This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, focusing on a Fuel Oil Service System, Piping & Misc Tightness & Operational Test. The TGI is dated 01-MAY-2025 and is associated with Project 19P, System 26111, with a component number of 26111-3-300KTR. The instruction details three primary work tasks:
- Contractor Work (22/KE): Accomplish and document the tightness & operational test in accordance with reference TP 26111-3-300KTR.
- Quality Assurance (QA) Work (33/G1): Perform and document the tightness & operational test using the same reference document.
- S/F (Support/Facilities) Work (EM02): Complete and document the tightness & operational test as specified.
The document is marked FOUO (For Official Use Only) and includes preparation details by Daisuke Saiga and approval by Jason Y. Ohta, both from code 246.2, with preparation and approval dates in April 2025. The instruction is part of the broader naval maintenance process for the USS Blue Ridge, likely preparing for a specific maintenance or readiness evaluation of the vessel's fuel oil service system.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
01-MAY-2025 1254
20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26111-3-300KTR TT T 4 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 26111
CU PHASE TITLE: FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM02L192
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SAIGA, DAISUKE 246.2 3152432271 17-APR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 29-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-L192
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1115
Tightness & Operational Test for FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
01-MAY-2025 1254
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26111-3-300KTR TT T 4 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 26111
CU PHASE TITLE: FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 26111-3-300KTR FUEL OIL SERVICE SYS,
PIPING & MISC (T & OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
/ EM02 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22115 KEY OP: T02