AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
This solicitation is hereby modif ied. See changes on page 2 of this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N64498-16-R-5019
X 9B. DATED (SEE ITEM 11)
11-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2016
CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0232, ANDREA MERLINO
215-897-2043, ANDREA.MERLINO@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
N64498 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N64498-16-R-5019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
1) Section B is hereby amended as Follows:
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
This CLIN has been deleted.
CLIN 0002 QUANTITY UNIT AMOUNT
Material and Services 1 Lot
FFP
Material and Services for the development, integration, instillation, testing and delivery to upgrade 3 Generator and Switchboard Systems for the Improved Navy Lighterage System (INLS) class vessels, in accordance with the Statement of Work, Section C Paragraphs 4.1-4.17.
FOB: Destination
NET AMOUNT _______________________
CLIN 0003
CLIN 0004
Technical Data CLIN remains the same.
NSP
CLIN 0005
2) The following have been amended:
NOTES
1. CONTRACT TYPE: The Naval Surface Warfare Center, Philadelphia Division (NSWCPD) proposes to award a
Research and Development, Firm-Fixed-Price (FFP), completion type contract for the delivery of three (3) generator and switchboard systems and for engineering and technical support services described in Section C, Statement of
Work. The contract will have a period of performance of twelve (12) months from the date of award.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates an award of a Research and Development, Firm-Fixed-Price, completion type contract resulting from this solicitation.
3) Section C is hereby amended as Follows:
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
Performance Work Statement (PWS) for
Development, Integration, Instillation, Testing and Delivery of Generator and Switchboard System for
Improved Navy Lighterage System-class Vessels
1.0 INTRODUCTION
1.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the
Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 42, which is responsible for Propulsion and Power Systems.
2.0 SCOPE OF WORK
2.1 Purpose: This effort is for the development and delivery of three (3) prototype Generator and Switchboard
Control, Monitoring and Protection Systems for Improved Navy Lighterage System (INLS)-class vessels, as well as for the integration/installation support services of the systems: Two (2) of the Systems will be installed on either a
Warping Tug (WT) or Causeway Ferry Power Module (PM) - these crafts are identical in relation to the power system, and the final determination will be based on craft availability at the Government’s discretion; and one (1)
System will be installed on a Beach Module (BM).
The new system shall, at least, meet the current system’s capability with a higher level of dependency. The new system shall be designed, manufactured, tested and verified to meet the minimum requirements stated within
Applicable Documents listed within Section 3, as well as to the requirements stated within Section 4 of this document.
2.2 Background: The existing systems experience unacceptable rates of electronic component failure, and the
Navy has a need to resolve the obsolescence of these systems for INLS-class vessels. Specific crafts for which these new Systems will be installed include the WT, Causeway Ferry PM, and BM. The current system design incorporates two separate devices; one device is responsible for the Generator engine control, monitoring and protection and the other device is responsible for the Switchboard voltage, current monitoring and protection; within the WT and PM, there are presently two generators installed, whereas within the BM there is only one generator installed.
3.0 APPLICABLE (REFERENCE) DOCUMENTS
Unless otherwise specified, the Systems shall be designed, constructed, and tested in accordance with the applicable provisions of the following standard. The latest edition of each reference document (including any amendments or corrigenda) shall apply.
3.1 Government Documents
MILITARY STANDARDS
MIL-DTL-15024 - Plates, Tags, and Bands for Identification of Equipment
MIL-P-15024/5 - Plates, Identification
MIL-PRF-32006 - Programmable Controller, Naval Shipboard
MIL-STD-810 - Environmental Engineering Consideration and Laboratory test
MIL-STD-882 - Standard Practice for System Safety
MIL STD-883 - Test Methods and Procedures for Microelectronics
MIL-STD-1310 - Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic
Compatibility and Safety
MIL-STD-1472 - Department of Defense Design Criteria Standard, Human Engineering
ASME Y14.100 - Engineering Drawing Practices
DI-R-3533 - Reliability/Maintainability Program Plan
MILITARY HANDBOOKS
MIL-HDBK-454 - General Guidelines for Electronic Equipment
MIL-HDBK-780 - Standard Microcircuit Drawings
MIL-HDBK-2036 - Preparation of Electronic Equipment Specification
(Unless otherwise indicated, copies of the above specification, standards, and handbooks are available from the Naval Publication and Forms Center, Standardization Documents Order Desk, 700 Robbins Avenue, Building-4D, Philadelphia, PA 19111-5094 or at http://quicksearch.dla.mil/ .)
3.2 Non-Government Documents
Non-Government standards and other publications are normally available from the organizations that prepare or distribute the documents. These documents also may be available in or through libraries or other informational services.
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE-STD- 45 Recommended Practices for Electric Installations on Shipboard http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=1041371&filter=AND(p_Publication_Number:8
072)
3.3 Other Government-documents, Drawings, and Publications
PUBLICATIONS
NAVSEA Technical Publication S9074-AR-GIB-010/278 – Requirements for Fabrication, Welding and
Inspection, Casing Inspection and Repair for Machinery, Piping and Pressure Vessels (Section J –
Attachment 14)
Electrical Isolation Procedures for Welding, Sandblasting and Painting Tasks Improved Navy Lighterage
System (Section J – Attachment 4a and 4b)
NAVSEA Technical Publication S0400-AD-URM-010/TUM – Tag out user manual (Section J –
Attachment 13)
(Unless otherwise indicated, copies of the above publication are available from the Naval Publications and
Forms Center, Standardization Documents Order Desk, 700 Robbins Avenue, Building-4D, Philadelphia, PA 19111-5094.)
