- FY22 MCAF P-1366/AJJY073105P2, APR – MUNITIONS STORAGE IGLOOS PHASE 2, ANDERSEN AIR FORCE BASE, GUAM
- Solicitation number
- N6274221R1337
About this file
This federal contract opportunity solicitation seeks design-build construction services for eight new earth-covered munitions storage igloos and magazines at Andersen Air Force Base, Guam. The solicitation includes construction of 16,000 square feet of 7-bar rated munitions storage area across the eight igloos using conventional construction methods. Structural, lightning protection, and mechanical work will be design-bid-build, while earth berm, coatings, site improvements, roadways, aprons, utilities, and related work will be design-build. The solicitation also includes four pre-priced options to construct additional igloos. The government may exercise the options within 365 days of award. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1337_AMD5.pdf | ||
| 21R1337 Note 8.pdf | ||
| 21R1337 Note 7.pdf | ||
| 21R1337_AMD4.pdf | ||
| 21R1337 Note 5.pdf | ||
| 21R1337 Note 6.pdf | ||
| 21R1337_AMD3.pdf | ||
| 21R1337 Note 4.pdf | ||
| 21R1337 Note 3.pdf | ||
| P1366 SV SignIn.pdf | ||
| 21R1337 Note 2.pdf | ||
| 21R1337_AMD1.pdf | ||
| 21R1337 Note 1.pdf | ||
| 1a_P-1366 - Final RFP - DB RFP.pdf | ||
| 1b_P-1366 - Final RFP - Drawings.pdf | ||
| 21R1337-RFP.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. N6274221R1337 Amendment No. 0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
PART 2: GENERAL REQUIREMENTS
SECTION 01 33 00.05 20 – CONSTRUCTION SUBMITTAL PROCEEDURES
Remove Replace with
“Submittal Register” “Submittal Register”
Pages 1-21 Pages 1-22
SECTION 01 35 13.02 – INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
Insert before Section 01 35 26
Pages 1-11
Insert after Section 01 35 13.02
ICS Checklist
PART 6: ATTACHMENTS
ATTACHMENT A: PART A DRAWINGS
The following drawings, bearing the revision date of 08/06/2021, supersede previously issued drawings bearing the same number and title:
DRAWING
NUMBER
NAVFAC
DRAWING
NUMBER
REVISION
NUMBER DRAWING TITLE
S-301 17240929 2 BUILDING SECTIONS
FY22 MCAF PROJECT P-1366 / AJJY073105P2 APR - Munitions Storage Igloos, Phase 2 Andersen Air Force Base, Guam
1181839 1571341
AMENDMENT No. 0002
REPLACEMENT SHEETS
DIVISION 01
GENERAL REQUIRMENTS
SECTION 01 33 00.05 20
CONSTRUCTION SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 22 PAGES
N62742-16-D0001
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 14 00 SD-01 Preconstruction Submittals
1.4 GEntry Authorization List
1.4 GEvent Waiver Request
1.4 GFree-Zone Request
1.5.1.1List of Contact Personnel
1.6.1Personnel List
1.6.3Vehicle List
01 20 00 SD-01 Preconstruction Submittals
1.3 GEarned Value Report
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 31 19.05 20 SD-01 Preconstruction Submittals
1.3.2 GDesign Submittal Packaging
1.3.9 GDesign Baseline NAS
1.3.9 GConstruction Baseline NAS
1.3.8 GPerformance Assessment Plan
(PAP)
1.3.5.1 GCDW Facilitator Experience
Resume
1.3.6 GCDW Preliminary Concept
Design
1.3.5.2 GCDW Cost Estimate
1.3.5.3 GConcept Design Workshop
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) mwise Snapshot
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2List of Contractor's Personnel
01 32 17.00 20 SD-01 Preconstruction Submittals
1.2.2.1 GBaseline NAS
1.2.2.3 GConstruction Baseline NAS
1.9Designated Project Scheduler
SD-07 Certificates
1.3 GThree-Week Look Ahead
Schedule
1.4.1 GMonthly Network Analysis
Updates
SD-11 Closeout Submittals
1.4.2 GAs-Built Schedule
01 33 00.05 20 SD-01 Preconstruction Submittals
1.3.1Submittal Register
01 33 10.05 20 SD-01 Preconstruction Submittals
2.1 GConsolidated RFP Documents
1.6.5 GSubmittal Register
SD-04 Samples
1.11.3 Grendering
SD-05 Design Data
1.8 GDesign Drawings
1.9 GSpecifications
1.10 GBasis of Design
2.2 GDesign Submittals
1.10.2 GDesign Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 33 10.05 20 1.10 GSustainability Notebook
1.11 GProject Rendering
