This document is a Task Group Instruction (TGI) for an overhaul of 1B Boiler Safety Valves and Pilot Panels for the USS Blue Ridge (LCC-19), scheduled for contract work from January 12, 2026, to May 15, 2027. The TGI details the comprehensive maintenance requirements for three specific boiler safety valve and pilot panel assemblies manufactured by Greno Industries Inc., each with unique specifications including different popping pressures ranging from 705 to 730 PSIG.

The work involves a detailed overhaul process including matchmarking parts, complete disassembly and cleaning, inspection for defects, refurbishing existing parts, and installing new components as needed. The contractor must perform shop tests, document test results, and return all equipment with test certification data sheets to SRF-JRMC. The TGI is a response to a Boiler Inspection and Repair Management Information System (BIRMIS) report and is specifically for a contract with the original equipment manufacturer (OEM), Greno Industries Inc.

View the file

Other files

File Type Posted
N6264925RA059-0006.pdf PDF
Attachment II Price Proposal Breakdown Form N6264925RA059_REV1.xlsx XLSX spreadsheet
N6264925RA059-0005.pdf PDF
TGI 3819P65416A01_c1v2.pdf PDF
N6264925RA059-0004.pdf PDF
TGI 3819P22114A12_c0v1.pdf PDF
N6264925RA059-0003.pdf PDF
DWG_NMP-162_D_.pdf PDF
TGI 3819P43701A01_c2v1.pdf PDF
DWG_2492510_81994_C_.pdf PDF
N6264925RA059-0002.pdf PDF
TGI_3819P22114A11_c1v2.pdf PDF
N6264925RA059-0001.pdf PDF
TGI_3819P123AGT02_c0v0-TT_rev.pdf PDF
TGI_3819P22114A11_c1v1.pdf PDF
TGI_3819P123AGT08_c0v0.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_3819P25001T03_c0v0.pdf PDF
TGI_3819P22114A13_c0v1.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P43701T01_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P22124A01_c0v0.pdf PDF
TGI_3819P22114A17_c0v0.pdf PDF
TGI_3819P25001A01_c1v0.pdf PDF
TGI_3819P65416A01_c0v1.pdf PDF
TGI_3819P22114A08_c1v1.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P22115A10_c0v0.pdf PDF
TGI_3819P22115A04_c0v0.pdf PDF
TGI_3819P22115A08_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P22115A02_c1v1.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114A09_c1v1.pdf PDF
TGI_3819P123AGT06_c0v0.pdf PDF
TGI_3819P22115T03_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
TGI_3819P22114A03_c2v2.pdf PDF
TGI_3819P22114A04_c1v1.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P25507A01_c0v0.pdf PDF
TGI_3819P43701T02_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
TGI_3819P25001T02_c0v0.pdf PDF
TGI_3819P22114A06_c1v1.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL).pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

06-MAR-2025 1001

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A12

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR SAF V & PNL AY A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K2-1) - F/O – ACCOMPLISH AN OVERHAUL OF 1B BOILER SAFETY VALVES & PILOT PANELS

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SUZUKI, KOUHEI 232 3152432490 21-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

WATANABE, YOSHIO 232 3152432375 24-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

KANKE, KOUHEI

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1. SCOPE/PURPOSE:

1.1 Title: Overhaul of 1B Boiler Safety Valves and Pilot Panels: accomplish

1.2 Location of Work:

1.2.1 Contractor’s Facility

1.3 Identification:

1.3.1 Quantity (One EA), 1B Boiler High Drum Safety Valve and Pilot Panel Assembly Mfr: Greno Industries Inc.

Specification: MIL-V-24740

1.3.1.1 Quantity (One EA), Safety Valve

Specification: MIL-V-24740, Class I, Style 57 Mfr Id: 6350-357

TGI Short Form

06-MAR-2025 1001

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A12

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR SAF V & PNL AY A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K2-1) - F/O – ACCOMPLISH AN OVERHAUL OF 1B BOILER SAFETY VALVES & PILOT PANELS

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

Size: Inlet 2-1/2-Inch IPS, Outlet 3-1/2-Inch IPS Popping Pressure: 730 PSIG

APL: 88A150412

1.3.1.2 Quantity (One EA), Pilot Panel

Model: 8000

APL: 501550030

1.3.2 Quantity (One EA), 1B Boiler Low Drum Safety Valve and Pilot Panel Assembly Mfr: Greno Industries Inc.

Specification: MIL-V-24740

1.3.2.1 Quantity (One EA), Safety Valve

Specification: MIL-V-24740, Class I, Style 57 Mfr Id: 6350-357 Size: Inlet 2-1/2-Inch IPS, Outlet 3-1/2-Inch IPS Popping Pressure: 720 PSIG

APL: 88A150412

1.3.2.2 Quantity (One EA), Pilot Panel

Model: 8000

APL: 501550030

1.3.3 Quantity (One EA), 1B Boiler Superheater Safety Valve and Pilot Panel Assembly Mfr: Greno Industries Inc.

Specification: MIL-V-24740

1.3.3.1 Quantity (One EA), Safety Valve

Specification: MIL-V-24740, Class I, Style 23 Mfr Id: 6350-323 Size: Inlet 2-1/2-Inch IPS, Outlet 3-1/2-Inch IPS Popping Pressure: 705 PSIG

APL: 88A150422

1.3.3.2 Quantity (One EA), Pilot Panel

Model: 8000

APL: 501550030

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 5/15/2027

2. PROCEDURE:

2.1 Accomplish an overhaul of each equipment listed in 1.3.1 through 1.3.4 in accordance with 2.3.

06-MAR-2025 1001

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A12

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR SAF V & PNL AY A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K2-1) - F/O – ACCOMPLISH AN OVERHAUL OF 1B BOILER SAFETY VALVES & PILOT PANELS

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

2.1.1 Matchmark each part.

2.1.2 Disassemble and clean each internal and external surface free of foreign matter (including paint), and inspect each part for defect.

2.1.3 Refurbish each part not being replaced with new by hand dressing to remove each high spot, burr, abrasion, nick, corrosion, gasket material and foreign matter.

2.1.4 Install new each part and equipment in place of those identified as defective. Each new part and equipment must conform to manufacturer’s specification on material list of 2.3.

2.2 Accomplish shop test of each equipment listed in 1.3.1 through 1.3.3 in accordance with 2.3.

2.2.1 Document each test result.

2.3 Notes:

2.3.1 Planner: Code 232 K. Suzuki, 243-2490

2.3.2 This TGI is for contract to OEM (Gleno Industries Inc)

2.3.3 Return each equipment listed in 1.3.1 through 1.3.3 with test certification data sheet to SRF-JRMC.

2.3.4 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.5 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line item “K2-1”.

2.3.6 JCN EM02-L192 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC Service Work: None.

06-MAR-2025 1001

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A12

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR SAF V & PNL AY A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K2-1) - F/O – ACCOMPLISH AN OVERHAUL OF 1B BOILER SAFETY VALVES & PILOT PANELS

FOUO Pg 4 of 4

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S6435-Q1-MMO-

Remote Operated Pilot Sdafety Valve System for 600 PSI Boilers

6 N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 IMCH: HRs 22/KE PC N

2.2 IMCH: HRs 22/KE PC N

Machinery Work CFM for repair parts and misc such as grease, oil and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A12

File details come from the government source that posted it. Updated .