This document is a Task Group Instruction (TGI) for repairing a crack on the 1A Boiler Casing of the USS Blue Ridge (LCC-19), located in the Fire Room at Commander, Fleet Activities Yokosuka. The specific repair involves conducting visual and liquid penetrant inspections to identify crack ends, drilling 1/8-inch diameter stop holes, grinding out cracks, and performing weld repairs on the boiler's front inner casing, which is made of carbon steel (ASTM A-36, 0.1875 inch thick). The boiler, manufactured by Foster Wheeler Corp, operates at a design pressure of 705 PSIG and a maximum operating pressure of 655 PSIG.

The task is scheduled for execution between January 12, 2026, and May 15, 2027, with SRF-JRMC providing supporting services including crane and rigging, utility services (electrical, air, water, and steam), safety inspections, gas-free inspections, and quality assurance/non-destructive testing (NDT) inspections. The repair also requires special consideration for potential asbestos and lead hazards. Material requirements include machine bolts, nuts, washers, glass cloth, fiberglass insulation, and lagging hooks, with specific stock numbers and quantities listed in the document's material list.

View the file

Other files

File Type Posted
N6264925RA059-0006.pdf PDF
Attachment II Price Proposal Breakdown Form N6264925RA059_REV1.xlsx XLSX spreadsheet
N6264925RA059-0005.pdf PDF
TGI 3819P65416A01_c1v2.pdf PDF
N6264925RA059-0004.pdf PDF
TGI 3819P22114A12_c0v1.pdf PDF
N6264925RA059-0003.pdf PDF
DWG_NMP-162_D_.pdf PDF
TGI 3819P43701A01_c2v1.pdf PDF
DWG_2492510_81994_C_.pdf PDF
N6264925RA059-0002.pdf PDF
TGI_3819P22114A11_c1v2.pdf PDF
N6264925RA059-0001.pdf PDF
TGI_3819P123AGT02_c0v0-TT_rev.pdf PDF
TGI_3819P22114A11_c1v1.pdf PDF
TGI_3819P123AGT08_c0v0.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_3819P25001T03_c0v0.pdf PDF
TGI_3819P22114A13_c0v1.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P43701T01_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P22124A01_c0v0.pdf PDF
TGI_3819P22114A17_c0v0.pdf PDF
TGI_3819P25001A01_c1v0.pdf PDF
TGI_3819P65416A01_c0v1.pdf PDF
TGI_3819P22114A08_c1v1.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P22115A10_c0v0.pdf PDF
TGI_3819P22115A04_c0v0.pdf PDF
TGI_3819P22115A08_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P22115A02_c1v1.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114A09_c1v1.pdf PDF
TGI_3819P123AGT06_c0v0.pdf PDF
TGI_3819P22115T03_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
TGI_3819P22114A04_c1v1.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P25507A01_c0v0.pdf PDF
TGI_3819P43701T02_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
TGI_3819P25001T02_c0v0.pdf PDF
TGI_3819P22114A06_c1v1.pdf PDF
TGI_3819P22115A12_c0v0.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL).pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-MAR-2025 1407

20.14.15.2.9020 (September 2024) ICN: 3819P22114 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER BO A 6 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(D11-1) F/O - REPAIR CRACK ON 1A BOILER CASING

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EM02L194

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKEMOTO, HIROTAKA 234 3152434479 07-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

HARADA, HIDEO 234 3152435176 28-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L194

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI, YASUHIKO 8-76-0-E U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1114

1. SCOPE/PURPOSE:

1.1 Title: Crack of Inner Casing of 1A Boiler; repair

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3.1 Quantity (One EA), Boiler, Main Propulsion, 1A

Mfr: Foster Wheeler Corp Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG

APL: 021550096

1.3.1.1 Quantity (One AY), Front Inner Casing, 1A Boiler

Casing Material: Carbon Steel, ASTM A-36, 0.1875 Inch THK

TGI Short Form

03-MAR-2025 1407

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER BO A 6 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(D11-1) F/O - REPAIR CRACK ON 1A BOILER CASING

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

Remarks: See Sketch Encosure-01 for details.

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.5.2 Potential Lead Hazard

1.6 Contractor Start Date: 1/12/2026

1.7 Contractor Work Completion Date: 5/15/2027

2. PROCEDURE:

2.1 Repair each crack on the casing listed in 1.3.1.1, using Ref. No. 3 and Enclosure-01 for guidance.

2.1.1 Accomplish visual inspection and liquid penetrant inspection (PT) to identify each crack end.

2.1.2 Drill 1/8 inch diameter stop hole(s) on end of crack and weld repair.

2.1.3 Grind out each crack prior to weld repair.

2.1.4 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column A, Lines One through 7.

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 H.Takemoto, 243-4479

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 JCN EM02-L194 is related to this TGI.

2.3.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1A Boiler report dated 17 OCT 2024, Line item “D11-1”.

2.3.5 Removal and installation each boiler outer casing and interior lagging for Asbestos Contain Material have been covered by TGI No. 3819P22103A01.

2.3.6 Removal and installation each boiler outer casing exterior lagging have been covered by TGI No. 3819P22101A01 and 3819P22102A01.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

03-MAR-2025 1407

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER BO A 6 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(D11-1) F/O - REPAIR CRACK ON 1A BOILER CASING

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.5 SRF-JRMC will provide the following service work: (TGI No: 3819P22114S04)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Provide utility service, electrical.

2.5.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Provide safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Provide gas free inspection for SRF-JRMC employees.

2.5.6 [C133] Provide QA inspection for (G) symbols.

2.5.7 [C135] Provide NDT inspection for (G) symbol(s).

03-MAR-2025 1407

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER BO A 6 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(D11-1) F/O - REPAIR CRACK ON 1A BOILER CASING

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-GY-STM-

010/CH-221

Boilers 8 N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 BLRM HRs, INSL HRs, WELD HRs, QA HRs, PNTR HRs 22/KE PC N

2.2 PNTR HRs , QA HRs 22/KE PC N

CFM for firewatch cost, welding rod, marine chemist cost, PT inspection cost, asbestos sampler and analysis cost, and MISC such as covering material, plastic bags, and etc.

22/MQ CS N

Process Funding Document 10/CT OM N

Version-1: Revise incorrect reference sequence C234 H.HARADA 2/14/2025 -/-/N

/ V-01 N

Version-2: Revise incorrect initial condition C234 H.HARADA 2/27/2025 -/-/N

/ V-02 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M BOLT,MACHINE, ORDERED

FOR KTR

ORIG: C234 H.TAKEMOTO 243-

9B 5306 002083988 NA 4 N 50305189

400/EA

002 M NUT,PLAIN,HEXAGON,

ORDERED FOR KTR

C234 H.TAKEMOTO 243-4479

9B 5310 010825343 NA 4 N 50305191

400/EA

003 M WASHER,FLAT, ORDERED

FOR KTR

C234 H.TAKEMOTO 243-4479

9B 5310 008238803 NA 4 N 50305188 4/PG

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22114 KEY OP: A03

03-MAR-2025 1407

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A BOILER BO A 6 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(D11-1) F/O - REPAIR CRACK ON 1A BOILER CASING

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

004 M CLOTH,PLAIN WEAVE, H/W

GLASS CLOTH, COLOR IS

NATURAL

C234 H.TAKEMOTO 243-4479

ORDERED FOR KTR

9B 8305 001487364 NA 4 N 50305190 1/RO

005 M INSULATI, INSULATION,

FIBROUS GLASS, THERMAL,

BLANKET WITHOUT BINDER,

UNFACED, SIZE: 5FT W X 45FT

L X 1"THK, MIL-DTL-32585,

TYPE I, FORM 3, NSN: 5640-00-

173-6591 (NSN MISTAKENLY

INDICATES FACING D, BUT

CORRECT ITEM IN THIS NSN

IS UNFACED.)

C234 H.TAKEMOTO 243-4479

ORDERED FOR KTR

9Q 5640 LL9607458 NA 4 N 50317418 1/RO

006 M HOOK & WASHER, P/N:

LAGGING HOOK & WASHER

STEEL LARGE SIZE, 500 EA

PAIR PER PG

THIS IS SPECIAL ORDER

MAT'L FOR USING LAGGING

PADS.

C234 H.TAKEMOTO 243-4479

ORDERED FOR KTR

9B 5340 LL4661528 NA 4 N 50317801 3/PG

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P22114A03-Sketch.pdf 30-JAN-2025 0000

3819P22114A03

SKETCH

ENCLOSURE-01

SHEET 1 of 1

Hirotaka.Takemoto.ja Line

Hirotaka.Takemoto.ja_1 Line

Hirotaka.Takemoto.ja_2 Line

Hirotaka.Takemoto.ja_3 Oval

Hirotaka.Takemoto.ja_4 Line

Hirotaka.Takemoto.ja_5 Line

Hirotaka.Takemoto.ja_6 Oval

Hirotaka.Takemoto.ja_7 Line

Hirotaka.Takemoto.ja_8 Line

Hirotaka.Takemoto.ja_9 Line

Hirotaka.Takemoto.ja_10 Text Box

PIC 1

Hirotaka.Takemoto.ja_11 Text Box

PIC 2

Hirotaka.Takemoto.ja_12 Rectangle

Hirotaka.Takemoto.ja_13 Rectangle

Hirotaka.Takemoto.ja_14 Text Box

1A BOILER CASING

Hirotaka.Takemoto.ja_15 Text Box The crack extends towards the back

Hirotaka.Takemoto.ja_16 Line

Hirotaka.Takemoto.ja_17 Line

Hirotaka.Takemoto.ja_18 Line

Hirotaka.Takemoto.ja_19 Line

Hirotaka.Takemoto.ja_20 Line

File details come from the government source that posted it. Updated .