAINTAIN A MINIMUM OF 6' - 8 CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL

ROOMS.

11. LOCATE ALL PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.

12. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.

13. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF PIPE UNLESS NOTED OTHERWISE.

14 INVERT ELEVATIONS GIVEN RELATIVE TO FINISH FLOOR ELEVATION OF 100'-0". ACTUAL FINISH FLOOR ELEVATION IS 606.64' AMSL.

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:4

:4

P M

P-001

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

P

LU

M B

IN

G

N O

TE

S

, L E

G E

N D

, S Y

M B

O

LS

A

B B

R E

V

IA

TI

O

N S

DAG

15154391

15154391

LJD CGM

05/07/2020

JM / SR

1651220

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

1/26/21

BFP

B F

P

1 2 3 4 5 6 7

F

D

C

B

A

101E1

141105

125122121

138-1

137-1

112 113

143 142

E

1 1/2" NG

1 1/2" NG UP

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:4

:4

P M

P-100

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

F

IR

S T

F

LO

O R

P

LU

M

B

IN

G P

LA

N

O

V E

R A

LL

DAG

15154392

15154392

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 3/32" = 1'-0"

B1

FIRST FLOOR - PLUMBING PLAN - OVERALL

4' 8' 16'0'

PLAN

NORTH

FIRST FLOOR ROOM SCHEDULE

Name Number

TECH ORDER LIBRARY 129

FLIGHT CHIEF 131

CHIEF OFFICE 132

SUPPORT OFFICE 133

BATTERY CHARGING 134

BATTERY STORAGE 135

COSO 136

MECHANICAL ROOM 137

ELECTRICAL ROOM 138

STORAGE 139

ELEVATOR MACHINE ROOM 141

RESTROOM 142

RESTROOM 143

FIRST FLOOR ROOM SCHEDULE

Name Number

RECEPTION 115

A/V CLOSET 116

HERITAGE ROOM 117

FITNESS / AFE TRAINING 118

HALL 119

VESTIBULE 121

FLIGHT CC 122

ADO 123

CORRIDOR 124

VESTIBULE 125

WORK CAFE 126

RESTROOM 127

SUPPORT EQUIPMENT / MAINTENANCE 128

FIRST FLOOR ROOM SCHEDULE

Name Number

VESTIBULE 101

CORRIDOR 102

LOBBY 103

MOTHER'S ROOM 104

STAIR 105

MEN'S RESTROOM 106

MEN'S LOCKERS 107

JANITOR 108

WOMEN'S RESTROOM 109

WOMEN'S LOCKERS 111

COMM ROOM 112

STORAGE 113

MASS BRIEFING 114

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

4" SS

3" SS UP

TO FD-B

4" SS UP

TO FCO-2

3" SS UP

TO FD-B

3" SS UP

TO FD-B

4" SS

4" SS

4" SS

4" SS

P-401

A1

1 2 3

F

D

C

B

A

SP-101

3" DCW

M A

T C

H

LI

N E

P -1

2" SS UP

TO EWC-1

2" SS UP

TO SK-2

95'-10" INV EL.

SEE C-104 FOR

CONTINUATION

3" DCW UP

3" SS

3" SS UP

TO FD-B

3" SS UP

TO FD-B

97'-3" INV EL.

137-1

117 121

104113

138-1

111 109

E1

1 1/2" NG

1 1/2" NG UP

3" SS UP

TO FCO-1

3" SS

3" SS

3" SS

4" SS4" SS

2" V UP

IN WALL

2" V UP

AT WALL

3" SS UP

3" SS UP

TO FD-B

3" SS

2" SS UP

3" SS UP

TO FS-A

2" S-FM UP

E

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:4

:4

P M

P-101

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

U N

D E

R G

R O

U N

D

P

LU

M B

IN

G

P

LA

N

A R

E A

A

DAG

15154393

15154393

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/8" = 1'-0"

A1

UNDER GROUND - PLUMBING PLAN - AREA A

4' 8' 16'0'

PLAN

NORTH

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME

SCHEDULE.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

4 5 6 7

F

D

C

B

A

4" SS UP

TO WC-2

2" SS UP

TO LAV-2

4" SS

4" SS

2" SS UP

TO FD-A

3" SS

2" V UP3" SS UP

TO TD-1

M A

T C

H

LI

N E

P -1

2" SS UP

TO EEW-1

3" SS UP

TO FCO-1

122 123

143 142

2" SS UP

TO FD-A

4" SS

4" SS

4" SS4" SS

3" SS UP

TO FD-C

2" SS UP

TO FD-A

4" SS UP

TO FCO-1

4" SS UP

2" SS UP

TO SK-1

2" SS UP

TO FCO-1

2" SS

4" SS UP

TO FCO-2

4" SS UP

TO FCO

2" V UP

E

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:4

:5

P M

P-102

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

U N

D E

R G

R O

U N

D

P

LU

M B

IN

G

P

LA

N

A R

E A

B

DAG

15154394

15154394

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/8" = 1'-0"

A1

UNDER GROUND - PLUMBING PLAN - AREA B

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME

SCHEDULE.

