TGI_3819P22114T03_c0v0.pdf
PDF 24 KB Posted
- Solicitation number
- N6264925RA059
About this file
This document is a Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), specifically detailing a tightness and operational test for the Fuel Oil Service System, Piping & Misc (T & OP) - KTR. The TGI is dated 01-MAY-2025 and includes a comprehensive breakdown of work tasks to be performed by contractors, quality assurance personnel, and support/field personnel. The instruction references technical procedure TP 26111-3-300KTR and provides a structured framework for executing and documenting the required testing and operational verification of the fuel oil service system.
The document identifies key personnel involved in the task, including Daisuke Saiga (preparer), Jason Y. Ohta (approver), and Yasuhiko Takahashi (zone manager), with associated contact information and organizational codes. The TGI is marked FOUO (For Official Use Only) and contains sections for work certification signatures, material references, and task descriptions, though no specific material list is populated in this version of the document. The instruction is part of a larger naval maintenance effort for the USS Blue Ridge, which is part of a solicitation for repair and maintenance work to be performed at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
01-MAY-2025 0926
20.14.15.2.9020 (September 2024) ICN: 3819P22114 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26111-3-300KTR TT T 3 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 26111
CU PHASE TITLE: FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM02L194
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SAIGA, DAISUKE 246.2 3152432271 17-APR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 29-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-L194
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1114
Tightness & operational test for FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
01-MAY-2025 0926
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26111-3-300KTR TT T 3 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 26111
CU PHASE TITLE: FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 26111-3-300KTR FUEL OIL SERVICE SYS,
PIPING & MISC (T & OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
/ EM02 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22114 KEY OP: T03
File details come from the government source that posted it. Updated .