2.04b Attachment J-1 Pricing Worksheet REV 1.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
USS LEWIS B. PULLER (ESB-3) FY25 Voyage Repair
Solicitation number
N6817125R0003
Issued by

About this file

This is a pricing worksheet template (Attachment J-1) for the USS LEWIS B PULLER FY25 Voyage Repair contract. The worksheet breaks down pricing across four CLINs: CLIN 0001 for MSC Base Work Items (including technical representatives, testing/QA, and electrical safety procedures), CLIN 0002 for FDRMC Base Work Items (covering 26 specific repair tasks including ladder preservation, door repairs, ventilation cleaning, and deck preservation), CLIN 0003 for MSC Additional Government Requirements (estimated 143 hours plus $8,360.94 in materials), and CLIN 0004 for FDRMC Additional Government Requirements (estimated 1,990 hours plus $38,360 in materials).

The worksheet requires contractors to provide detailed cost breakdowns for labor, subcontracts, materials, G&A/profit, and travel expenses for each work item. A separate travel expenses section requires itemization of personnel counts, duration, hourly rates, airfare, lodging, per diem, and transportation costs. The work is to be performed in Taranto, Italy between February 27 - March 13, 2025, under the oversight of the Department of the Navy Naval Supply Systems Command.

View the file

Other files

File Type Posted
2.04b Attachment J-1 Pricing Worksheet REV3.xlsx XLSX spreadsheet
Attachment J-2a Composite_Work_Package_MSC_REV2.pdf PDF
N6817125R0003 Conformed through 0009.pdf PDF
Attachment J-2b Composite_Work_Package_FDRMC Rev2.pdf PDF
N6817125R0003 0009.pdf PDF
N6817125R0003 0008.pdf PDF
N6817125R0003 Conformed through 0008.pdf PDF
N6817125R0003 0007.pdf PDF
N6817125R0003 Conformed through 0007.pdf PDF
N6817125R0003 Conformed through 0006.pdf PDF
2.04b Attachment J-1 Pricing Worksheet REV2.xlsx XLSX spreadsheet
N6817125R0003 0006.pdf PDF
2.04c Attachment J-2b Composite_Work_Package_FDRMC Rev2.pdf PDF
2.04c Attachment J-2b Composite_Work_Package_FDRMC Rev1.pdf PDF
N6817125R0003 0005.pdf PDF
N6817125R0003 Conformed through 0005.pdf PDF
N6817125R0003 0003.pdf PDF
N6817125R0003 0004.pdf PDF
N6817125R0003 0002.pdf PDF
N6817125R0003 0001.pdf PDF
Attachment J-2a Composite_Work_Package_MSC.pdf PDF
Attachment S-2_QA Checklist updated.pdf PDF
N6817125R0003.pdf PDF
Attachment J-2b Composite_Work_Package_FDRMC.pdf PDF
Attachment S-5 _PP Information.docx DOCX document
Attachment S-1_Non-Disclosure Agreement.pdf PDF
Attachment J-1 Pricing Worksheet.xlsx XLSX spreadsheet
Attachment S-3_Foreign ACP Questionnaire.docx DOCX document
Attachment S-4_Foreign National Cert.pdf PDF
Attachment J-4 GFM List.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-1 SUMMARY

