2.04b Attachment J-1 Pricing Worksheet REV3.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
USS LEWIS B. PULLER (ESB-3) FY25 Voyage Repair
Solicitation number
N6817125R0003
Issued by

About this file

The file "2.04b Attachment J-1 Pricing Worksheet REV3.xlsx" is a pricing worksheet for the USS LEWIS B. PULLER (ESB-3) FY25 Voyage Repair contract. The Excel spreadsheet contains detailed pricing information for repair services to be performed in Taranto, Italy from 27 February 2025 to 13 March 2025. The worksheet likely includes line-item pricing for specific repair and maintenance tasks, labor rates, material costs, and potentially overhead and profit calculations for the naval vessel repair project. The document is associated with Solicitation Number N6817125R0003 issued by the Department of the Navy Naval Supply Systems Command, and is designed to provide a comprehensive cost breakdown for the proposed voyage repair work.

View the file

Other files

File Type Posted
Attachment J-2a Composite_Work_Package_MSC_REV2.pdf PDF
N6817125R0003 Conformed through 0009.pdf PDF
Attachment J-2b Composite_Work_Package_FDRMC Rev2.pdf PDF
N6817125R0003 0009.pdf PDF
N6817125R0003 0008.pdf PDF
N6817125R0003 Conformed through 0008.pdf PDF
N6817125R0003 0007.pdf PDF
N6817125R0003 Conformed through 0007.pdf PDF
N6817125R0003 Conformed through 0006.pdf PDF
2.04b Attachment J-1 Pricing Worksheet REV2.xlsx XLSX spreadsheet
N6817125R0003 0006.pdf PDF
2.04c Attachment J-2b Composite_Work_Package_FDRMC Rev2.pdf PDF
2.04b Attachment J-1 Pricing Worksheet REV 1.xlsx XLSX spreadsheet
2.04c Attachment J-2b Composite_Work_Package_FDRMC Rev1.pdf PDF
N6817125R0003 0005.pdf PDF
N6817125R0003 Conformed through 0005.pdf PDF
N6817125R0003 0003.pdf PDF
N6817125R0003 0004.pdf PDF
N6817125R0003 0002.pdf PDF
N6817125R0003 0001.pdf PDF
Attachment J-2a Composite_Work_Package_MSC.pdf PDF
Attachment S-2_QA Checklist updated.pdf PDF
N6817125R0003.pdf PDF
Attachment J-2b Composite_Work_Package_FDRMC.pdf PDF
Attachment S-5 _PP Information.docx DOCX document
Attachment S-1_Non-Disclosure Agreement.pdf PDF
Attachment J-1 Pricing Worksheet.xlsx XLSX spreadsheet
Attachment S-3_Foreign ACP Questionnaire.docx DOCX document
Attachment S-4_Foreign National Cert.pdf PDF
Attachment J-4 GFM List.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-1 SUMMARY

OFFERORATTACHMENT J-1 (Pricing Worksheet): USS LEWIS B PULLER FY25 VOYAGE REPAIR AVAILABILITY
Work Item NumberDescriptionLaborSubcontractMaterialG&A and ProfitTravel
UnitQuantityUnit PriceExtendedExtended Price
CLIN 0001 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
MSC Base Work Items
0001ESB-SWI-SCOPE GENERAL REQUIREMENTS AND DEFINITIONSNot Seperately Priced
0002TECHNICAL AND MANUFACTURERS REPRESENTATIVE
0004ESB-SWI-TESTING AND QUALITY ASSURANCE
0005ESB-SWI-HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
0013ESB-SWI-INTEGRATED PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTSHour$ - 0$ - 0
0501OEM SUPPORT FOR REVERSE OSMOSISHour$ - 0$ - 0
0595TANK LEVEL INDICATOR SYSTEM REPAIRSHour$ - 0$ - 0
CLIN 0002 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FDRMC Base Work Items
528-00-001Flight Deck Isolation Valve; replaceHour$ - 0$ - 0
593-31-001Deck Drain and Piping; cleanHour$ - 0$ - 0
631-10-001Bulkhead Preservation; accomplishHour$ - 0$ - 0
631-21-001Commercial Broadband Satellite Program (CBSP) Port Cable Pipe; preservationHour$ - 0$ - 0
637-00-001Overhead Panel; replaceHour$ - 0$ - 0
640-00-002Locker Latch Replace; accomplishHour$ - 0$ - 0
644-11-001A8 Level Pipe Preservation; accomplishHour$ - 0$ - 0
992-11-001Project Team Office Space; provideHour$ - 0$ - 0
CLIN 0003 TOTAL$ - 0
MSC Additional Government Requirement
Additional Growth Requirements (AGR) - To be calculated on an estimate of 143 hours.143.00$ - 0
Estimated Value:Percentage:
Additional Growth Requirements (AGR) - To be calculated on an estimate of $9,508.44 Material / Other expenses$ 9,508.44$ - 0
CLIN 0004 TOTAL$ - 0
FDRMC Additional Government Requirement
Additional Growth Requirements (AGR) - To be calculated on an estimate of 170 hours.170.00$ - 0
Estimated Value:Percentage:
Additional Growth Requirements (AGR) - To be calculated on an estimate of $2,690 Material / Other expenses$ 2,690.00$ - 0
TOTAL EVALUATED PRICE$ - 0

Price Analysis Toolkit.xlsx

J-1 TRAVEL EXPENSES BREAKDOWN

J-1 Travel Expenses BreakdownPrices in USD
RFP #N6817124R0016
DESCRIPTIONNO. OF PERSONNELNO. OF DAYSTRAVEL HRSHOURLY RATETRAVEL TOTAL PRICE
TRAVEL EXPENSES$ - 0$ - 0
AIRFARELODGINGPER DIEMRENTAL CAR / TRANSPORTATIONTOTAL PRICE
$ - 0$ - 0$ - 0$ - 0$ - 0

TRAVEL EXPENSES TOTAL AMOUNT $ - 0

File details come from the government source that posted it. Updated .