Attachment_9_-_Generator_System_Operational_Test_WT_PM.docx

DOCX document 477 KB Posted

Attached to
The development of Three (3) generator and switchboard control, monitoring and protection systems, along with the associated integration and installation service support.
Solicitation number
N64498-16-R-5019
Issued by

About this file

Attachment 9- Generator System Operational Test WT PM

View the file

Other files

File Type Posted
Admendment_0002.pdf PDF
Attachment_17-_Woodword_L-Series_Integrate_Speed_Control.pdf PDF
Attachment_15-_WT CFPM_SWBD_Layout.pdf PDF
Attachment_20-_BM_SWBD_Layout.pdf PDF
Attachment_21-_BM_Field_Termination_Drawings.pdf PDF
Attachment_16-_WT CPFM_Field_Termination_Drawings.pdf PDF
Attachment_7_Rev.__1-_Attachment_7_-_Switchboard_System_Wiring_Diagram.pdf PDF
Attachment_24-_DEIF_Crompton_Site_Visit_Power_Point_Part_2.pdf PDF
Attachment_5_Rev.__1-Attachment_5_-_Crompton_Configuration_Parameter.pdf PDF
Attachment_19-_DEIF_Layout.pdf PDF
Attachment_23-_DEIF_Crompton_Site_Visit_Power_Point.pdf PDF
Attachment_22-_ASME_Y14.100.pdf PDF
N64498-16-R-5019-0001.pdf PDF
N64498-16-R-5019.pdf PDF
Attachment_10_-Generator_System_Operational_Test_BM.docx DOCX document
Attachment_6_-_Generator_System_Wiring_Diagram.pdf PDF
Attachment_4b_-_Welding_Tasks_Electrical_Isolation_Tech_Refresh.pdf PDF
Attachment_12_-Switchboard_System_Operational_Test_BM.docx DOCX document
Attachment_1_-_Alarm_Set_Points_(2).pdf PDF
Copy_of_Attachment_3_-_DEIF_Configuration_Parameter.xlsx XLSX spreadsheet
Attachment_2_-_Crafts_Network_Diagram_(2).pdf PDF
Attachment_7_-_Switchboard_System_Wiring_Diagram.pdf PDF
Attachment_5_-_Crompton_Configuration_Parameter.pdf PDF
cdrls.pdf PDF
Attachment_8_-_Generator_and_Switchboard_System_Input_Output_Test.docx DOCX document
Attachment_11_-Switchboard_System_Operational_Test_WT_PM.docx DOCX document
Attachment_8_Appendix_-_Generator_and_Switchboard_System_IO_Table.pdf PDF
Attachment_14_-_S9074-AR-GIB-010_278.pdf PDF
Attachment_4a_-_Welding_Tasks_Electrical_Isolation_Non_Tech.pdf PDF
Attachment_13_-_S0400-AD-URM-010_TUM.pdf PDF
N64498-16-R-5019.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPROVED NAVY LIGHTERAGE SYSTEM (INLS)

CONTRACT NO.

CDRL DATA ITEM NO:

Test Title:Ships Service Diesel Generator Operational
Test (Warping Tug/Power Module)
Test No:

Revision:

Hull:

TEST PROCEDURE PREPARATION/APPROVAL

PREPARED BY:

K. Fischer

DATE:

JULY 2015

APPROVED BY:

DATE:

TEST PROCEDURE CONDUCTED

CONTRACTOR:
DATE:
GOV. WITNESS:
DATE:
TEST TITLE:TEST NO:HULL NO:
Beach Module Bow Ramp Operational Test169-00001BM X

REVISION RECORD

REV
AFFECTED

PAGES

DESCRIPTION
APPROVED

Original Issue

TEST OBJECTIVE:

The objective of this test is to demonstrate the no load, incremental and full load operation of the ships service diesel generators and to demonstrate that the manual features will control the generator within specific limits.

EQUIPMENT INVOLVED:

1. Starboard Ship Service Diesel Generator

2. Port Ship Service Diesel Generator

REFERENCES:

1. IEEE – 45, section 34.2.1, Ship Test, New Installations, Circuits

2. NAVFAC # 1600428 Electrical One Line Diagram

SAFETY PRECAUTIONS:

1. Test personnel shall strictly adhere to all shipyard safety precautions including, but not limited to all caution and warning notes contained in this test procedure and applicable documents.

2. All unauthorized personnel shall be kept clear of test areas for duration of test. Persons in adjacent areas shall be notified of testing being done.

3. Ensure all power sources are de-energized during insulation resistance tests.

4. A 500 Volt Megger shall be used only on the Generator Stator Circuit. A 50 Volt Megger shall be used on all other circuits, rotor, exciter field for a minimum of 60 seconds.

5. Observe Wattmeter and Ammeter during voltage adjustment demonstration to prevent overloading generator.

6. In the event of unusual noise or vibration, shut down the Generator.

PREREQUISITES:

1. Generator and Switchboard System Cable Test

2. Generator and Switchboard System Input Output Test

ADDITIONAL INSTRUCTIONS:

1. The test conductor will list on comment sheet, Section “H”, any discrepancies requiring corrective action, any unusual response observed while performing test or any significant events and observations occurring during performance of the test. If hazardous conditions exist, test is to be stopped until conditions are corrected.

2. Verify calibration of installed instruments and equipment to be used during test is complete.

3. All breakers on switchboard shall be secured during test. Vessel lighting electrical loads should be fed from a shore power supplied source the duration of the test.

4. Controls and indicators not specifically mentioned in this procedure shall be observed for proper operation.

5. Read the entire test procedure prior to initiating the tests described herein.

TEST EQUIPMENT REQUIRED TO ACCOMPLISH THIS TEST PROCEDURE:

QTYDESCRIPTIONDESIGN TEST READING (DTS)
(1)Load Bank, 250 kW, 450 Volt, Resistive Load Bank
3 Phase, 60 Hz,
(1)Megger500 VDC, Conforming to type GC or
GM of MIL-0-16485 (or equal) SCAT
4452.
(1)Megger50 VDC, Weston, Model 799 Scat 4448
(1)Contact Thermometers or Digital0-100 Deg C or 32-212 Deg F
ThermometersOmega Model 871 or equal

(1) Stop Watch

(4) Slack Tube Manometer Inches of Water

PERSONNEL REQUIRED TO ACCOMPLISH THIS TEST PROCEDURE:

1. Two Qualified Electricians, One Qualified Machinery Installer

GOVERNMENT SUPPORT PERSONNEL:

1. Subject Matter Expert (SME): One SME, ISEA/SSA/PE or equivalent to witness and sign off on testing as Government Representative.

2. Ship’s Force personnel to stand by as safety watch, as necessary.

3. Ship’s Force engineer to align machinery as required.

4. Ship’s Force ET to support electrical checks and system alignment.

5. Contractor will require 4 hours of ISEA or SSA support. This support must be scheduled with the ISEA or SSA at least two weeks in advanced.

EQUIPMENT CONFIGURATION:

1. Ship Service Generators shall have all fluids checked and filled to their service levels.

2. Ensure starting batteries have been charged.

3. Align fuel oil system for normal operation.

4. Connect the variable resistive load bank to the bus work of the generator under test at the switchboard.

5. Align all auxiliary equipment to support the SSDG under full load conditions.

6. Attach a manometer to each SSDG exhaust and combustion air test port

TEST INSTRUCTIONS:

STEP 1: Ensure safety instructions paragraph are followed.

STEP 2: Measure the insulation resistance (cold) of the generator. Correct the insulation resistance readings to 25 degrees centigrade using the Nomograph on page 12. RECORD ON DATA SHEET

NO LOAD TEST

STEP 3: Bring engine up to speed with Generator Circuit Breaker open. Test is conducted at No Load as output power will be cut off. Check operation of over speed trips, manual trips, and all safety control and warning systems to ensure proper operation

STEP 4: Turn Auto/Manual switch to Manual. Line voltage should measure 460 VAC. Adjust manual Rheostat as necessary to obtain 460 VAC indication on AC Voltmeter. RECORD ON DATA SHEET

STEP 5: Adjust Automatic Voltage to minimum and maximum voltage. The Rheostat should be capable of adjusting the Generator Voltage between 432 and 510 Volts. RECORD ON DATA SHEET

STEP 6: Demonstrate operation of the speed control device in Manual Mode to control speed of the unit. Record the minimum and maximum values and the time to go from minimum to maximum on the Data Sheet. RECORD ON DATA SHEET

FULL LOAD TEST

STEP 7: Operate the Generator at full rated load for 30 minutes to bring it up to or near its operating temperature. During this period the general operation of the generator shall be monitored and any necessary adjustments shall be made.

STEP 8: Demonstrate that the generator Voltage can be adjusted over the minimum acceptable range of 436.5 to 481.5 volts under full load. RECORD ON DATA SHEET

STEP 9: After reaching operating temperature, the load shall be removed from the generator. At No Load and with Generator excitation under the control of the Voltage Regulator, set the generator to 100% of rated speed (1800 RPM). Note: Do not readjust speed during test.

STEP 10: Apply load steps in 20% increments from no load to 100% load using ships load and the resistive load bank. (In order to achieve the 20 and 40 percent load’s, minimal ships loads should be running and the Engine Room Supply Fan should be run at half speed. Above the 40 percent load step, additional ship loads can be applied along with the resistive load bank and the Engine Room Supply Fan shall run at full speed). Maintain voltage at rated output voltage for each load step for 15 minutes and record dates on the data sheets.
Observed Load (kW)
% Load
Engine Speed (RPM)
Time (min.)
15
20
1800
15
30
40
1800
15
45
60
1800
15
60
80
1800
15
75
100
1800
15
82
110
1800
20 min / 2 hrs

110% LOAD TEST

STEP 11: Operate the unit at 110% rated load for 2 hours (minimum) to approximately 3 hours, until temperatures stabilize within 1 degree centigrade for 3 consecutive data points. Record Generator and Diesel Engine Data at 20 minute intervals as listed on the data sheets. RECORD ON DATA SHEET

SHUTDOWN

STEP 12: Secure the Diesel Generator and take hot insulation resistance readings. Correct the insulation resistance readings to 25 degrees centigrade using the Nomograph on page 11. RECORD ON DATA SHEET

STEP 13: Return all equipment to pretest conditions.

STEP 14: Perform a visual inspection of the generator set for oil for fuel leaks, loose connections and fittings.

COLD INSULATION RESISTANCE SSDG

STEP 2 MINIMUM EXPECTED RESULTS ACTUAL RESULTS

EQUIPMENT
NOT CLEANED
CLEANED IN PLACE
RECOND
NEW
SSDG #1
SSDG #2
STATOR
0.2 MEGOHMS
1.0 MEGOHMS
2.0 MEGOHMS
10.0 MEGOHMS
EXCITER FIELD
0.5 MEGOHMS
1.25 MEGOHMS
2.5 MEGOHMS
5.0 MEGOHMS
______________________________________________________________________________________
TEST CONDUCTORGOVERNMENT WITNESSDATE

NO LOAD DATA SHEET

STEP
FUNCTION
EXPECTED RESULTS
ACTUAL RESULTS
SSDG #1
SSDG #2
4
Line Voltage
SAT
5
Manual Voltage Control
SAT
Maximum Voltage in Manual
481.5V
Minimum Voltage in Manual
436.5V
6
Speed Change Control Range
57 – 63 Hz
Time from Min to Max – Speed Control
1 Min. Nominal
______________________________________________________________________________________
TEST CONDUCTORGOVERNMENT WITNESSDATE

TEST TITLE: TEST NO: REV

Ships Service Diesel Generator Operational Test WT/PM

STEP 10 FULL LOAD DATA SHEET

SSDG#1
SSDG#2

Start Time

Date

Data Sheet
20% LOAD

40% LOAD

60% LOAD

80% LOAD

100% LOAD

Parameter
SSDG#1
SSDG#2
SSDG#1
SSDG#2
SSDG#1
SSDG#2
SSDG#1
SSDG#2
SSDG#1
SSDG#2

Power (ekW)

Power Factor

Engine RPM

Frequency (Hz)

Voltage Phase A

Voltage Phase B

Voltage Phase C

Current Phase A

Current Phase B

Current Phase C

L.O. Pressure

Engine F.W. Temp Coolant/Out

Manifold Exhaust Temp

Exh Press (60” H2O max)

Air Intake Temp

Comb Air Press (32” H2O max)

______________________________________________________________________________________
TEST CONDUCTORGOVERNMENT WITNESSDATE

STEP 11 110% LOAD DATA SHEET

SSDG#1
SSDG#2

Start Time

Date

Data Sheet
20 Minutes

40 Minutes

60 Minutes

80 Minutes

100 Minutes

120 Minutes

Parameter
SSDG#1
SSDG#2
SSDG#1
SSDG#2
SSDG#1
SSDG#2
SSDG#1
SSDG#2
SSDG#1
SSDG#2
SSDG#1
SSDG#2

Power (ekW)

Power Factor

Engine RPM

Frequency (Hz)

Voltage Phase A

Voltage Phase B

Voltage Phase C

Current Phase A

Current Phase B

Current Phase C

L.O. Pressure

Eng F.W. Temp Coolant/Out

Manifold Exhaust Temp

Exh Press (60” H2O max)

Air Intake Temp

Comb Air Press (32” H2O max)

______________________________________________________________________________________
TEST CONDUCTORGOVERNMENT WITNESSDATE
STEP 12HOT INSULATION RESISTANCE SSDG
USE NOMOGRAPH
MINIMUM EXPECTED RESULTS
ACTUAL RESULTS

EQUIPMENT

NOT CLEANED

CLEANED IN PLACE

RECOND

NEW

SSDG#1
SSDG#2

STATOR

0.2 MEGOHMS

1.0 MEGOHMS

2.0 MEGOHMS

10.0 MEGOHMS

EXCITER FIELD

0.5 MEGOHMS

1.25 MEGOHMS

2.5 MEGOHMS

5.0 MEGOHMS

______________________________________________________________________________________
TEST CONDUCTORGOVERNMENT WITNESSDATE

NOMOGRAPH FOR TEMPERATURE CORRECTION OF INSULATION RESISTANCE

TEST EQUIPMENT

NAME
MODEL

NUMBER

SERIAL

NUMBER

CALIBRATION

DUE DATE

REMARKS/WITNESS

CONTRACTOR:
DATE:
GOVERNMENT REP:
DATE:
NUMBER
COMMENTS
CONTRACTOR:
DATE:
GOVERNMENT REP:
DATE:
NUMBER
OPEN ITEMS AND CORRECTIONS
CONTRACTOR:
DATE:
GOVERNMENT REP:
DATE:
NUMBER
TEST RESULTS SUMMARY

This test was conducted in accordance with this test procedure; no adjustments were made to equipment under test except as required by the test procedure, and the results of the test are as stated in this report.

CONTRACTOR:
DATE:
GOVERNMENT REP:
DATE:

image1.jpeg

File details come from the government source that posted it. Updated .