This is a pricing template for federal contract P1080 with the FDA for on-base power electrical improvements at Portsmouth Naval Shipyard (PNSY). The solicitation requests line-item prices for a base contract (CLIN 0001) plus fourteen optional contract line items (CLINs 0002-0016). The base scope encompasses upgrades and modifications to shipyard power distribution, energy storage, and onsite generation across multiple work areas, including AC and DC ductbanks, Building 72 demolition and renovation, hazardous materials abatement, pavement, water mains, storm drains, gas mains, excavation and disposal of hazardous and non-hazardous soils, structural fill, crushed stone materials, and miscellaneous unit-priced items for rock removal, hazardous soil handling, hazardous underground pipe removal, hazardous material abatement for lead-based paint, lead dust, uranium-glazed tiles, joint compound, and temporary rail restoration.
The optional items include new 16-inch water main installation (CLIN 0002), water storage tank construction (CLIN 0003), existing 8-inch water main replacement (CLIN 0004), water main cleaning and lining (CLIN 0005), new 20-inch water main installation (CLIN 0006), water pump station improvements (CLIN 0007), auxiliary seawater system work (CLIN 0008), substation building renovation (CLIN 0009), capacitor banks (CLIN 0010), roadway milling and pavement overlay (CLIN 0011), contractor parking (CLIN 0012), employee parking (CLIN 0013), additional natural gas generators (CLINs 0014-0015), and furniture/fixtures for buildings (CLIN 0016, with government estimated price of $14,104). Award is expected on CLIN 0001, with the government reserving the right to award options within 180 calendar days at proposed prices. Contract completion is 1930 calendar days after award. All unit prices and extended totals must be completed; if discrepancies exist, unit price controls. The solicitation includes provisions for material unbalancing evaluation, bonding requirements if options are exercised, and delivery of hazardous materials to the PNSY facility. Estimated quantities are provided for tracking actual quantities during performance, invoiced upon completion based on in-place measurements.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1080 FDA - 100% FINAL PRICE SCHEDULE
06 FEB 2026
Provide line-item prices, where indicated by blank underlines, for the following items:
Line Item Description Quantity
Unit
Unit Price Sub-Total Total Price
0001. BASE PRICE: Total CLIN 0001 Price for Project P-1080 On-Base Power
Electrical Improvements for providing
CLINs 0001.A through 0001.AC for
Drawing Work Areas A, B, C, D, E, F, G, H, J, L, M, N, O, and Other Costs as noted below. The project objectives are to provide upgrades and modifications to shipyard power distribution, energy storage, and onsite generation to increase capacity, capability, and resiliency of the power system in accordance with the drawings and specifications complete, but excluding work provided in another
Priced line Item. See Drawings G-015 through G-023 for Work Area
Designations.
LS
0001.A Subtotal Price for the CLIN 0001 Base
Price Scope that is NOT PRICED in
CLINs 0001.B through 0001.AC. Note that the Option pricing identified in
CLINs 0002 through 0016 are specific to those work scopes and are not to be included in CLIN0001.
LS
0001.B Subtotal of Base Price for Providing
AC Ductbanks as shown on the drawings complete in accordance with the details on drawings and specifications, but excluding work provided in another line item.
LS
0001.C Subtotal of Base Price for Providing
DC Ductbank as shown on the Drawings complete in accordance with the details on the drawings and specifications, but excluding work provided in another line item.
LS
0001.D Subtotal of Base Price for Building 72
Demolition, Renovations and New
Construction as shown on the Drawings complete (incl. switchgear, & electrical equipment) in accordance with the details on the drawings and specifications but excluding work provided in another line item.
LS
0001.E Subtotal of Base Price for Hazardous
Materials within buildings and structures including but not limited to asbestos, low-level radiological contaminants including uranium-glazed tiles, lead based or other hazardous paint, PCBs, and heavy metals indicated by the drawings, specifications, and hazardous material reports, but
LS
excluding work provided in another line item.
0001.F Subtotal of Base Price for Providing 1-inch-thick Wearing Course Pavement complete in accordance with the details on the drawings and specifications but excluding work provided in another line item.
LS
0001.G Subtotal of Base Price for Providing 8-inch Water Main complete in accordance with the drawings and specifications but excluding work provided in another line item.
LS
0001.H Subtotal of Base Price for Providing
12-inch Water Main complete in accordance with the drawings and specifications but excluding work provided in another line item.
LS
0001.I Subtotal of Base Price for Providing
Water Service Connections complete in accordance with the drawings and specifications but excluding work provided in another line item.
LS
0001.J Subtotal of Base Price for Providing
15-inch Storm Drain complete in accordance with the drawings and specifications, but excluding work provided in another line item.
LS
0001.K Subtotal of Base Price for Providing
18-inch Storm Drain complete in accordance with the drawings and specifications, but excluding work provided in another line item.
LS
0001.L Subtotal of Base Price for Excavation and Handling of Hazardous Soils during Base Bid Work shown on
Sheets G-028 through G-035 including, but not limited to, sampling, excavation and stockpiling of all hazardous soils identified in the drawings indicated within outlined areas of pre-characterized soils, including 20 additional samples for further delineation of the pre-characterized and hazardous soils area, and all testing complete in accordance with the drawings and specifications, excluding Disposal and work provided in another line item.
LS
0001.M Subtotal of Base Price for Providing
Gas Main, and B162 and B72 Gas
Regulating Stations complete in accordance with the drawings and specifications, but excluding work provided in another line item.
0001.N Subtotal of Base Price for UNITIL to provide Gas Main, and B162 and B72
Gas Regulating Stations complete in accordance with the drawings and specifications, inclusive of contractor markup and administrative costs but excluding work provided in another line item.
LS
0001.O Subtotal of Base Price for Excavation and Disposal of Non-Hazardous Soils
(common earth) complete in accordance with the drawings and specifications, but excluding work provided in another line item.
LS
0001.P Subtotal of Base Price for Providing
Structural Fill complete in accordance with the drawings and specifications but excluding work provided in another line item.
LS
0001.Q Subtotal of Base Price for Providing
Ordinary Fill complete in accordance with the drawings and specifications but excluding work provided in another line item.
LS
0001.R Subtotal of Base Price for Providing
DOT ¾” Crushed Stone Materials complete in accordance with the drawings and specifications, but excluding work provided in another line item.
LS
0001.S Subtotal of Base Price for Providing
DOT 1-1/2” Crushed Stone Materials complete in accordance with the drawings and specifications, but excluding work provided in another line item.
LS
0001.T Base Scope Unit Price for Providing 10
CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
2,475
EA
0001.U Base Scope Unit Price for Providing 10
CY of Excavation and Handling of
Hazardous Soils for the areas in this
CLIN that have not been previously characterized in the contract documents as having Hazardous Soils including, but not limited to additional samples as necessary, temporarily stockpiling to accommodate the
Government's scheduling of trucks for disposal, and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
EA
0001.V Base Scope Unit Price for Providing 10
LF of Hazardous Underground Pipe and/or Hazardous Pipe/Insulation
Removal per location. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and disposal coordination with PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
EA
0001.W Base Scope Unit Price for Providing 20
SF of Hazardous Material Abatement for Paint Containing Lead, Cadmium, or Chromium Removal within
Buildings). Pricing to include all testing
(expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and disposal in coordination with
PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item
“h” below
EA
0001.X Base Scope Unit Price for Providing 20
SF of Hazardous Material Abatement for Lead Dust within Buildings).
Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and disposal in coordination with
PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item
“h” below
EA
0001.Y Base Scope Unit Price for Providing 10
SF of Hazardous Uranium Glazed Tiles
Removal and Disposal within Buildings to Government Provided Dumpsters.
Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and disposal in coordination with
PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item
“h” below
0001.Z Base Scope Unit Price for Providing 10
LF Hazardous Pipe Insulation Glove
Bag Removal and Disposal (6”-12” Dia.