OFFERORATTACHMENT J-1 (Pricing Worksheet): USS LEWIS B PULLER FY25 VOYAGE REPAIR AVAILABILITY
Work Item NumberDescriptionLaborSubcontractMaterialG&A and ProfitTravel
UnitQuantityUnit PriceExtendedExtended Price
CLIN 0001 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
MSC Base Work Items
0001ESB-SWI-SCOPE GENERAL REQUIREMENTS AND DEFINITIONSNot Seperately Priced
0002TECHNICAL AND MANUFACTURERS REPRESENTATIVE
0004ESB-SWI-TESTING AND QUALITY ASSURANCE
0005ESB-SWI-HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
0013ESB-SWI-INTEGRATED PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTSHour$ - 0$ - 0
0020ESB-SWI-GAS FREE CERTIFICATESHour$ - 0$ - 0
0501OEM SUPPORT FOR REVERSE OSMOSISHour$ - 0$ - 0
0595TANK LEVEL INDICATOR SYSTEM REPAIRSHour$ - 0$ - 0
CLIN 0002 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FDRMC Base Work Items
130-00-001Inclined Ladder and Mezzanine Ladder; preserveHour$ - 0$ - 0
130-00-002Starboard Inclined Ladder; preserveHour$ - 0$ - 0
159-11-001A9 Weather Deck Warning Sign; replaceHour$ - 0$ - 0
167-00-001Joiner Door and Handle; repairHour$ - 0$ - 0
167-00-002A8 Communication Center Door Repair; accomplishHour$ - 0$ - 0
167-11-001Quick Acting Watertight Door Dog Wedge; repairHour$ - 0$ - 0
167-11-002Security Combination Door Lock; installHour$ - 0$ - 0
169-00-001Shower Door Repair; accomplishHour$ - 0$ - 0
311-11-001Kickpipe; replaceHour$ - 0$ - 0
508-11-001Lagging and Insulation; replaceHour$ - 0$ - 0
512-00-001Ventilation Cleaning; accomplishHour$ - 0$ - 0
512-00-002Split Air Condition Cleaning; accomplishHour$ - 0$ - 0
516-10-001Container (CONEX) Refrigeration Unit Box; cleanHour$ - 0$ - 0
526-11-001Flight Deck Drain; preserveHour$ - 0$ - 0
528-00-001Flight Deck Isolation Valve; replaceHour$ - 0$ - 0
588-21-001Port Side Roll Up Door Repair; accomplishHour$ - 0$ - 0
588-21-002Helicopter Hangar Door Bottom Bar Assembly; repairHour$ - 0$ - 0
593-31-001Deck Drain and Piping; cleanHour$ - 0$ - 0
631-10-001Bulkhead Preservation; accomplishHour$ - 0$ - 0
631-21-001Commercial Broadband Satellite Program (CBSP) Port Cable Pipe; preservationHour$ - 0$ - 0
634-11-001Cosmetic Polymeric (PRC) Deck Covering; replaceHour$ - 0$ - 0
637-00-001Overhead Panel; replaceHour$ - 0$ - 0
640-00-001Metal Joiner Door Preservation; accomplishHour$ - 0$ - 0
640-00-002Locker Latch Replace; accomplishHour$ - 0$ - 0
644-11-001A8 Level Pipe Preservation; accomplishHour$ - 0$ - 0
992-11-001Project Team Office Space; provideHour$ - 0$ - 0
CLIN 0003 TOTAL$ - 0
MSC Additional Government Requirement
Additional Growth Requirements (AGR) - To be calculated on an estimate of 143 hours.143.00$ - 0
Estimated Value:Percentage:
Additional Growth Requirements (AGR) - To be calculated on an estimate of $8,360.94 Material / Other expenses$ 8,360.94$ - 0
CLIN 0004 TOTAL$ - 0
FDRMC Additional Government Requirement
Additional Growth Requirements (AGR) - To be calculated on an estimate of 143.25 hours.1,990.00$ - 0
Estimated Value:Percentage:
Additional Growth Requirements (AGR) - To be calculated on an estimate of $8,360.94 Material / Other expenses$ 38,360.00$ - 0
TOTAL EVALUATED PRICE$ - 0

Price Analysis Toolkit.xlsx

J-1 TRAVEL EXPENSES BREAKDOWN

J-1 Travel Expenses BreakdownPrices in USD
RFP #N6817124R0016
DESCRIPTIONNO. OF PERSONNELNO. OF DAYSTRAVEL HRSHOURLY RATETRAVEL TOTAL PRICE
TRAVEL EXPENSES$ - 0$ - 0
AIRFARELODGINGPER DIEMRENTAL CAR / TRANSPORTATIONTOTAL PRICE
$ - 0$ - 0$ - 0$ - 0$ - 0

TRAVEL EXPENSES TOTAL AMOUNT $ - 0

File details come from the government source that posted it. Updated .