TGI_3819P22115A11_c0v0.pdf

PDF 62 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 7 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA059
Issued by

About this file

This document is a Task Group Instruction (TGI) for cleaning, inspection, and alignment of the 1B Boiler Smoke Indicator on the USS Blue Ridge (LCC-19), located in the Fire Room. The task involves mechanical cleaning and visual inspection of multiple components including a damper unit, lamp unit, reflector unit, and extension vision unit manufactured by Robert H. Wager Company Inc. The work is scheduled to start on 1/12/2026 and complete by 5/15/2027, with SRF-JRMC providing supporting services such as crane rigging, utility services, and quality assurance inspections.

The TGI specifies detailed procedures including disconnecting and matchmarking parts, cleaning with non-inflammable glass cleaner, conducting visual inspections for deterioration or damage, and submitting an inspection report to the supervisor. The document includes a comprehensive material list with 10 specific items to be ordered, such as vision units, felt sheets, mirrors, lamp adapters, and gaskets. The work is part of a response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated 17 OCT 2024 and is associated with Job Control Number EM02-L192.

View the file

Other files

File Type Posted
N6264925RA059-0006.pdf PDF
Attachment II Price Proposal Breakdown Form N6264925RA059_REV1.xlsx XLSX spreadsheet
N6264925RA059-0005.pdf PDF
TGI 3819P65416A01_c1v2.pdf PDF
N6264925RA059-0004.pdf PDF
TGI 3819P22114A12_c0v1.pdf PDF
N6264925RA059-0003.pdf PDF
DWG_NMP-162_D_.pdf PDF
TGI 3819P43701A01_c2v1.pdf PDF
DWG_2492510_81994_C_.pdf PDF
N6264925RA059-0002.pdf PDF
TGI_3819P22114A11_c1v2.pdf PDF
N6264925RA059-0001.pdf PDF
TGI_3819P123AGT02_c0v0-TT_rev.pdf PDF
TGI_3819P22114A11_c1v1.pdf PDF
TGI_3819P123AGT08_c0v0.pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_3819P25001T03_c0v0.pdf PDF
TGI_3819P22114A13_c0v1.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P43701T01_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P22124A01_c0v0.pdf PDF
TGI_3819P22114A17_c0v0.pdf PDF
TGI_3819P25001A01_c1v0.pdf PDF
TGI_3819P65416A01_c0v1.pdf PDF
TGI_3819P22114A08_c1v1.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P22115A10_c0v0.pdf PDF
TGI_3819P22115A04_c0v0.pdf PDF
TGI_3819P22115A08_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P22115A02_c1v1.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114A09_c1v1.pdf PDF
TGI_3819P123AGT06_c0v0.pdf PDF
TGI_3819P22115T03_c0v0.pdf PDF
TGI_3819P123AGT05_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
TGI_3819P22114A03_c2v2.pdf PDF
TGI_3819P22114A04_c1v1.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P25507A01_c0v0.pdf PDF
TGI_3819P43701T02_c0v0.pdf PDF
TGI_3819P123AGT07_c0v0.pdf PDF
TGI_3819P25001T02_c0v0.pdf PDF
TGI_3819P22114A06_c1v1.pdf PDF
TGI_3819P22115A12_c0v0.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

06-MAR-2025 0953

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A11

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1B BOILER SMOKE INDICATOR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TSUNOI, TAKUMA 234 7077872058 21-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

HARADA, HIDEO 234 3152435176 22-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1 SCOPE/PURPOSE:

1.1 Title: Cleaning, Inspection and Alignment of 1B Boiler Smoke lndicator (Periscope); accomplish

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Smoke Indicator (Periscope), 1B Boiler Mfr: Robert H. Wager Company INC.

Mfr: ID: 734 Material of Piping: Aluminum Alloy (5086)

FSCM: 79128

APL: 382030009

TGI Short Form

06-MAR-2025 0953

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A11

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1B BOILER SMOKE INDICATOR

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.1.1 Quantity (One EA), Lamp Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 105A

FSCM: 79128

APL: 382030009

1.3.1.2 Quantity (2 EA), Damper Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 110A

FSCM: 79128

APL: 382030022

1.3.1.3 Quantity (One EA), Reflector Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 95B

FSCM: 79128

APL: 382030009

1.3.1.4 Quantity (One EA), Extension Vision Unit

Mfr: Robert H. Wager Company INC.

Mfr: ID: 100A

FSCM: 79128

APL: 382030021

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 5/15/2027

2 PROCEDURE:

2.1 Accomplish mechanical cleaning of the smoke indicator listed in 1.3.1, using Ref. No. 3, Ref. No. 4 and Paragraph 221-3.5 of Ref. No. 5 for guidance.

2.1.1 Matchmark and Disconnect each part of the smoke indicator for cleaning and inspection.

2.1.2 Clean each scavenging air ports, piping, lamp unit listed in 1.3.1.1, damper unit listed in 1.3.1.2, mirror of the reflector unit listed in 1.3.1.3 and extension vision unit listed in 1.3.1.4, using a non-inflammable glass cleaner, soft, clean, lint-free cloth to apply the cleaner and to buff surface.

2.1.3 Accomplish a visual inspection of smoke indicator for deterioration, pitting, each crack, and area of damage or distortion.

2.1.3.1 Submit one legible copy, in hard copy, or approved transferrable media, of a report listing results of the requirements of

2.1.3 to the SUPERVISOR.

2.1.4 Connect each part of the smoke indicator.

06-MAR-2025 0953

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A11

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1B BOILER SMOKE INDICATOR

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.1.4.1 Adjust each mirror and housing of the reflector unit listed in 1.3.1.3 and extension vision unit listed in 1.3.1.4 of the smoke indicator.

2.1.4.2 Accomplish an alignment check of the smoke indicator.

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 T. Tsunoi, 070-7787-2058

Planner: Code 233 M. Takemura, 080-9350-1458

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 Ship’s Force will conduct alignment check of the smoke indicator.

2.3.4 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line item "K51-01".

2.3.5 JCN EM02-L192 is related to this TGI.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No: 3819P22115S12)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

06-MAR-2025 0953

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A11

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1B BOILER SMOKE INDICATOR

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY25 Local Standard Items - ORG N 3 DWG 200-2492016 Smoke Indicators - ARRGT &

DETS

A Y ALL

4 DWG 731-A GENERAL ARRANGEMENT

OF 3 UNIT TYPE SMOKE

INDICATOR

A Y ALL

5 TM S9086-GY-STM-

010/CH-221

Boilers 8 Y 181

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 BLRM HRs, ELEC HRs, RGRS HRs 22/KE PC N

2.2 PNTR HRs, QA HRs, RGRS HRs 22/KE PC N

CFM for covering material, insulation tape, plastic bags, rope, tyvek suit, fasteners, painting material and other consumable material

(MISC).

22/MQ CS N

Process Funding Document 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M DAMPER UNIT, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

DAMPER UNIT, SMOKE

INDICATOR

PART#110A

9B 4410 010187093 NA 4 N 50525094 2/EA

002 M REFLECTING UNIT ASS, C234

T. TSUNOI 070-7787-2058

ORDER FOR KTR

REFLECTING UNIT, SMOKE

INDICATOR

PART#95A

9B 4410 003780112 NA 4 N 50525099 1/AY

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A11

06-MAR-2025 0953

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A11

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BOILER PERISCOPE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K51-01) F/O – ACCOMPLISH CLN, INSP AND ALIGN OF 1B BOILER SMOKE INDICATOR

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

003 M VISION UNIT, C234 T. TSUNOI

070-7787-2058

ORDER FOR KTR

VISION UNIT, SMOKE

INDICATOR

PART#100A

9B 4410 003780111 NA 4 N 50525100 1/AY

004 M FELT SHEET, C234 T. TSUNOI

070-7787-2058

ORDER FOR KTR

FELT SHEET, VISION UNIT &

REFLECTING UNIT

SMOKE INDICATOR

9B 8305 002618493 NA 4 N 50525101 1/YD

005 M MIRROR,GLASS, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

WATERPROOF MIRROR,

VISION UNIT & REFLECTING

UNIT

SMOKE INDICATOR

9B 9340 006417089 NA 4 N 50525102 2/EA

006 M ADAPTER,LAMP, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

ADAPTER, LAMP, LAMP UNIT

SMOKE INDICATOR

PART#105A

9B 4410 002186244 NA 4 N 50525085 1/AY

007 M NUT,GLAND, C234 T. TSUNOI

070-7787-2058

ORDER FOR KTR

GLAND NUT, LAMP UNIT &

DAMPER UNIT, SMOKE

INDICATOR

9B 5310 010877980 NA 4 N 50525089 2/EA

008 M LAMP,INCANDESCENT, C234

T. TSUNOI 070-7787-2058

ORDER FOR KTR

LAMP BULB, LAMP UNIT,

SMOKE INDICATOR

9B 6240 009273180 NA 4 N 50525086 1/EA

009 M LAMPHOLDER, C234 T.

TSUNOI 070-7787-2058

ORDER FOR KTR

LAMP SOCKET, LAMP UNIT,

SMOKE INDICATOR

PART# 7N

9B 6250 011959128 NA 4 N 50525087 1/EA

010 M GASKET, C234 T. TSUNOI 070-

7787-2058

ORDER FOR KTR

GASKET SHEET, 50" X 50" X

1/16" THK

9B 5330 013922760 NA 4 N 50525090 1/SH

File details come from the government source that posted it. Updated .