4' 8' 16'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

BFP

B F

P

WH-1

HB-1

RP-1

P-401

A3

1 2 3

F

D

C

B

A

WH-101

3"FD-B

3"FD-B

3"FD-B

3"FD-B

3/4" DCW

1 1/2" DCW

3/4" DHW

3/4" DHWR

3" DCW

1 1/2" DHW

3/4" DHWR

3/4" DCW

1/2" DHW

3/4" DCW

3/4" DHWR

3" DCW

2 1/2" DCW

1 1/2" DHW

3/4" DHWR

2" S-FM DN

TO SP-101

2" S-FM

FCO-2

SK-1

3" DCW DN

3" V UP

3" DCW

1 1/2" NG

GAS METER

SK-2

EWC-1

M A

T C

H

LI

N E

P -1

1/2" DHWR

1/2" DHW

1 1/2" DHW

HWB-101

HWB-102

1 1/4" NG DN

3/4" NG DN

2" S-FM

TP-101

3"FD-B

BFP-102

137-1

109111

E1

138-1

TMV-1

1 1/2" DHW

BFP-101

1 1/2" NG

3/4" DCW

1/2" SW

3" DCW

1/2" SW

WATER SOFTENER

3" SS

1 1/4" NG DN

3/4" DHW

3/4" DCW

WH-1

1/2" DCW

1/2" DHW

2" V

1 1/2" SS

1 1/2" V

1 1/2" V

3" FD-B

FCO-1

FS-A

2" SS DN

1/2" DCW

1/2" DHW

1/2" DCW DN

TO ICE MAKER

1/2" DHW DN

1 1/2" V

1/2" DCW DN

3/4" DCW

1 1/2" DCW

3/4" DHW

3/4" DHWR

1/2" DHW DN

1/2" DCW DN

2" S-FM

2" V UP

AT WALL

E

GENERAL NOTES

WORK NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:4

:5

P M

P-103

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

F

IR

S T

F

LO

O R

P

LU

M

B

IN

G P

LA

N

A

R E

A A

DAG

15154395

15154395

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR - PLUMBING PLAN - AREA A

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME

SCHEDULE.

ROUTE 2" SUMP PUMP PUMP DISCHARGE THROUGH WALL AT 36" AFF AND TERMINATE

WITH 45 DEG. ELBOW. PROVIDE SIGN AT DISCHARGE: "ELEVATOR SUMP PUMP

DISCHARGE, DO NOT PLUG." PROVIDE SPLASH BLOCK FOR DISCHARGE.

SUMP PUMP CONTROL PANEL.

1" MW TO HEATING AND CHILLED WATER SYSTEMS.

2" S-FM TO BE DISCHARGED OUTSIDE ONTO SPLASH BLOCK, 6" AFF.

PROVIDE DCW AND DHW VALVES AND SANITARY FOR FUTURE BAR CONNECTION. CAP

UTILITIES AT WALL, 12" AFF. PROVIDE ISOLATION VALVES.

1/2" DCW TEE FOR FUTURE DISHWASHER CONNECTION. CAP AND VALVE BELOW SINK.

PROVIDE LINE SIZE DOUBLE-CHECK BACKFLOW PREVENTER IN DCW LINE PRIOR TO

ICE MAKER CONNECTION.

PROVIDE 12" DIAMETER, 48,000 GRAIN WATER SOFTENER.

4' 8' 16'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

D

C

B

A

WH-1

FD-A

1 1/2" DCW

1/2" DCW

1/2" DHW

1 1/2" DCW

3/4" DHW

3/4" DHWR

FCO-2

TD-1

2" V DN

WH-1

3/4" DCW

FCO-1

3" VTR

1/2" DHW

1/2" DHWR

M A

T C

H

LI

N E

P -1

EEW-1

WC-2

LAV-2

CS-2

1/2" DHW DN

1/2" DCW DN

3/4" DHW

3/4" DHWR

SK-1

TP-103

FCO-2

1/2" DCW

TP-104

126125123122

118 129

TMV-2

3"FD-C

3" SS

2" SS UP

TO FCO-1

3" SS UP

TO FCO-1

3" SS UP

TO FD-A

3" SS

FCO-1

FD-A

CS-1

FD-A

1" DCW DN

1/2" DHW DN

1/2" DHW DN

1/2" DCW DN

(TYP 2)

FCO-1

CO

3/4" DCW

1 1/2" DCW

1/2" DHW

3/4" DCW

2" V DN

1 1/2" V DN WC-2

LAV-2

WC-2

LAV-2

2" V DN

2" V UP

IN WALL

2" V

E

3" SS

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:4

:5

P M

P-104

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

F

IR

S T

F

LO

O R

P

LU

M

B

IN

G P

LA

N

A

R E

A B

DAG

15154396

15154396

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR - PLUMBING PLAN - AREA B

4' 8' 16'0'

PLAN

NORTH

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME

SCHEDULE.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

1 2 3 4 5 6

D

C

B

A

E2

211201

226 227

225219

222 223

231 245 244

138-2

215 214

137-2

E

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:0

P M

P-105

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

S E

C O

N D

F

LO

O R

P

LU

M

B

IN

G P

LA

N

O

V E

R A

LL

DAG

15154397

15154397

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 3/32" = 1'-0"

B1

SECOND FLOOR - PLUMBING PLAN - OVERALL

4' 8' 16'0'

PLAN

NORTH

SECOND FLOOR ROOM SCHEDULE

Name Number

SMALL BRIEFING 249

LARGE BRIEFING 251

SECOND FLOOR ROOM SCHEDULE

Name Number

VESTIBULE 233

WEAPONS OIC 234

INTEL 235

OIC 236

SSR 237

INTEL COMM 238

VAULT CIRCULATION 239

MISSION PLANNING & WEAPONS 241

CSSO (CVN) 242

LARGE BRIEFING 243

ISSO (CVN) 244

ISSO / SECURE COMM 245

SMALL BRIEFING 246

SMALL BRIEFING 247

SMALL BRIEFING 248

SECOND FLOOR ROOM SCHEDULE

Name Number

OPS ADMIN 217

ACTIVE DUTY 218

OPS DESK 219

HALL 220

TRAINING / STAN EVAL 221

SCHEDULE 222

DO 223

CORRIDOR 224

CC 225

CONFERENCE ROOM 226

CSS 227

VESTIBULE 228

ALIS ADMIN 229

ALIS SERVER ROOM 231

MAIN BRIEFING 232

SECOND FLOOR ROOM SCHEDULE

Name Number

STAIR 201

LOBBY 202

MEN'S RESTROOM 203

MEN'S LOCKERS 204

WOMEN'S RESTROOM 205

WOMEN'S LOCKERS 206

JANITOR 207

ELECTRICAL ROOM 208

MISSION PLANNING & ALIS ADMIN 209

STORAGE 211

COMM ROOM 212

FIRST SGT 213

CORRIDOR 214

MULTI-FUNCTION WORK AREA 215

OPS ADMIN 216

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

1 2 3

D

C

B

A

P-402

A1

P-402

A3

1 1/2" SS UP

TO EWC-1

1/2" DCW

1/2" DCW DN

2" V UP

TO VTR

EWC-1

3" V UP

TO VTR

M A

T C

H

LI

N E

P -1

137-2 222 223 219

217 221

216 218

212 213

138-2 208

205206

201 211

E2

1/2" SW

1 1/2" V

1/2" SW

1/2" DCW

E

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:0

P M

P-106

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

S E

C O

N D

F

LO

O R

P

LU

M

B

IN

G P

LA

N

A

R E

A A

DAG

15154398

15154398

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/8" = 1'-0"

A1

SECOND FLOOR - PLUMBING PLAN - AREA A

4' 8' 16'0'

PLAN

NORTH

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

3. SEE SHEET P-105 FOR SECOND FLOOR ROOM NUMBER AND NAME

SCHEDULE.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

4 5 6

D

C

B

A

1/2" DCW

TP-106

M A

T C

H

LI

N E

P -1

225 226 227

234233232

229 242 241

245 244 243

1/2" SW1/2" SW

1/2" SW

FCO-1

FCO-1

2"FD-A 2"FD-A

CRAC-201

CRAC-202

2" V DN

2" V DN

IN WALL

2" V UP

TO 3' VTR

E

GENERAL NOTES

WORK NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

KEY PLAN

A B

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:0

P M

P-107

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

S E

C O

N D

F

LO

O R

P

LU

M

B

IN

G P

LA

N

A

R E

A B

DAG

15154399

15154399

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/8" = 1'-0"

A1

SECOND FLOOR - PLUMBING PLAN - AREA B

4' 8' 16'0'

PLAN

NORTH

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

3. REFER TO ARCHITECTURAL DETAIL B1/A-352 FOR MOUNTING OVERHEAD

UTILITIES IN THE SECURE AREA.

4. SEE SHEET P-105 FOR SECOND FLOOR ROOM NUMBER AND NAME

SCHEDULE.

SECURE WALL PENETRATION. SEE DETAIL B1, SHEET P-503.1

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

2" SS UP

2" SS UP

TO FD-A

2" SS UP

TO FD-A

2" SS UP

TO FD-A

3" SS UP

TO FCO-1

2" SS UP

3" SS

3" SS

3" SS

3" SS

4" SS UP

TO FCO-1

4" SS

4" SS

4" SS

3" SS UP

TO SH-2

3" SS UP

TO SH-1

3" SS UP

TO SH-2

3" SS UP

TO MB-1

4" SS UP

1 2

C

B

A

3" SS UP

TO FD-A

4" SS

2" SS

4" SS

4" SS

109111

108 4" SS

3" SS UP

TO FD-A

3" SS UP

TO FD-A

4" SS UP

TO WC

(TYP 5)

4" SS UP/DN

FD-A

FD-A

FD-A

1 2

C

B

A

LAV-1

SH-2

LAV-1

SH-1

SH-2

MB-1

1 1/2" DHW1 1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW 3/4" DCW

2 1/2" DCW

1 1/2" DHW

3/4" DHWR

1" DCW

1/2" DCW

1/2" DCW

1/2" DHW

FCO-1

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DCW

1/2" DHW

3/4" DCW

3/4" DHWR

1 1/4" DHW

1/2" DCW

1/2" DHW

3/4" DHWR UP

1 1/4" DHW UP

2 1/2" DCW UP

1/2" DCW

1/2" DHW

2" V

3/4" DHW

1 1/4" DHW

FCO-1

CS-3

2" V UP

1/2" SW

1/2" SW UP

FD-A

FD-A

(TYP 3)

FD-A

3" S

S

3" SS

2" SS UP

(TYP 3)

(TYP 3)

2" S

S

2" V

1 1/4" DCW

(TYP 5) 1" DCW

(TYP 3)

2" SS UP

(TYP 4)

2" SS UP

TO FD-A

1/2" DHW

1/2" DCW

3" SS UP

WC-2 WC-1 WC-1

WC-2 WC-1

U-2 U-1 U-1

TP-102

4" SS UP

(TYP 5)

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:1

P M

P-401

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

F

IR

S T

F

LO

O R

E

N

LA

R G

E D

P

LU

M B

IN

G

P

LA

N

DAG

15154400

15154400

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/4" = 1'-0" (P-101)

A1

UNDER GROUND - ENLARGED PLUMBING PLAN

SCALE: 1/4" = 1'-0" (P-103)

A3

FIRST FLOOR - ENLARGED PLUMBING PLAN

2' 4' 8'0'

PLAN

NORTH

2' 4' 8'0'

PLAN

NORTH

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

3. SEE SHEET P-100 FOR FIRST FLOOR ROOM NUMBER AND NAME

SCHEDULE.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

1 2

C

B

A

WC-2 WC-1 WC-1

WC-2

WC-1

WC-1

U-2 U-1

LAV-1 LAV-1 LAV-1

FD-A

FD-A

LAV-1 LAV-1LAV-1

SH-2

SH-1

SH-2

WCO-1

FCO-1

2" SS

206 205

FD-A

MB-1

WCO-1

FD-A

FD-A

FCO-1

FD-A

2" SS DN

2" V DN

4" V UP

2" V

(TYP 6) 2" SS 1 1/2" V

(TYP 2)

2" SS DN

2" V

(TYP 3)

2" V

(TYP 3)

2" V

2" V

4" SS TO WC

(TYP 6)