2.2.2 GGeotechnical Report
1.13 GGuam project DACP documents
SD-11 Closeout Submittals
1.12 GRecord Documents
1.10 GSustainability Notebook
1.12.3 GDD Form 1354
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-05 Design Data
1.5.3.2 GInterim Design High Performance
and Sustainable Building Checklist
1.5.3.2 GInterim Design Sustainability
eNotebook
1.5.3.2 GFinal Design High Performance
and Sustainable Building Checklist
1.5.3.2 GFinal Design Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 33 29 1.5.3.2 GFinal Sustainability eNotebook
1.5.3.2 GAmended Final Sustainability
eNotebook
1.5.3.2 GAmended Final High
Performance and Sustainable
Building Checklist
01 35 13.02 SD-03 Product Data
GNetwork Switches
GMedia Converters
GUninterruptible Power Supply
(UPS)
GRemote Terminal Unit (RTU)
GIntermediary Network Devices
SD-10 Operation and Maintenance
Data
3.5.1 GOperator Manual
3.5.2 GSustainment Materials
3.5.3 GSecurity Controls Documents
3.5.3.1 GSystem Authorization Documents
3.5.3.2 GAccess Controls Summary
3.5.3.3 GAuditing Controls Summary
3.5.3.4 GConfiguration Management Plan
3.5.3.5 GContingency Plan
3.5.3.6 GSecurity Features Guide
3.5.3.7 GVulnerability Management Plan
3.5.3.8 GMaintenance Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 35 13.02 3.5.3.9 GDocumented Statements
3.5.3.10 GTest Results
SD-11 Closeout Submittals
3.7 GTechnical Narrative
3.6 GCompleted Navfac Marianas Ics
Checklist
01 35 26 SD-01 Preconstruction Submittals
1.8.1.1 GAccident Prevention Plan (APP)
1.8.1.2 GAPP - Construction
SD-06 Test Reports
1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
SD-07 Certificates
1.5Contractor Safety Self-Evaluation
Checklist
1.7.1.4Crane Operators/Riggers
1.8.3.2 GStandard Lift Plan
1.8.3.3 GCritical Lift Plan
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
1.15License Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 35 26 1.15.1 GRadiography Operation Planning
Work Sheet
1.15.1 GPortable Gauge Operations
Planning Worksheet
01 45 00.05 20 SD-01 Preconstruction Submittals
1.3.3 GDesign Quality Control (DQC)
Plan
1.3.3 GConstruction Quality Control
(CQC) Plan
1.9 GIndoor Air Quality (IAQ)
Management Plan
SD-05 Design Data
1.4.2Design Quality Control
Documentation
01 45 35 SD-01 Preconstruction Submittals
1.3.12 GStatement of Special Inspections
3.1.1 GSIOR Letter of Acceptance
3.1.1 GSpecial Inspections Project
Manual
3.1.1Special Inspections Agency's
Written NDT Practices
3.1.1NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.1Biweekly Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 45 35 SD-07 Certificates
Part 2AISC Certified Steel Fabricator
Part 2Certified Plant
Part 2Certificate of Compliance
1.3.7 GSpecial Inspector of Record
1.3.4 GSpecial Inspector
3.1.1Technicians
SD-11 Closeout Submittals
3.1.1 GInterim Report of Special
Inspections for Each DFOW
3.1.1 GComprehensive Final Report of
Special Inspections
3.1.4 GFinal Report of Structural
Observations
3.1.4 GFinal Walk-Down Inspection
01 50 00 SD-01 Preconstruction Submittals
3.3.1Traffic Control Plan
1.4.1.4Contractor Computer
Cybersecurity Compliance
Statements
1.4.6Contractor Temporary Network
Cybersecurity Compliance
Statements
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.6.1Preconstruction Survey
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 57 19 1.10Solid Waste Management Permit
1.7.8Regulatory Notifications and
Permits
1.7 GEnvironmental Protection Plan
3.2.1.2Stormwater Notice of Intent
3.2.1.1 GStormwater Pollution Prevention
Plan
1.7.9.1Dirt and Dust Control Plan
1.6.5Employee Training Records
1.6.4Environmental Manager
Qualifications
SD-06 Test Reports
3.7.1.1Laboratory Analysis
3.2.1Stormwater Erosion / Sediment
Control Inspection Report
3.2.1.3 GStormwater Inspection Reports
for Construction General Permit
3.2.1.3 GStormwater Inspection Reports
for Construction General Permit
3.7.2.1 GSolid Waste Management Report
3.2.1 GSWPPP Inspection Reports
SD-07 Certificates