Pipe). Pricing to testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and disposal in coordination with
PNSY complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item
“h” below
EA
0001.AA Base Scope Unit Price 10 LF for
Providing Hazardous Pipe Insulation
Glove Bag Removal and Disposal (3/4”-
4” Dia. Pipe). Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and disposal in coordination with PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
EA
0001.AB Base Scope Unit Price for Providing 10
SF of Hazardous Joint Compound
Abatement within Buildings to
Government Provided Dumpsters.
Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work including hygienist, monitoring, replacement with select material, handling and coordination with PNSY for disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
EA
0001.AC Base Scope Unit Price for Providing 40
Trackage Feet Temporary Response to unplanned shipyard rail movements and rapidly restore rail. Pricing to include minor Backfill, Ballast, Crushed
Stone, Wood Ties, Two Rail installation for 40 TF of Roadway (80 LF of rail total), and certification complete in accordance with the drawings and specifications, but excluding work provided in another line item., and in accordance with Notes Item “h” below.
0002. OPTION ITEM No. 1: Total CLIN
0002 Price for providing CLINs 0002.A through 0002.C for New 16” Water
Main from the connection at the
Kittery Water District Main to Gate #2
Metering Pit, across Bridge #2, Wyman
Ave to the Bldg. 163 Pump Station, and any associated work with regards to intersecting Sanitary Sewer, the Storm
Drainage and any Rail Impacts as shown in Work Areas R, S F, and T.
Pricing to include excavation, shoring, Bridge 2 Pipe Structural Framing and
Supports, New pipe main installation, Testing, Insulation and Jacketing above ground, Backfill, Temporary Paving, Traffic Control, Bridge and Surface
Restoration, Environmental Mitigation, Dewatering, Shoring, HAZMAT, SCADA, Vibration Monitoring, Archaeological Monitoring, Site
Improvements, Site Restoration, etc., and
General Conditions as required per plans and specifications to complete this Option
Item. See Drawings G-015 through G-
023 for Work Area Designations.
LS
0002.A Subtotal Price Option No. 1 CLIN 0002 for Scope in this Work Area that is
NOT PRICED in the following CLINs
0002.B and 0002.C.
LS
0002.B Option Item No. 1 Unit Price for 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
EA
0002.C Option Item No. 1 Unit Price for
Providing 10 CY of Excavation and
Removal of Hazardous Soils for the areas in this CLIN that have not been previously characterized in the contract documents as having
Hazardous Soils including but not limited to additional sampling as necessary, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal, and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
EA
0003. OPTION ITEM No. 2: Total CLIN
0003 Price for providing the work of 1 $_____________
CLINs 0003.A through 0003.C shown in WORK AREA U: WATER
STORAGE TANK. Included is the Site
Work, and the Tank Structure, tie-in to the Meade Ave Water Main and SCADA to create a fully functioning and integrated water storage tank.
LS
0003.A Subtotal Price Option No. 2 CLIN 0003 for Scope in this Work Area that is
NOT PRICED in the following CLINs
0003.B and 0003.C.
LS
0003.B Option Item No. 2 Unit Price for
Providing 10 CY of Rock Removal and
Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item
“i” below.
EA
0003.C Option Item No. 2 Unit Price for
Providing 10 CY of Excavation and
Removal of Hazardous Soils for the areas in this CLIN that have not been previously characterized in the contract documents as having
Hazardous Soils including but not limited to additional sampling as necessary, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal (if applicable), and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
EA
0004. OPTION ITEM No. 3: Total CLIN
0004 Price for providing CLINs 0004.A through 0004.C to Remove the Existing
8” Water Main. Furnish and
Installation of the 12” Water Main along Meade Ave to the connection @
Building 403, the abandonment and fill of the existing 8”, and any associated work with regards to intersecting
Sanitary Sewer, the Storm Drainage shown in Work Area R. Pricing to include excavation, shoring, pipe bedding, pipe main installation, testing, backfill, temporary paving, traffic control, and surface restoration as required per plans and specifications
LS
0004.A Subtotal Price Option No. 3 CLIN 0004 for Scope in this Work Area that is
NOT PRICED in the following CLINs
0004.B and 0004.C.
0004.B Option Item No. 3 Unit Price for 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
EA
0004.C Option Item No. 3 Unit Price for
Providing 10 CY of Excavation and
Removal of Hazardous Soils for the areas in this CLIN that have not been previously characterized in the contract documents as having
Hazardous Soils including but not limited to additional sampling as necessary, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal (if applicable), and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
EA
0005. OPTION ITEM No. 4: Total CLIN
0005 Price to Clean & Line the
Existing 16” Water Main along Sicard
Street and the Existing 16” Water
Main along John Paul Jones Street shown in Work Area R. Pricing includes excavation, shoring, cleaning, lining installation, testing, backfill, temporary paving, traffic control, and surface restoration as required per plans and specifications
LS
0006. OPTION ITEM No. 5: Total CLIN
0006 Price for Providing the New 20”
Water Main from the connection at the
Kittery Water District Main to Gate #1
Metering Pit, across Bridge #1 to the
Bldg. 163 Pump Station, Removal of the Existing 12” Main, and any associated work with regards to intersecting Sanitary Sewer, the Storm
Drainage and Rail Impacts shown in
Work Areas R, S, and T. Pricing to include excavation, shoring, Bridge 1
Pipe Structural Framing and Supports, New pipe main installation, Testing, Insulation and Jacketing above ground, Backfill, Temporary Paving, Traffic
Control, Bridge and Surface Restoration, Environmental Mitigation, Dewatering, Shoring, HAZMAT, SCADA, Vibration
Monitoring, Archaeological Monitoring, Third Party Commissioning, Site
Improvements, Site Restoration, etc., and
General Conditions as required per plans and specifications to complete this Option
Item. See Drawings G-015 through G-
023 for Work Area Designations.
0007 OPTION ITEM No. 6: Total CLIN
0007 Price for Providing the work shown in Work Area T: WATER
PUMP STATION (B163). Included in this CLIN are the Exterior and Interior
Improvements, as well as SCADA system improvements to result in a fully integrated system per plans and specifications to complete this Option
Item.
LS
0008 OPTION ITEM No. 7: Total CLIN
0008 Price for providing CLINs 0008.A through 0008.C for the Entire Work in
Work Area V: AUXILIARY SEA
WATER SYSTEM (ASW) as required per plans and specifications to complete this Option Item.
LS
0008.A Subtotal Price Option No. 7 CLIN 0008 for Scope in this Work Area that is
NOT PRICED in the following CLINs
0008.B and 0008.C.
LS
0008.B Option Item No. 7 Unit Price for 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
EA
0008.C Excavation and Removal of 10 CY of
Hazardous Soils for areas not characterized in the contract documents as having Hazardous Soils including not limited to additional sampling as necessary, temporarily stockpiling to accommodate the
Government's scheduling of trucks for disposal (if applicable), and testing
(expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item
“h” below.
EA
0009. OPTION ITEM No. 8: Total CLIN
0009 Price for Providing the Entire
Work in WORK AREA K: BUILDING
243 (SUBSTATION 4). Included in this
Subtotal is renovation of the existing
Building 243 (Substation 4), and new
15kV Gear, and SCADA system.
0010. OPTION ITEM No. 9: Total CLIN
0010 Price for Providing the Entire
Work for the Capacitor Banks as required per plans and specifications to complete this Option Item.
LS
0011. OPTION ITEM No. 10: Total CLIN
0011 Price for the Providing the Entire
Work for Complete Roadway Milling and Pavement Overlay on roads impacted, including Striping, Markings, and Loop Detectors as required per plans and specifications to complete this Option
Item.
LS
0012. OPTION ITEM No. 11A: Total CLIN
0012 Contractor Personal Owned
Vehicle Off Installation Parking as required per plans and specifications to complete this Option Item. Included in this bid option, the Contractor to provide off installation parking and transport for all P1080 Prime and Subcontractor
Personal Owned Vehicles (POV). Parking shall be at an offsite parking facility and transport their employees as required to
PNSY. The contractor is required to utilize a pre-established parking lot or parking structure either privately owned or coordinated with the Seacoast area commuting options as required per plans and specifications to complete this Option
Item.
LS
0013. OPTION ITEM No. 11B: Total CLIN
0013 PNSY Employee Parking of
Personal Owned Vehicle (POV) at Off
Installation Parking Location required per plans and specifications to complete this Option Item. Included in this bid option, Contractor to provide a minimum of 100 parking spots at one or multiple designated parking locations within approximately 1.5 Miles or less of one or both access points to PNSY. The contractor is required to utilize a pre-established parking lot or parking structure that has continuous public walkway paths between PNSY and established parking lot or parking structure.
LS
0014. OPTION ITEM No. 12: Total CLIN
0014 Price for Providing the Entire
Work for Two Additional Natural Gas
Generators in Work Area P as required per plans and specifications to complete this Option Item.
TOTAL PRICE FOR CLINs 0001 - 0016 _
GENERAL BID NOTES
a. All work required in accordance with the drawings and specifications must be included in the Contractor’s proposed price.
b. Evaluation will be made on the total sum of Contract Line Item (CLIN) 0001, and the extended total under
Contract Line items 0002, through 0016. For CLINs 0001 through 0016, enter unit price and extended total in space provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provided a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price. All SubCLIN unit cost items are summed together with other SubCLINs under the primary CLIN to form the total cost for that CLIN. Award is expected to be made on CLIN 0001.
c. The Government reserves the unilateral right to award CLIN(s) 0002 through 0016 to the Contractor at the proposed price within 180 calendar days after the contract award. A firm fixed proposed price is required for all
CLINs. No provision is made for economic price adjustment. If Option(s) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11A, 11B, 12, 13, and/or 14 are exercised, the contract completion date remains 1930 calendar days after award of the contract.
d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the CLINS 0002 through 0016 (Options 1 through 14) to the total price for CLIN 0001. In accordance with
FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the
Option(s).
e. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
f. If any of the CLIN(s) 0002 through 0016 are exercised, additional bonding and consent of surety is required.
Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
g. All hazardous material and hazardous soils shall be delivered to the PNSY Hazardous Waste Facility in Building
357 for disposal in accordance with the project specifications.
0015. OPTION ITEM No. 13: Total CLIN
0015 Price for Providing the Entire
Work for One Additional Natural Gas
Generator in Work Area P as required per plans and specifications to complete this Option Item.
LS
0016. OPTION ITEM No. 14: Total CLIN
0016 Price for the entire work to furnish and install FF&E for buildings
B72, and B162 as required per plans and specifications to complete this Option
Item.
Gov’t Est’d
Price: $14,104
HAR Percent
(NTE 5%)
HAR Subtotal
Total FF&E
Estimated Price
h. All subCLINs which provide quantities are estimated quantities for the described scope of work by the respective CLIN. These quantities are for scope not otherwise indicated in the plans, specifications or reports provided with the solicitation. The bidder is to utilize these quantities to establish unit prices and include this subtotal and quantity in the total bid price for the Base Scope and applicable Bid Options. Contractor’s Quality
Control Manager is to track actual quantities and locations, coordinated with and verified by the Contracting
Officer’s Representative prior to execution of the work, for each line item as the work progresses and invoice for actual quantities when completed. All quantities described in this Price Schedule shall be based upon in-place measurements.
i. The quantities shown for CLIN(s) 0001.T and Bid Option CLIN(s) 0002.B, 0003.B, 0004.B and 0008.B associated with rock are estimated quantities that represent the full extent rock anticipated to require removal and disposal for the total scope of the applicable CLIN. The bidder is to utilize these quantities to establish unit prices and include this subtotal and quantity in the total bid price for the Base Scope and applicable Bid Options. Contractor’s Quality
Control Manager is to track actual quantities and locations, coordinated with and verified by the Contracting
Officer’s Representative prior to execution of the work, for each line item as the work progresses and invoice for actual quantities when completed. All quantities described in this Price Schedule shall be based upon in-place measurements.