3.4 Order of Precedence
In the event of a conflict between the text of this document and the references cited herein, the text of this document shall take precedence. Nothing in this document, however, shall supersede applicable laws and regulations unless exemption has been obtained.
4.0. REQUIREMENTS
http://quicksearch.dla.mil/ http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=1041371&filter=AND(p_Publication_Number:8072) http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=1041371&filter=AND(p_Publication_Number:8072)
4.1 Generator System
The Warping Tug and Causeway Ferry Power Module’s generator control, monitoring and protection system shall consist of two, independent subsystems. Each subsystem in the Warping Tug and Causeway
Ferry Power Module shall be designed to run alone, or in continuous parallel operation with the other generator subsystem up to their combined maximum power rating. Paralleled generators shall maintain loads within 3% of each other.
The current and original system design allows the Warping Tugs and Causeway Ferry Power Modules the ability to be paralleled to shore power. However, operational guidance per NAVSEA 05D has changed since the crafts were built and paralleling to shore power is no longer permitted. Therefore, the new
System does not have to maintain this capability and the Contractor is required to eliminate the existing paralleling capability with shore power in the design and implementation of the new System. This shall be accomplished by demolishing and removing all devices, connections, and wiring associated with existing shore power paralleling circuitry. All existing functions and capabilities of the switchboard shall remain intact after removal of paralleling circuitry (including placing the craft onto shore power from dead bus and backfeeding ship’s power to the shore power receptacle). The Contractor shall provide all devices and capabilities as required to maintain existing functionality, as well as reroute and relocate existing devices, equipment, circuits, and cabling as required. Refer to Attachment 7 – Switchboard System Wiring
Diagram for more information.
The Beach Module system shall consist of a single subsystem, and shall be the same design as used for the
Warping Tug and Causeway Ferry Power Module system without the continuous parallel operation requirement (a Beach Module only has one generator and therefore is unable to parallel).
All generator systems shall start independently of other systems outside of a battery provided for that purpose, and shall not shut down automatically upon loss of electrical control power.
This section provides a set of minimum performance characteristics that the demonstration system must contain.
4.1.1 Remote Control, Monitoring and Protection System
In remote mode, the system will be controlled and monitored from INLS Machinery Control System
(MCS) station.
a) Controls to allow generator starting and stopping i.Start Command ii.Stop Command
b) Generator circuit breaker controls that allows generator starting and stopping i.Close or Sync generator breakers ii.Open generator breaker
c) Indicators and Alarms (Currently displayed PPU screen) i.Indicators
1) Voltage, all phases o L1 – Phase o L2 – Phase o L3 – Phase
2) Current, all phases o L1 – Phase o L2 – Phase o L3 – Phase
3) Power
4) Frequency
5) Generator Running
6) Generator Local/Remote
7) Generator Circuit Breaker Status o Open o Close o Tripped
8) Diesel Engine RPM
9) Lube Oil Pressure
10) Exhaust Temperature
11) Battle Override
12) Generator System Communication Status
ii. Alarms (Section J – Attachment 1)
1) Emergency Stop Activated
2) Overspeed Trip Activated
3) Lube Oil Pressure Shutdown
4) DataLink Failure
5) Jacket Water Temperature
6) Expansion Tank Level Low
7) Stator Temperature Summary alarm
8) Low Battery Voltage
9) Generator Summary Alarm
d) Start Sync Control
4.1.2 Local Control, Monitoring, and Protection System
a) Controls to place generator system in local and remote mode i.Local Command ii.Remote Command
b) Controls to allow generator starting and stopping i.Start Command ii.Stop Command
c) Indicators, Buttons, Alarms (currently displayed on remote LCD screen) i.Indicators
1) Engine Overspeed
2) Engine Overcrank
3) Emergency Stop
4) Alarm
5) Local/Remote
6) Engine Operating Status
7) Generator Status
8) Circuit Breaker Open/Close
9) Alarm Inhibit
10) Controller Status
11) Controller Power
12) Regulator
13) Diesel Engine RPM
14) Lube Oil Pressure
15) Jacket Water Temperature
16) Oil Differential Pressure
17) Fuel Differential Pressure
18) T/C Exhaust Temp
19) Stator Temp
20) Generator System Communication Status ii.Buttons/switch
1) Start button
2) Stop button
3) Local/Remote button
4) Emergency stop push button
5) Battle Override switch
6) Alarm Silence
7) Alarm Horn
8) Exit
iii. Alarms (Section J – Attachment 1)
1) Low Battery Voltage
2) Fail to Stop
3) Fail to Start
4) Emergency Stop
5) High Coolant Temp
6) High Coolant Temp Shutdown
7) Shutdown Overspeed
8) Generator High Frequency
9) Generator Low Frequency
10) Generator High Voltage
11) Generator Low Voltage
12) Lube Oil High Temperature
13) Battle Override
14) Generator Winding Temperature
15) High Exhaust Temperature
16) Governor Failure
17) Low Engine Oil Pressure
18) Low Engine Oil Pressure Shutdown
19) Engine Oil Sump Temp
20) High Pressure Fuel Leakage
21) Generator Summary Alarm
22) Emergency Stop Activated
23) Overspeed Trip Activated
24) Stator Temperature Summary Alarm
d) Generator Manual Voltage Regulator Controls i.Voltage Regulator
e) Speed/Frequency Controls i.Diesel Engine RPM ii.TACH Speed + iii.TACH Speed – iv.Raise Speed v.Lower Speed
f) Frequency
g) Voltage
h) Amperage
i) Load Sharing
j) Close Breaker Sync
k) Start Sync Control
4.2 Switchboard System
The Warping Tug and Causeway Ferry Power Module’s switchboard system shall consist of two, independent subsystems. One of the subsystems shall be designated as the primary in relation to primary generator subsystem while the other is designated as secondary.
The Beach Module system shall consist of a single subsystem, and shall be the same design as used for the
Warping Tug and Causeway Ferry Power Module switchboard system.
Each subsystem in the Warping Tug and Causeway Ferry Power Module shall be designed to run alone or in continuous parallel. The subsystem shall be independent to the extent that a failure on either subsystem will not render the other synchronization subsystem inoperable. The Warping Tug and Causeway Ferry
Power Module switchboard system shall be modified to prevent paralleling of generators to shore power as stated in Section 3.1 above.
This section provides a set of minimum performance characteristics that the demonstration system must contain.
4.2.1 Generator Circuit Breaker and Switchboard System Control
The system requirements to close the circuit breaker depend on the position of the Mode Control Switch
(OFF, Manual, Automatic (AUTO), Power Management (PM)) of the Switchboard.
a. Mode Control Switch in “Manual” Position
i. Close Circuit Breaker
“Close” Push Button (PB) (located on switchboard door) + ANSI 25 SYNC +
DB (Synchronism Check & Dead Bus)
“Close” PB + ANSI 59 Over Voltage / Power Available
Manual Breaker Close + ANSI 25 SYNC + DB (Synchronism Check & Dead
Bus)
Manual Breaker Close + ANSI 59 Over Voltage/Power Available
b. Mode Control Switch in Automatic (AUTO) Position (In this mode the start signal is sent to the generator immediately when this mode is selected. The generator is up to speed, the generator will send signal back to the switchboard to close circuit breaker).
i. Close Circuit Breaker -
- ANSI 59 Over Voltage / Power Available
- ANSI 59 Over Voltage / Power Available (Redundant Relay)
c. Mode Control Switch in Power Management (PM) Position (In this mode, a generator start signal is sent to the switchboard and to the generator from a remote station. After generator is up to speed, the generator will send signal back to the switchboard to close circuit breaker).
i. Close Circuit Breaker
- ANSI 59 Over Voltage / Power Available
- ANSI 59 Over Voltage / Power Available (Redundant Relay)
ii. Other relay requirements must be satisfied
- ANSI 32R Reverse Power Relay (This relay signals the under voltage release (Accessory in the Generator breaker) to change state and allowing the breaker to open
The system requirement to open the circuit breaker depends on the position of the Mode Control Switch
(OFF, Manual, Automatic (AUTO), Power Management (PM)) of the Switchboard.
a. Mode Control Switch in “Manual” Position
i. Open Circuit Breaker
“Open” Push Button (PB) (located on switchboard door)
Manual Open Breaker
b. Mode Control Switch in Automatic (AUTO) Position
i. Open Circuit Breaker -
- ANSI 27 Under Voltage / Power Available
c. Mode Control Switch in Power Management (PM) Position (In this mode, open command is sent from a remote station to open the circuit breaker and to stop the generator)
i. Open Circuit Breaker -
- ANSI 27 Under Voltage / Power Available
4.2.2 Remote Monitoring (For set point limit, see Section J – Attachment 1).
When switchboard is in Power Management (PM) mode, the system will be monitored at INLS MCS station.
a) L1 – Phase Voltage i.High High ii.High iii.Low iv.Low Low
b) L2 – Phase Voltage i.High High ii.High iii.Low iv.Low Low
c) L3 – Phase Voltage i.High High ii.High iii.Low iv.Low Low
d) L1 – Phase Current i.High ii.Low
e) L2 – Phase Current i.High ii.Low
f) L3 – Phase Current i.High ii.Low
g) Frequency i.High ii.Low
h) Power
i) Switchboard System Communication Status
4.2.3 Local Monitoring
a) Voltage, all phases and combinations i.L1-L2 ii.L2-L3 iii.L3-L1 iv.L1-N v.L2-N vi.L3-N vii.System Voltage (Average)
b) Current, all phases i.L1 ii.L2 iii.L3 iv.System Current (Average) v.System Current (Sum) vi.Neutral Current vii.Ground Current
c) System Watts ii.L2 iii.L3 iv.System Watts
d) Volt-ampere reactive (VAr), all phases ii.L2 iv.System VAr
e) Volt-ampere (VA), all phases ii.L2 iv.System VA
f) Power Factor (PF), all phases ii.L2
g) Phase angle (PA), all phases ii.L2
h) Generator Frequency
i) Bus Frequency
j) Generator-Bus Angle
4.2.4 System Protection
a. Sync Check Monitoring (ANSI 25) (Optional)
b. Sync Check Monitoring with Dead Bus(ANSI 25D)
c. Under Voltage (ANSI 27)
d. Directional Power (Forward) (Optional)
e. Direction Power (Reverse Power) (ANSI 32R)
f. Under Current (Optional)
g. Directional Reactive Power (loss of Excitation/Reverse VAr) (Optional)
h. Unbalanced Current (Optional)
i. Phase Sequence (ANSI 47) (Optional)
j. Unbalanced Voltage (ANSI 47) (Optional)
k. Instantaneous Over Current (ANSI 51V)(Optional)
l. AC Time Over Current (ANSI 51) (Optional)
m. Neutral Ground Fault (ANSI 51G) (Optional)
n. Over Voltage (ANSI 59), QTY 2
o. Over Frequency (ANSI 81U) (Optional)
p. Under Frequency (ANSI 81O) (Optional)
4.3 Material
a) Material shall have no adverse effect on the health of personnel when used for its intended purpose.
b) Contact between dissimilar metal shall be avoided in order to minimize corrosion. An interposing material that will minimize or eliminate this galvanic effect shall be used.
c) Guards for protection of personnel shall be provided for exposed moving parts and/or electrical equipment. Hot surfaces shall be guarded and shielded in accordance with American
Bureau of Shipping (ABS) rule for building and classing steel vessels. E-stop switch needs to have a guard on it.
d) Enclosure shall be designed for washdown environment, and in accordance with National
Electrical Manufacturers Association (NEMA) 4X. Enclosure depth shall not exceed 10 inches.
e) The equipment shall be standard, commercial off the shelf, repairable and/or interchangeable, unless standard equipment will not provide the required performance.
f) Material and/or equipment purchased, manufactured, or assembled and all work performed under the contract shall be inspected by the Contractor prior to submission to the Government to verify conformance with specification requirements.
g) Contractor shall provide an index of all products used, indicating if the product has a Material
Safety Data Sheet (MSDS) and copies of all of the MSDSs.
h) In the event that the Contractor wishes to substitute equipment, which is equivalent to proposed design and/or materials list, by manufacturer's make and model number “or equal,” the Contractor shall submit a substitution request in writing to the local Government representative, In-Service Engineering Agent (ISEA), and Software Support Activity (SSA) for approval. The substitution request shall include sufficient detail to demonstrate that all the requirements of the contract governing the determination of equivalence have been met, including the equipment equivalency certification prepared by the Contractor for acceptance by the Government ISEA and SSA.
The Government shall not be liable for any cost or schedule impacts resulting from the
Contractor seeking approval for the use of equivalent equipment, or for the use of said equipment. Approval of equivalent equipment shall, in no circumstances, relieve the
Contractor from fulfilling any other obligations or requirements in this Statement of Work except those for which the local Government representative, ISEA, and SSA explicitly grant approval for in writing.
i) All tools and installation materials required to complete the installation will be supplied by the Contractor, including the lugs, terminals, ferrules, spade connectors, nylon stuffing tubes and packing, heat-shrink conductor marker sleeves, tie-wraps, misc. brackets, wireway hangers, fasteners, repair insulation, cable banding, and/or touch-up paint, etc.
4.4 Painting
a) Equipment and components shall be painted in accordance with manufacturer’s procedure for marine application.
4.5 Welding and allied process
a) All hot work must be in accordance with NAVSEA standard items 009-12 and the “Electrical
Isolation Procedures for Welding, Sandblasting and Painting Tasks Improved Navy
Lighterage System” (Section J – Attachment 4a and 4b). Remove and reinstall insulation as required to perform hot work. Contractor shall assume all liability for fire damage to the craft as a result of the hot work performed.
At a minimum, the Contractor shall meet the following requirements for a fire watch during all hotwork:
i. Provide fire watch personnel and ensure that the fire watch is available and in place at the operation side. Fire watch personnel shall:
- Have fire-extinguishing equipment readily available and be trained in its use.
- Be familiar with facilities and procedures for sounding an alarm in the event of a fire.
- Watch for fires in all exposed areas, and try to extinguish them first only when obviously within the capacity of the equipment available, or otherwise sound the alarm immediately.
ii. Maintain a fire watch for 30 minutes after the completion of the hot work operations to detect and extinguish any possible smoldering fires and perform a final checkup four hours after cutting and/or welding has been completed.
iii. Protect combustibles from ignition by utilizing any of the following methods:
- Have work moved to a location free from dangerous combustible materials.
- Have combustible materials moved to a safe distance from the work area or properly shield the combustible materials against ignition.
- Schedule hot work operations to ensure that they do not interfere with operations utilizing combustibles located within the immediate area.
b) NAVSEA Technical Publication S9074-AR-GIB-010/278 shall be used for guidance.
4.6 Identification Plates
a) Each system shall be provided with a permanently attached corrosion-resistant identification plate in accordance with MIL-DTL-15024 and MIL-P-15024/5 and should be of a design and adhered in matter that is suitable for the intended purpose. Method of attachment of the identification plate shall be corrosion-resistant. The plate shall contain the following information:
i. Item Name
ii. Part Number
iii. National Stock Number
iv. Contract or order number
v. Manufacturer’s name and commercial and government entity (CAGE) number
4.7 Standardization and Interchangeability
a) Repairable equipment shall be standard, commercial off the shelf (COTS), unless standard equipment will not provide the required performance. All reasonable efforts shall be made to utilize COTS parts/equipment. The Contractor shall identify all repairable and replacement equipment for the System in accordance with CDRL B2.
b) The system for the Beach Module, the Warping Tug and the Causeway Ferry Power Module shall have the same design to the maximum extent possible, and shall share common components.
4.8 Reliability and Maintainability (R&M)
a) The Contractor shall develop, implement, and maintain a comprehensive reliability and maintainability program that ensure that the R&M are major considerations in the design, test and production of the System.
b) The Contractor shall plan, implement, and manage an R&M engineering effort that assures the satisfaction of System objectives and personal safety. Tasks shall include:
i. Identification and control of program risks, such as single point failure modes and critical items.
ii. Selection of suitable parts and materials.
iii. Minimizing the effects of variability in the manufacturing process.
iv. Ensuring sustained product integrity, personnel safety, and logistics support information is derived from early R&M engineering analyses such that R&M engineering can be applied to influence the configuration.
v. Employing a closed loop corrective action system that uses anomaly data from all available sources and feeds back to the design process.
vi. Producing proposed R&M requirements verification methods.
c) The System shall have a 12 year design life.
d) The System shall be capable of running at optimal performance for no less than 100 continuous hours.
e) The System shall be designed and constructed so it can be easily maintained, disassembled, repaired and reassembled.
f) Capable of storage for up to three years with minimal to no preventive maintenance, and capable of being activated at any time during that period.
g) All Equipment shall have appropriate access paths to provide effective and rapid replacement of defective parts or perform any scheduled maintenance.
h) The meantime for System repairs/maintenance shall be no more than 2 hours.
i) The meantime between scheduled maintenance shall be no less than 1000 hours of System performance, or one year.
j) The meantime between field parts repair rate shall be no less than 600 hours of System performance.
k) The Contractor shall include R&M report/review in monthly status report. Items shall include:
i. R&M requirements and tasks
ii. Schedules for accomplishing R&M tasks
iii. Milestones accomplished or problems encountered
iv. Data resources and Trade Off Analyses
4.9 Environmental Design Conditions
a) Ambient air temperature range of -20 degrees Fahrenheit and +131 degrees Fahrenheit.
b) Seawater temperature between +28 degrees Fahrenheit to +100 degrees Fahrenheit.
c) Relative humidity throughout range of 0 to 95 percent.
4.10 Human Engineering
a) The System shall be arranged so as to achieve safe, reliable, and effective performance by the operator and maintenance personnel and to optimize personnel skill requirements.
b) MIL-STD-1472 and ASTM-F1186 shall be utilized as guidance.
4.11 Equipment Safety
a) The System shall be designed so that all procedures for installing, operating, inspecting and adjusting can be accomplished in a safe manner. Protection for operating and maintenance personal against hazard and accident is important.
b) A system safety hazard analysis report shall be submitted to the procuring activity.
c) MIL-STD-882 and Safety Engineering Bulleting No.3 shall be used as guidance for selection and use of safety analysis techniques.
4.12 Communication
a) Built in serial Modbus Remote Terminal Unit (RTU) protocol allowing monitor and access of the System.
b) Woodward L-Series Integrated Speed Control.
c) Ethernet TCP/IP communication is desirable.
4.13 Vibration
a) All equipment shall be free of local vibration that could damage the structure, machinery or systems; endanger personnel; or interfere with operation or maintenance of machinery or system.
b) Removable plates, doors, light fixtures, and all other contractor-mounted equipment; shall not rattle.
c) Gasket shall be used and self-locking fasteners shall be provided to prevent loosening of fasteners under vibration.
4.14 Hardware
a) Shall not experience or suffer software or firmware inconsistencies due to low voltage conditions.
b) Shall be designed for marine service and shall operate within the manufacturers’ rated performance without degradation under the environmental condition of Section 4.9.
c) Cables used shall be low smoke type, designated and constructed in accordance with IEEE-
STD-45. Contractor shall provide certification, upon demand, that all cables provided meet the requirements contained in IEEE-STD-45. Electrical cable applications and installations shall be in accordance with IEEE-STD-45.
d) Shall be located and arranged to prevent exposure to damage or personal injury caused by leaking oil, water, steam or other piping.
e) Shall operate such that when power is interrupted and restored, no damage will result to any component or part of the equipment.
f) The Generator and Switchboard System shall not weigh more than 50 lbs.
4.15 Software
a) Shall have ability to set options, configure parameters (for existing parameter list, see Section
J – Attachment 3 for Generator system and Section J – Attachment 5 for Switchboard system), view status information and/or even a test interface in order to get measured values from the diesel engine and switchboard components.
b) Shall define a general Software Development Plan (SDP) appropriate for the software effort to be performed under this contract.
c) The SDP shall be delivered to the Government (Software Support Activity) for concurrence, and shall not vary significantly from that proposed to the Government for evaluation for award.
d) Any changes, modification, additions or substitutions to the SDP also requires prior
Government concurrence.
e) Shall be submitted IAW CDRL C2, source code.