WCO-1

1 2

C

B

A

WC-2 WC-1 WC-1

WC-2

WC-1

WC-1

U-2 U-1

LAV-1

FD-A FD-A

LAV-1

SH-2

SH-1

SH-2

WCO-1

1/2" DCW

3/4" DCW

1 1/4" DHW

1" DHW

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHWR

FD-A

1 1/2" DCW

1/2" DCW

1/2" DHW

1/2" DHW

1 1/4" DHW

1 1/4" DHW

3/4" DHW

CS-4

1 1/4" DHW

TP-105

205 202

1/2" SW

3/4" DHWR DN

1/2" SW DN

1 1/4" DHW DN

2 1/2" DCW DN

1 1/2" DCW

FD-A

FD-A

FD-A

(TYP 3)

(TYP 3)

1/2" DCW

1/2" DHW

1 1/4" DCW

(TYP 6)

1" DCW

(TYP 2)

1/2" DCW

1/2" DHW

1/2" DHW

1/2" DCW

MB-1

1 1/4" DHW

2" DCW

2" DCW

2" DCW

2" DCW

1/2" DCW

1/2" DCW

1/2" DHW

GENERAL NOTES

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:1

P M

P-402

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

S E

C O

N D

F

LO

O R

E

N

LA

R G

E D

P

LU

M B

IN

G

P

LA

N

DAG

15154401

15154401

LJD CGM

05/07/2020

JM / SR

1651220

SCALE: 1/4" = 1'-0" (P-106)

A1

SECOND FLOOR - ENLARGED WASTE & VENT PLAN

SCALE: 1/4" = 1'-0" (P-106)

A3

SECOND FLOOR - ENLARGED PLUMBING PLAN

2' 4' 8'0'

PLAN

NORTH

2' 4' 8'0'

PLAN

NORTH

1. SEE SHEET P-001 FOR PLUMBING GENERAL NOTES,

SYMBOLS AND ABBREVIATIONS.

2. ALL EXPOSED VENT PIPING THROUGH THE ROOF SHALL BE PAINTED TO

MATCH ROOF COLOR.

3. SEE SHEET P-105 FOR SECOND FLOOR ROOM NUMBER AND NAME

SCHEDULE.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

GAS COCK

GAS COCK

GAS

METER

PRESSURE REGULATOR,

25 PSIG INLET, 14 IN. W.C. OUTLET,

1048 CFH DEMAND

BUILDING WALL

SEE PLANS FOR SIZES

GRADE

TO EMCS

FL

O

W

CHECK VALVE

FOR CONTINUATION

& SIZE, SEE FLOOR PLAN

GATE (OR BALL)VALVE

DIAL TYPE PRESSURE

GAUGE (0-100 PSIG)

IN-LINE CIRCULATING

PUMP (SEE PUMP

SCHEDULE)

GAUGE COCK

UNION

AQUASTAT FOR CONTROL

OF PUMP

A

1. FOR PIPE SIZES SEE FLOOR PLAN.

2.

NOTES:

HOT WATER PIPED TO NORMALLY CLOSED PORT OF MIXING VALVE

4.

3.

FOR HEATER SELECTION SEE SCHEDULE AND SPECIFICATIONS.

VALVE TO OPEN TO COLD WATER FLOW ON THERMOSTAT FAILURE.

DRAIN PIPE TO NEAREST

FLOOR DRAIN (SEE PLANS FOR

DRAIN LOCATION)

110° F HOT WATER

TO SYSTEM

THERMOMETER

THERMOSTATIC MIXING VALVE

TMV-1

UNION

CHECK VALVE

STRAINER

DHWR FROM

RECIRC. PUMP

DCW

PRESSURE

GAGE

BALL

VALVE

DCW

140° F HOT

WATER FROM HEATER

DHWR (SEE

PLANS FOR SIZE)

FLOOR

AQUASTAT

RECIRC. PUMP

DCW

FULL SIZE OF

P&T RELIEF

VALVE OUTLET

EXPANSION TANK

(4 GALLON VOLUME,

0.9 GALLON ACCEPTANCE)

COMBINATION GAS

VALVE AND PRESSURE

REGULATOR (14" W.C.

IN AND 8" W.C. OUT)

FULL SIZE DIRT LEG

GAS COCK

NATURAL GAS

DHW

WH-101

5. RECIRCULATION PUMP SHALL OPERATE DURING OCCUPIED HOURS. SEE

M-702 FOR POINTS THAT ARE CONTROLLED AND MONITORED BY THE DDC

SYSTEM.

CONDENSATE

NEUTRALIZATION KIT

FLUE EXHAUST

INTAKE

CONCRETE EQUIPMENT

PAD. SEE S-501

30" MINIMUM

FINISHED FLOOR

SUPPORT

STAND (TYP)

ANCHOR TO FLR (TYP)

CIVIL

INTERFACE PVC PIPE

3' -6

M

IN

IM

U

M C

O V

E R

5'-0"

12"

PVC IRON PIPE FLANGED

COPPER PIPE

SLEEVE PENETRATION.

FILL SPACE AROUND PIPE

WITH FIREPROOF MASTIC

GRADE

CONCRETE THRUST BLOCK (TYP)

BACKFLOW PREVENTION

DEVICE (TYP)

DOUBLE CHECK VALVE

ASSEMBLY BACKFLOW

PREVENTER (SEE PLANS

FOR SIZE)

1' -0

M

IN

PLAN VIEW

ELEVATION VIEW

OS&Y VALVE WITH PRESSURE

GAUGE CONNECTION (TYP)

STRAINER

FLANGE

TO EMCS

BYPASS - FULL SIZE

WATER METER

PROVIDE SPOOL PIECE

BETWEEN STRAINER AND

METER

BACKFLOW

PREVENTER

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:1

P M

P-501

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

P

LU

M B

IN

G

D E

T A

IL

S

S

H E

E T

DAG

15154402

15154402

LJD CGM

05/07/2020

JM / SR

1651220

NOT TO SCALE

A1

NATURAL GAS PRESSURE REGULATOR WITH METER

NOT TO SCALE

C4

DOMESTIC WATER CIRCULATING PUMP

NOT TO SCALE

A2

GAS-FIRED WATER HEATER WITH MIXING VALVE

NOT TO SCALE

B1

DOMESTIC WATER SERVICE ENTRANCE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

NOTE:B

C

D

F

E

2" 154-330

1-1/4"

1-1/2"

3/4"

1"

61-113

114-154

12-32

33-60

SHOWER

SINK

JANITOR'S SINK

LAVATORY

1.5

0.75 0.75

A

SIZE

SINGLE FIXTURE

PDI

PDI SIZE "A"

1/2"

SIZE

PIPE

1-11

UNIT LOAD

FIXTURE

STANDARDS AND

INSTALL PER PDI

INSTRUCTIONS

MANUFACTURER'S

HOT OR COLD WATER SUPPLY

VALVE WATER CLOSET

MULTIPLE FIXTURES

FIXTURE UNIT TABULATION

IF HORIZONTAL BRANCH IS LESS THAN 20' LONG, PROVIDE ONE

WHA AT END OF LINE. IF BRANCH IS GREATER THAN 20' LONG,

PROVIDE ANOTHER WHA IN MIDDLE, EACH SIZED FOR HALF THE

FIXTURE UNITS.

FIXTURE

COLD

HOT

URINAL * --

1.5 1.5

DISHWASHER 1.125

1.5

1.125

2.25 2.25

* REFER TO IPC

PROVIDE WATER HAMMER ARRESTERS. INSTALL IN

HORIZONTAL OR VERTICAL POSITION, BUT NEVER UPSIDE

DOWN. INSTALL IN LINE WITH WATER FLOW DIRECTION IF

POSSIBLE. SIZE THE UNITS AS SHOWN ON THE DRAWINGS

AND/OR PER THE TABLES SHOWN.

ELECTRONIC

CONTROL MODULE

S

3/4" SUPPLY, EXTEND TO

CONNECT TO MAIN

UNION

ATMOSPHERIC VACUUM

BREAKER

STRAINER

SOLENOID CONTROL VALVE

TRAP PRIMER DISTRIBUTION

MANIFOLD

CAP UNUSED OUTLETS

1/2" PEX, EXTEND AND CONNECT

TO FLOOR DRAIN BODY (TYP)

INSTALL TRAP PRIMER ASSEMBLY A MINIMUM OF 12" ABOVE

FLOOR RIM ELEVATION OF HIGHEST DRAIN CONNECTED.

EACH OUTLET SHALL BE CONNECTED ONLY TO ONE FLOOR

DRAIN OR FLOOR SINK.

TRAP PRIMER DISTRIBUTION PIPING SHALL BE BUBBLE

TIGHT AND SEALED.

PROGRAM CONTROL MODULE TO OPEN SOLENOID

CONTROL VALVE AT MANUFACTURER'S RECOMMENDED

FREQUENCY AND DURATION.

GALVANIZED WALL BOX AND COVER PROVIDED BY TRAP

PRIMER MANUFACTURER.

POWER CONNECTION, PROVIDED BY OTHERS.

NOTES:

1.

2.

3.

KEYED NOTES:

TRAP PRIMER VALVE SHOULD BE MOUNTED ONE FOOT ABOVE THE FINISHED FLOOR FOR

EVERY 20 FOOT OF PRIME LINE.

A METERED AMOUNT OF WATER FROM THE FLOOR DRAIN TRAP PRIMER IS DISTRIBUTED TO

AS MANY AS (8) INDIVIDUAL FLOOR DRAIN TRAPS.

INSTALL ASSEMBLY WITH ACCESS FOR PERIODIC INSPECTION.

NOTES:

1.

2.

3.

DISTRIBUTION

UNIT

DCW SUPPLY

IN

ST

AL

LA

TI

O

N D

IM

EN

SI

O

N

1/

4" M

IN

IM

U M

" M

IN

IM

U M

(N O

TE

FINISHED FLOOR

ISOLATION VALVE

UNION

TRAP PRIMER

VALVE

COPPER TYPE L

(TYP.)

TRANSITION TO TYPE

K COPPER (TYP.)

PLASTIC TUBING (PEX EQUIVALENT) (TYP.)

MIN 1/2" FLOOR DRAIN

TRAP MAKE-UP WATER LINE. (TYP.)

VE

N

T

EX

TE

N

SI

O

N A

S R

EQ

U

IR

ED

VENT PIPE 3" MIN.

MASTIC

STAINLESS STEEL

CLAMPING RING

EPDM PREMOLDED

PIPE SEAL

SPLICING CEMENT

LAP SEALANT

METAL ROOF

METAL DECK

ROOF PENETRATION

BY ROOF MFGR.

INCREASER

IF REQUIRED

VENT

SANITARY / VENT

IN WALL

1/2" TEMPERED WATER

PUSH HANDLE

DOUBLE POLE SINGLE

THROW NORMALLY OPEN

FLOW SWITCHF S

THERMOSTATIC MIXING

VALVE (85° F OUTLET)

TEMPERATURE GAUGE

ALARM HORN

AND STROBE1/2" DCW

1/2" DHW

WALL

BRACKET

EYEWASH WITH

STAINLESS

STEEL BOWL

SILENCING SWITCH FOR TESTING

NOZZLE

" M

IN

8" MIN.

WALL

1 1/2" VENT

WHA

1 1/2" WASTE

1/2" DCW

1/2" DCW

SHUT-OFF

VALVE

FLOOR

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:2

P M

P-502

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

P

LU

M B

IN

G

D E

T A

IL

S

S

H E

E T

DAG

15154403

15154403

LJD CGM

05/07/2020

JM / SR

1651220

NOT TO SCALE

A1

WATER HAMMER ARRESTORS

NOT TO SCALE

C1

ELECTRONIC TRAP PRIMER

NOT TO SCALE

C3

TRAP PRIMER

NOT TO SCALE

A3

VENT FLASHING

NOT TO SCALE

A4

EMERGENCY EYEWASH

NOT TO SCALE

C4

ELECTRIC WATER COOLER CONNECTION DIAGRAM - ADA

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

COVER

CLEANOUT PLUG

MAIN LINE

FINISHED FLOOR

OR CONCRETE PAD

CAULK, BUNA-N

OR VITON SEAL

RISER EXTENSION

UP TO CLEANOUT.

NEED NOT BE

LARGER SIZE THAN 4"

WALL SURFACE

CLEANOUT PLUG

ROUND POLISHED STAINLESS

STEEL WALL COVER PLATE

(NOT REQUIRED UNLESS

LOCATED IN WALLS)

COUNTERSUNK SCREW

SCREWED COUNTERSUNK PLUG

OPENING CUT-OUT IN WALL

HORIZONTAL LINE

OR CLEANOUT TEE

SLOPE

(SEE DETAIL B3, S-502)

SYMMETRICAL

ABOUT

STRAINER

CAULKED OUTLET

SEE PLANS FOR

TYPE REQUIRED

C L

SLOPE

(SEE DETAIL B3, S-502)

SYMMETRICAL

ABOUT

STRAINER

CAULKED OUTLET

SEE PLANS FOR

TYPE REQUIRED

STEEL PIPE SLEEVE

ANCHOR

LUGS (4 REQ'D)

C L

OPEN STEEL GRATE COVER FOR SUMP

PIT. SET TOP FLUSH WITH ELEVATOR PIT

PUMP

SUMP PIT

SEE STRUCTURAL

DRAWINGS

UNION

PUMP DISCHARGE-UP

CHECK VALVE

BALL VALVE (NORMALLY OPEN)

GROUND FLOORTO DISCONNECT,

SEE ELEC DRAWINGS

DISCHARGE TO

OUTSIDE

FLOAT

3/8"

1/4"

3/8"

BACKUP MATERIAL

SEALANT

INSULATION

CENTER OF PIPE

INSULATION

SEALANT

BACKUP MATERIAL

FLOOR

PIPE SLEEVE (SEE STRUCTURAL

DRAWINGS FOR DETAIL)

PROVIDE SLEEVE FOR FLOOR

PENETRATION WITH 2" MORE

CLEARANCE. FILL CLEARANCE

WITH FIREPROOF MASTIC.

CENTER OF PIPE

PIPE

3/8"

PIPE

ESCUTCHEON

INTERIOR SIDE OF

EXTERIOR WALL

PIPE SLEEVE (SEE STRUCTURAL

DRAWINGS FOR DETAIL)

#4 AWG THHN/THWN INSULATED

GROUND CABLE, (TYP)

COORDINATE WITH ELECTRICAL CONTRACTOR NEW HARD CEILING

FASTENED TO BOTTOM CEILING SUPPORT ANGLE REFER TO

ARCHITECTURAL DWGS. FOR ADD. INFO.

NOTES:

SECURED AREA REQUIRES THAT PENETRATIONS SUCH AS THE DETAIL SHOWN BE ACCESSIBLE FOR INSPECTION BY PROGRAM SECURITY. COORDINATE WITH CONTRACTING OFFICER DURING INSTALLATION AND BONDING OF PIPES CROSSING BETWEEN SECURED AREAS.

CONTRACTOR SHALL KEEP A LOG OF ALL PIPE PENETRATIONS INDICATING LOCATION, PURPOSE AND INDICATION THAT THE INSTALLATION HAS BEEN

COORDINATED WITH CONTRACTING OFFICER AND PROGRAM SECURITY.

LABEL SHALL BE PERMANENTLY AFFIXED. LABEL PIPE FUNCTION.

INSULATION SHOULD BE CUT UP TO THE EDGE OF PIPE CLAMP TO ENSURE THAT GROUNDING IS PROPERLY CONNECTED.

DO NOT MECHANICALLY TIE PIPE TO WALL CONSTRUCTION IN ANY WAY.

SPACE BETWEEN PIPE AND SLEEVE TO BE FREE OF FOREIGN MATERIAL. WEDGES SHALL NOT BE USED TO MAINTAIN PIPE POSITION.

PIPE SHALL NOT CONTACT SLEEVE AT ANY TIME. PIPE MUST BE CENTERED IN WALL OPENING. PROVIDE ADDITIONAL CLEARANCE FOR POSITIONAL CHANGE OF PIPE

DUE TO LOADING OF PIPE OR SYSTEM OPERATION.

SECURE AREA

ACOUSTICAL PIPE

WRAPPING (TYP)

PIPE INSULATION, (TYP)

PIPE LABEL, SEE NOTE 3

COPPER GROUND PIPE

CLAMP LOCATED WITHIN 6" OF

WALL OR FLOOR, SEE NOTE 4

STEEL DECK.

STRUCT. STEEL

SEE STRUCT. DWG.

BEAM CLAMP (TYP)

PIPING (TYP)

FILL GAP WITH SOUND ATTENUATING FOAM

FOR NON-FIRE RATED PARTITIONS. FILL GAP

WITH FIRE-STOP FOR RATED PARTITIONS.

WALL, SEE ARCHITECTURAL

AND STRUCTURAL PLANS

1.

2.

3.

4.

5.

6.

7.

25 GA. MINIMUM METAL SLEEVE

3" 3"

NON-SECURE AREA

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/2

/2

:0

:5

A

M

P-503

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

P

LU

M B

IN

G

D E

T A

IL

S

S

H E

E T

DAG

15154404

15154404

LJD CGM

05/07/2020

JM / SR

1651220

NOT TO SCALE

C3

FLOOR CLEANOUT

NOT TO SCALE

A1

WALL CLEANOUT

NOT TO SCALE

A3

FLOOR DRAIN IN GROUND FLOOR

NOT TO SCALE

B3

FLOOR DRAIN IN UPPER FLOORS

NOT TO SCALE

A4

ELEVATOR PIT SUMP PUMP DETAIL

NOT TO SCALE

B4

PIPE PENETRATIONS

NOT TO SCALE

B1

SECURE AREA PIPING PENETRATION

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:2

P M

P-601

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

P

LU

M B

IN

G

S C

H E

D U

LE

S

DAG

15154405

15154405

LJD CGM

05/07/2020

JM / SR

1651220

PLUMBING FIXTURE SCHEDULE

TAG DESCRIPTION

FIXTURE FITTING

TRAP CARRIER MOUNTING HEIGHT

CONNECTION SIZE

REMARKSTYPE SIZE TYPE C.W. H.W. WASTE VENT

EEW-1 EMERGENCY EYE WASH DRENCH EYE/FACE WASH N/A 11" STAINLESS STEEL BOWL WITH FLIP TOP SPRAY HEADS, FULL FLOW

STAY-OPEN BALL VALVE, 3 GPM EYE/FACE WASH

N/A N/A N/A 1/2" * N/A 2" N/A WALL MOUNTED, PROVIDE WITH OPTIONAL HORN AND

STROBE & EMERGENCY FIXTURE THERMOSTATIC MIXING

VALVE

EWC-1 ADA ELECTRIC WATER COOLER RECESSED BI-LEVEL, WALL HUNG, BARRIER-FREE UNIT 38" W X 41" H X 31" D LEAD-FREE BUBBLER WITH FRONT, EASY TOUCH CONTROLS 1-1/2" N/A ORIFICE HT. 40" AFF & ACCESSIBLE

ORIFICE HT. 34" AFF

1/2" N/A 1-1/2" 1-1/4" STAINLESS STEEL

HB-1 HOSE BIBB INTERIOR HOSE BIBB N/A BRASS W/ANTI-SIPHON VACUUM BREAKER, TEE KEY HANDLE, AND HOSE

CONNECTION

N/A N/A 48" AFF 3/4" N/A N/A N/A WALL MOUNTED WITH POLISHED CHROME FINISH

LAV-1 COUNTER MOUNTED LAVATORY

(ACCESSIBLE)

TOP MOUNTED VITREOUS CHINA 19" x 17" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL 0.5 GPM FAUCET AND

PERFORATED GRID STRAINER

2" W/CLEANOUT

PLUG

N/A 1/2" 1/2" 2" 1-1/2" PROVIDE WITH OVERFLOW

LAV-2 ADA WALL MOUNTED LAVATORY WALL MOUNTED VITREOUS CHINA 18" x 13" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL 0.5 GPM FAUCET AND

PERFORATED GRID STRAINER

2" W/CLEANOUT

PLUG

N/A 34" AFF 1/2" 1/2" 2" 1-1/2" PROVIDE WITH OVERFLOW

MB-1 SQUARE MOP BASIN PRECAST TERRAZO, MOLDED MARBLE CHIPS AND PORTLAND CEMENT

BASIN WITH DROPPED THRESHOLD AND SS SPLASH PANELS

24" X 24" X 12" DEEP WALL-MOUNTED FAUCET, 8" CENTERS, VACCUUM BREAKER SPOUT, PAIL HOOK

WALL BRACE, AND 3/4" MALE THREAD HOSE CONNECTION, 36" HOSE, AND SS

WALL HOOK

3" N/A FAUCET: 36" AFF & BASIN - FLOOR

MOUNTED

3/4" 3/4" 3" 1-1/2" INTEGRAL CORROSION-RESISTANT METAL DRAIN WITH

REMOVABLE STRAINER AND 3" BOTTOM OUTLET

SH-1 SHOWER INTEGRAL FLOOR/SHOWER BASE WITH PRESSURE BALANCING SHOWER

VALVE

N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL SERVICE STOPS,

ADJUSTABLE STOP SCREW, 1.5 GPM HAND SHOWER HEAD, 60" FLEXIBLE HOSE,

30" ADJUSTABLE MOUNTING BAR, FLANGE, AND ESCUTCHEON

2" N/A HEAD: 75" AFF & CONTROL VALVE 48"

AFF

1/2" 1/2" 2" 1-1/2" PROVIDE CAST IRON DRAIN WITH TWO PIECE BODY,

INTEGRAL CLAMPING COLLAR, AND STAINLESS STEEL

DRAIN STRAINER PLATE

SH-2 ADA SHOWER INTEGRAL FLOOR/SHOWER BASE WITH PRESSURE BALANCING SHOWER

VALVE

N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL SERVICE STOPS,

ADJUSTABLE STOP SCREW, 1.5 GPM HAND SHOWER HEAD, 60" FLEXIBLE HOSE,

30" ADJUSTABLE MOUNTING BAR, FLANGE, AND ESCUTCHEON

2" N/A HEAD: 75" AFF & CONTROL VALVE 48"

AFF

1/2" 1/2" 2" 1-1/2" PROVIDE CAST IRON DRAIN WITH TWO PIECE BODY,

INTEGRAL CLAMPING COLLAR, AND STAINLESS STEEL

DRAIN STRAINER PLATE

SK-1 DOUBLE BOWL SINK EQUAL DOUBLE BOWL SINK, TYPE 304 20 GA. SS, SURFACE MOUNTED, WITH

SOUND DEADENING

33" X 22" X 9" DEEP THREE FAUCET HOLES, 8" SWIVEL SPOUT, SINGLE LEVER HANDLE, 1.5 GPM

AERATOR, HOSE SPRAY, GARBAGE DISPOSAL

1-1/2" N/A HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2" PROVIDE SS BASKET STRAINER AND 1/2 HP, 120V

GARBAGE DISPOSAL

SK-2 SINGLE SINK SINGLE BOWL SINK, TYPE 304 20 GA. SS, SURFACE MOUNTED, WITH SOUND

DEADENING

14" x 16" x 8" DEEP THREE FAUCET HOLES, 8" SWIVEL SPOUT, SINGLE LEVER HANDLE, 1.5 GPM

AERATOR

1-1/2" N/A HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2" PROVIDE SS BASKET STRAINER

U-1 URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER RIM 24" AFF 3/4" N/A 2" 1-1/2" NONE

U-2 ADA URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER RIM 17" AFF 3/4" N/A 2" 1-1/2" NONE

WC-1 FLOOR MOUNT WATER CLOSET 1.28 GPF, ELONGATED BOWL, FLOOR MOUNT WHITE, VITREOUS CHINA 1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET

CARRIER

RIM 15" AFF 1-1/4" N/A 4" 2" PROVIDE SOLID PLASTIC, OPEN FRONT SEAT (LESS

COVER)

WC-2 ADA WATER CLOSET 1.28 GPF, ELONGATED BOWL, FLOOR MOUNT WHITE, VITREOUS CHINA 1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET

CARRIER

RIM 17" AFF 1-1/4" N/A 4" 2" PROVIDE SOLID PLASTIC, OPEN FRONT SEAT (LESS

COVER)

WH-1 WALL HYDRANT EXTERIOR WALL HYDRANT N/A BRASS AUTOMATIC DRAINING, FREEZELESS, WITH ANTI-SIPHON VACUUM

BREAKER, TEE KEY HANDLE, AND HOSE CONNECTION

N/A N/A 24" AFF 3/4" N/A N/A N/A WALL MOUNTED W/BRASS FINISH BOX AND DOOR

* TEPID WATER.

THERMOSTATIC MIXING VALVE SCHEDULE (TMV)

TAG LOCATION

INLET - DCW INLET - DHW OUTLET

DESIGN MAXIMUM PRESSURE

DROP (PSI) NOTESCONNECTION SIZE TEMP (°F) CONNECTION SIZE TEMP (°F) CONNECTION SIZE TEMP (°F)

MAXIMUM

DESIGN FLOW

(GPM)

MINIMUM

DESIGN FLOW

(GPM)

TMV-1 RM 137-1 1 1/2" 60 1 1/2" 140 1 1/2" 110 28 0.5 5

TMV-2 RM 134 1/2" 60 1/2" 140 1/2" 110 28 0.5 5

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

T A

/2

2/

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

N A

S J

R B

F

O R

T W

O R

T H

T

X

N A

V Y

A

IR

S T

A T

IO

N

J O

IN

T

R E

S E

R V

E B

A S

E F

O R

T W

O R

T H

T

E X

A S

AS NOTED

U N

C L A

S S

IF

IE

D

The Johnson-McAdams Firm P.A.

F

IL

E P

A T

H

P

LO

T T

E D

15154699

C

U s e rs \c h a rl e s .m c a fe e \D o c u m e n ts

\B L

D G

P

-1

-M

-O P

S -C

E N

T R

A L c h a rl e s .m c a fe e b u rn s m c d

. c o m .r v t

/1

/2

:5

:3

P M

P-602

F A

S Q

U A

D R

O N

O P

E R

A T

IO

N

S /A

M U

F A

C

IL

IT

Y

P

LU

M B

IN

G

S C

H E

D U

LE

S

DAG

15154406

15154406

LJD CGM

05/07/2020

JM / SR

1651220

DOMESTIC WATER HEATER SCHEDULE (DWH)

TAG LOCATION TYPE

CAPACITY

(GAL)

ALTITUDE

(FT.)

PRESSURE RATING

(PSIG)

LVG. WATER TEMP

(°F)

ENT. WATER TEMP

(°F) FUEL SOURCE

BURNER INPUT

(BTU/H)

RECOVERY

(GAL/HR AT 100F

RISE)

MIN. EFFICIENCY

FORCED DRAFT MOTOR

(HP) VOLTS PHASE NOTES

WH-101 MECH ROOM CONDENSING GAS

FIRED

100 650 125 140 40 NATURAL GAS 250,000 290 95 0.5 120 1

NOTES:

1. PROVIDE CONDENSATE NEUTRALIZATION KIT, VENT AND FLUE KIT.

2. PROVIDE WITH MANUFACTURER'S DISCONNECT PER DIVISION 26 SPECIFICATIONS.

FLOOR DRAIN SCHEDULE

TAG DESCRIPTION TYPE STRAINER NOTES

FD-A CAST IRON, TWO PIECE BODY, INTEGRAL CLAMPING COLLAR, TRAP PRIMER

CONNECTION

1, 2, 3

FD-B CAST IRON, TWO PIECE BODY, INTEGRAL CLAMPING COLLAR, TRAP PRIMER

CONNECTION

FLOOR DRAIN - ROUND 9"ø CAST IRON TRACTOR GRATE, HEAVY DUTY 1, 2, 3

FD-C CAST IRON, TWO PIECE BODY, INTEGRAL CLAMPING COLLAR, TRAP PRIMER

CONNECTION WITH FUNNEL

SIGHT DRAIN 9"ø CAST IRON TRACTOR GRATE, HEAVY DUTY WITH FUNNEL 1, 2, 3

FS-A CAST IRON, TWO PIECE BODY, ACID RESISTANT, INTEGRAL CLAMPING COLLAR FLOOR SINK - 1/2 GRATE 12" SQUARE 1/2 GRATE, NICKEL-BRONZE 1, 2, 3

TD-1 8' LONG x 6" WIDE CAST IRON TRENCH DRAIN HEAVY DUTY - LOAD CLASS C 8' LONG x 6" WIDE CAST IRON TRENCH GRATE 2, 3

NOTES:

1.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .