Attachment G - Price Proposal Form (Revised Amendment 0006).pdf
PDF 462 KB Posted
- Solicitation number
- N6247026R0004
About this file
This is a Pricing Template for Federal Contract P1080, a major infrastructure project at Portsmouth Naval Shipyard (PNSY) involving on-base power electrical improvements and related utilities upgrades. The contracting agency is the U.S. Navy, with a contract completion date of 1,930 calendar days after award.
The base contract (CLIN 0001) comprises 30 line items totaling substantial work across multiple technical categories: AC and DC ductbanks, Building 72 demolition and renovation with switchgear installation, hazardous materials abatement (asbestos, lead-based paint, uranium tiles, PCBs), pavement restoration, water and storm drain infrastructure (8-inch, 12-inch, 15-inch, and 18-inch mains), water service connections, excavation and disposal of hazardous and non-hazardous soils, structural fill, crushed stone materials, rock removal, underground pipe removal, and gas main infrastructure including regulating stations. Unit pricing is required for multiple hazardous material line items (0001.U through 0001.AC) with estimated quantities ranging from 10 to 2,475 units. The government reserves the unilateral right to award fourteen optional contract line items (CLINs 0002–0016) within 180 days of base contract award, covering additional water infrastructure improvements, a water storage tank, pump station upgrades, auxiliary seawater system work, substation renovation, capacitor banks, roadway milling and pavement overlay, contractor and employee parking facilities, additional natural gas generators, and furnishings, fixtures, and equipment (FF&E) for buildings B72 and B162, with an estimated FF&E price of $14,104. All pricing is firm fixed-price with no economic price adjustment provision. Material hazardous waste must be delivered to the PNSY Hazardous Waste Facility in Building 357. Award is expected on CLIN 0001 based on evaluation of the base requirement and all options combined.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1080 FDA - 100% FINAL PRICE SCHEDULE
26 JAN 2026
Provide line-item prices, where indicated by blank underlines, for the following items:
Line Item
Description Quantity Unit Unit Price Sub-Total Total Price
0001. BASE PRICE: Total CLIN 0001 Price for Project P-1080 On-Base Power Electrical Improvements CLINs 0001.A thru 0001.AD for Drawing Work Areas A, B, C, D, E, F, G, H, J, L, M, N, O, and Other Costs as noted below. The project objectives are to provide upgrades and modifications to shipyard power distribution, energy storage, and onsite generation to increase capacity, capability, and resiliency of the power system in accordance with the drawings and specifications complete, but excluding work provided in another Priced line Item. See Drawings G-015 thru G-023 for Work Area Designations.
1 LS $_____________ $_____________
0001.A Subtotal Price for the CLIN 0001 Base Price Scope that is NOT PRICED in SubCLINs Line Items 0001.B thru 0001.AD. Note that the Option pricing identified in CLINs 0002 thru 00016 are specific to those work scopes and are not to be included in CLIN0001.
1 LS $_____________ $_____________
0001.B Subtotal of Base Price for Providing AC Ductbanks as shown on the drawings complete in accordance with the details on drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.C Subtotal of Base Price for Providing DC Ductbank as shown on the Drawings complete in accordance with the details on the drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.D Subtotal of Base Price for Building 72 Demolition, Renovations and New Construction as shown on the Drawings complete (incl. switchgear, & electrical equipment) in accordance with the details on the drawings and specifications but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.E Subtotal of Base Price for Hazardous Materials within buildings and structures including but not limited to asbestos, low-level radiological contaminants, lead based or other hazardous paint, PCBs, and heavy metals that the contractor may encounter in accordance with the drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.F Subtotal of Base Price for Providing Wearing Course Pavement complete in accordance with the details on the drawings
1 LS $_____________ $_____________
and specifications but excluding work provided in another line item.
0001.G Subtotal of Base Price for Providing 8-inch Water Main complete in accordance with the drawings and specifications but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.H Subtotal of Base Price for Providing 12-inch Water Main complete in accordance with the drawings and specifications but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.I Subtotal of Base Price for Providing Water Service Connections complete in accordance with the drawings and specifications but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.J Subtotal of Base Price for Providing 15-inch Storm Drain complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.K Subtotal of Base Price for Providing 18-inch Storm Drain complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.L Subtotal of Base Price for Excavation and Removal of Hazardous Soils during Base Bid Work shown on Sheets G-028 through G-035 including, but not limited to sampling, excavation, stockpiling, and 20 additional samples and all testing compete in accordance with the drawings and/or specifications, excluding Disposal and or work provided in another line item.
1 LS $_____________ $_____________
0001.M Subtotal of Base Price for Providing Gas Main complete in accordance with the drawings and specifications but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.N Subtotal of Base Price for Providing B162 and B72 Gas Regulating Stations complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.O Subtotal of Base Price for Excavation and Disposal of Non-Hazardous Soils (common earth) complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.P Subtotal of Base Price for Providing Structural Fill complete in accordance with the drawings and specifications but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.Q Subtotal of Base Price for Providing Ordinary Fill complete in accordance with the drawings and specifications but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.R Subtotal of Base Price for Providing DOT ¾” Crushed Stone Materials complete in accordance with the drawings and specifications, but excluding work provided in another line item.
0001.S Subtotal of Base Price for Providing DOT 1-1/2” Crushed Stone Materials complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1 LS $_____________ $_____________
0001.T Base Scope Unit Price for Providing 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
2,475 EA $_____________ $_____________
0001.U Base Scope Unit Price for Providing 10 CY of Excavation and Removal of Hazardous Soils for the areas in this CLIN that have not been previously characterized in the contract documents as having Hazardous Soils including, but not limited to, 20 additional samples, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal, and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
510 EA $_____________ $_____________
0001.V Base Scope Unit Price for Providing 10 LF of Hazardous Underground Pipe and/or Hazardous Pipe/Insulation Removal per location. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
10 EA $_____________ $_____________
0001.W Base Scope Unit Price for Providing 20 SF of Hazardous Material Abatement for Paint Containing Lead, Cadmium, or Chromium Removal within Buildings).
Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
60 EA $_____________ $_____________
0001.X Base Scope Unit Price for Providing 20 SF of Hazardous Material Abatement for Lead Dust within Buildings). Pricing to include
50 EA $_____________ $_____________
all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
0001.Y Base Scope Unit Price for Providing 20 SF of Hazardous Uranium Tiles Removal within Buildings to Government Provided Dumpsters. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
20 EA $_____________ $_____________
0001.Z Base Scope Unit Price for Providing 10 LF Hazardous Pipe Insulation Glove Bag Removal (6”-12” Dia. Pipe). Pricing to testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
25 EA $_____________ $_____________
0001.AA Base Scope Unit Price 10 LF for Providing Hazardous Pipe Insulation Glove Bag Removal (3/4”- 4” Dia. Pipe). Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
25 EA $_____________ $_____________
0001.AB Base Scope Unit Price for Providing 10 SF of Hazardous Joint Compound Abatement within Buildings to Government Provided Dumpsters. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, replacement with select material and appropriate disposal, complete in accordance with the drawings and
40 EA $_____________ $_____________
specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below
0001.AC Base Scope Unit Price for Providing 40 Trackage Feet Temporary Response to unplanned shipyard rail movements and rapidly restore rail. Pricing to include minor Backfill, Ballast, Crushed Stone, Wood Ties, Two Rail installation for 40 TF of Roadway (80 LF of rail total), and certification complete in accordance with the drawings and specifications, but excluding work provided in another line item., and in accordance with Notes Item “h” below.
3 EA $_____________ $_____________
0001.AD Subtotal of Base Price for UNITIL to provide Gas Service to the Regulating Stations and for the Gas Regulating Stations complete in accordance with the drawings and specifications, but excluding work provided in another line item.
0002. OPTION ITEM No. 1: Total CLIN 0002 Price for Providing the New 16” Water Main from the connection at the Kittery Water District Main to Gate #2 Metering Pit, across Bridge #2, Wyman Ave to the Bldg. 163 Pump Station, and any associated work with regards to intersecting Sanitary Sewer, the Storm Drainage and any Rail Impacts as shown in Work Areas R, S F, and T. Pricing to include excavation, shoring, Bridge 2 Pipe Structural Framing and Supports, New pipe main installation, Testing, Insulation and Jacketing above ground, Backfill, Temporary Paving, Traffic Control, Bridge and Surface Restoration, Environmental Mitigation, Dewatering, Shoring, HAZMAT, SCADA, Vibration Monitoring, Archaeological Monitoring, Site Improvements, Site Restoration, etc., and General Conditions as required per plans and specifications to complete this Option Item.
See Drawings G-015 thru G-023 for Work Area Designations.
1 LS $_____________ $_____________
0002.A Subtotal Price Option No. 1 CLIN 0002 for Scope in this Work Area that is NOT PRICED in the following SubCLINs Line Items 0002.B and 0002.C.
1 LS $_____________ $_____________
0002.B Option Item No. 1 Unit Price for 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
200 EA $_____________ $_____________
0002.C Option Item No. 1 Unit Price for Providing 10 CY of Excavation and Removal of Hazardous Soils for the areas in this CLIN
55 EA $_____________ $_____________
that have not been previously characterized in the contract documents as having Hazardous Soils including not limited to sampling, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal (if applicable), and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
0003. OPTION ITEM No. 2: Total CLIN 0003 Price for Providing the work shown in
WORK AREA U: WATER STORAGE
TANK. Included is the Site Work, and the Tank Structure, tie-in to the Meade Ave Water Main and SCADA to create a fully functioning and integrated water storage tank.
1 LS $_____________ $_____________
0003.A Subtotal Price Option No. 2 CLIN 0003 for Scope in this Work Area that is NOT PRICED in the following SubCLINs Line Items 0003.B and 0003.C.
1 LS $_____________ $_____________
0003.B Option Item No. 2 Unit Price for Providing 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
55 EA $_____________ $_____________
0003.C Option Item No. 2 Unit Price for Providing 10 CY of Excavation and Removal of Hazardous Soils for the areas in this CLIN that have not been previously characterized in the contract documents as having Hazardous Soils including not limited to sampling, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal (if applicable), and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
15 EA $_____________ $_____________
0004. OPTION ITEM No. 3: Total CLIN 0004 Price to Remove the Existing 8” Water Main. Furnish and Installation of the 12” Water Main along Meade Ave to the connection @ Building 403, the abandonment and fill of the existing 8”, and any associated work with regards to intersecting Sanitary Sewer, the Storm Drainage shown in Work Area R. Pricing to include excavation, shoring, pipe bedding, pipe main installation, testing, backfill, temporary paving, traffic control, and surface restoration as required per plans and specifications
0004.A Subtotal Price Option No. 3 CLIN 0004 for Scope in this Work Area that is NOT PRICED in the following SubCLINs Line Items 0004.B and 0004.C.
1 LS $_____________ $_____________
0004.B Option Item No. 3 Unit Price for 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
60 EA $_____________ $_____________
0004.C Option Item No. 3 Unit Price for Providing 10 CY of Excavation and Removal of Hazardous Soils for the areas in this CLIN that have not been previously characterized in the contract documents as having Hazardous Soils including not limited to sampling, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal (if applicable), and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
20 EA $_____________ $_____________
0005. OPTION ITEM No. 4: Total CLIN 0005 Price to Clean & Line the Existing 16” Water Main along Sicard Street and the Existing 16” Water Main along John Paul Jones Street shown in Work Area R.
Pricing includes excavation, shoring, cleaning, lining installation, testing, backfill, temporary paving, traffic control, and surface restoration as required per plans and specifications
1 LS $_____________ $_____________
0006. OPTION ITEM No. 5: Total CLIN 0006 Price for Providing the New 20” Water Main from the connection at the Kittery Water District Main to Gate #1 Metering Pit, across Bridge #1 to the Bldg. 163 Pump Station, Removal of the Existing 12” Main, and any associated work with regards to intersecting Sanitary Sewer, the Storm Drainage and Rail Impacts shown in Work Areas R, S, and T. Pricing to include excavation, shoring, Bridge 1 Pipe Structural Framing and Supports, New pipe main installation, Testing, Insulation and Jacketing above ground, Backfill, Temporary Paving, Traffic Control, Bridge and Surface Restoration, Environmental Mitigation, Dewatering, Shoring, HAZMAT, SCADA, Vibration Monitoring, Archaeological Monitoring, Third Party Commissioning, Site Improvements, Site Restoration, etc., and General Conditions as required per plans and specifications to complete this Option Item.
See Drawings G-015 thru G-023 for Work Area Designations.
0007 OPTION ITEM No. 6: Total CLIN 0007 Price for Providing the work shown in Work Area T: WATER PUMP STATION (B163). Included in this CLIN are the Exterior and Interior Improvements, as well as SCADA system improvements to result in a fully integrated system per plans and specifications to complete this Option Item.
1 LS $_____________ $_____________
0008 OPTION ITEM No. 7: Total CLIN 0008 Price for Providing the Entire Work in Work Area V: AUXILIARY SEA WATER SYSTEM (ASW) as required per plans and specifications to complete this Option Item.
1 LS $_____________ $_____________
0008.A Subtotal Price Option No. 7 CLIN 0008 for Scope in this Work Area that is NOT PRICED in the following SubCLINs Line Items 0008.B and 0008.C.
1 LS $_____________ $_____________
0008.B Option Item No. 7 Unit Price for 10 CY of Rock Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “i” below.
38 EA $_____________ $_____________
0008.C Excavation and Removal of 10 CY of Hazardous Soils for areas not characterized in the contract documents as having Hazardous Soils including not limited to sampling, temporarily stockpiling to accommodate the Government's scheduling of trucks for disposal (if applicable), and testing (expedited), complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “h” below.
10 EA $_____________ $_____________
0009. OPTION ITEM No. 8: Total CLIN 0009 Price for Providing the Entire Work in
WORK AREA K: BUILDING 243
(SUBSTATION 4). Included in this Subtotal is renovation of the existing Building 243 (Substation 4), and new 15kV Gear, and SCADA system.
1 LS $_____________ $_____________
0010. OPTION ITEM No. 9: Total CLIN 0010 Price for Providing the Entire Work for the Capacitor Banks as required per plans and specifications to complete this Option Item.
1 LS $_____________ $_____________
0011. OPTION ITEM No. 10: Total CLIN 0011 Price for the Providing the Entire Work for Complete Roadway Milling and Pavement Overlay on roads impacted, including Striping, Markings, and Loop Detectors as
TOTAL PRICE FOR CLINs 0001 - 0016 _ required per plans and specifications to complete this Option Item.
0012. OPTION ITEM No. 11A: Total CLIN 0012 Contractor Personal Owned Vehicle Off Installation Parking as required per plans and specifications to complete this Option Item. Included in this bid option, the Contractor to provide off installation parking and transport for all P1080 Prime and Subcontractor Personal Owned Vehicles (POV). Parking shall be at an offsite parking facility and transport their employees as required to PNSY. The contractor is required to utilize a pre-established parking lot or parking structure either privately owned or coordinated with the Seacoast area commuting options as required per plans and specifications to complete this Option Item.
1 LS $_____________ $_____________
0013. OPTION ITEM No. 11B: Total CLIN 0013 PNSY Employee Parking of Personal Owned Vehicle (POV) at Off Installation Parking Location required per plans and specifications to complete this Option Item.
Included in this bid option, Contractor to provide a minimum of 100 parking spots at one or multiple designated parking locations within approximately 1.5 Miles or less of one or both access points to PNSY. The contractor is required to utilize a pre-established parking lot or parking structure that has continuous public walkway paths between PNSY and established parking lot or parking structure.
1 LS $_____________ $_____________
0014. OPTION ITEM No. 12: Total CLIN 0014 Price for Providing the Entire Work for Two Additional Natural Gas Generators in Work Area P as required per plans and specifications to complete this Option Item.
1 LS $_____________ $_____________
0015. OPTION ITEM No. 13: Total CLIN 0015 Price for Providing the Entire Work for One Additional Natural Gas Generator in Work Area P as required per plans and specifications to complete this Option Item.
1 LS $_____________ $_____________
0016. OPTION ITEM No. 14: Total CLIN 0016 Price for the entire work to furnish and install FF&E for buildings B72, and B162 as required per plans and specifications to complete this Option Item.
Gov’t Est’d Price:
$14,104
HAR Percent
(NTE 5%)
HAR Subtotal
Total FF&E Estimated Price
GENERAL BID NOTES
a. All work required in accordance with the drawings and specifications must be included in the Contractor’s proposed price.
b. Evaluation will be made on the total sum of Contract Line Item (CLIN) 0001, and the extended total under Contract Line items 0002, through 0016. For CLINs 0001 through 0016, enter unit price and extended total in space provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provided a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price. Award is expected to be made on
CLIN 0001.
c. The Government reserves the unilateral right to award CLIN(s) 0002 through 0016 to the Contractor at the proposed price within 180 calendar days after the contract award. A firm fixed proposed price is required for all CLINs. No provision is made for economic price adjustment. If Option(s) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11A, 11B, 12, 13, and/or 14 are exercised, the contract completion date remains 1930 calendar days after award of the contract.
d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the CLINS 0002 through 0016 (Options 1 through 14) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
e. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
f. If any of the CLIN(s) 0002 through 0016 are exercised, additional bonding and consent of surety is required.
Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
g. All hazardous material and contaminated soils shall be delivered to the PNSY Hazardous Waste Facility in Building 357 for disposal in accordance with the project specifications.
h. The quantities shown for CLIN(s) 0001.U through 0001.AC, and Bid Option CLIN(s) 0002.C, 0003.C, 0004C, and 0008.C, are estimated quantities for the described work of the CLIN. The bidder is to utilize these quantities to establish unit prices and include this subtotal and quantity in the total bid price for the Base Scope and applicable Bid Options. The actual quantities may vary in location and/or amount. Contractor’s Quality Control Manager is to track actual quantities and locations, coordinated with and verified by the Contracting Officer’s Representative prior to execution of the work, for each line item as the work progresses and invoice for actual quantities when completed.
Applicable locations for these unit price quantities will be any location within the entire project site such that any variation in location will not be cause for a contract modification or change in scope. Actual quantities greater than the estimated amount will be increased via a modification to the contract. Should any quantities not be utilized in performance of the associated scope, the resulting credits shall be available for Government recapture or repurpose.
i. The quantities shown for CLIN(s) 0001.T and Bid Option CLIN(s) 0002.B, 0003.B, 0004.B and 0008.B associated with rock are estimated quantities that represent the full amount of rock anticipated to require removal and disposal for the total contract. The bidder is not to include any other rock removal and disposal scope or cost in other CLINs.
The bidder is to utilize these quantities to establish unit prices and include this subtotal and quantity in the total bid price for the Base Scope and applicable Bid Options. The actual quantities may vary in location and/or amount.
Contractor’s Quality Control Manager is to track actual quantities and locations, coordinated with and verified by the Contracting Officer’s Representative prior to execution of the work, for each line item as the work progresses and invoice for actual quantities when completed. Applicable locations for these unit price quantities will be any location within the entire project site such that any variation in location will not be cause for a contract modification or change in scope. Actual quantities greater than the estimated amount will be increased via a modification to the contract. Should any quantities not be utilized in performance of the associated scope, the resulting credits shall be available for Government recapture or repurpose.