About this file

This document provides a notice of questions and answers related to solicitation N6274221R1337 for the construction of eight new earth covered munitions storage igloos and four option igloos at Andersen Air Force Base in Guam. The structural, lightning protection, and mechanical work for the igloos will be design-bid-build while the earth berm, coatings, site improvements, roadways, aprons, and utilities will be design-build. Clarification is provided that headed bars are not required for top and bottom bars of precast wall footings. Registration requirements for electrical engineering sign-offs follow FAR 52.236-25. Reference materials for a separate Phase 3 project will not be provided. A single set of drawings combining design-bid-build and design-build elements may be provided by the Government for design submissions.

View the file

Other files

File Type Posted
21R1337_AMD5.pdf PDF
21R1337 Note 8.pdf PDF
21R1337 Note 7.pdf PDF
21R1337_AMD4.pdf PDF
21R1337 Note 6.pdf PDF
21R1337_AMD3.pdf PDF
21R1337 Note 4.pdf PDF
21R1337 Note 3.pdf PDF
21R1337_AMD2.pdf PDF
P1366 SV SignIn.pdf PDF
21R1337 Note 2.pdf PDF
21R1337_AMD1.pdf PDF
21R1337 Note 1.pdf PDF
1a_P-1366 - Final RFP - DB RFP.pdf PDF
1b_P-1366 - Final RFP - Drawings.pdf PDF
21R1337-RFP.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice No. 5

16 August 2021

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-21-R-1337

FY22 MCAF P-1366/AJJY073105P2, APR-MUNITIONS STORAGE IGLOOS, PHASE 2,

ANDERSEN AIR FORCE BASE, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

17. Reference: Det. A3/S-302. Please confirm if transverse top and bottom bars of precast wall footing and transverse bar of precast wall panel base need to be headed bars as shown in Det.

A3/S-302.

ANSWER: Headed bars are not required for top and bottom bars of precast wall footing.

Headed bar is required for vertical leg as indicated. Clarification will be provided in a forthcoming amendment.

18. Ref. Final DB RFP PART 3 – PROJECT PROGRAM, Chapter 6 - D503001 (Telecommunications Systems). PDF page 438. Para 6. The Final DB RFP PART 3 – PROJECT PROGRAM, Chapter 6 - D503001 (Telecommunications Systems) requires that communications and security systems designs must be signed by both an RCDD and a Registered PE (Electrical). Is a PE registration from any US State/Territory other than Guam acceptable since this is a Federal Government project?

ANSWER: PE registration shall be in accordance with FAR 52.236-25 Requirements for Registration of Designers.

19. Ref. Final RFP drawings. Sheet 4 of 24. The final RFP drawings, FY22MCAF Project P-

1336/AJJY073105P2 APR-MUNITIONS STORAGE IGLOOS, PHASE 2 (PART B), AAFB,

GUAM, sheet GB004 (sheet 4 of 24) makes reference to P-3105 (Phase 3) Project in the plan titled, SCOPE OF WORK SUMMARY and notes 4 and 6. Request that the final approved drawings and basis of design is provided of the referenced project P-3105 (Phase 3).

ANSWER: Please refer to Notice No. 3, Q7 response.

20. Ref. Final RFP drawings. Part B. This project, FY22MCAF Project P-

1336/AJJY073105P2 APR-MUNITIONS STORAGE IGLOOS, PHASE 2 (PART B), AAFB,

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC

258 MAKALAPA DRIVE, SUITE 100

JOINT BASE PEARL HARBOR HICKAM, HAWAII 96860-3134

GUAM, contains elements of DB and DBB. Is it the intent of the Government to have a single set of drawings that combines both DB and DBB elements for any of the design deliverable submissions? If so, will the Government provide the CAD drawings of the DB portion of this project to the successful offeror.

ANSWER: Please refer to Notice No. 3, Q8 response.

End of Notice