This document is a Task Group Instruction (TGI) for maintenance work on the USS Blue Ridge (LCC-19), specifically focused on cleaning, inspecting, and lubricating the 1B Boiler GIS Safety Valve Operational System. The work involves servicing hand easing gear boxes, safety valve actuators, and associated cables located in the Fire Room, with detailed procedures for lubricating components, removing and installing new lubricating oil and grease, and performing mechanical functional inspections. The contractor work is scheduled to start on 1/12/2026 and complete by 5/15/2027, with SRF-JRMC providing supporting services including crane rigging, utility services, safety inspections, and quality assurance inspections.

The TGI provides specific technical instructions for maintenance on components manufactured by KUT-ROL, including a KR610-3 model cam action speed reducer, with references to multiple drawing and standard item documents. The work is in response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated 17 OCT 2024, and is part of a larger maintenance package for the USS Blue Ridge at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan.

View the file

Other files

File Type Posted
N6264925RA059-0006.pdf PDF
Attachment II Price Proposal Breakdown Form N6264925RA059_REV1.xlsx XLSX spreadsheet
N6264925RA059-0005.pdf PDF
TGI 3819P65416A01_c1v2.pdf PDF
N6264925RA059-0004.pdf PDF
TGI 3819P22114A12_c0v1.pdf PDF
N6264925RA059-0003.pdf PDF
DWG_NMP-162_D_.pdf PDF
TGI 3819P43701A01_c2v1.pdf PDF
DWG_2492510_81994_C_.pdf PDF
N6264925RA059-0002.pdf PDF
TGI_3819P22114A11_c1v2.pdf PDF
N6264925RA059-0001.pdf PDF
TGI_3819P123AGT02_c0v0-TT_rev.pdf PDF
TGI_3819P22114A11_c1v1.pdf PDF
TGI_3819P123AGT08_c0v0.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_3819P25001T03_c0v0.pdf PDF
TGI_3819P22114A13_c0v1.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P43701T01_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P22124A01_c0v0.pdf PDF
TGI_3819P22114A17_c0v0.pdf PDF
TGI_3819P25001A01_c1v0.pdf PDF
TGI_3819P65416A01_c0v1.pdf PDF
TGI_3819P22114A08_c1v1.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P22115A10_c0v0.pdf PDF
TGI_3819P22115A04_c0v0.pdf PDF
TGI_3819P22115A08_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P22115A02_c1v1.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114A09_c1v1.pdf PDF
TGI_3819P123AGT06_c0v0.pdf PDF
TGI_3819P22115T03_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
TGI_3819P22114A03_c2v2.pdf PDF
TGI_3819P22114A04_c1v1.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P25507A01_c0v0.pdf PDF
TGI_3819P43701T02_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
TGI_3819P25001T02_c0v0.pdf PDF
TGI_3819P22114A06_c1v1.pdf PDF
TGI_3819P22115A12_c0v0.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

IKEDA, KOUTARO 232 3152430958 24-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

MOMOSE, HARUHISA 232 3152434533 25-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1. SCOPE/PURPOSE:

1.1 Title: 1B Boiler Low and High Drum Safety Valve Hand Easing Gear Box, Superheater Actuator, and Cables; clean, inspect, and lubricate

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Low and High Drum Safety Valves Hand Easing Gear Box Mfr: KUT-ROL Mfr Dwg: 651201 Model No: KR610-3 Type: Cam Action, Speed Reducer

TGI Short Form

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.1.1 Quantity (2 EA), Cable for Hand Easing Gear Box

1.3.2 Quantity (One EA), Superheater Safety Valve Actuator

Type: Lever Operated Lever Material: Steel, MIL-S-22698 Remarks: MOD PLAN and ELEVATION 87-A on sheet 11 of Ref. No. 5 for detail

1.3.2.1 Quantity (One EA), Cable for Actuator Handle

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 5/15/2027

2. PROCEDURE:

2.1 Clean and lubricate each hand easing gear box listed in 1.3.1, each superheater actuator listed in 1.3.2, and each cable listed in 1.3.1.1 and 1.3.2.1, using Ref. No. 3 through Ref. No. 5, and Preliminary “g” through “m”, and “r” of Ref. No. 6 for guidance.

2.1.1 Remove existing and install each new lubricating oil for hand easing gear box cable end rod, conforming to 2190 TEP.

2.1.2 Remove existing and install each new grease for zerk fittings and cam roller of each hand easing gear box, conforming to

DOD-G-24508.

2.2 Accomplish a mechanical functional inspection of each hand easing gear box listed in 1.3.1 and each superheater actuator listed in 1.3.2 with each cable listed in 1.3.1.1 and 1.3.2.1, using Ref. No. 4 through Ref. No. 6 for guidance.

2.2.1 Verify each hand easing gear box listed in 1.3.1 and each cable listed in 1.3.1.1 for ease of operation and alignment.

Allowable binding: None.

2.2.2 Verify each superheater actuator listed in 1.3.2 and each cable listed in 1.3.2.1 by manually pulling and releasing for ease of operation and alignment. Allowable binding: None.

2.3 Notes:

2.3.1 Planner: Code 232 K. Ikeda, 243-0958

2.3.2 Zone Manager (ZM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line Item K22-01.

2.3.4 Removal and installation of GIS safety valve and pilot panel has been accomplished by KTR TGI No. 3819P22115-A12, Line Item K2-01.

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.3.5 Each cable listed in 1.3.1.1 and 1.3.1.2 has been disconnected from each control panel for low and high drum and superheater safety relief valve during accomplishment of mechanical functional inspection.

2.3.6 JCN EM02-L192 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide following service work: (TGI No. 3819P22115-S13)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) Symbol(s).

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 651201 KUT-ROL MODEL KR610-3

EASING GEAR OPERATOR

ASSEMBLY

D Y ALL

4 DWG 200-8337505 BOILER/ATM ESCAPE

SYSTEM EASING GEAR GIS

HIGH DRUM SAFETY VALVE

- Y ALL

5 DWG 200-6577980 S/A 1371 LCC-19

SUPHTR/LOW DRUM SAFE V

REPL AND ASSOC PP INSTL

B Y ALL

6 MRC 64 Y62U N Cam Action Safety Valve Hand Easing Gear.

- Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 OMCH: HRs, RGRS: HRs 22/KE PC N

2.2 OMCH: HRs 22/KE PC N

Outside Machinist Work CFM for fasteners, connection equipment, and misc.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A13

File details come from the government source that posted it. Updated .