This request for proposal (RFP) solicits bids for the demolition and replacement of three earth-covered munitions storage igloos at Andersen Air Force Base in Guam. The project includes design-bid-build and design-build components. Under design-bid-build, the work involves demolishing three antiquated igloos totaling 6,000 square feet and replacing them with new 7-bar rated magazines constructed using conventional methods. The design-build portion encompasses supporting facilities, site improvements, and utilities. The solicitation was issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy. Bids are due by the date specified in the RFP. The selected contractor will be responsible for completing the project within the allotted timeframe.

View the file

Other files

File Type Posted
21R1330_Notice7-Issued.pdf PDF
21R1330_Notice6-Issued.pdf PDF
21R1330_Amend0007-Issued.pdf PDF
21R1330_Amend0006-Issued.pdf PDF
21R1330_Amend0005-Issued.pdf PDF
21R1330_Notice5-Issued.pdf PDF
21R1330_Notice4-Issued.pdf PDF
0_21R1330 AMD4.pdf PDF
21R1330_Notice3.pdf PDF
P83003_SV-Sign-in_Completed_211109.pdf PDF
21R1330_Notice2-Issued.pdf PDF
P83003_Amd0003_DB-RFP_Attchs.pdf PDF
21R1330_Amend0002-Issued.pdf PDF
21R1330 RFP Iss.zip ZIP file
P83003_Amd2_ICS-Chklst.pdf PDF
21R1330 Amd 0001 Iss.zip ZIP file
21R1330_Notice1-Issued.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18RXXXX

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP N62742-21-R-1330, WON 1596284, FY22 MCAF PROJECT P-83003/AJJY183003, HAYMAN MUNITIONS STORAGE IGLOOS, MSA 2, ANDERSEN AIR FORCE BASE, GUAM

Amendment No. 0003 is continued on Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1330

X 9B. DATED (SEE ITEM 11)

6-Oct-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Oct-2021

CODE

NAVFAC PACIFIC

CONSTRUCTION CONTRACTS BR (CODE ACQ33)

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL: TEL:

N6274221R1330 Amendment No. 0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT NO. 0003 SUMMARY

This amendment revises the following documents, drawings, and specification pages that accompany this amendment. Technical revisions made are to the yield stress limitation for structural steel channels, angles, and plates.

REQUEST FOR PROPOSAL (RFP)

DOCUMENT 00100, INSTRUCTIONS TO OFFERORS

Remove Page 2 of 19 and replace with the revised Page 2 of 19 (Amendment No. 0003).

DOCUMENT 00700, NEGOTIATED CONTRACT CLAUSES

Remove in its entirety and replace with the revised Document 00700, NEGOTIATED CONTRACT CLAUSES, (Amendment No. 0003), which adds 1.174 DFARS 252.223-7999, ENSURING ADEQUATE COVID-19 SAFETY

PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 2021-O0009) (OCT 2021).

PART 6: ATTACHMENTS

ATTACHMENT A: PART A DRAWINGS

The following drawings, bearing the revision date of 10/20/2021, supersede previously issued drawings bearing the same number and title:

DRAWING

NUMBER

NAVFAC

DRAWING

NUMBER

REVISION

NUMBER DRAWING TITLE

S-001 17228162 3 STRUCTURAL GENERAL NOTES

S-702 17228175 3 DOOR ELEVATIONS

S-703 17228176 3 DOOR SECTIONS

ATTACHMENT B: PART A (DESIGN-BID-BUILD) SPECIFICATIONS

SECTION 05 12 00 – STRUCTURAL STEEL

Remove Replace with

Page 2 Page 2

Remove Replace with

Page 6 Page 6

--End of Amendment--

FY22 MCAF PROJECT P-83003/AJJY183003, HAYMAN WON 1596284

MUNITIONS STORAGE IGLOOS, MSA 2,

ANDERSEN AIR FORCE BASE, GUAM

RFP N62742-21-R-1330

DOCUMENT 00100

d. PRICE AND NON PRICE PROPOSALS (ELECTRONIC): An electronic copy of the price and non-price proposals shall be submitted in .pdf format on a CD-ROM with the paper copy of the subcontracting plan. The offeror is responsible for ensuring that all original paper and electronic copies are identical. Should there be a discrepancy between the paper and electronic versions, the paper copy shall govern.

e. Proposals shall be submitted as follows:

(1) If sent via U. S. Postal Mail/Express Courier:

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC

Construction Contracts Branch (CON33) 258 Makalapa Drive, Suite 100 Pearl Harbor, HI 96860-3134

