TGI_3819P22124A01_c0v0.pdf

PDF 185 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 7 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA059
Issued by

About this file

This document is a Task Group Instruction (TGI) for the dry lay-up of 1A/B boilers on the USS Blue Ridge (LCC-19), a naval vessel. The TGI provides detailed instructions for performing maintenance on two Foster Wheeler main propulsion boilers, each with a design pressure of 705 PSIG and maximum operating pressure of 655 PSIG. The work is to be conducted in the Fire Room (8-76-0-E) with a contractor start date of 1/12/2026 and completion date of 5/15/2027.

The document specifies that SRF-JRMC (Ship Repair Facility Japan Maintenance Activity) will provide various support services, including crane and rigging, utility services (electrical, low pressure air, water, and steam), safety inspections, gas-free inspections, and quality assurance inspections. A comprehensive material list is included, detailing items such as plastic sheets, rubber sheets, rivets, nuts, washers, studs, hose clamps, and air ducts required for the boiler dry lay-up process. The instruction references multiple technical documents and standard items to guide the maintenance procedure.

View the file

Other files

File Type Posted
N6264925RA059-0006.pdf PDF
Attachment II Price Proposal Breakdown Form N6264925RA059_REV1.xlsx XLSX spreadsheet
N6264925RA059-0005.pdf PDF
TGI 3819P65416A01_c1v2.pdf PDF
N6264925RA059-0004.pdf PDF
TGI 3819P22114A12_c0v1.pdf PDF
N6264925RA059-0003.pdf PDF
DWG_NMP-162_D_.pdf PDF
TGI 3819P43701A01_c2v1.pdf PDF
DWG_2492510_81994_C_.pdf PDF
N6264925RA059-0002.pdf PDF
TGI_3819P22114A11_c1v2.pdf PDF
N6264925RA059-0001.pdf PDF
TGI_3819P123AGT02_c0v0-TT_rev.pdf PDF
TGI_3819P22114A11_c1v1.pdf PDF
TGI_3819P123AGT08_c0v0.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_3819P25001T03_c0v0.pdf PDF
TGI_3819P22114A13_c0v1.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P43701T01_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P22114A17_c0v0.pdf PDF
TGI_3819P25001A01_c1v0.pdf PDF
TGI_3819P65416A01_c0v1.pdf PDF
TGI_3819P22114A08_c1v1.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P22115A10_c0v0.pdf PDF
TGI_3819P22115A04_c0v0.pdf PDF
TGI_3819P22115A08_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P22115A02_c1v1.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114A09_c1v1.pdf PDF
TGI_3819P123AGT06_c0v0.pdf PDF
TGI_3819P22115T03_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
TGI_3819P22114A03_c2v2.pdf PDF
TGI_3819P22114A04_c1v1.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P25507A01_c0v0.pdf PDF
TGI_3819P43701T02_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
TGI_3819P25001T02_c0v0.pdf PDF
TGI_3819P22114A06_c1v1.pdf PDF
TGI_3819P22115A12_c0v0.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL).pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-DEC-2024 1127

20.14.15.2.9020 (September 2024) ICN: 3819P22124 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EM02L200

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKEMOTO, HIROTAKA 234 3152434479 09-DEC-2024

APPROVED BY: CODE: PHONE: DATE:

IZUMI, NORIAKI 234 3152432243 17-DEC-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L200

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1124

1. SCOPE/PURPOSE:

1.1 Title: Dry Lay up of 1A/B Boiler; accomplish

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Boiler, Main Propulsion, 1A

Mfr: Foster Wheeler Corp Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG

APL: 021550096

TGI Short Form

21-DEC-2024 1127

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (One EA), Boiler, Main Propulsion, 1B

Mfr: Foster Wheeler Corp Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG

APL: 021550096

1.4 Security Classification: None.

1.5 Initial Condition: None

1.6 Contractor Start Date: 1/12/2026

1.7 Contractor Work Completion Date: 5/15/2027

2. PROCEDURE:

2.1 Accomplish dry lay up of the boiler listed in 1.3.1 and 1.3.2 in accordance with paragraph 221-2.3.3.1 of Ref. No. 3, using Ref. No. 4 and Ref. No. 5 for guidance.

2.1.1 Accomplish the requirements of 099-906YO of Ref. No. 2.

2.1.1.1 Accomplish the requirements of 009-09 of Ref. No. One.

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 H.Takemoto, 243-4479

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 JCN EM02-L200 is related to this TGI.

2.3.4 ELM-250053 was issued for the reference of ICN No.3819N22107, and the ELM was also authorized to apply this TGI by Code 260.

2.3.5 ELM-151002 was issued for the reference of CVN -68 class ship, and the ELM was also authorized to apply this TGI by Code 260.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No: 3819P22124S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Provide utility service, electrical.

21-DEC-2024 1127

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.5.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Provide safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Provide gas free inspection for SRF-JRMC employees.

2.5.6 [C133] Provide QA inspection for (G) symbols.

21-DEC-2024 1127

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-GY-STM-

010/CH-221

Boilers 8 N

4 PDD 200-ELM-

250053

TEMPORARY MANHOLE

COVER FOR HOT AIR LAY-

UP, FAB OF

- Y ALL

5 PDD 525-ELM-

151002

STANDARD SETUP

PROCEDURE OF DRY AIR

LAY-UP RIG FOR CVN-68 CL

SHIP CATSTM WET ACC

A Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 BLRM: QA:

2.2 PNTR:

CFM for hot lay up equipment, tape, paint and MISC such as covering material, plastic bags, and etc.

Process Funding Document

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M PLASTIC SHEET, ORIGI:C234

H.TAKEMOTO 243-4479

ORDER FOR KTR

9B 9330 005194300 NA 4 N 1/SH

002 M SHEET,ME, ORIGI:C234

H.TAKEMOTO 243-4479

ORDER FOR KTR

9B 9535 002326868 NA 4 N 3/SH

003 M RUBBER SHEET,SOLID,

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 9320 012303891 NA 4 N 1/SH

004 M RIVET,BLIND, ORIGI:C234

H.TAKEMOTO 243-4479

ORDER FOR KTR

9B 5320 008503282 NA 4 N 1/HD

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22124 KEY OP: A01

21-DEC-2024 1127

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22124 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1A/B BOILER HTD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O – ACCOMPLISH 1A/B BOILER DRY LAY UP

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

005 M NUT,PLAIN,HEXAGON,

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 5310 013722666 NA 4 N 20/EA

006 M WASHER,FLAT, ORIGI:C234

H.TAKEMOTO 243-4479

ORDER FOR KTR

9B 5310 007679425 NA 4 N 1/HD

007 M NUT, HEX, SLFLKG,

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 5310 004114385 NA 4 N 20/EA

008 M STUD,FULLY THREADED,

STUD, FULLY THREADED, SIZE

1/2"-13UNC-1A X 10"LG,

STAINLESS STEEL 18-8, MIN

TENSILE STRENGTH 70000PSI,

MIN ROCKWELL HARDNESS

B72.

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 5307 LL9003873 NA 4 N 10/EA

009 M STANDOFF, THRD, HEX,

STANDOFF, THREADED,

HEXAGON, 1/2-13UNC-2B, 1-

1/4" LONG, CRES 18-8.

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 5340 LL9007282 NA 4 N 10/BA

010 M HOSE,AIR DUCT, ORIGI:C234

H.TAKEMOTO 243-4479

ORDER FOR KTR

HOSE, AIR DUCT, 4"

USING HOT AIR LAY-UP

9B 4720 005402600 NA 4 N 400/FT

011 M CLAMP,HOSE, CLAMP,

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 4730 003551872 NA 4 N 50/EA

012 M CLAMP,HOSE, CLAMP, AIR

DUCT HOSE, CRES 301, MIL-

DTL-8783/1A

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 4730 008382379 NA 4 N 50/EA

013 M HOSE,AIR DUCT, DUCT 6”

ORIGI:C234 H.TAKEMOTO 243-

ORDER FOR KTR

9B 4720 005951719 NA 4 N 50/FT

File details come from the government source that posted it. Updated .