TGI_3819P22115T05_c0v0.pdf
PDF 24 KB Posted
- Solicitation number
- N6264925RA059
About this file
This document is a Task Group Instruction (TGI) for a hydrostatic test on Boiler #1B Desuperheater for the USS Blue Ridge (LCC-19), dated 06-MAY-2025. The instruction is part of a naval maintenance project with the component number 22111-2-102KTR, involving contractor, quality assurance (QA), and support/follow (S/F) work to accomplish and document the hydrostatic test in accordance with technical procedure TP 22111-2-102KTR. The document is marked FOUO (For Official Use Only) and includes preparation details from Nakajima Hisato and approval by Ohta Jason Y., with Takahashi Yasuhiko listed as the zone manager. The specific task involves conducting a tightness test for the designated boiler component, with multiple work groups responsible for test documentation and execution.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
06-MAY-2025 1438
20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: T05
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 22111-2-102KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 22111
CU PHASE TITLE: BOILER 1B, DESUPERHEATER (T) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01ZAG0 * EM01ZAG2 * EM01ZAG5 * EM01ZAK4 * EM01ZAG8 * EM01ZAH1 * EM01ZAH2 * EM01ZAH4 * EM01ZAH5 *
EM01ZAH7 * EM01ZAH9 * EM01ZAI2 * EM01ZAI6 * EM02L192
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NAKAJIMA, HISATO 246.2 3152434197 02-MAY-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 05-MAY-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-ZAG0 * EM01-ZAG2 * EM01-ZAG5 * EM01-ZAG8 * EM01-ZAH1 * EM01-ZAH2 * EM01-ZAH4 * EM01-ZAH5 * EM01-ZAH7 *
EM01-ZAH9 * EM01-ZAI2 * EM01-ZAI6 * EM01-ZAK4 * EM02-L192
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1115
Tightness Test for Boiler #1B, Desuperheater.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
06-MAY-2025 1438
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: T05
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 22111-2-102KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 22111
CU PHASE TITLE: BOILER 1B, DESUPERHEATER (T) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 22111-2-102KTR BOILER 1B (S & T) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the hydrostatic test in accordance with reference, TP 22111-2-102KTR.
22/KE PC N
(G) QA work:
Accomplish/document the hydrostatic test in accordance with reference, TP 22111-2-102KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the hydrostatic test in accordance with reference, TP 22111-2-102KTR.
/ EM02 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22115 KEY OP: T05