(2) If hand-carried (Delivery hours between 7:00 AM and 2:00 PM, Monday through Friday, except Federal Holidays):

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC

Construction Contracts Branch (CON33) 4256 Radford Drive, Building 62 (if facing the building, office is on the right. DO NOT drop off at the Navy Federal Credit Union) Honolulu, HI 96818-3296

1.1 INSTRUCTION FOR OBTAINING THE REQUEST FOR PROPOSAL

The RFP can be accessed at https://sam.gov. Printed copies of the RFP will not be issued. Contractors must be registered users on SAM.gov to obtain access to the RFP documents. Look on the SAM.gov website for registration instructions. Once registered, the contractor must request explicit access to view and/or download the documents.

An email will be forwarded once the contracting office has approved or declined the request.

1.2 INSTRUCTIONS FOR SUBMITTING QUESTIONS REGARDING SOLICITATION

Questions regarding the solicitation shall be submitted in writing in WORD format via electronic mail to Adele Murakami, adele.m.murakami.civ@us.navy.mil. Questions shall reference the drawing/detail and/or the specification section including paragraph number. Verbal queries will not be entertained. Responses to the questions will be provided in the form of a Notice and posted to the web site https://sam.gov. Contractors must be registered users on SAM.gov to request explicit access and obtain approval to view and/or download the notices.

The Government may not respond to questions submitted less than 10 business days before the proposal receipt due date.

1.3 AMENDMENTS

Amendments will be posted to https://sam.gov. It is the offeror's responsibility to check the website periodically for any amendments to the solicitation. Contractors must be registered users on SAM.gov to request explicit access and obtain approval to view and/or download the amendments.

1.4 PREAWARD SURVEY/RESPONSIBILITY DETERMINATION

FAR §9.104 requires prospective contractors to demonstrate, among other things, that they have adequate financial resources to perform the contract or the ability to obtain them, capability to comply with the required performance schedule, a satisfactory performance record, and be otherwise eligible to receive an award under applicable laws and

DOCUMENT 00700 (ADVERTISE)

DOCUMENT 00700

NEGOTIATED

CONTRACT CLAUSES

3/21

1.1 FAR 52.252-2, CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

FAR: https://www.acquisition.gov/browse/index/far DFARS: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

1.2 FAR 52.202-1, DEFINITIONS (JUN 2020)

1.3 FAR 52.203-3, GRATUITIES (APR 1984)

1.4 FAR 52.203-5, COVENANT AGAINST CONTINGENT FEES (MAY 2014)

1.5 FAR 52.203-6, RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

1.6 FAR 52.203-7, ANTI-KICKBACK PROCEDURES (JUN 2020)

1.7 FAR 52.203-8, CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

1.8 FAR 52.203-10, PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

1.9 FAR 52.203-12, LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

1.10 FAR 52.203-13, CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (JUN 2020)

1.11 FAR 52.203-14, DISPLAY OF HOTLINE POSTER(S) (JUN 2020)

1.12 FAR 52.203-17, CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO

INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)

1.13 FAR 52.203-19, PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

1.14 FAR 52.204-2, SECURITY REQUIREMENTS (MAR 2021) ALTERNATE II (APR 1984)

1.15 FAR 52.204-4, PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT

PAPER (MAY 2011)

1.16 FAR 52.204-9, PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

1.17 FAR 52.204-10, REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

1.18 FAR 52.204-13, SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

1.19 FAR 52.204-14, SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)

1.20 FAR 52.204-18, COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(a) Definition. As used in this clause–

Commercial and Government Entity (CAGE) code means–

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the

DOCUMENT 00700 (ADVERTISE)

DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

(b) Contractors shall ensure that the CAGE code is maintained throughout the life of the contract for each location of contract, including subcontract, performance. For contractors registered in the System for Award Management (SAM), the DLA Commercial and Government Entity (CAGE) Branch shall only modify data received from SAM in the CAGE master file if the contractor initiates those changes via update of its SAM registration. Contractors undergoing a novation or change-of-name agreement shall notify the contracting officer in accordance with subpart

42.12. The contractor shall communicate any change to the CAGE code to the contracting officer within 30 days after the change, so that a modification can be issued to update the CAGE code on the contract.

(c) Contractors located in the United States or its outlying areas that are not registered in SAM shall submit written change requests to the DLA Commercial and Government Entity (CAGE) Branch. Requests for changes shall be provided at https://cage.dla.mil. Change requests to the CAGE master file are accepted from the entity identified by the code.

(d) Contractors located outside the United States and its outlying areas that are not registered in SAM shall contact the appropriate National Codification Bureau (points of contact available at http://www.nato.int/structur/AC/135/main/links/contacts.htm) or NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx to request CAGE changes.

(e) Additional guidance for maintaining CAGE codes is available at https://cage.dla.mil.

(f) If the contract includes Federal Acquisition Regulation clause 52.204-2, Security Requirements, the contractor shall ensure that subcontractors maintain their CAGE code(s) throughout the life of the contract.

1.21 FAR 52.204-19, INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

The Contractor’s representations and certification, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

1.22 FAR 52.204-21, BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(JUN 2016)

(a) Definitions. As used in this clause–

“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

“Safeguarding” means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

DOCUMENT 00700 (ADVERTISE)

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

1.23 FAR 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)

1.24 FAR 52.204-25, PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

1.25 FAR 52.209-6, PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (JUN 2020)

1.26 FAR 52.209-9, UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (OCT 2018)

1.27 FAR 52.209-10, PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

1.28 FAR 52.210-1, MARKET RESEARCH (JUN 2020)

1.29 FAR 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) Commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed*,

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use not later than 592 calendar days after notice to proceed.

The time stated for completion shall include final cleanup of the premises.

*A "Notice to Proceed" is deemed to be given by the Government to the Contractor 21 calendar days after the contract award date. No formal written notice will be issued by the Government. Within 21 calendar days following the contract award date, the Contractor is obligated to submit performance and payment bonds in a form acceptable to the Government. The Government shall notify the Contractor of the acceptability of the performance and payment bonds within 5 working days of receipt of these documents. If these documents are not submitted in their proper form acceptable to the Government within 21 calendar days of contract award, any delays resulting thereby will be at the sole expense of the Contractor. The contract completion date will not be extended due to the Government's review of the acceptability of the Contractor's bonds, except where the Government's review of said documents extends beyond 5 working days.

1.30 FAR 52.211-12, LIQUIDATED DAMAGES—CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,224 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

1.31 FAR 52.211-13, TIME EXTENSIONS (SEP 2000)

1.32 FAR 52.211-15, DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

1.33 FAR 52.215-2, AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

DOCUMENT 00700 (ADVERTISE)

1.34 FAR 52.215-11, PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--MODIFICATIONS

(JUN 2020)

1.35 FAR 52.215-13, SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS (JUN

2020)

(a) The requirements of paragraphs (b) and (c) of this clause shall—

(1) Become operative only for any modification to this contract involving a pricing adjustment expected to exceed the threshold for submission of certified cost or pricing data in Federal Acquisition Regulation (FAR) 15.403-4(a)(1) on the date of execution of the modification; and

(2) Be limited to such modifications.

(b) Before awarding any subcontract expected to exceed the threshold for submission of certified cost or pricing data in FAR 15.403-4(a)(1), on the date of agreement on price or the date of award, whichever is later; or before pricing any subcontract modification involving a pricing adjustment expected to exceed the threshold for submission of certified cost or pricing data in FAR 15.403-4(a)(1), the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with FAR 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor's estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-4(a)(1) is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.

(c) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (b) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in each subcontract that exceeds the threshold for submission of certified cost or pricing data in FAR 15.403-4(a)(1) on the date of agreement on price or the date of award, whichever is later.

1.36 FAR 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

1.37 FAR 52.215-18, REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS

(PRB) OTHER THAN PENSIONS (JUL 2005)

1.38 FAR 52.215-19, NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

1.39 FAR 52.215-21, REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER

THAN CERTIFIED COST OR PRICING DATA—MODIFICATIONS (JUN 2020)

1.40 FAR 52.219-8, UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)

1.41 FAR 52.219-9, SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2021) ALTERNATE II (NOV 2016)

1.42 FAR 52.219-16, LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (SEP 2021)

1.43 FAR 52.219-28, POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)

1.44 FAR 52.222-1, NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

1.45 FAR 52.222-3, CONVICT LABOR (JUN 2003)

1.46 FAR 52.222-4, CONTRACT WORK HOURS AND SAFETY STANDARDS--OVERTIME

COMPENSATION (MAY 2018)

1.47 FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

1.48 FAR 52.222-26, EQUAL OPPORTUNITY (SEP 2016)

DOCUMENT 00700 (ADVERTISE)

1.49 FAR 52.222-27, AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION

(APR 2015)

1.50 FAR 52.222-35, EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

1.51 FAR 52.222-36, EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

1.52 FAR 52.222-37, EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

1.53 FAR 52.222-40, NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

1.54 FAR 52.222-50, COMBATING TRAFFICKING IN PERSON (OCT 2020)

1.55 FAR 52.222-54, EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

1.56 FAR 52.222-62, PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)

1.57 FAR 52.223-2, AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (SEP 2013)

1.58 FAR 52.223-3, HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB

2021)

1.59 FAR 52.223-5, POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

1.60 FAR 52.223-6, DRUG-FREE WORKPLACE (MAY 2001)

1.61 FAR 52.223-9, ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-

DESIGNATED ITEMS (MAY 2008)

1.62 FAR 52.223-15, ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (MAY 2020)

1.63 FAR 52.223-17, AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND

CONSTRUCTION CONTRACTS (AUG 2018)

1.64 FAR 52.223-18, ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (JUN 2020)

1.65 FAR 52.223-21, FOAMS (JUN 2016)

1.66 FAR 52.224-1, PRIVACY ACT NOTIFICATION (APR 1984)

1.67 FAR 52.224-2, PRIVACY ACT (APR 1984)

1.68 FAR 52.225-11, BUY AMERICAN -- CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS

(JAN 2021) (DEVIATION 2020-O0019) ALTERNATE I (JAN 2021) (DEVIATION 2020-O0019)

1.69 FAR 52.225-13, RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

1.70 FAR 52.227-1, AUTHORIZATION AND CONSENT (JUN 2020)

1.71 FAR 52.227-2, NOTICES AND ASSISTANCE REGARDING PATENT & COPYRIGHT INFRINGEMENT

(JUN 2020)

1.72 FAR 52.227-4, PATENT INDEMNITY -- CONSTRUCTION CONTRACTS (DEC 2007)

1.73 FAR 52.228-1, BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds,

(1) to unsuccessful bidders as soon as practicable after the opening of bids, and

(2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

DOCUMENT 00700 (ADVERTISE)

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 21 days after award of the contract, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

1.74 FAR 52.228-2, ADDITIONAL BOND SECURITY (OCT 1997)

1.75 FAR 52.228-3, WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT)(JUL 2014)

1.76 FAR 52.228-4, WORKER’S COMPENSATION AND WAR HAZARD INSURANCE OVERSEAS (APR

1984)

1.77 FAR 52.228-5, INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

1.78 FAR 52.228-11, PLEDGES OF ASSETS (FEB 2021)(DEVIATION 2020-O0016) (APR 2020)

(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond--

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and

(2) Standard Form 28, Affidavit of Individual Surety, except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12.

(b) The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained--

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.

(c) A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained--

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

DOCUMENT 00700 (ADVERTISE)

(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.

(d) The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.

1.79 FAR 52.228-12, PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)

1.80 FAR 52.228-14, IRREVOCABLE LETTER OF CREDIT (NOV 2014)

1.81 FAR 52.228-15, PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)

(DEVIATION 2020-O0016) (APR 2020)

(a) Definitions. As used in this clause-

Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of the Treasury, Financial Management, Service Surety Bond Branch, 3700 East West Highway, Room 6 F01, DOCUMENT 00700 (ADVERTISE)

Hyattsville, MD 20782.

Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

1.82 FAR 52.229-3, FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

1.83 FAR 52.232-5, PAYMENTS UNDER FIXED - PRICE CONSTRUCTION CONTRACTS (MAY 2014)

1.84 FAR 52.232-17, INTEREST (MAY 2014)

1.85 FAR 52.232-23, ASSIGNMENT OF CLAIMS (MAY 2014) ALTERNATE I (APR 1984)

1.86 FAR 52.232-27, PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)

1.87 FAR 52.232-33, PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

1.88 FAR 52.232-39, UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

1.89 FAR 52.232-40, PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013)

1.90 FAR 52.233-1, DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)

1.91 FAR 52.233-3, PROTEST AFTER AWARD (AUG 1996)

1.92 FAR 52.233-4, APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

1.93 FAR 52.236-1, PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

1.94 FAR 52.236-2, DIFFERING SITE CONDITIONS (APR 1984)

1.95 FAR 52.236-3, SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

1.96 FAR 52.236-4, PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by:

Moffatt & Nichol (Prime)

Duenas, Camacho, and Associates (Topographic Survey) - Survey of the project site was completed using spot elevations surveyed using GPS and Total Station Surveying Equipment in October 2018. The survey is based on Guam Geodedic Network (GGN) No. 949. Elevations are in regards to MSL.

Pacific Geotechnical Engineers, Inc. (Geotechnical Investigation) - Boreholes were drilled using hollow stem augers in areas adjacent to the existing munitions storage igloos.

Myounghee Noh and Associates (HAZMAT and Soil Screening Surveys)

(b) Weather conditions: Refer to respective reports.

DOCUMENT 00700 (ADVERTISE)

(c) Transportation facilities: Roads in the general area are shown on the drawings. Primary access route within AAFB are indicated on the drawings. Access routes shall be investigated by the Contractor to confirm their existence and allowable use.

1.97 FAR 52.236-5, MATERIAL AND WORKMANSHIP (APR 1984)

1.98 FAR 52.236-6, SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

1.99 FAR 52.236-7, PERMITS AND RESPONSIBILITIES (NOV 1991)

1.100 FAR 52.236-8, OTHER CONTRACTS (APR 1984)

1.101 FAR 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

1.102 FAR 52.236-10, OPERATIONS AND STORAGE AREAS (APR 1984)

1.103 FAR 52.236-11, USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

1.104 FAR 52.236-12, CLEANING UP (APR 1984)

1.105 FAR 52.236-13, ACCIDENT PREVENTION (NOV 1991)

1.106 FAR 52.236-14, AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

1.107 FAR 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

1.108 FAR 52.236-17, LAYOUT OF WORK (APR 1984)

1.109 FAR 52.236-21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE I

(APR 1984)

1.110 FAR 52.236-23, RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR (APR 1984)

1.111 FAR 52.236-24, WORK OVERSIGHT IN ARCHITECT-ENGINEER CONTRACTS (APR 1984)

1.112 FAR 52.236-25, REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)

1.113 FAR 52.236-26, PRECONSTRUCTION CONFERENCE (FEB 1995)

1.114 FAR 52.242-5, PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)

1.115 FAR 52.242-13, BANKRUPTCY (JUL 1995)

1.116 FAR 52.242-14, SUSPENSION OF WORK (APR 1984)

1.117 FAR 52.243-4, CHANGES (JUN 2007)

1.118 FAR 52.243-6, CHANGE ORDER ACCOUNTING (APR 1984)

1.119 FAR 52.244-6, SUBCONTRACTS FOR COMMERCIAL ITEMS (JUL 2021)

1.120 FAR 52.246-12, INSPECTION OF CONSTRUCTION (AUG 1996)

1.121 FAR 52.246-21, WARRANTY OF CONSTRUCTION (MAR 1994)

1.122 FAR 52.248-3, VALUE ENGINEERING -- CONSTRUCTION (OCT 2020)

1.123 FAR 52.249-2, TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED - PRICE) (APR

2012) ALTERNATE I (SEP 1996)

1.124 FAR 52.249-10, DEFAULT (FIXED - PRICE CONSTRUCTION) (APR 1984)

1.125 FAR 52.251-1, GOVERNMENT SUPPLY SOURCES (APR 2012)

1.126 FAR 52.252-4, ALTERATIONS IN CONTRACT (APR 1984)

Portions of this contract are altered as follows:

FAR 52.211-10, Commencement, Prosecution, and Completion of Work (APR 1984): Supplemental clarification of “notice to proceed”.

1.127 FAR 52.253-1, COMPUTER GENERATED FORMS (JAN 1991)

1.128 DFARS 252.201-7000, CONTRACTING OFFICER’S REPRESENTATIVE (DEC 1991)

1.129 DFARS 252.203-7000, REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (SEP 2011)

1.130 DFARS 252.203-7001, PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-

CONTRACT-RELATED FELONIES (DEC 2008)

1.131 DFARS 252.203-7002, REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

1.132 DFARS 252.203-7003, AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)

1.133 DFARS 252.203-7004, DISPLAY OF FRAUD HOTLINE POSTER(S) (AUG 2019)

DOCUMENT 00700 (ADVERTISE)

1.134 DFARS 252.204-7000, DISCLOSURE OF INFORMATION (OCT 2016)

1.135 DFARS 252.204-7003, CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

1.136 DFARS 252.204-7004, LEVEL I ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS

(FEB 2019)

1.137 DFARS 252-204-7009, LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY

CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (OCT 2016)

1.138 DFARS 252.204-7012, SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER

INCIDENT REPORTING (DEC 2019)

1.139 DFARS 252.204-7015, NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR

LITIGATION SUPPORT (MAY 2016)

1.140 DFARS 252.204-7018, PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)

1.141 DFARS 252.204-7020, NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(a) Definitions.

Basic Assessment means a contractor's self-assessment of the contractor's implementation of NIST SP 800-171 that—

(1) Is based on the Contractor's review of their system security plan(s) associated with covered contractor information system(s);

(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and

(3) Results in a confidence level of “Low” in the resulting score, because it is a self-generated score.

Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

High Assessment means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that—

(1) Consists of—

(i) A review of a contractor's Basic Assessment;

(ii) A thorough document review;

(iii) Verification, examination, and demonstration of a Contractor's system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor's system security plan; and

(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of “High” in the resulting score.

Medium Assessment means an assessment conducted by the Government that—

(1) Consists of—

(i) A review of a contractor's Basic Assessment;

DOCUMENT 00700 (ADVERTISE)

(ii) A thorough document review; and

(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of “Medium” in the resulting score.

(b) Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, as described in NIST SP 800-171 DoD Assessment Methodology at https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_ implementation_of_NIST_SP_800-171.html, if necessary.

(d) Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) to provide DoD Start Printed Page 61522Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to webptsmh@navy.mil for posting to SPRS.

(i) The email shall include the following information:

(A) Version of NIST SP 800-171 against which the assessment was conducted.

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract—

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:

Expand Table

DOCUMENT 00700 (ADVERTISE)

System security plan

CAGE codes supported by this plan

Brief description of the plan architecture

Date of assessment

Total score Date score of 110 will achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(e) Rebuttals. (1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User's Guide https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).

(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.

(f) Accessibility. (1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause. DoD will retain and protect any such documentation as “Controlled Unclassified Information (CUI)” and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

(g) Subcontracts. (1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items (excluding COTS items).

(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800-171 security requirements, in accordance with DFARS clause 252.204-7012 of this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800-171 DoD Assessment, as described in https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_ implementation_of_NIST_SP_800-171.html, for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.

(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to webptsmh@navy.mil for posting to SPRS along with the information required by paragraph (d) of this clause.

1.142 DFARS 252.205-7000, PROVISIONS OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(DEC 1991)

1.143 DFARS 252.209-7004, SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY

THE GOVERNMENT OF A COUNTRY THAT IS STATE SPONSOR OF TERRORISM (MAY 2019)

1.144 DFARS 252.219-7003, SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)—BASIC

(DEC 2019)

This clause supplements the Federal Acquisition Regulation 52.219-9, Small Business Subcontracting Plan, clause of this contract.

(a) Definitions. As used in this clause—

“Summary Subcontract Report (SSR) Coordinator” means the individual who is registered in the Electronic Subcontracting Reporting System (eSRS) at the Department of Defense level and is responsible for acknowledging receipt or rejecting SSRs submitted under an individual subcontracting plan in eSRS for the Department of Defense.

(b) Subcontracts awarded to qualified nonprofit agencies designated by the Committee for Purchase From People Who Are Blind or Severely Disabled (41 U.S.C. 8502-8504), may be counted toward the Contractor’s small business subcontracting goal (section 8025 of Pub. L. 108-87).

(c) A mentor firm, under the Pilot Mentor-Protege Program established under section 831 of Public Law 101-510, as amended, may count toward its small disadvantaged business goal, subcontracts awarded to—

(1) Protege firms which are qualified organizations employing the severely disabled; and

(2) Former protege firms that meet the criteria in section 831(g)(4) of Public Law 101-510.

(d) The master plan is approved by the Contractor's cognizant contract administration activity.

(e) In those subcontracting plans which specifically identify small businesses, the Contractor shall notify the Administrative Contracting Officer of any substitutions of firms that are not small business firms, for the small business firms specifically identified in the subcontracting plan. Notifications shall be in writing and shall occur within a reasonable period of time after award of the subcontract. Contractor-specified formats shall be acceptable.

(f) (1) For DoD, the Contractor shall submit reports in eSRS as follows:

(i) The Individual Subcontract Report (ISR) shall be submitted to the contracting officer at the procuring contracting office, even when contract administration has been delegated to the Defense Contract Management Agency.

(ii) Submit the consolidated SSR for an individual subcontracting plan to the “Department of Defense.”

(2) For DoD, the authority to acknowledge receipt or reject reports in eSRS is as follows:

(i) The authority to acknowledge receipt or reject the ISR resides with the contracting officer who receives it, as described in paragraph (f)(1)(i) of this clause.

(ii) The authority to acknowledge receipt of or reject SSRs submitted under an individual…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .