This document is a comprehensive Price Schedule for Project P1080, dated 30 DEC 2025, detailing a complex electrical infrastructure improvement project at a naval shipyard. The base scope (CLIN 0001) and 14 optional line items cover extensive work including power distribution upgrades, water main installations, hazardous material abatement, utility infrastructure improvements, building renovations, and associated site work. Key work areas include electrical systems, water storage, water mains, pump stations, sea water systems, roadway improvements, and multiple building modifications at Portsmouth Naval Shipyard (PNSY).

The price schedule provides unit pricing for numerous specific tasks, with particular emphasis on hazardous material handling, excavation, pipe installations, and infrastructure upgrades. The government reserves the right to award optional line items (CLINs 0002-0016) within 180 calendar days after contract award, with a total contract completion timeline of 1930 calendar days. Pricing is firm fixed, and actual quantities may vary. Notable requirements include off-site parking for contractor personnel, natural gas generator installations, and comprehensive environmental and site restoration components. All hazardous materials must be delivered to the PNSY Hazardous Waste Facility in Building 357 for proper disposal.

View the file

Other files

File Type Posted
Solicitation Amendment 0010.pdf PDF
Attachment G - Price Proposal Form (Revised Amendment 0009).pdf PDF
Solicitation Amendment 0009.pdf PDF
CSRA Risk Capture Form.xlsx XLSX spreadsheet
Attachment G - Price Proposal Form (Revised Amendment 0008).pdf PDF
Solicitation Amendment 0008.pdf PDF
Solicitation Amendment 0007.pdf PDF
Unitil Subcontracting Redacted.pdf PDF
Attachment G - Price Proposal Form (Revised Amendment 0006).pdf PDF
Solicitation Amendment 0006.pdf PDF
Solicitation Amendment 0005.pdf PDF
Foster Adaptor Redacted.pdf PDF
Solicitation Amendment 0004.pdf PDF
Attachment M - SITE VISIT ATTENDANCE LOG.pdf PDF
Solicitation Amendment 0003.pdf PDF
PPI Responses Amendment 0003.pdf PDF
Solicitation Amendment 0002.pdf PDF
Solicitation Amendment 0001.pdf PDF
Programmable Logic Controllers Redacted.pdf PDF
Backflow Preventer Redacted.pdf PDF
Flow Meter and Strainer Redacted.pdf PDF
Fire Hydrant Redacted.pdf PDF
Attachment D - Historical Small Business Utilization.docx DOCX document
Attachment H - PIEE Vendor Access Instructions.pdf PDF
Attachment I - Approved Identity Proofing Documents.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment E - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment L - Economic Price Adjustment Unit Price Form.pdf PDF
Solicitation - N6247026R0004.pdf PDF
Attachment B - Construction Experience Project Data.docx DOCX document
Attachment F - Individual Small Business Subcontracting Plan.docx DOCX document
Attachment G - Price Proposal Form.docx DOCX document
Attachment J - Criteria for Denying Access to Navy Installations.pdf PDF
Attachment K - DOD CUI Non-Disclosure Agreement.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1080 PRICE SCHEDULE

30 DEC 2025

Provide line item prices, where indicated by blank underlines, for the following items:

Line

Item

Description Quantit y

Unit Unit Price Sub-Total Total Price

0001. BASE PRICE: Total CLIN 0001 Price for

Project P-1080 On-Base Power Electrical

Improvements CLINs 0001.A thru

0001.AC for Drawing Work Areas A, B, C, D, E, F, G, H, J, L, M, N, O, and Other

Costs as noted below. The project objectives are to provide upgrades and modifications to shipyard power distribution, energy storage, and onsite generation to increase capacity, capability, and resiliency of the power system in accordance with the drawings and specifications complete, but excluding work provided in another Priced line Item. See Drawings G-015 thru G-023 for Work Area Designations.

1 LS $_____________ $_____________

0001.A Subtotal Price for the CLIN 0001 Base

Price Scope that is NOT PRICED in

SubCLINs Line Items 0001.B thru

0001.AC. Note that the Option pricing identified in CLINs 0002 thru 00016 are specific to those work scopes and are not to be included in CLIN0001.

1 LS $_____________ $_____________

0001.B Subtotal of Base Price to Furnish and

Install the AC Ductbanks as shown on the drawings complete in accordance with the details on drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.C Subtotal of Base Price to Furnish and

Install DC Ductbank as shown on the

Drawings complete in accordance with the details on the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.D Subtotal of Base Price for Building 72

Demolition, Renovations and New

Construction as shown on the Drawings complete (incl. switchgear, & electrical equipment) in accordance with the details on the drawings and specifications but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.E Subtotal of Base Price for Hazardous

Materials within buildings and structures including but not limited to asbestos, low-level radiological contaminants, lead based or other hazardous paint, PCBs, and heavy metals that the contractor may encounter in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.F Subtotal of Base Price to Furnish and

Install Wearing Course Pavement complete in accordance with the details on the drawings

1 LS $_____________ $_____________

and specifications, but excluding work provided in another line item.

0001.G Subtotal of Base Price to Furnish and

Install 8 inch Water Main complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.H Subtotal of Base Price to Furnish and

Install 12 inch Water Main complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.I Subtotal of Base Price to Furnish and

Install Water Service Connections complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.J Subtotal of Base Price to Furnish and

Install 15-inch Storm Drain complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.K Subtotal of Base Price to Furnish and

Install 18-inch Storm Drain complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.L Subtotal of Base Price for Excavation and

Removal of Hazardous Soils during Base

Bid Work including, but not limited to sampling, excavation, stockpiling, and testing compete in accordance with the drawings and or specifications, excluding Disposal and or work provided in another line item.

1 LS $_____________ $_____________

0001.M Subtotal of Base Price to Furnish and

Install Gas Main complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.N Subtotal of Base Price to Furnish, Install

B162 and B72 Gas Regulating Stations complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.O Subtotal of Base Price for Excavation of

Non-Hazardous Soils (common earth) complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.P Subtotal of Base Price for providing

Structural Fill complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.Q Subtotal of Base Price for providing

Ordinary Fill complete in accordance with the drawings and specifications, but excluding work provided in another line item.

0001.R Subtotal of Base Price for providing ¾”

Crushed Stone Materials complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.S Subtotal of Base Price for providing 1-1/2”

Crushed Stone Materials complete in accordance with the drawings and specifications, but excluding work provided in another line item.

1 LS $_____________ $_____________

0001.T Base Scope Unit Price for Ledge Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.

24,750 CY $_____________ $_____________

0001.U Base Scope Unit Price for providing

Excavation and Removal of Hazardous

Soils for areas not characterized in the contract documents as having Hazardous

Soils including not limited to sampling, temporarily stockpiling to accommodate the

Government's scheduling of trucks for disposal, and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below.

5,100 CY $_____________ $_____________

0001.V Base Scope Unit Price to provide

Hazardous Underground Pipe and/or

Hazardous Pipe/Insulation Removal per location (up to 10 feet in Length). Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below.

100 EA $_____________ $_____________

0001.W Base Scope Unit Price to provide

Hazardous Material Abatement for Paint

Containing Lead, Cadmium, or Chromium

Removal within Buildings). Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below

1,200 SF $_____________ $_____________

0001.X Base Scope Unit Price to provide

Hazardous Material Abatement for Lead

Dust within Buildings). Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below

1,000 SF $_____________ $_____________

0001.Y Base Scope Unit Price to provide

Hazardous Uranium Tiles Removal within

Buildings to Government Provided

Dumpsters. Pricing to include all testing

(expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below

400 SF $_____________ $_____________

0001.Z Base Scope Unit Price to Furnish and

Install Hazardous Pipe Insulation Glove

Bag Removal (6”-12” Dia. Pipe). Pricing to testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below

250 LF $_____________ $_____________

0001.AA Base Scope Unit Price to provide

Hazardous Pipe Insulation Glove Bag

Removal (3/4”- 4” Dia. Pipe). Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below

250 LF $_____________ $_____________

0001.AB Base Scope Unit Price to provide

Hazardous Joint Compound Abatement within Buildings to Government Provided

Dumpsters. Pricing to include all testing

(expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, 400 SF $_____________ $_____________ monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below

0001.AC Base Scope Unit Price to provide

Temporary Response to unplanned shipyard rail movements and rapidly restore rail. Pricing to include minor

Backfill, Ballast, Crushed Stone, Wood Ties, 100lb Two Rail installation for 60 LF of

Roadway (120 lf of rail), certification complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “h” below

60 LF $_____________ $_____________

0002. OPTION ITEM No. 1: Total CLIN 0002

Price to Furnish and Install the New 16”

Water Main from the connection at the

Kittery Water District Main to Gate #2

Metering Pit, across Bridge #2, Wyman

Ave to the Bldg. 163 Pump Station, and any associated work with regards to intersecting Sanitary Sewer, the Storm

Drainage and any Rail Impacts as shown in

Work Areas R, S F, and T. Pricing to include excavation, shoring, Bridge 2 Pipe

Structural Framing and Supports, New pipe main installation, Testing, Insulation and

Jacketing above ground, Backfill, Temporary

Paving, Traffic Control, Bridge and Surface

Restoration, Environmental Mitigation, Dewatering, Shoring, HAZMAT, SCADA, Vibration Monitoring, Archaeological

Monitoring, Site Improvements, Site

Restoration, etc., and General Conditions as required per plans and specifications to complete this Option Item. See Drawings G-

015 thru G-023 for Work Area Designations.

1 LS $_____________ $_____________

0002.A Subtotal Price Option No. 1 CLIN 0002 for

Scope in this Work Area that is NOT

PRICED in the following SubCLINs Line

Items 0002.B and 0002.C.

1 LS $_____________ $_____________

0002.B Option Item No. 1 Unit Price for Ledge

Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “i” below.

2,000 CY $_____________ $_____________

0002.C Option Item No. 1 Unit Price for providing

Excavation and Removal of Hazardous

Soils for areas not characterized in the contract documents as having Hazardous

Soils including not limited to sampling, temporarily stockpiling to accommodate the

550 CY $_____________ $_____________

Government's scheduling of trucks for disposal (if applicable), and testing

(expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.

0003. OPTION ITEM No. 2: Total CLIN 0003

Price to furnish and install the work shown in WORK AREA U: WATER STORAGE

TANK. Included is the Site Work, and the

Tank Structure, tie-in to the Meade Ave

Water Main and SCADA to create a fully functioning and integrated water storage tank.

1 LS $_____________ $_____________

0003.A Subtotal Price Option No. 2 CLIN 0003 for

Scope in this Work Area that is NOT

PRICED in the following SubCLINs Line

Items 0003.B and 0003.C.

1 LS $_____________ $_____________

0003.B Option Item No. 2 Unit Price for Ledge

Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “i” below.

550 CY $_____________ $_____________

0003.C Option Item No. 2 Unit Price for providing

Excavation and Removal of Hazardous

Soils for areas not characterized in the contract documents as having Hazardous

Soils including not limited to sampling, temporarily stockpiling to accommodate the

Government's scheduling of trucks for disposal (if applicable), and testing

(expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.

150 CY $_____________ $_____________

0004. OPTION ITEM No. 3: Total CLIN 0004

Price to Remove the Existing 8” Water

Main. Furnish and Installation of the 12”

Water Main along Meade Ave to the connection @ Building 403, the abandonment and fill of the existing 8”, and any associated work with regards to intersecting Sanitary Sewer, the Storm

Drainage shown in Work Area R. Pricing to include excavation, shoring, pipe bedding, pipe main installation, testing, backfill, temporary paving, traffic control, and surface restoration as required per plans and specifications

1 LS $_____________ $_____________

0004.A Subtotal Price Option No. 3 CLIN 0004 for

Scope in this Work Area that is NOT

PRICED in the following SubCLINs Line

Items 0004.B and 0004.C.

0004.B Option Item No. 3 Unit Price for Ledge

Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “i” below.

600 CY $_____________ $_____________

0004.C Option Item No. 3 Unit Price for providing

Excavation and Removal of Hazardous

Soils for areas not characterized in the contract documents as having Hazardous

Soils including not limited to sampling, temporarily stockpiling to accommodate the

Government's scheduling of trucks for disposal (if applicable), and testing

(expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.

200 CY $_____________ $_____________

0005. OPTION ITEM No. 4: Total CLIN 0005

Price to Clean & Line the Existing 16”

Water Main along Sicard Street and the

Existing 16” Water Main along John Paul

Jones Street shown in Work Area R.

Pricing includes excavation, shoring, cleaning, lining installation, testing, backfill, temporary paving, traffic control, and surface restoration as required per plans and specifications

1 LS $_____________ $_____________

0006. OPTION ITEM No. 5: Total CLIN 0006

Price to Furnish and Install the New 20”

Water Main from the connection at the

Kittery Water District Main to Gate #1

Metering Pit, across Bridge #1 to the Bldg.

163 Pump Station, Removal of the Existing

12” Main, and any associated work with regards to intersecting Sanitary Sewer, the

Storm Drainage and Rail Impacts shown in

Work Areas R, S, and T. Pricing to include excavation, shoring, Bridge 1 Pipe Structural

Framing and Supports, New pipe main installation, Testing, Insulation and Jacketing above ground, Backfill, Temporary Paving, Traffic Control, Bridge and Surface

Restoration, Environmental Mitigation, Dewatering, Shoring, HAZMAT, SCADA, Vibration Monitoring, Archaeological

Monitoring, Third Party Commissioning, Site

Improvements, Site Restoration, etc., and

General Conditions as required per plans and specifications to complete this Option Item.

See Drawings G-015 thru G-023 for Work

Area Designations.

1 LS $_____________ $_____________

0007 OPTION ITEM No. 6: Total CLIN 0007

Price to furnish, install and modify the work shown in Work Area T: WATER

PUMP STATION (B163). Included in this

CLIN are the Exterior and Interior

Improvements, as well as SCADA system improvements to result in a fully integrated system per plans and specifications to complete this Option Item.

0008 OPTION ITEM No. 7: Total CLIN 0008

Price for the entire work to furnish and install the work in Work Area V:

AUXILIARY SEA WATER SYSTEM

(ASW) as required per plans and specifications to complete this Option Item.

1 LS $_____________ $_____________

0008.A Subtotal Price Option No. 7 CLIN 0008 for

Scope in this Work Area that is NOT

PRICED in the following SubCLINs Line

Items 0008.B and 0008.C.

1 LS $_____________ $_____________

0008.B Option Item No. 7 Unit Price for Ledge

Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with

Notes Item “i” below.

375 CY $_____________ $_____________

0008.C Excavation and Removal of Hazardous

Soils for areas not characterized in the contract documents as having Hazardous

Soils including not limited to sampling, temporarily stockpiling to accommodate the

Government's scheduling of trucks for disposal (if applicable), and testing

(expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.

100 CY $_____________ $_____________

0009. OPTION ITEM No. 8: Total CLIN 0009

Price for the entire work to furnish and install WORK AREA K: BUILDING 243

(SUBSTATION 4). Included in this Subtotal is renovation of the existing Building 243

(Substation 4), and new 15kV Gear, and

SCADA system.

1 LS $_____________ $_____________

0010. OPTION ITEM No. 9: Total CLIN 0010

Price for the entire work to furnish and install the Capacitor Banks as required per plans and specifications to complete this

Option Item.

1 LS $_____________ $_____________

0011. OPTION ITEM No. 10: Total CLIN 0011

Price for the entire work to furnish and install Complete Roadway Milling and

Pavement Overlay on roads impacted, including Striping, Markings, and Loop

Detectors as required per plans and specifications to complete this Option Item.

1 LS $_____________ $_____________

0012. OPTION ITEM No. 11A: Total CLIN 0012

Contractor Personal Owned Vehicle Off

Installation Parking as required per plans and specifications to complete this Option

TOTAL PRICE FOR CLINs 0001 - 0016 _

GENERAL BID NOTES

a. All work required in accordance with the drawings and specifications must be included in the Contractor’s proposed price.

Item. Included in this bid option, the

Contractor to provide off installation parking and transport for all P1080 Prime and

Subcontractor Personal Owned Vehicles

(POV). Parking shall be at an offsite parking facility and transport their employees as required to PNSY. The contractor is required to utilize a pre-established parking lot or parking structure either privately owned or coordinated with the Seacoast area commuting options as required per plans and specifications to complete this Option Item.

0013. OPTION ITEM No. 11B: Total CLIN 0013

PNSY Employee Parking of Personal

Owned Vehicle (POV) at Off Installation

Parking Location required per plans and specifications to complete this Option Item.

Included in this bid option, Contractor to provide a minimum of 100 parking spots at one or multiple designated parking locations within approximately 1.5 Miles or less of one or both access points to PNSY. The contractor is required to utilize a pre-established parking lot or parking structure that has continuous public walkway paths between PNSY and established parking lot or parking structure.

1 LS $_____________ $_____________

0014. OPTION ITEM No. 12: Total CLIN 0014

Price for the entire work to furnish and install Two Additional Natural Gas

Generators in Work Area P as required per plans and specifications to complete this

Option Item.

1 LS $_____________ $_____________

0015. OPTION ITEM No. 13: Total CLIN 0015

Price for the entire work to furnish and install One Additional Natural Gas

Generator in Work Area P as required per plans and specifications to complete this

Option Item.

1 LS $_____________ $_____________

0016. OPTION ITEM No. 14: Total CLIN 0016

Price for the entire work to furnish and install FF&E for buildings B72, and B162 as required per plans and specifications to complete this Option Item.

Gov’t

Est’d

Price:

$14,104

HAR Percent

(NTE 5%)

3%

HAR Subtotal

$436

Total FF&E

Estimated Price

$14,540

b. Evaluation will be made on the total sum of Contract Line Item (CLIN) 0001, and the extended total under

Contract Line items 0002, through 0016. For CLINs 0001 through 0016, enter unit price and extended total in space provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provided a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price. Award is expected to be made on

CLIN 0001.

c. The Government reserves the unilateral right to award CLIN(s) 0002 through 0016 to the Contractor at the proposed price within 180 calendar days after the contract award. A firm fixed proposed price is required for all

CLINs. No provision is made for economic price adjustment. If Option(s) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11A, 11B, 12, 13, and/or 14 are exercised, the contract completion date remains 1930 calendar days after award of the contract.

d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the CLINS 0002 through 0016 (Options 1 through 14) to the total price for CLIN 0001. In accordance with

FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the

Option(s).

e. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

f. If any of the CLIN(s) 0002 through 0016 are exercised, additional bonding and consent of surety is required.

Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

g. All hazardous material and contaminated soils shall be delivered to the PNSY Hazardous Waste Facility in

Building 357 for disposal in accordance with the project specifications.

h. The quantities shown for CLIN(s) 0001.U through 0001.AC, and Bid Option CLIN(s) 0002.C, 0003.C, 0004C, and 0008.C, are estimated quantities for the described work that are in addition to the scope of work indicated in the drawings and specifications and must be executed in accordance with the requirements of the contract documents.

These quantities are in addition to the base bid and bid option quantities, as determined by the bidder, that must be included in CLIN(s) 0001.A through 0001.S, and Bid Option CLIN(s) 0002.A, 0003.A, and 0004.A, and 0008.A to complete the full scope of work. The bidder is to utilize these quantities to establish unit prices and include this subtotal and quantity in the total bid price for the Base Scope and applicable Bid Options. The actual quantities may vary in location and/or amount. Contractor’s Quality Control Manager is to track actual quantities and locations, coordinated with and verified by the Contracting Officer’s Representative prior to execution of the work, for each line item as the work progresses and invoice for actual quantities when completed. Applicable locations for these unit price quantities will be any location within the entire project site such that any variation in location will not be cause for a contract modification or change in scope. Actual quantities greater than the estimated amount will be increased via a modification to the contract. Should any quantities not be utilized in performance of the associated scope, the resulting credits shall be available for Government recapture or repurpose.

i. The quantities shown for CLIN(s) 0001.T and Bid Option CLIN(s) 0002.B, 0003.B, 0004.B and 0008.B associated with ledge are estimated quantities that represent the full amount of ledge anticipated to require removal and disposal for the total contract. The bidder is not to include any other ledge removal and disposal scope or cost in other CLINs. The bidder is to utilize these quantities to establish unit prices and include this subtotal and quantity in the total bid price for the Base Scope and applicable Bid Options. The actual quantities may vary in location and/or amount. Contractor’s Quality Control Manager is to track actual quantities and locations, coordinated with and verified by the Contracting Officer’s Representative prior to execution of the work, for each line item as the work progresses and invoice for actual quantities when completed. Applicable locations for these unit price quantities will be any location within the entire project site such that any variation in location will not be cause for a contract modification or change in scope. Actual quantities greater than the estimated amount will be increased via a modification to the contract. Should any quantities not be utilized in performance of the associated scope, the resulting credits shall be available for Government recapture or repurpose.