1.6.5 GEmployee Training Records
1.5.1.2 GECATTS Certificate of
Completion
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 57 19 3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.6.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
3.8.1 GContractor Hazardous Material
Inventory Log
3.7.3.1 GHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
3.2.1.5As-Built Topographic Survey
01 57 19.01 20 SD-01 Preconstruction Submittals
3.3.1Storm Water Notice of Intent
(NOI)
3.3.1Site-specific Storm Water
Pollution Prevention Plan
(SWPPP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 57 19.01 20 3.3.2Storm Water Inspection Reports for Construction General Permit
(CGP)
01 57 19.03 20 SD-01 Preconstruction Submittals
1.6 GESS Work Plan
3.1 GData Collection Results
3.1 GData Collection Results
1.5.6 GRecord of Training
3.2 GComprehensive Community
Relations Plan
1.7 GInstallation Commanding Officer
(ICO) Notification
1.8 GGeographic Information System
(GIS) Work Area Grid
1.5 GPersonnel Qualifications and
Duties
1.5.1 GSite Health and Safety Plan
(SHSP)
3.3 GOccupancy, Population and
Vehicle Survey
SD-06 Test Reports
1.9 GQC Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 57 19.03 20 1.10 GMunitions and Explosives of
Concern (MEC)/Material
Potentially Presenting an
Explosive Hazard (MPPEH) Spot
Report
3.9 GBedrock Determinations
SD-11 Closeout Submittals
1.11 GGIS Data
1.12 GAfter Action Report (AAR)
01 58 00 SD-02 Shop Drawings
1.3.1 GPreliminary Drawing Indicating
Layout And Text Content
01 74 19 SD-01 Preconstruction Submittals
1.7Construction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.4Final Cleaning
1.5Spare Parts Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 78 00 SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
2.1 GCertification of EPA Designated
Items
3.5.1 GInterim DD FORM 1354
3.5.2 GChecklist for DD FORM 1354
3.5.2 GHigh Performance and
Sustainable Building (HPSB)
Checklist
1.7 GFinal Construction Photographs
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GOperation and Maintenance
(O&M) Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 20 SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
01 78 24.00 20 1.4.1 GeOMSI, Progress Submittal
1.4.2 GeOMSI, Prefinal Submittal
1.4.3 GeOMSI, Final Submittal
01 91 00.15 20 SD-05 Design Data
3.2 GDesign Phase Commissioning
Plan
SD-06 Test Reports
3.3 GDesign Review Report
3.7 GInterim Construction Phase
Commissioning Plan
3.7 GFinal Construction Phase
Commissioning Plan
3.11 GInitial Commissioning Report
1.9 GIssues Log
3.8 GCompleted Pre-Functional
Checklists
3.7.5 GCompleted Building Envelope
Inspection Checklists
SD-07 Certificates
1.8 GCommissioning Firm
1.10 GCertificate Of Readiness
SD-11 Closeout Submittals
3.11 GFinal Commissioning Report
3.11 SFinal Commissioning Report
(eNotebook)
03 31 30 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
03 31 30 1.8.2.2Concrete Curing Plan
1.7.4 GConcrete Qualification Program
1.6 GConcrete Quality Control Program
1.8.2.4Concrete Placement and
Compaction
1.8.2.4Concrete Pumping
1.8.2.1Curing Concrete Elements
1.8.2.3Form Removal Schedule
1.6.2 GLaboratory Qualifications
1.6.1 GQuality Control Personnel
SD-02 Shop Drawings
3.2.7 GExpansion Joints
1.8.1.1Formwork
1.8.1.3 GPrecast Elements
1.6.1.2 GReinforcing Steel
SD-03 Product Data
1.8.5.4 GAdmixtures
1.8.5.3 GAggregates
1.2 GCorrosion Inhibitors
2.8.4 GJoint Filler
2.8.5 GJoint Sealants
2.8.2 GMaterials for Curing Concrete
1.8.2.8Safety Data Sheets
2.7.2 GMechanical Reinforcing Bar
Connectors
2.5 GNon-Shrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
03 31 30 3.2.7Preformed Joint Filler
2.7.1 GReinforcing Bars
3.2.1Reinforcement Supports
2.8.3Sealer-Hardener
2.8.1Waterstops
2.7.3Welded Wire Fabric
SD-05 Design Data
1.8.5.1 GConcrete Mixture Requirements
1.8.2.9 GMixture Designs
SD-06 Test Reports
1.8.5.3Aggregates
1.8.5.4Admixtures
1.8.5.5Cement
1.7.1Concrete Mixture Proportions
1.8.5 GConcrete Test Reports
1.7.4.1Fresh Concrete Properties
1.7.4.2Hardened Concrete Properties
2.7.2Mechanical Reinforcing Bar
Connectors
2.7.1Reinforcing Bars
1.8.5.2Supplementary Cementing
Materials
2.3Water
SD-07 Certificates
1.8.5.4Admixtures
2.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
03 31 30 1.8.3.1Cementitious Material Mill
Certificates
1.6.1.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
1.8.2.6Coatings
SD-11 Closeout Submittals
1.8.3.1Aggregate Moisture Content
1.8.3.1Aggregate Sampling
1.8.5Concrete Test Reports
1.8.4.3Quality Control Charts
1.8.4.1Daily Inspection Reports
1.8.4.4Quality Team Meetings
1.8.4.2Sampling Logs
03 45 33 SD-02 Shop Drawings
2.1.1.2 GDrawings of Precast Members
SD-03 Product Data
2.2.8.1Inserts
2.2.9Bearing Pads
SD-04 Samples
2.3.9Surface Finish
SD-05 Design Data
2.1.1.2 GDesign Calculations
1.4.3 GConcrete Mix Design
SD-06 Test Reports
1.4.3 GConcrete Mix Design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
03 45 33 2.2.2.1Fly Ash
2.2.2.2Pozzolan
2.2.2.4Ground Granulated Blast-Furnace
Slag
2.2.4Aggregates
1.4.1.1Concrete and Aggregate Quality
Control Testing
2.2.3Water
SD-07 Certificates
2.3Quality Control Procedures
3.12 GConstruction Records
SD-11 Closeout Submittals
1.4.4Batch Ticket
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.5.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2 GNon-Shrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
05 12 00 SD-05 Design Data
3.2 GDesign Calculations for Steel
Connections
1.5.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Bolt Testing Reports
3.7.3Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.5.3.1 GWelding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4 GWelding Procedure Specifications
(WPS)
25 05 11 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
25 05 11 3.2.6.1 GWireless Communication
Request
3.2.3.2 GDevice Account Lock Exception
Request
3.10 GMultiple IP Connection Device
Request
1.9.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.9.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.4.3ICS Change Request Form
1.4.3ICS SAAR-N Systems Access
Authorization Request Forms
1.4.3ICS Privileged Access Form
SD-02 Shop Drawings
3.2.4.1 GUser Interface Banner Schedule
1.7.2 GNetwork Communication Report
1.7.5 GCybersecurity Riser Diagram
1.7.3 GControl System Inventory Report
1.7.1 GCybersecurity Interconnection
Schedule
SD-03 Product Data
1.7.6 GControl System Cybersecurity
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
25 05 11 1.7.7 GSustainment Materials
1.7.8 GSecurity Controls Documentation
SD-06 Test Reports
1.4.2 GWireless Communication Test
Report
SD-07 Certificates
1.8 GSoftware Licenses
1.6.1 GCybersecurity Representative's
Certification Of Qualifications
SD-08 Manufacturer’s Instructions
3.15 GOperator Manual
SD-11 Closeout Submittals
3.6.2.2.5 GPassword Summary Report
1.7.4 GSoftware Recovery And
Reconstitution Images
3.3.2.1 GDevice Audit Record Upload
Software
25 08 11.00 20 SD-01 Preconstruction Submittals
1.8.1 GAuthorization Strategy Plan
SD-05 Design Data
3.1.2.1 GControl System Security Controls
3.1.2.3 GSecurity Plan
3.1.2.4 GPorts, Protocols, And Services
Management Registration Form
SD-06 Test Reports
3.1.3.3 GACAS Vulnerability Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
25 08 11.00 20 3.1.3.5 GSecurity Technical
Implementation Guide Checklists
3.1.3.4 GSCAP Report
3.1.3.7 GISSE Checklist (Step 3)
3.1.4.3 GISSE Checklist (Step 4)
SD-07 Certificates
1.7.1 GInformation Assurance Technical
Level II/Security +
26 41 00 SD-02 Shop Drawings
1.4.1.1 GOverall lightning protection
system
1.4.1.2 GEach major component
SD-06 Test Reports
1.4.3 GLightning Protection and
Grounding System Test Plan
3.4.1 GLightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3 GLightning Protection System
Installers Documentation
1.4.2 GComponent UL Listed and
Labeled
1.4.4 GLightning protection system
inspection certificate
3.1.1 GRoof manufacturer's warranty
31 23 00.00 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 22 PAGES
FY22 MCAF P-1366 /AJJY073015P2 Munition Storage Igloos (Phase 2)
31 23 00.00 20 1.9.1Shoring and Sheeting Plan
SD-06 Test Reports
1.8 GBorrow Site Testing
3.14.2.1Fill and backfill
3.14.2.2Select granular material
3.3Test pit logs
3.4.1Boring logs
1.9.3Moisture-density relations
1.9.4Field dry density and moisture content
2.2Bedding material
1.9.5Controlled low strength material
(CLSM)
31 32 23 SD-01 Preconstruction Submittals
1.4.1 GProbing and Grouting Plan
SD-03 Product Data
3.1.2Drilling Equipment
3.1.3Grouting Equipment
SD-11 Closeout Submittals
1.4.2 GProbing and Grouting Logs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 01 35 13.02
INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
FY22 MCAF PROJECT P-1366/AJJY073105P2 APR - Munitions Storage 1181839 Igloos, Phase 2, Andersen Air Force Base, Guam
SECTION 01 35 13.02
INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
PAC 02/ 21
PART 1 GENERAL
1.1 RELATED SECTIONS
Sections 25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS, Section 25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONROL SYSTEMS, 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEMS, and 33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT apply to this section with additions and modifications specified herein.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
APPLICABLE DOCUMENTS
SECNAV M-5510.30 DON Personnel Security Program Manual
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST SP 800-37 The Risk Management Framework (RMF) for DoD Information Technology (IT)
NIST SP 800-82 Guide to Industrial Control Systems (ICS) Securitys
NIST SP 800-53 Security and Privacy Controls for Federal Information Systems and Organizations
U.S. DEPARTMENT OF DEFENSE (DOD)
DoDI 8500.01 Cybersecurity
DoDI 8510.01 DoD Risk Management Framework (RMKF) for DoD Information Technology (IT)
OTHER APPLICABLE DOCUMENTS
UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design
UFC 4-010-06 Cybersecurity of Facility-Related Control Systems
PWUC Public Works Utilities Criteria (PWUC) for Design & Construction: Electric, Sewer, & Water
NAVFAC FRCS NAVFAC FRCS Diagram Requirements Job Aid_MAY2019.pdf
PART 2 - SECTION 01 35 13.02 Page 1
1.3 DEFINITIONS
1.3.1 Industrial Control Systems (ICS)
Within NAVFAC, Industrial Control Systems (ICS), Facility-Related Control Systems (FRCS), and parts of those systems generally consist of Utility Control Systems (UCS) such as Advanced Metering Infrastructure (AMI) and Supervisory Control and Data Acquisition (SCADA) systems as well as Building Control Systems (BCS) such as the Direct Digital Control (DDC) systems used in elevators, smart-lighting, and Heating, Cooling, & Ventilation (HVAC).
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES and paragraph "DOCUMENTATION" and its subparagraphs in this section:
SD-03 Product Data
Network Switches; G
Media Converters; G
Uninterruptible Power Supply (UPS); G
Remote Terminal Unit (RTU); G
Intermediary Network Devices; G
SD-10 Operation and Maintenance Data
Operator Manual; G
Sustainment Materials; G
Security Controls Documents; G
System Authorization Documents; G
Access Controls Summary; G
Auditing Controls Summary; G
Configuration Management Plan; G
Contingency Plan; G
Security Features Guide; G
Vulnerability Management Plan; G
Maintenance Plan; G
Documented Statements; G
Test Results; G
PART 2 - SECTION 01 35 13.02 Page 2
SD-11 Closeout Submittals; G
Technical Narrative; G
Completed Navfac Marianas Ics Checklist; G
1.5 WORK COVERED BY CONTRACT DOCUMENTS
This work includes providing for all ICS equipment, network architectures, programming/configuration, testing, commissioning, and documentation to be assessed and authorized under the Department of Navy Risk Management Framework (RMF) process per the most current versions of the standards and regulations referenced in paragraph "REFERENCES" in this section.
1.5.1 General Guidance
For all provided systems and parts of systems, the Government must be afforded the capability to seamlessly and efficiently understand, operate, test, maintain, secure from unauthorized access, diagnose and troubleshoot problems, and recover from run-time errors.
All provided equipment and software must be currently marketed products, not currently scheduled for end of life or obsolescence, to ensure system sustainability. Where older versions of software are provided due to incompatibility concerns between different versions, provide the Government with the means (licenses, install disks, and any other installation materials) to fully update the provided software to the latest marketed version. Hardware and software products for systems networking should have been evaluated and accredited at a licensed/approved evaluation facility and listed as being in conformance to the Common Criteria for IT Security Evaluation (ISO Standard 15408, visit https://www.niap-ccevs.org for more information); products shown to be in the evaluation process for this purpose are acceptable. If multiple versions of hardware exists, devices supporting encryption will be considered first; if additional licenses are required for encryption, those licenses will be obtained as well. Operating systems and malware/antivirus protection application(s) must also be approved for use by the Department of the Navy in the DoN Applications and Database Management System ( https://www.dadms.navy.mil ). All software licenses are required to be in the name of the Department of the Navy.
Legacy devices that are not required in the new system configuration must be disconnected, removed and turned over to the Government unless otherwise indicated.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 INDUSTRIAL CONTROL SYSTEMS REQUIREMENTS
3.1.1 Contractor Personnel Requirements
Personnel installing or interacting with new or existing systems hardware and software are required to be United States citizens. Personnel requesting access to existing Navy systems for the purpose of installing
PART 2 - SECTION 01 35 13.02 Page 3 new software, programming/configuring software, or modifying code for existing software are required to have a favorable security background check in accordance with IT-II designation, per SECNAV M-5510.30 .
Security Background checks must be initiated by the Contractor immediately after award to ensure that background checks are completed and confirmed with NAVFAC Marianas CIO prior to scheduled installation. The Contractor's Facility Security Officer (FSO) is responsibility to initiate and process the security background checks.
Individuals developing or using Security Controls documentation, or other documents that are designated "Controlled Unclassified Information" (CUI), will be required to complete and submit a signed Non-Disclosure and Data Handling Agreement for CUI information. Individuals installing or interacting with new or existing systems equipment will be required to submit documentation showing compliance with the following additional requirements:
a. Fill out and sign/submit the NAVFAC Marianas SCADA Change Request Form (as needed)
b. Fill out and sign/submit the ICS SAAR-N Systems Access Authorization Request Forms
c. Fill out and sign/submit the ICS IA Addendum
d. Complete DoD CYBER AWARENESS CHALLENGE training at https://public.cyber.mil/training/
e. Fill out and sign/submit the NAVFAC Marianas ICS Privileged Access Form (for elevated privileges, such as for administrator or programmer tasks)
Individuals engaged in systems design, programming, and configuration activities, must possess at least five years of documented experience in implementing similar systems, specific project experience that is relevant to the type of work being done on the system, and manufacturer training in the use and programming of any controls devices being installed.
3.1.2 Installations Requirements
Existing systems must remain operable and services must not be interrupted during the construction process to the greatest extent possible unless otherwise indicated. Coordinate construction phasing in the project schedule/connection or tie-in plan and safety plan with the Government and the system operator for approval prior to start of construction.
Systems may be located within controlled access areas. Access request procedures and requirements for access must be followed for these locations. Escorts may be necessary in many if not all circumstances. The Contractor will be responsible for coordinating access and escorts with the Government.
The Government must be afforded the ability to monitor and witness all installation, testing, and on-site configuration/programming work.
Due to rigorous network security requirements, access to existing systems is not permitted without the individual's consent to a systems use agreement. In general, no applications may be installed on Government
PART 2 - SECTION 01 35 13.02 Page 4 systems without explicit request and Government approval. Government systems and systems provided to the Government must not be outfitted with hardware or software "back doors" to permit remote access. Use of flash memory devices (including USB "thumb" drives) on Government equipment is also prohibited. Information used in the course of systems implementation must be designated "Controlled Unclassified Information" (CUI) and must not be disseminated without written authorization from the Contracting Officer.
3.2 PROGRAMMING AND CONFIGURATION REQUIREMENTS
a. For installations that do not intend to integrate new ICS with any existing ICS with an Authorization to Operate (ATO), or where new ICS needs to be programmed prior to integration, contractor laptops may be used but must be validated, scanned for vulnerabilities, and approved by NAVFAC Marianas CIO prior to usage.
b. For any new ICS that need to be configured while already integrated to an existing ICS with an ATO, a Government laptop belonging to the accreditation boundary of that existing ICS must be utilized for programming and configuration. Coordinate with NAVFAC Marianas CIO to check-out appropriate laptop.
c. For programmable or configurable interfaces, coordinate requirements with the system operator and submit draft interface diagrams (and mimic diagrams as applicable) and descriptions for Government approval to ensure compliance with system operator requirements.
d. Configure all provided systems and parts of systems as needed to comply with the NAVFAC Marianas ICS Checklist.
e. All programmed code and scripts developed under this project must be documented and contain annotations within the code structure in accordance with industry best practices, for ease of understanding in troubleshooting or adapting. All compilers used to develop code must be indicated within documentation. Code must be organized into logical sections, clearly defined, with comments indicating the function of each section, including any expected inputs, outputs, and calling functions. Modifications to existing code must be properly annotated, including date of change, reason for change, any changes to be expected for inputs or outputs. All code should be provided in compiled and uncompiled formats along with custom application programming interfaces (API) or packages used. All scripts and source code must be delivered to the Government in readable format as part of close-out submittals, unless this requirement is waived by NAVFAC Marianas CIO. Conduct code reviews at regular intervals to ensure quality and reduce the likelihood of errors and security vulnerabilities. Document the results of this process and provide for Government review upon request.
f. Systems with programmable interfaces must be configured with adequate interfaces and mimic diagrams (as applicable) for operators to easily view and understand all available data and system conditions. Mimic diagrams must bear resemblance to actual equipment and process layouts to the satisfaction of the Government and the system operators. Where possible, a graphical network analysis/status interface must be provided to allow for troubleshooting and verification of network conditions. Interfaces must not display false information, and should accurately convey fault conditions such as when network connectivity
PART 2 - SECTION 01 35 13.02 Page 5 for particular devices has been lost. Programmable interfaces should also be configured and secured in accordance with the Application Security Development Security Technical Implementation Guide.
g. All code programming and script development under this project must be conducted in a secure environment that meets the Department of Defense requirements set forth in the Standards and Regulations referenced for cybersecurity in this document.
h. Copies of code modified or produced under this contract must only be retained while under a sustainment or support contract with the Government, and must only be used for the purposes described within the bounds of the agreement unless expressly authorized in writing by NAVFAC Marianas CIO. Code modified or generated under this contract must be disposed of as described in the Non-disclosure and Data Handling agreement.
3.3 TESTING AND COMMISSIONING REQUIREMENTS
a. Provide NAVFAC Marianas CIO with System Authorization Documents within sixty calendar days of award to receive approval of suggested hardware and software prior to procurement. Upon approval of hardware and software, coordinate with NAVFAC Marianas CIO to create a draft System Assessment Plan (SAP) in which applicable testing methods will be determined prior to installation.
b. Request an editable version of the NAVFAC Marianas ICS Checklist from the Government, and annotate with information required by the checklist, as well as the date and name of the Government representative who witnessed validation of each item. Facilitate Government testing of the system via network scans, Security Template Implementation Guide (STIG) testing, Cyber Hygiene Checklists, and provide support for interpreting scan and STIG test results as needed. Demonstrate to the satisfaction of the Government that all provided system components are in compliance with the NAVFAC Marianas ICS Checklist, SAP, and Security Controls documentation prior to commissioning.
c. Conduct systems testing and verification, witnessed by the Government and its system operator as each system component is brought online and commissioned. Systems testing and verification must show via operator interface(s) that system statuses and measurements are reported accurately, controls are fully operable, and programming/configuration conforms to statement of work and operator requirements. Notify the contracting officer forthwith of any equipment or system malfunctions encountered before or during testing that are outside the scope of work. Detailed test procedures, results, date/time, witnessing personnel, and other conditions as applicable must be documented for submission as part of close-out submittals.
3.4 TRAINING REQUIREMENTS
a. Provide on-site training for length of time and personnel as indicated to show how to operate, maintain, troubleshoot, repair, and reconfigure/reprogram the systems. Training requirement must include opportunity for hands-on experience.
Develop and provide an operator manual with step-by-step instructions (w/screenshots) showing how to perform key operational &
PART 2 - SECTION 01 35 13.02 Page 6 maintenance/troubleshooting tasks.
Develop and provide a systems administration manual for IT components with step-by-step instructions (w/screenshots) showing how to perform key operational & maintenance/troubleshooting tasks such as user account maintenance, controlled startup/shutdown procedures, backup/restore procedures, software license maintenance, and database maintenance tasks.
Modify the operator and systems administration manuals based on feedback received as a result of the training session.
3.5 DOCUMENTATION
Provide five sets of CD-ROM containing native (editable) file formats.
All software licenses are required to be in the name of the Department of the Navy.
3.5.1 Operator Manual
Provide bound hard copies as indicated for training purposes. Provide final Operator Manuals (including modifications based upon feedback) in conjunction with OMSI submittals for all installed equipment in accordance with specification 01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI). All documents must be submitted in native (editable) and PDF formats on CD-R or DVD-R in the quantities indicated.
3.5.2 Sustainment Materials
Provide the following for every PLC, RTU, Supervisory Controller, or other network-capable (whether networked or not upon delivery) control device, organized by device and delivered on CD-R or DVD-R in conjunction with OMSI submittals:
a. Original firmware
b. Original firmware hash
c. SOP for application of firmware updates/patches
d. POC or website for firmware updates/patches
e. Count of interfaces and types
f. Protocols in use, per interface (specify upstream and downstream devices)
g. Configuration file
h. SOPs for each device configuration
i. SOPs for standard systems maintenance tasks
- User account maintenance
- Software license maintenance
- System Backup/restoral
PART 2 - SECTION 01 35 13.02 Page 7
- Controlled start-up and shutdown of the system
- Database maintenance
3.5.3 Security Controls Documents
Edit existing documentation where applicable; otherwise provide new documentation as described. Provide draft Systems Authorization documents, Access Controls Summary, Auditing Controls Summary, Configuration Management Plan, Contingency Plan, Security Features Guide, Vulnerability Management Plan, and Maintenance Plan documents, as well as Documented Statements along with all formal design submittals, complete with all information available at the time of the submittal. Provide a document changelog and outline or mark sections of documents that have been changed from originals and from each previous submittal. Provide final Security Controls documents in conjunction with As-Builts submittals, and additionally include the completed NAVFAC Marianas ICS Checklist. Request editable templates for hardware and software lists from the Government, as well as an example network diagram for use as guidance. Hardware and software lists must be in formats editable via Microsoft Excel 2010. Network diagrams for the purpose of RMF submittals must be in formats editable via Microsoft Visio 2010. All documents must be submitted in native (editable) and PDF formats on CD-R or DVD-R in the quantities indicated.
3.5.3.1 System Authorization Documents (within 60 calendar days of award)
a. Draft hardware list (include the following for each device):
- Manufacturer
- Product line
- Model (and specific variant if applicable)
- Product type
- Location (installation/special area/building/floor/room)
- Key technical ratings (e.g. memory)
- Serial munber
- MAC addresses
- IP addresses
- Unique Navy identifier or barcode (if assigned)
- Operating system software (cross reference with software list)
- Application software (cross reference with software list)
- Network connections and types (cross reference with network diagram)
- Warranty information
b. Software List (include the following for all software):
PART 2 - SECTION 01 35 13.02 Page 8
- Manufacturer
- Version/subversion
- Location/device
- Used network ports/protocols/services
- Warranty information
Both hardware and software lists should also include Common Criteria EAL status, DADMS entry number, and OS/IOS/Firmware version(s) as applicable.
c. Network diagram
- Network diagram must show equipment locations, name/hostname, models, OS/IOS/Firmwaare version, VLAN (if used), and IP addresses on network communications schematic.
- Network diagram must be layered to remove sensitive information such as IP addresses, VLAN, Port…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .