TGI_3819P22114A11_c1v1.pdf
PDF 60 KB Posted
- Solicitation number
- N6264925RA059
About this file
This document is a Task Group Instruction (TGI) for inspection of a 5-inch lift check valve in the 1A Boiler Economizer Outlet Feed Water System on the USS Blue Ridge (LCC-19). The detailed technical instruction covers a comprehensive mechanical inspection and refurbishment process for a specific valve (V12) manufactured by Anchor/Darling Valve Co., with precise requirements for disassembly, cleaning, testing, and reassembly.
The TGI specifies a contractor work period from January 12, 2026 through May 15, 2027, with specific technical procedures including torque testing of body-bound studs, liquid penetrant inspection of valve components, visual inspection of sealing surfaces, and installation of a new pressure seal ring. Supporting services will be provided by SRF-JRMC, including crane rigging, utility services, safety inspections, and quality assurance. The document is part of a larger naval maintenance package for the USS Blue Ridge, prepared by naval technical personnel and dated March 4, 2025.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
04-MAR-2025 1346
20.14.15.2.9020 (September 2024) ICN: 3819P22114 KeyOp: A11
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A MF BLR ECN IN CHK V- A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25511
CU PHASE TITLE: (L75-01) F/O – INSP 1A BLR ECONO OUT FEED WATER SYS LIFT CHECK VLV IN 8-76-0-E
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
EM02L194
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
IKEDA, KOUTARO 232 3152430958 24-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
MOMOSE, HARUHISA 232 3152434533 04-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-L194
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 8-76-0-E U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1114
1. SCOPE/PURPOSE:
1.1 Title: 1A Boiler Economizer Outlet Feed Water System Lift Check Valve; inspect
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), 1A Boiler Economizer Outlet Feed Water System Lift Check Valve Mfr: Anchor/Darling Valve Co.
Size: 5.00-Inch IPS Body Material: Cast Carbon Steel Bonnet Type: Pressure Seal (Silver Plate) Valve No: V12 of Ref. No. 3
TGI Short Form
04-MAR-2025 1346
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A11
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A MF BLR ECN IN CHK V- A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25511
CU PHASE TITLE: (L75-01) F/O – INSP 1A BLR ECONO OUT FEED WATER SYS LIFT CHECK VLV IN 8-76-0-E
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3.1.1 Quantity (One EA), Pressure Seal Ring
Material: ASTM A-29, AISI 1005 through 1012 Remarks: PC No. 5 of Ref. No. 4
1.3.1.2 Quantity (One EA), Label Plate
Material: Alum Remarks: SKETCH B of Ref. No. 9
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 5/15/2027
2. PROCEDURE:
2.1 Accomplish a mechanical inspection of each valve listed in 1.3.1, using Ref. No. 3 through Ref. No. 6 for guidance.
2.1.1 Matchmark each valve part.
2.1.2 Disassemble, clean free of foreign matter (including paint), and inspect each part for defects.
2.1.2.1 The removal of body-bound studs only to determine the condition of threads is not required.
2.1.3 Torque test each body-bound stud in accordance with Section 075-8.6.3.2 (d) of Ref. No. 6.
(V) “TORQUE TEST”
2.1.4 Accomplish liquid penetrant (PT) inspection of seat, disc, and body inlay area in accordance with Ref. No. 7.
2.1.4.1 Acceptance criteria must be in accordance with Paragraph 7 of Ref. No. 8, except hairline cracks in hard-faced seat and disc are acceptable provided each valve does not show evidence of leakage.
(I) “PT INSPECT"
2.1.5 Inspect sealing surfaces of each inlay area and bonnet.
2.1.5.1 Inspect valve body to verify that stainless steel inlay is free of steam cuts and cracks and that diameter of inlay area is round to within 0.003 inch and free of non-design taper. Measure diameter at top and bottom of inlay area in increments of 45 degrees, on each circle. Inlay diameter must not exceed oversize number one diameter, plus 0.002 to 0.005-inch clearance described by Ref. No. 9.
(V) “VISUAL INSPECTION”
2.1.6 Assemble each valve in accordance with Ref. No. 3 and Ref. No. 4.
2.1.6.1 Fabricate and install each new pressure seal ring listed in 1.3.1.1 in accordance with Ref. No. 9, using Ref. No. 10 for guidance.
04-MAR-2025 1346
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A11
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A MF BLR ECN IN CHK V- A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25511
CU PHASE TITLE: (L75-01) F/O – INSP 1A BLR ECONO OUT FEED WATER SYS LIFT CHECK VLV IN 8-76-0-E
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
2.1.6.2 Accomplish a silver plating of the pressure seal ring listed in 1.3.1.1 in accordance with General Note 4 of Ref. No. 9 and
ASTM B 700.
2.1.6.3 Attach a label plate listed in 1.3.1.2 to the valve bonnet indicating the size of seal ring installed, straight or tapered body neck, name of installing activity, and date of installation.
2.1.7 Submit one legible copy, in hard copy, or approved transferrable media, of a report listing results of the requirements of 2.1 to the SUPERVISOR.
2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.3 Notes:
2.3.1 Planner: Code 232 K. Ikeda, 243-0958
Planner: Code 233 K. Uchimura, 080-9350-1432
2.3.2 Zone Manager (ZM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1A Boiler report dated 17 OCT 2024, Line Item L75-01.
2.3.4 Removal lagging as interference is covered by TGI No. 3819P22101-A01.
2.3.5 JCN EM02-L194 is related to this TGI.
2.4 Government Furnished Material (GFM):
2.4.1 SRF-JRMC will provide GFM listed in Material List.
2.5 SRF-JRMC will provide following service work: (TGI No. 3819P22114-S14).
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) Symbol(s).
04-MAR-2025 1346
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A11
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A MF BLR ECN IN CHK V- A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25511
CU PHASE TITLE: (L75-01) F/O – INSP 1A BLR ECONO OUT FEED WATER SYS LIFT CHECK VLV IN 8-76-0-E
FOUO Pg 4 of 5
OTHER SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N 3 DWG 208-2492086 Feed SUCT & DISCH & TRANS
Piping -Plan H N
4 DWG 1S-595-5 5"-600# GLOBE LIFT CHECK
VALVE CAST CARBON STEEL
PRESSURE SEAL TYPE,
BUTT WELD E
E N
5 TM 0948-LP-012-
Standard Navy Valves 31 N
6 TM S9086-CJ-STM-
010/CH-075
Fasteners 7 N
7 TM T9074-AS-GIB-
010/271
Requirements for Nondestructive Testing Methods
1 N
8 MIL MIL-STD-2035 Nondestructive Testing Acceptable Criteria
A N
9 DWG 803-6074287 Repair Guide Pressure Seal Valves
A N
10 DWG 803-5001021 Pressure Seal Rings Standard and Oversize Valves Pressure Seal Class 600 - 1500
E N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 OMCH: HRs, IMCH: HRs, RGRS: HRs, ELEC: HRs 22/KE PC N
2.2 PNTR: HRs 22/KE PC N
Outside Machinist Work CFM for gasket, fasteners, and misc. 22/MQ CS N
Electrical Work CFM for silver plating solution and misc, 22/MQ CS N
Process Funding Document. 10/CT OM N
Version-1: modify Procedure 2.5 SRF-JRMC service work. C232 H.
Momose, 03/04/2025, -/-/N
/ V-01 N
MATERIAL LIST
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22114 KEY OP: A11
04-MAR-2025 1346
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A11
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A MF BLR ECN IN CHK V- A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25511
CU PHASE TITLE: (L75-01) F/O – INSP 1A BLR ECONO OUT FEED WATER SYS LIFT CHECK VLV IN 8-76-0-E
FOUO Pg 5 of 5
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M BAR, METAL, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
BAR, METAL, ROUND, 7"DIA,
FORGED CARBON STEEL,
ASTM A29 (1008), FORGING -
OPEN DIE
LL4912661 NA 4 N 1/FT
File details come from the government source that posted it. Updated .