This document is a Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) detailing a boiler desuperheater tightness test for the 1B Boiler. The task involves installing and removing test fittings on the desuperheater outlet piping, with work to be performed by a contractor between January 12, 2026, and May 15, 2027, at the Commander, Fleet Activities Yokosuka Naval Base in Japan. The specific objectives include conducting a tightness test for mechanical joints of the desuperheater, removing and reinstalling blank flanges, and replacing gaskets in accordance with specified military standards.

The TGI includes detailed technical specifications for the Foster Wheeler Corporation boiler, with a design pressure of 705 PSIG and maximum operating pressure of 655 PSIG. SRF-JRMC will provide supporting services including crane and rigging, utilities (low pressure air, water, and steam supply), safety inspections, gas-free inspections, and quality assurance inspections. The document specifies a cleanliness requirement for piping system/equipment at Level II and notes a potential asbestos hazard. The task is in response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated October 17, 2024.

View the file

Other files

File Type Posted
N6264925RA059-0006.pdf PDF
Attachment II Price Proposal Breakdown Form N6264925RA059_REV1.xlsx XLSX spreadsheet
N6264925RA059-0005.pdf PDF
TGI 3819P65416A01_c1v2.pdf PDF
N6264925RA059-0004.pdf PDF
TGI 3819P22114A12_c0v1.pdf PDF
N6264925RA059-0003.pdf PDF
DWG_NMP-162_D_.pdf PDF
TGI 3819P43701A01_c2v1.pdf PDF
DWG_2492510_81994_C_.pdf PDF
N6264925RA059-0002.pdf PDF
TGI_3819P22114A11_c1v2.pdf PDF
N6264925RA059-0001.pdf PDF
TGI_3819P123AGT02_c0v0-TT_rev.pdf PDF
TGI_3819P22114A11_c1v1.pdf PDF
TGI_3819P123AGT08_c0v0.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_3819P25001T03_c0v0.pdf PDF
TGI_3819P22114A13_c0v1.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P43701T01_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P22124A01_c0v0.pdf PDF
TGI_3819P22114A17_c0v0.pdf PDF
TGI_3819P25001A01_c1v0.pdf PDF
TGI_3819P65416A01_c0v1.pdf PDF
TGI_3819P22114A08_c1v1.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P22115A10_c0v0.pdf PDF
TGI_3819P22115A04_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P22115A02_c1v1.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114A09_c1v1.pdf PDF
TGI_3819P123AGT06_c0v0.pdf PDF
TGI_3819P22115T03_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
TGI_3819P22114A03_c2v2.pdf PDF
TGI_3819P22114A04_c1v1.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P25507A01_c0v0.pdf PDF
TGI_3819P43701T02_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
TGI_3819P25001T02_c0v0.pdf PDF
TGI_3819P22114A06_c1v1.pdf PDF
TGI_3819P22115A12_c0v0.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL).pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

05-MAR-2025 1729

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A08

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 9 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(H9-01) F/O - ACCOMPLISH SET UP AND RST OF 1B BLR DSUPHTR TIGHTNESS TEST

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KIMURA, REIYA 234 7076038983 11-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

HARADA, HIDEO 234 3152435176 12-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 8-76-0-E U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1. SCOPE/PURPOSE:

1.1 Title: Set Up and Restoration for 1B Boiler Desuperheater Tightness Test; accomplish

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Boiler, Main Propulsion, 1B

Mfr: Foster Wheeler Corp.

Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG

FSCM: 23230

APL: 021550096

TGI Short Form

05-MAR-2025 1729

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A08

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 9 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(H9-01) F/O - ACCOMPLISH SET UP AND RST OF 1B BLR DSUPHTR TIGHTNESS TEST

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard.

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 5/15/2027

2. PROCEDURE:

2.1 Accomplish the requirements of 099-906YO of Ref. No. 2.

2.1.1 Accomplish the requirements of 009-09 of Ref. No. One.

2.2 Install test fitting to the desuperheater outlet piping of the boiler listed in 1.3.1 to accomplish tightness test for each mechanical joint of the desuperheater after reinstallation, using Ref. No. 3, Ref. No. 4 and Enclosure-01 for guidance.

2.2.1 Remove blank flange from the boiler desuperheater outlet piping.

2.3 Remove test fitting from the desuperheater outlet piping of the boiler listed in 1.3.1 after completion of tightness test for the desuperheater, using Ref. No. 3, Ref. No. 4 and Enclosure-01 for guidance.

2.3.1 Install blank flange to the boiler desuperheater outlet piping.

2.3.1.1 Remove existing and install new gasket conforming to MIL-G-24716.

2.4 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.5 Notes:

2.5.1 Planner: Code 234 R. Kimura, 070-7603-8983

2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.5.3 Tightness Test for mechanical joints of the desuperheater will be covered by T-Phase.

2.5.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line item “H9-01”.

2.5.5 JCN EM02-L192 is related to this TGI.

2.6 Government Furnished Material (GFM):

2.6.1 SRF-JRMC will provide GFM listed in the Material List.

2.7 SRF-JRMC will provide the following service work: (TGI No. 3819P22115S09)

05-MAR-2025 1729

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A08

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 9 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(H9-01) F/O - ACCOMPLISH SET UP AND RST OF 1B BLR DSUPHTR TIGHTNESS TEST

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

2.7.1 [C740] Crane and crane rigging service.

2.7.2 [X99E] Utilities service.

2.7.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

2.7.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.7.6 [C133] QA Inspection for (G) symbol(s).

05-MAR-2025 1729

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A08

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER BO A 9 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 22111

CU PHASE TITLE: *(H9-01) F/O - ACCOMPLISH SET UP AND RST OF 1B BLR DSUPHTR TIGHTNESS TEST

FOUO Pg 4 of 4

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II.

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 514-2492519 600LB H.P. AUX STM-SECT D Y ALL

4 DWG 514-2492520 600 LB H.P. AUX STM-L/M D Y SH

6A, SH

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 QA HRs 22/KE PC N

2.2 BLRM HRs, INSL HRs 22/KE PC N

2.3 BLRM HRs, INSL HRs, PNTR HRs, QA HRs 22/KE PC N

2.4 PNTR HRs, QA HRs 22/KE PC N

CFM for asbestos sampler and analysis cost, all paint, covering materials and other consumable.

22/MQ CS N

Process Funding Document 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M GASKET,SPIRAL WOUND,

GASKET SPIRAL WOUND

1"IPS

C-234 R.KIMURA, 070-7603-

ORDERED FOR KTR

9B 5330 013387833 NA 4 N 50435079 2/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P22115A08-Sketch.pdf 12-FEB-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A08

3819P22115A08

SKETCH

ENCLOSURE-01

Sheet 1 of 1

Reiya.Kimura.ja Text Box Desuperheater Outlet Piping

Reiya.Kimura.ja_1 Text Box Test Connection

Reiya.Kimura.ja_2 Line

Reiya.Kimura.ja_3 Line

Reiya.Kimura.ja_4 Oval

Reiya.Kimura.ja_5 Line

Reiya.Kimura.ja_6 Oval

Reiya.Kimura.ja_7 Underline

File details come from the government source that posted it. Updated .