4.16 Drawings/Documentations
a) Contractor shall provide as built drawings/documentation (CDRL B002), and shall be prepared in accordance with ASME Y14.100– Engineering Drawing Practices.
b) Existing drawings for Commercial off the Shelf (COTS) equipment shall be delivered in electronic and full size format.
c) All drawings shall be made in AutoCAD 2010 or higher with the main details of the drawing drawn full scale and reduced by plotting process or by use of “paper space”.
d) Drawings shall make reference to and be consistent with all other related drawings (CDRL
B002). The Parts List or Bill of Materials shall include at a minimum: Part number, manufacturer, description, and quantity shall apply. If any, original OEM name and part number shall also be included.
e) Should changes to drawings occur during the development and/or warranty period, the
Contractor is responsible for updating the set of final as built drawings/documentation to show the modifications made.
f) The Government shall have Government Purpose Rights to all drawings/documentation produced in this contract.
4.17 Technical Data Package
a) All documentation shall provide ninth grade reading level.
b) User guider shall include, at a minimum, information about the main functions of the System, function description of the main components, possible error or problems, along with how to fix them. (CDRL B001)
c) Technical manual shall emphasize technical adequacy and accuracy as well as format, and shall be in sufficient depth for operation, maintenance and troubleshooting of equipment by
Navy enlisted personnel afloat and ashore without the services of a manufacturer representative. (CDRL B001)
d) Training manual shall provide knowledge and skills necessary to safely and effectively operate and maintain the System. (CDRL B001)
e) The Government shall have Government Purpose Rights to all technical data produced in this contract. The Government will retain all rights and ownership of drawings resulting from this procurement.
4.18 Integration and Installation Support Service
The Contractor shall integrate and install the Systems aboard the stated INLS Modules, to be determined by at a later date. Efforts shall be in accordance with the parameters set forth above and below.
4.18.1 General Shipboard Condition/Regulation
a) The INLS Modules(s), shall be maintained in a satisfactory condition during the entire period the module (s) and its components are in the Contractor’s possession. During installation the module(s) shall be kept free of chips, shaving, refuse, dirt, cigarette butts, water, and other extraneous matter. Rubbish shall be removed from places which are to permanently close or which may become inaccessible. Minimize wear and damage incident to production, and prevent corrosion or other deterioration during the interval between manufacture and delivery.
b) The Contractor shall ensure on-schedule completion and delivery. The Contractor shall identify and maintain visibility of all problems and potential problems arising during installation that could impact the on-schedule completion of the alteration. Potential problem areas shall be electronically provided to the Government representative.
c) Attention of the Contractor is directed to Public Law 91-596, approved December 29, 1970
(84 Stat. 1590, 29 USC 655) known as the "OCCUPATIONAL SAFETY AND HEALTH
ACT OF 1970" and to the "OCCUPATIONAL SAFETY AND HEALTH STANDARDS
FOR SHIPYARD EMPLOYMENT" promulgated there under by the Secretary of Labor (29
CFR. 1910 and 1915). These regulations apply to all shipbuilding and related work, as defined in the regulations. Nothing contained in this document shall be construed as relieving the
Contractor from any obligations that it may have for compliance with the aforesaid regulations.
d) The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and Municipal laws, codes, and regulations.
e) The Contractor shall use only experienced, responsible, and capable people to perform the work. The Contracting Officer may require that the Contractor remove from the job employees who endanger persons or property, or whose continued employment under this
Statement of Work is inconsistent with the interest of military security.
f) All equipment removed from the ship, shall be turned over to the Amphibious Construction
Battalion (ACB) Port Engineer, or Sealift Support personnel at Blount Island Command
(BIC), in the condition the equipment was found in before work began. Damage to the material by the Contractor shall be the sole responsibility of the Contractor.
g) During the install, the Contractor’s representative or foreman shall host an initial kickoff meeting, an approximately 15 minute daily safety and planning meeting, and a short 15 minute daily wrap-up meeting to discuss progress and potential issues or concerns. The
Contractor is required to extend invitations to the local Government representative, ISEA, and
SSA for each of these meetings. The Contractor is required to provide copies of meeting minutes (CDRL A006), if applicable, not more than 24 hours after the conclusion of each meeting via email.
h) Lockout and tag-out must be performed in accordance with U.S. Navy Tag-Out Policy, NAVSEA Technical Publication S0400-AD-URM-010/TUM prior to hot work or any other applicable work. Use a Fluke Multi-meter or equivalent to confirm that no power is present in the electrical circuits.
The list below identifies the “minimum” lockout / tag-out points for the project. Additional points for lockout / tag-out are to be identified by the Contractor as necessary.
Energy Sources, Lockout points on WT/PM/BM:
1. Shore Power, 460VAC, 3-phase, WT Main SWBD CB SP-4P, Eng Rm.
2. Main Generator(s), 460VAC, 3-phase, 24VDC starting batteries, Eng Rm.
3. Main Propulsion Engines #1 & 2, 24VDC starting batteries, Eng Rm.
4. Inverter Battery Bank, 24VDC, Fan Rm.
5. MCS UPS Batteries Bank, 24VDC, Passage 2-7-1.
4.18.2 Warranty & Certificate of Identicalness (COI)
a) The Contractor shall provide a one year warranty on parts, which starts from the date the equipment is commissioned on-site.
b) The contract must provide COI, (CDRL E007) for the equipment/software and the documentation to show that they are identical in all respects to the equipment/software and the documentation previously used/provided.
4.18.3 Current Instrumentation and Controls
The System shall be capable of working with existing instrumentation and controls of the generator and switchboard as listed below under sections 4.18.3.1 through 4.18.3.2, or the Contractor shall provide functioning replacements as part of the package.
The Contractor shall refer to Section J – Attachments 6 and 7 to ensure that all equipment selected will support the existing instrumentation and control.
4.18.3.1 Generator System
a) 24VDC Battery
b) 24VDC to 12VDC Converter
c) Starter and Alternator
d) Start Breaker and Relay
e) Generator Engine Glow Plug
i. Glow Plug Breaker 50A
ii. Glow Plug Heavy Duty Relay
iii. Glow Plug Momentary Earth Relay
f) Fuel/Stop Solenoid
g) Fuel Boost Pump
h) Fuel/Stop Relay
i) L Series Speed Control
j) TACH Magnetic Pickup
k) Combined Oil Pressure Switch and Sender
l) High Water Temp Shutdown Switch
m) Coolant Temperature Switch
n) Starter Enable
o) Low Engine Oil Pressure
p) Air Shut Off
q) Generator Engine Fuel Pressure
r) High Water Temp Alarm Switch
s) High Oil Sump Temp Switch
t) High Press Fuel Leak Switch
u) Oil Differential Pressure
v) Fuel Differential Pressure
w) T/C Exhaust Temperature
x) Stator Temperature
4.18.3.2 Switchboard System
a) Switchboard Mode Switch
i. Auto
ii. Power Management (PM)
iii. Manual
iv. Off
b) 150: 5A Current Transformer
c) 480:120V Potential Transformer
d) 3 Position Voltmeter Switch
e) Ammeter 0-150 with 3 Phase Switch
f) 24VDC Power Supply for Switchboard System
g) Phase Sequence Relay
h) Load Bus
i) Generator Circuit Breaker (CB)
j) Open/Close Circuit Breaker Relay
k) Open/Close Circuit Breaker Push Button
l) Sync Switch
4.18.4 Testing
a) The Contractor shall conduct testing specified herein for all equipment, subsystems, and systems to demonstrate compliance with these specification and contract requirements.
b) The Contractor shall provide all necessary materials, test facilities, power, equipment, instrumentation and personnel to conduct each test. All costs for the testing shall be borne by the Contractor.
c) The Contractor shall prepare a Test Schedule depicting the logical flow and planned dates for the conduct of each test. The Test Schedule will serve as a planning document for both the
Contractor and the Government.
d) The Contractor shall be responsible for the preparation of all test documentation (CDRL
D002, D004, D006, D008, D010). All test documentation shall provide the detailed description of the operations to be performed, the parameters to be measured during the conduct of each test, pass/fail criteria, safety of personnel and equipment. If applicable, each test shall cross-reference to its associated technical requirement. All test documentation shall be submitted to the Government for approval prior to the testing.
e) The Contractor shall use the available original procedures (Section J –Attachments 8 to 12) as guidance to prepare the test documentations. These procedures were used when the crafts were built to ensure the system’s technical requirement.
f) Each test shall be conducted in the presence of the Government, except where the Contracting
Officer’s Representative (COR) may authorize the Contractor to proceed with conducting and certifying the results of the test. No test shall be started without prior notification provided to the COR, unless otherwise authorized; each test shall be performed using the latest issue of the approved test procedure, including any revision. Each test shall be conducted in accordance with step by step instructions contained in the test procedure. Except as required by the test procedure, adjustments to equipment being tested shall not be made during the test conduct.
g) A test shall be stopped if the equipment being tested fails to meet the acceptance criteria of the test procedure. The cause of the failure shall be identified. After correction of the failure, the test procedure shall return to those steps previously accomplished and not affected by the failure or correction. The satisfactory completion of the test procedure as documented by the test shall serve to demonstrate compliance with the related technical requirements of these specifications.
h) The Contractor shall submit a request for Government test support (i.e., use of Government facilities, support, etc.) to the COR for review and approval/disapproval. Requests shall be made two weeks in advance, at a minimum. Each request shall include a listing of support service required and an estimate of the length of time that the Government support services will be required.
i) The Contractor shall record minutes and action item during meeting with Government
Representatives, and shall submit an action item list to the Government at the conclusion of the meeting. Responsibility for correction of each action item, together with completion dates, shall be included. (CDRL D003, D005, D007, D009, D011)
j) With Navy personnel support, the Contractor shall perform acceptance trials. Acceptance trials shall be conducted prior to delivery of the craft to the Navy. Acceptance trials must be conducted in three phases: Pre-underway, underway and post-underway.
The pre-underway phase will consist of review of documentation, and demonstrations and inspections of the craft, its equipment, and systems in order to verify that trials may be conducted safely and that the craft will be capable of performing its intended mission.
The underway phase will consist of operational demonstrations and inspections of the craft, its equipment, and system in order to verify the capability of the craft to perform its intended mission.
The post-underway phase will consist of open and inspect examination of selected equipment, and additional demonstration and inspections as required to verify the capability of the craft to perform its intended mission.
k) Prior to the start of trials the craft shall be complete in all respects. All documentation and data shall be complete and up to date in accordance with the requirement of the contract.
Temporary rigging, industrial equipment, and debris shall be removed. In the event that the
Government determines that the craft or documentation is not ready for trials, the trials will be postponed until the deficiencies have been corrected.
l) The Contractor is responsible for the supervision and operation of all machinery related to this instillation.
4.19 Training
a) Contractor shall provide special factory training to government representatives for their new equipment. Training shall include knowledge and skills necessary to safely and effectively operate and maintain the new equipment.
5. PLACE OF PERFORMANCE
The Generator and Switchboard System development is to be performed at the Contractor’s facility. Integration and
Installation Support Service shall be performed at Jacksonville, FL.
6. TRAVEL
Approximately 10 trips to Jacksonville, FL will be required to support this effort. For estimating purposes, the following travel information is provided; estimates are for two people per trip. Destinations, duration, and number of trips are subject to change.
ORIGIN: DESTINATION: Number of Days/Trip Number of Trips
TBD Jacksonville, FL 2 10
7. SECURITY REQUIREMENTS
7.1 The Contractor is not required to have a facility clearance. Contractor-personnel are not required to have a
SECRET or higher clearance.
7.2 The Contractor is responsible for completing all required government-mandated training to maintain security and network access to government-sites and IT systems.
8. DATA REQUIREMENTS
All CDRLs shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
8.1 Contracting Officer’s Management Report (CDRL A001)
8.1.1 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
8.1.2 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
8.2 Travel Report (CDRL A002)
8.2.1 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
8.2.2 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
8.2.3 The Contractor may be required to travel in performance of this task order. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the COR. All travel shall be conducted in accordance with FAR 31.205-46 Travel Costs and the
Federal Travel Regulations (FTR) and shall be pre-approved by the COR. The Contractor shall submit travel reports in accordance with DI-MGMT-81943 (CDRL A002).
8.3 Other Direct Costs Report (CDRL A003)
8.4 Contractor’s Personnel Roster (CDRL A004)
8.5 Project Master Schedule (CDRL A005)
8.6 Agendas, Minutes, and Action Item Reporting and Tracking (CDRL A006)
8.7 Engineering Change Request (CDRL A007)
8.8 Data Package (CDRL B001)
8.9 Drawings/Documentation (CDRL B002)
8.10 System/Software Installation Procedure (CDRL B003)
8.11 Shipboard Check-in/Checkout Procedure (CDRL B004)
8.12 Check-in Report (CDRL B005)
8.13 Software Development Plan (SDP) (CDRL C001)
8.14 Source Code (CDRL C002)
8.15 Test Schedule (CDRL D001)
8.16 Components/Unit Test Plan & Procedure (CDRL D002)
8.17 Components/Unit Test Report (CDRL D003)
8.18 Integrated Test Plan & Procedure (CDRL D004)
8.19 Integrated Test Report (CDRL D005)
8.20 System Test Plan & Procedure (CDRL D006)
8.21 System Test Report (CDRL D007)
8.22 Factory Acceptance Plan & Procedure (CDRL D008)
8.23 Factory Acceptance Report (CDRL D009)
8.24 Shipboard Test Plan & Procedure (CDRL D010)
8.25 Shipboard Test Report (CDRL D011)
8.26 Final Completion Report (E002)
8.27 Final Data Package (E003)
8.28 Final Drawings/Documentation (E004)
8.29 Final System/Software Installation Procedure (E005)
8.30 Warranty Letter (E006)
8.31 Certificate of Identicalness (E007)
8.32 Checkout Report (E008)
9. GOVERNMENT POINTS OF CONTACT
The Contracting Officer’s Representative (COR) for contact is, Mrs. Stephanie Williams, Code 51, phone number
215-897-7035. The Subject Matter Expert (SME) is, Kenneth Fischer, Code 512, phone number 215-897-7443.
10. SPECIAL REQUIREMENTS
10.1 Shipping:
The three (3) prototype Generator and Switchboard Systems shall be shipped to:
MMV104 Sealift Support / BIC
6200 Flagship Circle North
Jacksonville, FL 32226
Attn: Joseph Messenger, NAVFAC NEPO SSA
The Contractor is responsible for all the shipping costs.
All CDRL submissions shall be issued in accordance with the instructions as stated within the CDRLs.
10.2 Milestones:
The Contractor shall use the below list as a guide to develop the master project schedule with its proposed deadline date.
- Preliminary Design Review (PDR)
Meeting minutes with Stakeholder
Preliminary Design Material
Peer Review: Invitation
Preliminary Data Package
Preliminary Design Drawings/Documents
Software Development Plan
Test and Inspection Plan
Components/Unit Test Plan and Procedure Draft
PDR Invitation
Resolve issues with Stakeholder
- Detailed/Critical Design Review (CDR)
CDR Material
CDR Invitation
Data Package
Matured Design Drawings/Documents Final & Approved
Components/Unit Test Plan and Procedure Final & Approved
Integration Test Plan and Procedure Draft
Peer Review: Invitation
Resolve issues with Stakeholder
- Implementation/Code & Unit Test
Data Package Final & Approved
Integration Test Plan and Procedure Final & Approved
System Test Plan and Procedure Draft
Factory Acceptance Test Plan and Procedure Draft
Peer Review: Invitation
Resolve issues with Stakeholder
- Test, Validation
System Test Plan and Procedure Final & Approved
Factory Acceptance Test Plan and Procedure Final & Approved
Peer Review: Invitation
Software Source Code Final & Approved
Component/Unit Test Procedure – Completed
Integration Test Procedure – Completed
System Test…