This is a Price Proposal Breakdown Form for the USS BLUE RIDGE (LCC-19) DepotShip Repair Availability (DSRA) contract, solicitation number N6264925RA059. The document details 72 specific Task Group Instructions (TGIs) for ship maintenance and repair work to be performed at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan, with a performance period from 12 Jan 2026 through 13 Dec 2027.
The detailed breakdown includes multiple technical work items focused on boiler systems, piping, testing, and various ship system inspections and maintenance, such as tightness and operational tests for steam, feed water, cooling, and auxiliary systems. Despite the extensive list of tasks, all current pricing fields are marked as zero (YEN0), suggesting this is a template or preliminary pricing document. Offerors are required to submit proposals by 16 Jul 2025 at 10:00 AM Japan Standard Time, with prior access request required through DoD SAFE by 9 Jul 2025. The solicitation is specifically intended for sources authorized to operate and do business in Japan.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | N6264925RA059 | CLIN 0001(72 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| SHIP NAME: | USS BLUE RIDGE (LCC-19) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| AVAILABILITY: | 5C1 DSRA | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 72 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 17.45% |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | 3819P123ACA01 | Preserve Fresh Water Ballast (9-86-5-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 3819P123AGA01 | Repair Structural Member in 8-86-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 3819P123AGT01 | Tightness & Operational Test for Potable Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 3819P123AGT02 | Tightness & Operational Test for Main Steam System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 3819P123AGT03 | Tightness & Operational Test for High Pressure Steam Drain System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 3819P123AGT04 | Tightness & Operational Test for Aux Steam System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 3819P123AGT05 | Tightness & Operational Test for Gland Seal and Vent Exhaust System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 3819P123AGT06 | Tightness & Operational Test for Main Feed Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 3819P123AGT07 | Tightness & Operational Test for Steam Exhaust/Escape System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 3819P123AGT08 | Tightness & Operational Test for Main Lube Oil System #1 - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 3819P123AGT09 | Tightness & Operational Test for MAIN/AUXILIARY CONDENSATE SYS - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 3819P123AGT10 | Tightness & Operational Test for Low Pressure Air System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 3819P123AGT11 | Tightness & Operational Test for Circulating/Cooling Sea Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 3819P123AGT12 | Tightness & Operational Test for Firemain System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | 3819P22114A01 | Preserve Bilge Area and Foundation in 8-76-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 16 | 3819P22114A02 | Accomplish Cleaning, Inspection, Alignment of 1A Boiler Smoke lndicator (Periscope) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 17 | 3819P22114A03 | Repair Crack of Inner Casing of 1A Boiler | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 18 | 3819P22114A04 | Inspect 1A Boiler Handhole, Manhole Seat and Plate | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 19 | 3819P22114A05 | Accomplish Set Up and Restoration for 1A Boiler Desuperheater Tightness Test | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 3819P22114A06 | Clean and Adjust Each 1A Boiler Forced Draft Blower (FDB) Shutter | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | 3819P22114A07 | Replace 1A Boiler Steam Atomizing Check Valve with Piping | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 22 | 3819P22114A08 | Replace View Port Gasket and Light of 1A Boiler | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 23 | 3819P22114A09 | Replace Furnace Light and Furnace Camera Wall Box Assembly of 1A Boiler Boiler Combustion Monitoring System (BCMS) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 24 | 3819P22114A10 | Accomplish Hydrostatic Test of 1A Boiler Fuel Oil (FO) Burner Lead Piping | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 25 | 3819P22114A11 | Inspect 1A Boiler Economizer Outlet Feed Water System Lift Check Valve | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 26 | 3819P22114A12 | Remove and Install No. One Deaerating Feed Tank (DFT) Steam Pressure Relief Valve | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 27 | 3819P22114A13 | Clean and Inspect Each 1A Boiler Forced Draft Blower (FDB) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 28 | 3819P22114A14 | Remove and Install 1A Boiler Safety Valves and Pilot Panels | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 29 | 3819P22114A15 | Clean, Inspect, and Lubricate 1A Boiler Low and High Drum Safety Valve Hand Easing Gear Box, Superheater Actuator, and Cables | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 30 | 3819P22114A16 | Accomplish Overhaul of 1A Boiler Safety Valves and Pilot Panels | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 31 | 3819P22114A17 | Inspect and Repair 1A Boiler Side Wall Header Sliding Feet and Outer Casing Bolted Joint Gasket | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 32 | 3819P22114T01 | Tightness & Operational Test for Aux Steam System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 33 | 3819P22114T02 | Tightness & Operational Test for Main Feed Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 34 | 3819P22114T03 | Tightness & Operational Test for FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 35 | 3819P22114T04 | Tightness & Operational Test for 1A BOILER - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 36 | 3819P22114T05 | Tightness & Operational Test for DEAERATING FEED TANK - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 37 | 3819P22114T06 | Tightness Test for Boiler #1A, Desuperheater - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 38 | 3819P22115A01 | Preserve Bilge Area and Foundation in 8-76-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 39 | 3819P22115A02 | Clean and Adjust Each 1B Boiler Forced Draft Blower (FDB) Shutter | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 40 | 3819P22115A03 | Replace 1B Boiler Steam Atomizing Check Valve with Piping | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 41 | 3819P22115A04 | Replace View Port Gasket and Light of 1B Boiler | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 42 | 3819P22115A05 | Replace Furnace Light and Furnace Camera Wall Box Assembly of 1B Boiler Boiler Combustion Monitoring System (BCMS) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 43 | 3819P22115A06 | Accomplish Hydrostatic Test of 1B Boiler Fuel Oil (FO) Burner Lead Piping | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 44 | 3819P22115A07 | Inspect 1B Boiler Handhole, Manhole Seat and Plate | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 45 | 3819P22115A08 | Accomplish Set Up and Restoration for 1B Boiler Desuperheater Tightness Test | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 46 | 3819P22115A09 | Clean and Inspect Each 1B Boiler Forced Draft Blower (FDB) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 47 | 3819P22115A10 | Remove and Install 1B Boiler Safety Valves and Pilot Panels | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 48 | 3819P22115A11 | Accomplish Cleaning, Inspection and Alignment of 1B Boiler Smoke lndicator (Periscope) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 49 | 3819P22115A12 | Accomplish Overhaul of 1B Boiler Safety Valves and Pilot Panels | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 50 | 3819P22115A13 | Clean, Inspect, and Lubricate 1B Boiler Low and High Drum Safety Valve Hand Easing Gear Box, Superheater Actuator, and Cables | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 51 | 3819P22115A14 | Inspect and Repair 1B Boiler Side Wall Header Sliding Feet and Outer Casing Bolted Joint Gasket | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 52 | 3819P22115T01 | Tightness & Operational Test for 1B BOILER - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 53 | 3819P22115T02 | Tightness & Operational Test for FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 54 | 3819P22115T03 | Tightness & Operational Test for Aux Steam System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 55 | 3819P22115T05 | Tightness Test for Boiler #1B, Desuperheater - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 56 | 3819P22124A01 | Accomplish Dry Lay up of 1A/B Boiler | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 57 | 3819P25001A01 | Accomplish SA98081D Forced Draft Blower Vane Actuator | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 58 | 3819P25001T01 | Tightness & Operational Test for Low Pressure Air System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 59 | 3819P25001T02 | Operational Test for Forced Draft Blower System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 60 | 3819P25001T03 | Operational Test for Forced Draft Blower System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 61 | 3819P25001T04 | Operational Test for Forced Draft Blower System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 62 | 3819P25001T05 | Operational Test for Forced Draft Blower System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 63 | 3819P25201A01 | Accomplish S/A 96771D, Engineering Plant Temperature Monitoring System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 64 | 3819P25507A01 | Accomplish Onboard Radiographic Test (RT) Inspection of Piping Welded Joint | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 65 | 3819P25514A01 | Replace Foundation of 1B Auxiliary Machinery Cooling Water (AMCW) Strainer in 8-76-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 66 | 3819P25606A01 | Accomplish Inspection of Main Condenser Scoop Injection Check Valve | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 67 | 3819P25606T01 | Tightness & Operational Test for Circulating/Cooling Sea Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 68 | 3819P26001A01 | Accomplish S/A 88717D, Installation of Main Engine Lube Oil Temperature Switch | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 69 | 3819P43701A01 | Accomplish S/A 88714D, Modification of Deaerating Feed Tank Level Control System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 70 | 3819P43701T01 | Tightness & Operational Test for DEAERATING FEED TANK - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 71 | 3819P43701T02 | Tightness & Operational Test for Main/Auxiliary Condensate System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 72 | 3819P65416A01 | Accomplish Replacement of Trunk Safety Net in 7-75-2-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 73 | |||||||||
| 74 | |||||||||
| 75 | |||||||||
| 76 | |||||||||
| 77 | |||||||||
| 78 | |||||||||
| 79 | |||||||||
| 80 | |||||||||
| 81 | |||||||||
| 82 | |||||||||
| 83 | |||||||||
| 84 | |||||||||
| 85 | |||||||||
| 86 | |||||||||
| 87 | |||||||||
| 88 | |||||||||
| 89 | |||||||||
| 90 | |||||||||
| 91 | |||||||||
| 92 | |||||||||
| 93 | |||||||||
| 94 | |||||||||
| 95 | |||||||||
| 96 | |||||||||
| 97 | |||||||||
| 98 | |||||||||
| 99 | |||||||||
| 100 | |||||||||
| 101 | |||||||||
| 102 | |||||||||
| 103 | |||||||||
| 104 | |||||||||
| 105 | |||||||||
| 106 | |||||||||
| 107 | |||||||||
| 108 | |||||||||
| 109 | |||||||||
| 110 | |||||||||
| 111 | |||||||||
| 112 | |||||||||
| 113 | |||||||||
| 114 | |||||||||
| 115 | |||||||||
| 116 | |||||||||
| 117 | |||||||||
| 118 | |||||||||
| 119 | |||||||||
| 120 | |||||||||
| 121 | |||||||||
| 122 | |||||||||
| 123 | |||||||||
| 124 | |||||||||
| 125 | |||||||||
| 126 | |||||||||
| 127 | |||||||||
| 128 | |||||||||
| 129 | |||||||||
| 130 | |||||||||
| 131 | |||||||||
| 132 | |||||||||
| 133 | |||||||||
| 134 | |||||||||
| 135 | |||||||||
| 136 | |||||||||
| 137 | |||||||||
| 138 | |||||||||
| 139 | |||||||||
| 140 | |||||||||
| 141 | |||||||||
| 142 | |||||||||
| 143 | |||||||||
| 144 | |||||||||
| 145 | |||||||||
| 146 | |||||||||
| 147 | |||||||||
| 148 | |||||||||
| 149 | |||||||||
| 150 | |||||||||
| 151 | |||||||||
| 152 | |||||||||
| 153 | |||||||||
| 154 | |||||||||
| 155 | |||||||||
| 156 | |||||||||
| 157 | |||||||||
| 158 | |||||||||
| 159 | |||||||||
| 160 | |||||||||
| 161 | |||||||||
| 162 | |||||||||
| 163 | |||||||||
| 164 | |||||||||
| 165 | |||||||||
| 166 | |||||||||
| 167 | |||||||||
| 168 | |||||||||
| 169 | |||||||||
| 170 | |||||||||
| 171 | |||||||||
| 172 | |||||||||
| 173 | |||||||||
| 174 | |||||||||
| 175 | |||||||||
| 176 | |||||||||
| 177 | |||||||||
| 178 | |||||||||
| 179 | |||||||||
| 180 | |||||||||
| 181 | |||||||||
| 182 | |||||||||
| 183 | |||||||||
| 184 | |||||||||
| 185 | |||||||||
| 186 | |||||||||
| 187 | |||||||||
| 188 | |||||||||
| 189 | |||||||||
| 190 | |||||||||
| 191 | |||||||||
| 192 | |||||||||
| 193 | |||||||||
| 194 | |||||||||
| 195 | |||||||||
| 196 | |||||||||
| 197 | |||||||||
| 198 | |||||||||
| 199 | |||||||||
| 200 |
1_3819P123ACA01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 1_3819P123ACA01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 1_3819P123ACA01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Preserve Fresh Water Ballast (9-86-5-W) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_3819P123AGA01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 2_3819P123AGA01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 2_3819P123AGA01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Repair Structural Member in 8-86-0-E | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_3819P123AGT01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 3_3819P123AGT01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 3_3819P123AGT01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Potable Water System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_3819P123AGT02
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 4_3819P123AGT02 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 4_3819P123AGT02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Main Steam System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_3819P123AGT03
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 5_3819P123AGT03 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 5_3819P123AGT03 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for High Pressure Steam Drain System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_3819P123AGT04
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 6_3819P123AGT04 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 6_3819P123AGT04 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Aux Steam System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_3819P123AGT05
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 7_3819P123AGT05 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 7_3819P123AGT05 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Gland Seal and Vent Exhaust System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_3819P123AGT06
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 8_3819P123AGT06 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 8_3819P123AGT06 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Main Feed Water System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_3819P123AGT07
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 9_3819P123AGT07 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 9_3819P123AGT07 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Steam Exhaust/Escape System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_3819P123AGT08
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 10_3819P123AGT08 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 10_3819P123AGT08 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Main Lube Oil System #1 - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_3819P123AGT09
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 11_3819P123AGT09 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 11_3819P123AGT09 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for MAIN/AUXILIARY CONDENSATE SYS - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_3819P123AGT10
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 12_3819P123AGT10 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 12_3819P123AGT10 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Low Pressure Air System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_3819P123AGT11
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 13_3819P123AGT11 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 13_3819P123AGT11 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Circulating/Cooling Sea Water System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_3819P123AGT12
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 14_3819P123AGT12 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 14_3819P123AGT12 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Firemain System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_3819P22114A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 15_3819P22114A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 15_3819P22114A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Preserve Bilge Area and Foundation in 8-76-0-E | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_3819P22114A02
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 16_3819P22114A02 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 16_3819P22114A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Accomplish Cleaning, Inspection, Alignment of 1A Boiler Smoke lndicator (Periscope) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_3819P22114A03
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 17_3819P22114A03 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 17_3819P22114A03 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Repair Crack of Inner Casing of 1A Boiler | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_3819P22114A04
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 18_3819P22114A04 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 18_3819P22114A04 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect 1A Boiler Handhole, Manhole Seat and Plate | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_3819P22114A05
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 19_3819P22114A05 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 19_3819P22114A05 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Accomplish Set Up and Restoration for 1A Boiler Desuperheater Tightness Test | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_3819P22114A06
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 20_3819P22114A06 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 20_3819P22114A06 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Adjust Each 1A Boiler Forced Draft Blower (FDB) Shutter | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
21_3819P22114A07
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 21_3819P22114A07 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 21_3819P22114A07 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Replace 1A Boiler Steam Atomizing Check Valve with Piping | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
22_3819P22114A08
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 22_3819P22114A08 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 22_3819P22114A08 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Replace View Port Gasket and Light of 1A Boiler | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
23_3819P22114A09
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 23_3819P22114A09 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 23_3819P22114A09 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Replace Furnace Light and Furnace Camera Wall Box Assembly of 1A Boiler Boiler Combustion Monitoring System (BCMS) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
24_3819P22114A10
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 24_3819P22114A10 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 24_3819P22114A10 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Accomplish Hydrostatic Test of 1A Boiler Fuel Oil (FO) Burner Lead Piping | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
25_3819P22114A11
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 25_3819P22114A11 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 25_3819P22114A11 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect 1A Boiler Economizer Outlet Feed Water System Lift Check Valve | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
26_3819P22114A12
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI 26_3819P22114A12 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA059 | ||||||||||
| SRF-JRMC TGI #: | 26_3819P22114A12 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Remove and Install No. One Deaerating Feed Tank (DFT) Steam Pressure Relief Valve | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .