Attachment S-5 _PP Information.docx

DOCX document 31 KB Posted

Attached to
USS LEWIS B. PULLER (ESB-3) FY25 Voyage Repair
Solicitation number
N6817125R0003
Issued by

About this file

This is a Past Performance Information Sheet template (Attachment S-5) that offerors must complete as part of their proposal for the USS LEWIS B. PULLER (ESB-3) FY25 Voyage Repair contract. The template requires contractors to provide details on up to three past performance references, including contract numbers, award amounts, performance periods, and whether CPARS evaluations were completed.

The form specifically requests detailed information about ship repair work similar to the current solicitation's requirements, including experience with ship systems (propulsion, electrical, communications), hull/structural work, preservation efforts, dry-dock operations, material control, quality control, facilities, and key personnel. Contractors must describe their contract management experience, schedule adherence, and handling of growth/new work. This template will be used to evaluate bidders' relevant past performance for the upcoming voyage repair work to be performed in Taranto, Italy from February 27 to March 13, 2025.

View the file

Other files

File Type Posted
2.04b Attachment J-1 Pricing Worksheet REV3.xlsx XLSX spreadsheet
Attachment J-2a Composite_Work_Package_MSC_REV2.pdf PDF
N6817125R0003 Conformed through 0009.pdf PDF
Attachment J-2b Composite_Work_Package_FDRMC Rev2.pdf PDF
N6817125R0003 0009.pdf PDF
N6817125R0003 0008.pdf PDF
N6817125R0003 Conformed through 0008.pdf PDF
N6817125R0003 0007.pdf PDF
N6817125R0003 Conformed through 0007.pdf PDF
N6817125R0003 Conformed through 0006.pdf PDF
2.04b Attachment J-1 Pricing Worksheet REV2.xlsx XLSX spreadsheet
N6817125R0003 0006.pdf PDF
2.04c Attachment J-2b Composite_Work_Package_FDRMC Rev2.pdf PDF
2.04b Attachment J-1 Pricing Worksheet REV 1.xlsx XLSX spreadsheet
2.04c Attachment J-2b Composite_Work_Package_FDRMC Rev1.pdf PDF
N6817125R0003 0005.pdf PDF
N6817125R0003 Conformed through 0005.pdf PDF
N6817125R0003 0003.pdf PDF
N6817125R0003 0004.pdf PDF
N6817125R0003 0002.pdf PDF
N6817125R0003 0001.pdf PDF
Attachment J-2a Composite_Work_Package_MSC.pdf PDF
Attachment S-2_QA Checklist updated.pdf PDF
N6817125R0003.pdf PDF
Attachment J-2b Composite_Work_Package_FDRMC.pdf PDF
Attachment S-1_Non-Disclosure Agreement.pdf PDF
Attachment J-1 Pricing Worksheet.xlsx XLSX spreadsheet
Attachment S-3_Foreign ACP Questionnaire.docx DOCX document
Attachment S-4_Foreign National Cert.pdf PDF
Attachment J-4 GFM List.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS TRETON (T-EPF 5) FY22 ROHAttachment S-1
USNS TRETON (T-EPF 5) FY22 ROHAttachment S-1
USS LEWIS B PULLER (ESB-3) FY25 VRAttachment S-5

ATTACHMENT S-5 (PAST PERFORMANCE/CPARS INFORMATION SHEET)

TO BE COMPLETED BY OFFEROR

Contractor:

DUNS/CAGE Code:

Reference #1
Reference #2
Reference #3

Contract Number / Delivery Order Number

Was CPARS completed?

If so, when?

Type of Contract

Ship Name

Type of Availability

Amount of Award

Period of Performance

Final Dollar Value of Contract (Award + Growth/New Work) **If work performed as a subcontractor, identify the final dollar value of the subcontract and only those portions.**

Procuring Agency Point(s) of Contact (not to exceed 3):

Name, Email and Telephone Number(s) of Government or Commercial Entity for which the contract was performed.

Was your company the prime or subcontractor? (If the subcontractor, identify only those portions of the contract performed by your company).

DETAILED DESCRIPTION OF WORK (DEMONSTRATING THE SIMILARITY OF THE WORK PERFORMED TO ATTACHMENT J-2(a) & (b) (WORK SPECIFICATION PACKAGE)

Work Specification Package Content: Provide details on work package similarities with current solicited work package.

Ship Systems: Propulsion, Electrical, Communication & Navigation, Auxiliary Machinery, Heating, Ventilation & air Conditioning (HVAC), etc.

Hull / Structural: Types of welding procedures and certifications used, type and scope of structural repair.

Preservation: Preservation efforts similar in scope to current requirement.

Dry-Dock: Duration of time spent in dry-dock as well as scope of work performed while in dry-dock.

Material Control and Storage

Quality Control

Facilities: Description of Facilities utilized for contract.

Key Personnel and OEM Management

Management of Contract: Description of schedule and critical path analysis. Was the contract completed on time? If not, provide detailed explanation. Discuss any growth/new work performed during the course of the contract and impact, if any, on project completion.

File details come from the government source that posted it. Updated .