Attachment B - Construction Experience Project Data.docx

DOCX document 21 KB Posted

Attached to
Military Construction Project (MILCON) P1080 Design-Bid-Build, Power Reliability and Water Resiliency Upgrades, Portsmouth Naval Shipyard, Kittery, Maine
Solicitation number
N6247026R0004
Issued by

About this file

Attachment B is a detailed Construction Experience Project Data Sheet designed to capture comprehensive information about a contractor's previous project experience. The document provides a structured template for contractors to document project details including company information, contract type, project characteristics, award and completion dates, contract value, and specific work performed.

The form requires detailed information across 10 key areas, including project type (new construction in water or on land), contract structure (firm-fixed price or cost/time and material), design or construction approach (design-build or design-bid-build), and specific project descriptions. It is specifically related to a Military Construction Project (MILCON) P1080 for Power Reliability and Water Resiliency Upgrades at Portsmouth Naval Shipyard in Kittery, Maine, under the Department of the Navy Naval Facilities Engineering Command, with solicitation number N6247026R0004.

View the file

Other files

File Type Posted
Solicitation Amendment 0010.pdf PDF
CSRA Risk Capture Form.xlsx XLSX spreadsheet
Attachment G - Price Proposal Form (Revised Amendment 0009).pdf PDF
Solicitation Amendment 0009.pdf PDF
Solicitation Amendment 0008.pdf PDF
Attachment G - Price Proposal Form (Revised Amendment 0008).pdf PDF
Unitil Subcontracting Redacted.pdf PDF
Solicitation Amendment 0007.pdf PDF
Solicitation Amendment 0006.pdf PDF
Attachment G - Price Proposal Form (Revised Amendment 0006).pdf PDF
Solicitation Amendment 0005.pdf PDF
Foster Adaptor Redacted.pdf PDF
Attachment G - Price Proposal Form (Revised Amendment 0004).pdf PDF
Attachment M - SITE VISIT ATTENDANCE LOG.pdf PDF
Solicitation Amendment 0004.pdf PDF
Solicitation Amendment 0003.pdf PDF
PPI Responses Amendment 0003.pdf PDF
Solicitation Amendment 0002.pdf PDF
Solicitation Amendment 0001.pdf PDF
Fire Hydrant Redacted.pdf PDF
Backflow Preventer Redacted.pdf PDF
Flow Meter and Strainer Redacted.pdf PDF
Programmable Logic Controllers Redacted.pdf PDF
Solicitation - N6247026R0004.pdf PDF
Attachment F - Individual Small Business Subcontracting Plan.docx DOCX document
Attachment G - Price Proposal Form.docx DOCX document
Attachment J - Criteria for Denying Access to Navy Installations.pdf PDF
Attachment K - DOD CUI Non-Disclosure Agreement.pdf PDF
Attachment E - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment L - Economic Price Adjustment Unit Price Form.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment D - Historical Small Business Utilization.docx DOCX document
Attachment H - PIEE Vendor Access Instructions.pdf PDF
Attachment I - Approved Identity Proofing Documents.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

Design Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction – In Water |_| New Construction – Land Based |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information

File details come from the government source that posted it. Updated .