Attachment J-1 Pricing Worksheet.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- USS LEWIS B. PULLER (ESB-3) FY25 Voyage Repair
- Solicitation number
- N6817125R0003
About this file
This is a pricing worksheet template (Attachment J-1) for the USS LEWIS B PULLER FY25 Voyage Repair contract to be performed in Taranto, Italy from February 27 - March 13, 2025. The worksheet is structured with four main CLINs: CLIN 0001 covers MSC Base Work Items including technical representatives, testing, high voltage safety, and monitoring requirements; CLIN 0002 contains FDRMC Base Work Items comprising various repairs and maintenance tasks such as ladder preservation, door repairs, ventilation cleaning, and deck preservation; CLIN 0003 covers MSC Additional Government Requirements with 143.25 estimated hours and $8,360.94 in materials; and CLIN 0004 includes FDRMC Additional Government Requirements with 1,990 estimated hours and $38,360 in materials.
The worksheet requires contractors to provide detailed pricing breakdowns for labor, subcontract costs, materials, G&A/profit, and travel expenses across multiple work items. A separate travel expenses breakdown section is included for listing personnel counts, duration, travel hours, airfare, lodging, per diem, and transportation costs. The template is currently blank with no prices entered.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1 SUMMARY
| OFFEROR | ATTACHMENT J-1 (Pricing Worksheet): USS LEWIS B PULLER FY25 VOYAGE REPAIR AVAILABILITY | |||||||||
| Work Item Number | Description | Labor | Subcontract | Material | G&A and Profit | Travel | ||||
| Unit | Quantity | Unit Price | Extended | Extended Price | ||||||
| CLIN 0001 TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| MSC Base Work Items | ||||||||||
| 0001 | ESB-SWI-SCOPE GENERAL REQUIREMENTS AND DEFINITIONS | Not Seperately Priced | ||||||||
| 0002 | TECHNICAL AND MANUFACTURERS REPRESENTATIVE | |||||||||
| 0004 | ESB-SWI-TESTING AND QUALITY ASSURANCE | |||||||||
| 0005 | ESB-SWI-HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | |||||||||
| 0013 | ESB-SWI-INTEGRATED PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | Hour | $ - 0 | $ - 0 | ||||||
| 0020 | ESB-SWI-GAS FREE CERTIFICATES | Hour | $ - 0 | $ - 0 | ||||||
| 0501 | OEM SUPPORT FOR REVERSE OSMOSIS | Hour | $ - 0 | $ - 0 | ||||||
| 0595 | TANK LEVEL INDICATOR SYSTEM REPAIRS | Hour | $ - 0 | $ - 0 | ||||||
| CLIN 0002 TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| FDRMC Base Work Items | ||||||||||
| 120-00-001 | Bracket; replace | Hour | $ - 0 | $ - 0 | ||||||
| 130-00-001 | Inclined Ladder and Mezzanine Ladder; preserve | Hour | $ - 0 | $ - 0 | ||||||
| 130-00-002 | Starboard Inclined Ladder; preserve | Hour | $ - 0 | $ - 0 | ||||||
| 159-11-001 | A9 Weather Deck Warning Sign; replace | Hour | $ - 0 | $ - 0 | ||||||
| 167-00-001 | Joiner Door and Handle; repair | Hour | $ - 0 | $ - 0 | ||||||
| 167-00-002 | A8 Communication Center Door Repair; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 167-11-001 | Quick Acting Watertight Door Dog Wedge; repair | Hour | $ - 0 | $ - 0 | ||||||
| 167-11-002 | Security Combination Door Lock; install | Hour | $ - 0 | $ - 0 | ||||||
| 169-00-001 | Shower Door Repair; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 311-11-001 | Kickpipe; replace | Hour | $ - 0 | $ - 0 | ||||||
| 508-11-001 | Lagging and Insulation; replace | Hour | $ - 0 | $ - 0 | ||||||
| 512-00-001 | Ventilation Cleaning; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 512-00-002 | Split Air Condition Cleaning; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 516-10-001 | Container (CONEX) Refrigeration Unit Box; clean | Hour | $ - 0 | $ - 0 | ||||||
| 526-11-001 | Flight Deck Drain; preserve | Hour | $ - 0 | $ - 0 | ||||||
| 528-00-001 | Flight Deck Isolation Valve; replace | Hour | $ - 0 | $ - 0 | ||||||
| 588-21-001 | Port Side Roll Up Door Repair; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 588-21-002 | Helicopter Hangar Door Bottom Bar Assembly; repair | Hour | $ - 0 | $ - 0 | ||||||
| 593-31-001 | Deck Drain and Piping; clean | Hour | $ - 0 | $ - 0 | ||||||
| 631-10-001 | Bulkhead Preservation; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 631-21-001 | Commercial Broadband Satellite Program (CBSP) Port Cable Pipe; preservation | Hour | $ - 0 | $ - 0 | ||||||
| 634-11-001 | Cosmetic Polymeric (PRC) Deck Covering; replace | Hour | $ - 0 | $ - 0 | ||||||
| 637-00-001 | Overhead Panel; replace | Hour | $ - 0 | $ - 0 | ||||||
| 640-00-001 | Metal Joiner Door Preservation; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 640-00-002 | Locker Latch Replace; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 644-11-001 | A8 Level Pipe Preservation; accomplish | Hour | $ - 0 | $ - 0 | ||||||
| 992-11-001 | Project Team Office Space; provide | Hour | $ - 0 | $ - 0 | ||||||
| CLIN 0003 TOTAL | $ - 0 | |||||||||
| MSC Additional Government Requirement | ||||||||||
| Additional Growth Requirements (AGR) - To be calculated on an estimate of 143.25 hours. | 143.00 | $ - 0 | ||||||||
| Estimated Value: | Percentage: | |||||||||
| Additional Growth Requirements (AGR) - To be calculated on an estimate of $8,360.94 Material / Other expenses | $ 8,360.94 | $ - 0 | ||||||||
| CLIN 0004 TOTAL | $ - 0 | |||||||||
| FDRMC Additional Government Requirement | ||||||||||
| Additional Growth Requirements (AGR) - To be calculated on an estimate of 143.25 hours. | 1,990.00 | $ - 0 | ||||||||
| Estimated Value: | Percentage: | |||||||||
| Additional Growth Requirements (AGR) - To be calculated on an estimate of $8,360.94 Material / Other expenses | $ 38,360.00 | $ - 0 | ||||||||
| TOTAL EVALUATED PRICE | $ - 0 |
Price Analysis Toolkit.xlsx
J-1 TRAVEL EXPENSES BREAKDOWN
| J-1 Travel Expenses Breakdown | Prices in USD |
| RFP #N6817124R0016 |
| DESCRIPTION | NO. OF PERSONNEL | NO. OF DAYS | TRAVEL HRS | HOURLY RATE | TRAVEL TOTAL PRICE |
| TRAVEL EXPENSES | $ - 0 | $ - 0 |
| AIRFARE | LODGING | PER DIEM | RENTAL CAR / TRANSPORTATION | TOTAL PRICE |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TRAVEL EXPENSES TOTAL AMOUNT $ - 0