Attachment J-2b Composite_Work_Package_FDRMC Rev2.pdf
PDF 852 KB Posted
- Attached to
- USS LEWIS B. PULLER (ESB-3) FY25 Voyage Repair
- Solicitation number
- N6817125R0003
About this file
This document is a comprehensive Work Item Specification for USS Lewis B Puller (ESB 3), detailing eight specific work items to be performed during the ship's maintenance availability. The work items include: replacing flight deck isolation valves, cleaning deck drain and piping, preserving bulkheads, preserving Commercial Broadband Satellite Program port cable pipe, replacing overhead panels, replacing locker latches, preserving A8 level pipes, and providing a project team office space.
Each work item contains detailed technical requirements, specific locations on the ship, quantities of materials/components to be addressed, and precise instructions for inspection, preparation, preservation, replacement, and documentation. The specification provides comprehensive guidance for contractors, including requirements for visual inspections, operational tests, surface preservation, equipment installation, and maintenance of facilities. The document is part of the Navy's FY-25 standard items and includes specific references to standard items, arrangement diagrams, and preservation guidelines, with most work items dated for implementation in September 2023.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
03 1 5
Standard Item # Title Change Date Change 009-01 General Criteria; accomplish 09/29/2023 Original 009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original 009-03 Toxic and Hazardous Substance; control 09/29/2023 Original 009-04 Quality Management System; provide 03/13/2024 CH-1 009-05 Temporary Access; accomplish 09/29/2023 Original 009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 09/29/2023 Original 009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original 009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original 009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original 009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original 009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original 009-20 Government Property; control 03/13/2024 CH-1 009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original 009-23 Interference; remove and install 09/29/2023 Original 009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original 009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish 09/29/2023 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility;
provide 09/29/2023 Original
009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original 009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original 009-67 Integrated Total Ship Testing; manage 09/05/2023 Original 009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish 09/29/2023 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original 009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair 09/29/2023 Original 009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original 009-80 Ship Facility; maintain 09/05/2023 Original 009-81 Compartment Closeout; accomplish 09/29/2023 Original 009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original 009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original
009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify 09/18/2023 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide 09/29/2023 Original
009-99 Ship Departure Report; provide 09/29/2023 Original 009-100 Ship's Stability; maintain 09/05/2023 Original 009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original 009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original 009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original 009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original 009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original 009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original 009-118 CG Deck Loading; accomplish 09/29/2023 Original 009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original 009-122 Temporary Padeye; install and remove 08/23/2023 Original 009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original 009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original
INDEX
ITEM THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I . FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
Standard Item # Title Change Change Date
009-11 Insulation and Lagging; accomplish Original 09/29/2023 009-12 Weld, Fabricate, and Inspect; accomplish CH-1 03/13/2024 009-25 Structural Boundary Test; accomplish Original 09/29/2023 009-26 Deck Covering; accomplish Original 09/01/2023 009-32 Cleaning and Painting Requirements; accomplish CH-1 03/13/2024 009-90 Technical Representative; provide Original 09/29/2023
Standard Items List - 2025 - CH-1
In Process Work Spec List
Work Spec Title 1 528-00-001 Flight Deck Isolation Valve; replace 2 593-31-001 Deck Drain and Piping; clean 3 631-10-001 Bulkhead Preservation; accomplish 4 631-21-001 Commercial Broadband Satellite Program (CBSP) Port Cable Pipe; preservation 5 637-00-001 Overhead Panel; replace 6 640-00-002 Locker Latch Replace; accomplish 7 644-11-001 A8 Level Pipe Preservation; accomplish 8 992-11-001 Project Team Office Space; provide
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 528-00-001
COAR: 26 PCN: EA01-L046
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 2 ITEM NO: 528-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Flight Deck Isolation Valve; replace
1.2 Location of Work:
1.2.1 Flight Deck (A5-86-0)
1.2.2 Mission Deck, A1 Level
1.3 Identification:
1.3.1 Quantity (16 EA), Valve, Gate 8.00 IPS Flanged Class 150PN20, A216-WCB Trim 8 BB/OS&Y, Carbon Steel
1.3.2 Quantity (4 EA), Valve, Gate 6.00 IPS Flanged Class 150PN20, A216-WCB Trim 8 BB/OS&Y, Carbon Steel
1.3.3 Quantity (12 EA), Valve, Gate 4.00 IPS Flanged Class 150PN20, A216-WCB Trim 8 BB/OS&Y, Carbon Steel
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 528-8468145 Rev D, Weather Deck Drains & Misc Drains System Diagram
2.3 MIL-STD-777F/Change 2, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships
2.4 605-2540769 Rev D, Label Plate Standards
2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Remove existing and install new equipment listed in 1.3, and located in 1.2, using 2.2 through 2.4 for guidance.
3.1.1 Restore each mating surface exposed by valve removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool. Take precautions to maintain phonographic finish on valves with flanges.
3.1.2 Install each valve, installing new each gasket conforming to 2.3, including Category and Group D-1.
3.1.3 Align the piping to each valve. Piping must be supported independently and must not impose a strain.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish an operational test in accordance with test notes S18 through S20 of 2.2. Allowable leakage at each new and disturbed joint:
None.
3.3 Install each new label plate listed in 1.3.1 and located in 1.2, in accordance with 2.2 and 2.4.
SHIP: USS LEWIS B PULLER (ESB 3)
SSP: BAHR-004-25 2 of 2 ITEM NO: 528-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 16 EA
Valve, Gate 8.00
IPS, 150 PSI,
A216-WCB None 2.2 None 3.1
2. 4 EA
Valve, Gate 6.00
IPS, 150 PSI,
A216-WCB None 2.2 None 3.1
3. 12 EA
Valve, Gate 4.00
IPS, 150 PSI,
A216-WCB None 2.2 None 3.1
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 593-31-001
COAR: 26 PCN: SERV-L126
EA01-0546
EA01-0553
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 4 ITEM NO: 593-31-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Deck Drain and Piping; clean
1.2 Location of Work:
1.2.1 Solid Waste MGT Room (A4-96-0)
1.2.2 Forward House (A1-A8 Level)
1.3 Identification:
1.3.1 Quantity (400 LF), Plumbing Deck Drain Piping
1.3.2 Quantity (28 EA) Deck Drains identified in Attachment A
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 528-8468142 Rev F, Plumbing Drains System Diagram
2.4 S9086-RK-STM-010/505 Rev 6, Piping Systems
2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a joint visual inspection of each clogged drain, drain piping, valve and Y-strainer located in 1.2 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, and to determine required repair, using 2.2 through 2.4 for guidance.
(V)(G) "PRE-REPAIR UNOBSTRUCTED FLOW TEST"
3.1.1 Accomplish pre-repair unobstructed flow test for each deck drain located in 1.2 using clean fresh water for a minimum of 30 minutes. Allowable leakage and obstruction: None.
Report: VISUAL INSPECTION AND PRE-REPAIR UNOBSTRUCTED
FLOW TEST
(WC) - WORK
COMPLETE + 1 day
3.1.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.
(V)(G) "HYDRO BLAST"
3.2 Accomplish hydro blasting, cleaning and flushing of deck drain and drain piping system, free of obstructions and foreign matter located in
SSP: BAHR-004-25 2 of 4 ITEM NO: 593-31-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1.2 and identified in 1.3, in accordance with paragraph 505-4.8 of 2.4, using 2.2 and 2.3 for guidance.
3.3 Accomplish the replacement of fifty (50) linear feet of drain piping and fifty (50) pipe clamps.
3.3.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column A, Lines One through 7.
3.4 Accomplish the requirement of 009-32 of 2.1 including Table 2, Line 26, Column A, B and E for the preservation of the interior of deck drain listed in 1.3 and located in 1.2 using 2.2 through 2.5 as guidance.
(V)(G) "POST-REPAIR UNOBSTRUCTED FLOW TEST"
3.5 Accomplish post-repair unobstructed flow test for each deck drain located in 1.2 using clean fresh water for a minimum of 30 minutes.
Allowable leakage and obstruction: None.
3.6 Accomplish the requirements of 009-11 of 2.1 for each new and disturbed lagging and insulation.
3.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.7.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 10 GL
Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1 None 3.4
2. 10 GL
PSX-700SG Dark Gray None 2.1 None 3.4
3. 10 GL
Amercoat 240, Haze Gray, MIL- PRF-23236, One Gallon Kit None 2.1 None 3.4
5.2 PUSH MATERIAL:
1. None.
SSP: BAHR-004-25 3 of 4 ITEM NO: 593-31-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SSP: BAHR-004-25 4 of 4 ITEM NO: 593-31-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 631-10-001
COAR: 26 PCN: V101-0672
SS03-0369
CG03-0996
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 2 ITEM NO: 631-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Bulkhead Preservation; accomplish
1.2 Location of Work:
1.2.1 Stateroom Shower (A3-94-7)
1.2.2 Vestibule (A5-96-8)
1.2.3 A2 Starboard Weather (A2-94-1.5)
1.3 Identification:
1.3.1 Quantity (30 SF), Bulkhead Shower, located in 1.2.1
1.3.2 Quantity (20 LF), Bottom of Bulkhead, located in 1.2.2
1.3.3 Quantity (30 SF), Bulkhead, located in 1.2.3
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a joint visual inspection with the SUPERVISOR of each bulkhead and vertical surface identified in 1.3 and located in 1.2 for structural integrity, deterioration, each pit, crack and area of damage or distortion, including damage and each existing surface imperfection, to include heavily scaled rust, laminated corrosion, each weld scar, jagged protrusion, remnant of previous installation and/or repair, using
2.2 and 2.3.
Report: VISUAL INSPECTION AND PRE-REPAIR UNOBSTRUCTED
FLOW TEST
(WC) - WORK
COMPLETE + 1 day
3.1.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.1 to the Supervisor.
3.2 Install and maintain protective covering, FME and containment to prevent contamination and damage of the Ship’s equipment, components, and spaces during contamination-producing operation.
3.2.1 Ensure all doors and hatches are closed and remain closed during surface preparation and preservation operations.
3.3 Provide ventilation for each enclosure, using explosive proof non-
SSP: BAHR-004-25 2 of 2 ITEM NO: 631-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
sparking electric exhaust fans or mechanical exhaust ventilation systems.
The location of the ventilation system must be arranged to provide air movement across all of the work area listed in 1.2, to prevent accumulation of flammable vapors. Exhaust from ventilation must be directed towards the atmosphere, and not recirculated into the enclosure.
3.4 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line One Columns A, B and D for preservation of bulkhead listed in 1.3 and located in 1.2.
3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.3.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 10 GL
Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1 None 3.4
2. 10 GL
Amercoat 5450, Soft White, 27880 None 2.1 None 3.4
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 631-21-001
COAR: 26 PCN: CE01-0264
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 2 ITEM NO: 631-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Commercial Broadband Satellite Program (CBSP) Port Cable Pipe; preservation
1.2 Location of Work:
1.2.1 A6 Weather Deck, Port
1.3 Identification:
1.3.1 Quantity (12 LF), CBSP Port Cable Pipe
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Accomplish the requirement of 009-32 of 2.1 including Table 2, Line 26, Column A, B and E for the preservation of the CBSP pipe listed in 1.3 and located in 1.2 using 2.2 as guidance.
3.2 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.2.1 Do not paint each item listed in Paragraph 631-8.17 of 2.3.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 GL
Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1 None 3.1
2. 1 GL
Amerishield, Haze Gray, 26270, One Gal None 2.1 None 3.1
5.2 PUSH MATERIAL:
1. None.
SSP: BAHR-004-25 2 of 2 ITEM NO: 631-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 637-00-001
COAR: 26 PCN: EX01-0032
CC02-0345
SS03-0326
CC02-0344
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 2 ITEM NO: 637-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Overhead Panel; replace
1.2 Location of Work:
1.2.1 A2 Passageway, Circular (A2-89-1-L)
1.2.2 Enlisted Berthing (A2-94-6-L)
1.2.3 Passage (A3-95-0)
1.3 Identification:
1.3.1 Quantity (10 EA), Overhead Panel
1.3.2 Quantity (50 EA), Overhead Panel Fasteners
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each damaged overhead panel and missing fastener identified in 1.3, and located in 1.2, using 2.2 for guidance.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Remove existing and repair each overhead panel identified in 1.3 and located in 1.2, using 2.2 for guidance and as designated by the
SUPERVISOR.
3.2.1 Template exact size, configuration, and location from existing shipboard conditions, using 2.2 for guidance.
3.2.2 Install each missing overhead panel fastener identified in 1.3 and located in 1.2, using 2.2 for guidance.
3.2.3 Fair and straighten each overhead panel as directed by
SUPERVISOR.
SSP: BAHR-004-25 2 of 2 ITEM NO: 637-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line One Columns A, B and D for preservation of overhead panel identified in 1.3 and located in 1.2.
(V)(G) "FINAL VISUAL INSPECTION"
3.4 Accomplish a final visual inspection to ensure complete installation of each overhead panel, using 2.2 for guidance.
3.5 Accomplish the requirements of 009-11 of 2.1 for each new and disturbed insulation and lagging.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.3.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 5 GL
Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1 None 3.3
2. 5 GL
AMERCOAT 5450,
Soft White, 27880 None 2.1 None 3.3
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 640-00-002
COAR: 26 PCN: EX01-0030
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 2 ITEM NO: 640-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Locker Latch Replace; accomplish
1.2 Location of Work:
1.2.1 CO Stateroom (A3-89.5-10-L)
1.3 Identification:
1.3.1 Quantity (2 EA), Standup locker door latch assembly, located in 1.2
1.3.1.1 Quantity (One EA), Big standup locker door latch
assembly
1.3.1.2 Quantity (One EA), Small standup locker door latch
assembly
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each locker latch assembly, handle, located in 1.2, identified in 1.3, using 2.2 and 2.3 as guidance and as designated by the SUPERVISOR.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Procure and install each new door locker latch assembly, identified in 1.3 and located in 1.2, using 2.2 for guidance and as designated by the SUPERVISOR.
3.2.1 Template exact size, configuration, and location from each existing shipboard condition.
(V)(G) "OPERATIONAL TEST"
3.3 Accomplish an operational test of each new installed locker latch assembly, cycle door lock open and closed (3X). Acceptance criteria:
locks, holds in place, no binding or rubbing.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.3.
4. NOTES:
SSP: BAHR-004-25 2 of 2 ITEM NO: 640-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 644-11-001
COAR: 26 PCN: CC01-0285
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 2 ITEM NO: 644-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: A8 Level Pipe Preservation; accomplish
1.2 Location of Work:
1.2.1 Forward Deck Toilet (A8-95-2-L)
1.3 Identification:
1.3.1 Quantity (20 LF), HVAC Pipe located in 1.2.1
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 528-8468142 Rev F, Plumbing Drains System Diagram
2.4 S9086-RK-STM-010/505 Rev 6, Piping Systems
2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each HVAC Pipe, located in 1.2, identified in 1.3, using 2.2 through 2.5 as guidance and as designated by the SUPERVISOR.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Accomplish the requirement of 009-32 of 2.1 including Table 5, Line 15, Column A and B for the preservation of the HVAC pipe listed in 1.3 and located in 1.2 using 2.2 through 2.4 as guidance.
3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.3.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
REQ
PARA NO.
SSP: BAHR-004-25 2 of 2 ITEM NO: 644-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
PROVIDED NO.
1. 2 GL
AMERCOAT 5450,
Pearl Gray, 26493, Heat Resisting None 2.1
80100144 10157 3.2
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 992-11-001
COAR: 26 PCN: SERV-L123
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-004-25 1 of 6 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Project Team Office Space; provide
1.2 Location of Work:
1.2.1 Within the Port
1.2.2 Contractor's Facility
1.3 Identification:
1.3.1 Not Applicable.
2. REFERENCES:
2.1 Standard Items, (FY25)
3. REQUIREMENTS:
3.1 Provide and maintain (to include cleaning) two (2) minimum of 40-foot lockable trailer or office space for use by the Project Team must be ready four (4) Days prior to start of the availability until one day after completion of the availability as designated by the SUPERVISOR at the location of 1.2. Provide Quantity 10 sets of keys to the Project Team Manager upon arrival to occupy office space.
3.1.1 Office space must be of the same quality that is provided for Contractor's mid-level engineering staff.
3.2 Office space must have the following services:
3.2.1 Electricity, lighting and power.
3.2.1.1 Overhead lighting must meet the following minimum
standards: Office areas - 42 feet candles; sanitary areas - 14-foot candles.
3.2.1.2 Office area must have outdoor lighting available at
every exit.
3.2.1.3 Provide 120 Volts AC, 20 Amperes, 60 Hertz, plus or
minus 5 percent, grounded voltage. Provide a minimum of 20 duplex wall receptacles.
3.2.2 Heating, air-conditioning and ventilation.
3.2.2.1 Office space must be either heated or cooled to maintain a temperature between 62 to 75 degrees Fahrenheit.
3.2.2.2 Provide replenishment air in accordance with local
building codes.
3.3 Office space must be furnished with like new condition the following:
3.3.1 Quantity (10 EA) Lockable office desks, with swivel casters.
3.3.2 Quantity (10 EA) Chair, straight back, with swivel casters capable of supporting up to 250 pounds.
SSP: BAHR-004-25 2 of 6 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3.3 Quantity (One EA) Filing cabinets, four (4) drawers, with lock and keys.
3.3.4 Quantity (10 EA) Waste baskets.
3.3.5 Provide water cooler, bottled water, and disposable cups as required for the entire availability.
3.3.6 Provide Quantity (10 EA) 32-inch computer monitor with
appropriate cable connection to suite each laptop and meet N6 requirements.
3.3.7 Provide Quantity (One EA) printer off the list that provided as identified on Attachment A for the only authorized printer, with paper, toner, automatic feed, 2-sided copying, capability to collate up to 15 copies, with separate paper trays for 8.5-inch x 11-inch and 11-inch x 17-inch, and repair service when requested.
3.3.7.1 Enable scanning capabilities.
3.3.7.2 Connect fax capabilities with a dedicated phone line.
3.3.7.3 Provide 5 reams minimum paper at printer station and
provide additional paper as needed.
3.3.7.4 Provide staplers, pens, scissors and tape.
3.3.7.5 Provide driver installation CD of the authorized printer to the project team 10 days prior to the start of the availability.
3.3.8 Provide Quantity (One EA) commercial grade micro-cut paper shredder in office for the duration of the availability. The shredder must be capable of shredding at least 5 sheets of 8 1/2 inches by 11 inches paper per pass.
3.3.9 Provide office facility for Project Team and each furnishing must be accessible 24 hours per day, 7 days per week and in effect from 3 calendar days prior to the contract performance period to 3 days after the contract performance period. Quantity (5 EA) broadband high-speed internet, 1GB per second, capable LAN drops at DSL bit rate or equivalent, with 24-hour continuous unlimited service for the duration of the availability. The broadband connection has to be configured to allow secure VPN connection to the US Navy computer network. The LAN drops shall be run adjacent to the telephone jacks.
(V)(G) "INTERNET SPEED"
3.3.9.1 Provide internet technical support during normal
business hours from 0730 to 1700 and weekends. Standard based IP connection utilizing Ethernet (IEEE 802.3) framing. Connection throughout to be 1.5 Gbps minimum per user/workstation.
3.3.10 Provide and maintain Quantity (One EA) refrigerators with a minimum fresh food capacity of 15 cubic feet, freezer capacity of at least 6 cubic feet, shelf area of 25 square feet and auto-defrost feature.
3.3.11 Provide and maintain Quantity (One EA) microwave oven
(1000W). The oven shall be at least 1.0 cubic foot and shall have recessed 12-inch diameter turntable, 10 power levels, digital keypad
SSP: BAHR-004-25 3 of 6 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
controls and clock/timer.
3.3.12 Provide printing service for Quantity (25 EA) booklets format of work specification at the arrival conference and at the 50% point of the availability.
3.3.13 Provide One (EA) 12-15 cups coffee maker.
3.3.14 Provide two (EA), whiteboard (5-foot X 6-foot) mounted in location as designated by SUPERVISOR, markers (multi color), and eraser.
3.4 Provide and maintain lavatory and sanitary facilities with running water. Provide hot (to be maintained at 140-degree Fahrenheit) and cold potable water (to be maintained between 65- and 75-degree Fahrenheit) for each Hygiene facilities. Facilities must be in close proximity of the office space and must be provided for the entire availability. Separate facilities must provide for female and male personnel. Sanitary facilities must contain the following:
3.4.1 Quantity (2 EA) Lavatories.
3.4.2 Quantity (2 EA) Water Closets.
3.4.3 Quantity (2 EA) Urinals (Men's Room).
3.4.4 Quantity (2 EA) Soap Dispensers.
3.4.5 Quantity (2 EA) Towel Dispensers.
3.4.6 Provide Quantity (One EA) Broom and Dust Pan.
3.5 Provide janitorial services to include sweep, damp mopping and trash pickup, on a daily basis in both office space and sanitary facilities.
3.5.1 Provide covered trash containers for the collection of large debris, trash and garbage generated by the Project Team. The containers must be placed at suitable location near the office and must be emptied as required.
3.5.1.1 The containers must be steam-cleaned weekly or as
required to maintain a sanitary condition free of insects, rodents and unpleasant odors.
3.6 Facility must be in accordance with the local building codes, sanitary, and current fire safety regulations. Adequate fire protection apparatus must be provided inside the facility and will include smoke alarms, sprinkler systems and two fully charged 15-pound CO2 fire extinguishers.
3.6.1 Furnishings and equipment in this Work Item must be maintained in a fully operable condition by the contractor.
3.6.2 Facility must be delivered to Project Team Representative, clean, sanitary, damage free and free of rodent, vermin and insect.
3.7 Facility must be located within the Port, as directed by SUPERVISOR.
3.7.1 Provide Quantity (20 EA) parking spaces mark for Project Team for adjacent to office facility.
4. NOTES:
SSP: BAHR-004-25 4 of 6 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: BAHR-004-25 5 of 6 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SSP: BAHR-004-25 6 of 6 ITEM NO: 992-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
| USS LEWIS B PULLER ESB 3 |
| CAT 1 STANDARD ITEMS |
| CAT II STANDARD ITEMS |
| 528-00-001 |
| Flight Deck Isolation Valve; replace |
| 593-31-001 |
| Deck Drain and Piping; clean |
| 631-10-001 |
| Bulkhead Preservation; accomplish |
| 631-21-001 |
| Commercial Broadband Satellite Program (CBSP) Port CablePipe; preservation |
| 637-00-001 |
| Overhead Panel; replace |
| 640-00-002 |
| Locker Latch Replace; accomplish |
| 644-11-001 |
| A8 Level Pipe Preservation; accomplish |
| 992-11-001 |
| Project Team Office Space; provide |
File details come from the government source that posted it. Updated .