_J-0200000_Management_and_Administration.pdf
PDF 395 KB Posted
- Attached to
- BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN Federal contract opportunity
- Solicitation number
- N62470-19-R-2001
About this file
This document package outlines requirements for base operations support services at U.S. Naval Station Rota, Spain. The solicitation seeks proposals for services including facilities maintenance, utilities operations, transportation, supply, and other support functions. Offerors must have experience providing comparable integrated support services on military installations. The Navy seeks a single contractor to provide maintenance for over 500 buildings and other infrastructure assets using a computerized maintenance management system. The contractor will also operate utilities plants and distribution systems, conduct waste management and environmental compliance programs, and provide transportation and supply chain logistics support. The base period of performance is one year with seven additional six-month option periods to be awarded at the government's discretion. Pricing shall be submitted as firm fixed hourly rates for recurring and non-recurring tasks.
Attachment J-0200000
View the file
Other files for this federal contract opportunity
Show all 50
BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J – 0200000
MANAGEMENT AND ADMINISTRATION
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-0200000-01 Definitions and Acronyms J-0200000-02 Directives, Instructions, and References J-0200000-03 Invoicing Procedures J-0200000-04 Forms J-0200000-05 Government-Furnished Property, Materials, and Services J-0200000-06 Service Provider Information J-0200000-07 Asset Information J-0200000-08 Specification Information J-0200000-09 NAVFAC MAXIMO Data Reporting J-0200000-10 NAVFAC MAXIMO System Access Procedures J-0200000-11 Installation Hazardous Waste Management Plans; and Spill Prevention, Control, and
Countermeasure Plans J-0200000-11.a Hazardous Waste Management Plan J-0200000-11.b Spill Prevention and Response Plan J-0200000-12 Contractor Hazardous Material Inventory Log J-0200000-13 Exhibit Line Item Numbers
ATTACHMENT J-0200000-01
DEFINITIONS AND ACRONYMS
Definition Description
Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
Component Inventory Management Unit
(CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Construction Equipment Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.
All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.
Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or
SPAR.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Electronic Operation And Maintenance And Support Information (eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility A building or structure designed and created to serve a particular function.
Fixed Burden Rate (FBR) The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Hazardous Material (HM) A material that because of its quality, concentration, physical, chemical or infectious nature may pose a threat to human health or the environment if released or spilled into the environment or any material designated by the Department of Transportation (DOT) or any materials that require a SDS form as posing a potential threat while being transported. Hazardous materials are listed in 49 CFR Part 172.
Hazardous Waste (HW) Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity.
Hazardous Waste Management Plan
In accordance with OPNAVINST 5090.1C, every Navy shore activity that generates HW shall develop and use a Hazardous Waste Management Plan or a Hazardous Waste management component in its P2 Plan and EMS. A Hazardous Waste Management Plan shall:
Identify applicable federal, state, and local regulations pertaining to the generation and management of hazardous waste.
Identify training requirements and describe procedures for obtaining training and maintaining training records.
Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.
Describe all hazardous waste generation and management procedures.
Include or reference the hazardous waste minimization plan and goals.
Include or reference contingency plans and emergency response procedures.
The plan shall be kept up to date to include changes in hazardous waste generation and management procedures, as well as changes in applicable federal, state, and local hazardous waste regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals. Tenant activities are covered by the host CO's Hazardous Waste Management Plan.
Hazardous Waste Manifest
A hazardous waste manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for hazardous waste manifests.
Infrastructure Condition Assessment Program
(ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Less-than-90-day Accumulation Areas or Storage Facilities
Temporary HW storage areas where HW may be stored for up to 90 days without a RCRA permit.
Maintenance And Repair The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
Monthly On-Site Labor Report
A compilation of all Contractor and subcontractor employee-hours involved in delivering contract services on a Government property.
NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Non-RCRA Regulated Waste
Waste that is not regulated as a hazardous waste under RCRA; however, is waste may be regulated by other federal, state or local regulations including but not limited to TSCA, Clean Air Act, Clean Water Act or other regulations and statues. Examples include Used Oil, Universal Waste, Oily Water, antifreeze, etc.
Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.
Non-Regulated Solid Waste (Debris and Rubbish)
Waste not associated with an industrial process such as refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food. Non-hazardous construction and demolition wastes such as dimension and non-dimension lumber, plywood, chipboard, and hardboard are included.
Partnering The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required.
Performance Assessment A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management Program
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance (QA) The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average.
An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
Real Property Inventory Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property. Individual RPIE’s can be combined to make a CIMU to facilitate facilities management. An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
Regulated Waste Any hazardous, non-hazardous, industrial process waste (aka special waste), e-waste, and/or off-specification HM, which because of its physical characteristics, chemical make-up or biological nature requires either special handling procedures and permitting, or poses an unusual threat to human health, equipment, property, or the environment.
Examples include (but are not limited to) liquid sludge, pastes, and/or filter cakes, chemical compounds and/or petroleum products, fine powders or highly dusty materials, spent blast media and/or grit, demolition wastes from industrial facilities, debris and/or residues from spill cleanup work, underground storage tank remediation materials, pollution control wastes, ash from fires, furnaces, boilers or incinerators, off-specification products, other materials that have the potential to be a hazardous waste.
All RW may be used or unused excess hazardous materials. Laboratory analysis may be required to verify the waste is not a RCRA-regulated hazardous waste.
Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Sampling Plan Plan and procedures to conduct sampling, field testing and laboratory analysis for a defined testing objective.
Satellite Accumulation Areas
Designated approved areas, at or near the point of generation and under the control of the operator generating the waste, where no more than 55 gallons (cumulative total) of all types of HW or 1 quart of acutely HW may be accumulated. The 55-gallon limit does not include non RCRA regulated waste, universal waste and used oil etc.
Spill Prevention Control and Countermeasure (SPCC) Plan
The SPCC Plan establishes engineering controls including procedures, methods, equipment and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill.
System An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole.
Unit Priced Labor (UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as:
the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
Universal Equipment Universal equipment refers to equipment that can cover two or more industries and is commercially employed in execution of operation, maintenance, and repair work, such as: Aerial Work Platforms, Backhoes, Cranes, Dump Trucks, Excavators, Generators, Graders, Lifts, Loaders, Man Lifts, Monitoring and Test Equipment, Pumps, Tractors, Trailers, etc.
Universal Waste (UW) Universal Waste (UW) (defined in 40 CFR Part 273) means batteries, fluorescent lamps, some pesticides, and mercury-containing equipment formally classified as a HW, but that are now subject to less stringent regulations, when recycled if recycling is available.
Utility Infrastructure Condition Assessment Program (UICAP)
A comprehensive assessment processes for planning, managing, and executing Navy utility infrastructure inspections.
Acronym Title ACO Administrative Contracting Officer BW Biweekly CDR Contract Discrepancy Report CIA Controlled Industrial Area CIMU Component Inventory Management Unit CMMS Computerized Maintenance Management System CNSSI Committee on National Security Systems Instruction COR Contracting Officer Representative COR Condition of Readiness DBH Diameter at Breast Height DCR Direct Condition Rating DoD Department of Defense DoDI Department of Defense Instruction DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract FSCM Facility Support Contract Manager GIS Geospatial Information System GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials HCA Head Contracting Agency ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asset Data Store IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MAP Maintenance Action Plan MDI Mission Dependency Index MEP Mechanical, Electrical and Plumbing MPAS Monthly Performance Assessment Summary MRI Mission Readiness Index MSDS Material Safety Data Sheets NAVFAC Naval Facilities Engineering Command NIST National Institute of Standards and Technology NIST SP National Institute of Standards and Technology Special Publication NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative
Acronym Title PAW Performance Assessment Worksheet PM Project Manager PM Planned Maintenance or Preventative Maintenance PRCSP Permit Required Confined Space Program PWS Performance Work Statement PWO Public Works Officer Q Quarterly QC Quality Control RPIE Real Property Inventory Equipment RSL Remaining Service Life SC Security Clearances SM Semimonthly SPAR Senior Performance Assessment Representative TE Technical Exhibit VIQ Variation in Quantity WBS Work Breakdown Structure
ATTACHMENT J-0200000-02
DIRECTIVES, INSTRUCTIONS, AND REFERENCES
The Contractor shall adhere to the applicable portions of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the Contractor from all obligations that must be fulfilled in the observance and execution of this contract.
When U.S., European and/or Spanish directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.
Reference Title
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements P.L. 91-596 Occupational Safety and Health Act
USEUCOM 252.222.9900
(Jan 1986-E)
Compliance With Local Labor Laws
NAVSTAROTAINST 4100.E Energy Conservation DoD FGS-Spain DoD FGS-Spain U.S. Department of Defense Environmental Final Governing
Standards–Spain DoD 4160.21-M Defense Material Disposition Manual
DoD 4160.21-M Defense Material Disposition Manual
Ministerio De Industria Publications 31/1995 Ley de Prevencion De Riesgos Laborales NAVSTA Rota Safety Instruction OPNAVINST 5100.23 Occupational Safety And Health Administration (OSHA)
P-5010-4 NAVMED
FAA AC 150/5320-12C Measurement, Construction, and Maintenance of Skid-Resistant Airport Pavement
Surfaces ETL 04/10 Determining the Need of Rubber Removal UFGS 32 01 11.51 Rubber and Paint Removal from Airfield Pavements UFGS 32 17 23.00 20 Pavement Markings UFGS 32 01 19.61 Resealing of Joints in Rigid Pavement CFR Codes of Federal Regulations NFPA National Fire Protection Association - Codes and Standards Standard EC. 1.6 Emergency Preparedness Management Plan NAVFAC Clause 5252.245-
Government-Furnished Property, Materials And Services
NAVFAC P-307 Management of Weight Handling Equipment NAVSUPINST 5100.27 Hazardous Material Safety Program NAVFACINST 11013.40 Project Partnering Policy FAR 52.228-5 Insurance – Work On A Government Installation FAR 52.237-2 Protection Of Government Buildings, Equipment, And Vegetation NIST 800-171 Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations DFAR 252.7008 Compliance with Safeguarding Covered Defense Information Controls DFAR 252.7009 Limitations on the Use or Disclosure of Third-Party Contractor DFAR 252.7009 Safeguarding Covered Defense Information and Cyber Incident Reporting
(Reported Cyber Incident Information)
ATTACHMENT J-0200000-03
INVOICE PROCEDURES
Instructions for invoicing are provided in Section G.
ATTACHMENT J-0200000-04
FORMS
Used Oil Disposal and Recycling Summary Report Form
Name of Facility Facility Location Disposal Quantity for Calendar Year [ ]
Recycled Quantity for Calendar Year [ ]
Total:
Solid Waste Management Report
Solid Waste Recycled
Description Amount
(lbs./tons) Cost Revenue
Glass Metal (aluminum, circuit boards, steel) Paper & Paper Board Plastic Food (cooking grease & oil, discarded food) Wood (packaging, pallets, plywood) Yard/Green Waste (mulch, trees, trimmings) Concrete Asphalt
Select Waste
Description Amount
(lbs./tons) Cost Revenue Construction and Demolition Debris Used Oil Ethylene Glycol Antifreeze Lead-Acid Batteries
Other Waste
Description Amount
(lbs./tons) Cost Revenue
Sewage Sludge (land applied) Sewage Sludge (disposed) Oil Water Separator Liquids OWWO Oil OWWO Sludge Lift Station Grease Other Waste (SPECIFY)
Directions for Process Material Log Sheets
Chemical Description:
Material Name - List the brand or generic name of the chemical material.
Manufacturer - List the name of the manufacturer of the product.
Constituents of Concern - List the constituents (ingredients) as listed on the Material Safety Data Sheet
(MSDS).
CAS # - List the Chemical Abstract Service (CAS) Number for each Constituent of Concern listed. This information is found on the MSDS. If no CAS number is listed, state “N/L”.
% - List the concentration of each Constituent of Concern listed. This information is found on the
MSDS. If the concentration is not listed, state “N/L”.
Product Weight - List the weight of material contained in one container of the product. This information is normally listed on the MSDS or can be determined from the density or specific gravity of the product listed on the MSDS.
In addition, check all the boxes that apply to this chemical:
o Pure or Mix - choose only one.
o Solid, Liquid or Gas - choose only one.
o Extremely Hazardous Substance (EHS), Ozone Depleting Substance (ODS), SARA TITLE III
Chemical (SARA III), Air Toxic Chemical (AIR TOX) or Carcinogen (CARC) - based on the information provided by the material’s MSDS. Choose all that apply.
o HM exempt - per EPCRA section 312 and based upon user knowledge, choose this box if the material would normally be exempt from reporting for hazardous material storage.
o Tri exempt - per EPCRA section 313 and based upon user knowledge, choose this box if the material would normally be exempt from reporting for the Toxic Release Inventory (TRI).
Physical and Chemical Hazards:
For each material listed, check all the physical and health hazard boxes that apply. These hazard categories are defined in 40 CFR 370.2.
Fire Hazard - flammable, combustible liquid, pyrophoric, oxidizer.
Sudden Release of Pressure - explosive, compressed gas.
Reactive - unstable reactive, organic peroxide, water reactive.
Immediate (acute) Health Hazard - highly toxic, toxic, irritant, sensitizer, corrosive.
Delayed (chronic) Health Hazard - carcinogens, mutagens, other long-term health hazards.
Storage Description: Storage Code:
List the appropriate storage type, pressure and temperature condition codes for the material based upon the codes listed below. List the storage type in the first box, the applicable pressure code in the second box and the applicable temperature code in the third box. More than one storage code may apply if material is stored in different types of containers.
Storage Type:
A - Above Ground Storage Tank F Can L Cylinder B - Below Ground Storage Tank G Carboy M Glass Bottle or Drum C - Tank Inside Building I Fiber Drum N Plastic Bottle or Drum D - Steel Drum J Bag R Other E - Plastic/Non-metallic Drum K Box
Pressure and Temperature Conditions:
1 - Ambient Pressure 4 Ambient Temperature 2 - Greater than Ambient Pressure 5 Greater than Ambient Temperature 3 - Less than Ambient Pressure 6 Less than Ambient Temperature but not Cryogenic
7 - Cryogenic Conditions
Inventory in Pounds:
Maximum Amount - List the maximum amount of a material that was on-hand (stored) at any one time.
Amount must be recorded in pounds.
Average Amount - List the average amount of a material that was on-hand during the reporting period.
Amount must be recorded in pounds.
Days on Site - List the number of days during the reporting period each material was on-site. If the material was present for the whole year, record as 365.
Amount Used in Pounds:
List the amount of each material used during the reporting period. Amount must be recorded in pounds.
Amount used is the best estimate based on the contractor material tracking system.
Contractor Hazardous Material Inventory Log
(EPRCA)
PRIME COMPANY NAME: ______________________________CONTRACT NO: ______________________
PROJECT TITLE / LOCATION: ________________________________________________________________
Material Name
Manufacturer
SDS
Number
State (Liquid, Solid, Gas)
Storage Quantity Quantity (lbs/gals) used in
Calendar Year [ ]
Average Daily
Maximum Daily
Contractor(s) certifies that the hazardous material(s) removed from installation will be used/reused for its intended purpose.
Company Using Material Listed Above Company Representative’s Signature
Submitted By: ________________________ Phone: ______________ Fax: __________ Date: _________ Printed Name
Contracting Officer _____________________Phone: ______________ Fax: __________ or ROICC Representative
Page ____ of ____
SECTION 01 57 19.00 20 – APPENDIX A
T otals:
P rodu ct N am e
(M anufact-urer’s
N am e & roduct
Identificati on N am e
O r
N um ber)
C O
N T
R A
C T
O R
V O
C /H
A P
T racking F orm
E m ission D ata ct T yp e
(I.E . P aint, S olvent, A dhesive)
U sage (I.E
S urface P rep, O r
C lean-U p)
A
L n iq u e Id en tifier
N u m b er
Q u an tity
U sed
(G al) ct D en sity
(L b./G al.)
V O
C on tent (lb./gal.)
T otal
V
W eight
(lbs.)
R E
P O
R T
IN
G
P E
R
IO
D (M on th
H A
N am e (N
O N
E if none present in product) eigh t of H
A P in P ct eight of
H A
P (lb s.)
(N
/A if N
N E present)
ATTACHMENT "A"
CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO
1 Does the operator know the weight of the load to be lifted?
2 Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?
3 Is the crane level and on firm ground?
4 Are outriggers required?
5 If so, are outriggers fully extended and down, and the load off the wheels?
If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?
If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?
Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?
9 Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?
10 Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?
11 Is the lift swing path clear of obstructions?
12 If rotation of the load being lifted is hazardous, is tag line or restraint line being used?
13 Are personnel prevented from standing or passing under a suspended load?
14 Are personnel prevented from entering the load fall zone?
15 Is the crane operator's attention diverted?
16 Are proper signals being used at all times?
17 If radio communications are used is the frequency isolated to the crane team?
18 Do the operations ensure that side and tip loading is prohibited?
Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?
20 If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?
21 Is the lift a critical lift?
If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?
23 Is Attachment "A" current, filled out completely, and posted in the crane?
Contractor Name (Print Legibly):
Contractor Name (Signature):
Location: Date:
CRANE AND RIGGING GEAR ACCIDENT REPORT
Accident Category: Crane Accident Rigging Gear Accident From:
UIC:
To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709 Fax: 757-967-3808
Activity: Report No:
Crane No: Category: Accident Date: Time: hrs:
Category of Service: SPS GPS Crane Type: Crane Manufacturer:
Was Crane/Rigging Gear Being Used in SPS: Yes No Was Crane/Rigging Gear Being Used in a Complex Lift/Critical
Non-Crane Rigging Operation: Yes No Location: Weather:
Crane Capacity: Hook Capacity: Weight of Load on hook:
Fatality or Permanent Disability? Yes No Material/Property Cost Estimate:
Reported to NAVSAFECEN? Yes No
Accident Type:
Personal Injury Overload Derail Damaged Rigging Gear
Load Collision Two Blocked Dropped Load Damaged Crane
Crane Collision Damaged Load Other: Specify
Cause of Accident:
Improper Operation Equipment Failure Inadequate Visibility
Improper Rigging Switch Alignment inadequate Communication
Track Condition Procedural Failure Other: Specify
Chargeable to:
Crane Walker Rigger Operator
Maintenance Management/Supervision Other: Specify
Crane Function:
Travel Hoist Rotate Luffing Telescoping Other N/A
Is this accident indicative of a recurring problem? Yes No
If yes, list Accident Report Nos.:
ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.
Preparer:
Phone:
E-mail:
Code:
Date:
Concurrences: (Include Code, Signature and Date) Code: Date:
Code: Date:
Certifying Official (Crane Accident Only):
Code:
Date:
CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS
This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.
1. Accident Category: Indicate either crane accident or rigging gear accident.
2. From: The naval activity that is responsible for reporting the accident and UIC number.
3. Activity: The naval activity where the accident took place.
4. Report No.: The activity assigned accident number (e.g., 95-001).
5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.
6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.
7. Accident Date: The date the accident occurred.
8. Time: The time (24 hour clock) the accident occurred (e.g., 1300).
9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).
10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.
11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.
12. SPS: Was the crane or rigging gear being used in an SPS lift?
13. Complex lift: Was the crane or rigging gear being used in a complex lift?
14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).
15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).
16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.
17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.
18. Weight of Load on Hook: If applicable, the weight of the load on the hook.
19. Fatality or Permanent Disability?: Check yes or no.
20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.
21. Reported to NAVSAFECEN?: Self-explanatory.
22. Accident Type: Check all that apply.
23. Cause of Accident: Check all that apply.
24. Chargeable to: Check all that apply.
25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.
26. Is this a recurring problem?: Check yes or no. Identify any other similar accidents.
27. Situation Description/Corrective Actions: Self-explanatory.
28. Preparer: Self-explanatory.
29. Concurrences: Self-explanatory.
30. Certifying Official (Crane Accidents Only): Self-explanatory.
31. Brief Description: No more than one paragraph summarizing the resultant incident.
32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.
33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term Corrective Actions are those actions taken that will allow return to work in short time frame.
Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.
CRANE AND RIGGING GEAR NEAR MISS REPORT
Near Miss Category: Crane Near Miss Rigging Gear Near Miss
From:
UIC:
To: Navy Crane Center Bldg 491 NNSY Portsmouth, VA 23709 Fax (757) 967-3808 nfsh_ncc_accident@navy.mil
Activity: Report No:
Crane/Equipment No: Category: Near Miss Date: Time:
hrs
Category of Service: SPS GPS Crane /Equipment Type: Crane/Equipment Manufacturer:
Location: Weather:
Crane/Equipment Capacity: Hook Capacity: Weight of Load on Hook:
Is this near miss indicative of a recurring problem? Yes No
If yes, list report numbers:
In the space below, include a brief description of the event and corrective actions taken to prevent recurrence:
Preparer:
Phone and email
Code Date
CRANE AND RIGGING GEAR NEAR MISS INSTRUCTIONS
This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.
1. Near Miss Category: Indicate either crane or rigging gear near miss.
2. From: The naval activity that is responsible for reporting the near miss and UIC number.
3. Activity: The naval activity where the near miss took place.
4. Report No.: The activity assigned near miss number (e.g., 95-001).
5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.
6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.
7. Near Miss Date: The date the near miss occurred.
8. Time: The time (24 hour clock) the near miss occurred (e.g., 1300).
9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).
10. Crane Type: The type of crane involved in the near miss (e.g., mobile, bridge), if applicable.
11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.
12. Location: The detailed location where the near miss took place (e.g., building 213, dry dock 5).
13. Weather: The weather conditions at time of the near miss (e.g., wind, rain, cold).
14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.
15. Hook Capacity: The capacity of the hook involved in the near miss at the maximum radius of the operation, if applicable.
16. Weight of Load on Hook: If applicable, the weight of the load on the hook.
17. Is this a recurring problem?: Check yes or no. Identify any other similar near misses or accidents.
18. Situation Description/Corrective Actions: Self-explanatory.
19. Preparer: Self-explanatory.
ATTACHMENT J-0200000-05
GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
GOVERNMENT-FURNISHED FACILITIES LIST
Facility Description Approx
Size (sm) Location / Remarks
Contractor Laydown 1,000 Building 45 (Interior space) 5 Covered Swimming Pool Building 143 (Interior space) 20 LOX Plant Shop Fenced Enclosure, 2 Shelters Building 504 (Interior space) 50 LOX Storeroom/Office Building 593 (Interior space) 2 Bath House/Snack Stand Building 1802 and 3265 (Hospital) 12 / 60 Storage of materials that pertain to the maintenance of hospital facilities
ATTACHMENT J-0200000-06
SERVICE PROVIDER INFORMATION
Service Provider Information is provided as a separate attachment. Refer to Microsoft Excel attachment “J-
0200000-06 - SERVICE PROVIDER INFORMATION.
ATTACHMENT J-0200000-07
ASSET INFORMATION
Asset Information is provided as a separate attachment. Refer to Microsoft Excel attachment “J-0200000-07 –
ASSET INFORMATION”.
ATTACHMENT J-0200000-08
SPECIFICATION INFORMATION
Specification Information is provided as a separate attachment. Refer to Microsoft Excel attachment “J-0200000-
08 – SPECIFICATION INFORMATION”.
ATTACHMENT J-0200000-09
NAVFAC MAXIMO DATA REPORTING
PURPOSE AND OVERVIEW
The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for NAVFAC MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated NAVFAC business process and procedures for how data is to be submitted.
GENERAL TYPES OF DATA
Work Order Data
Work order data includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program or as part of IMP), and work issued as Non-Recurring (IDIQ). Specific NAVFAC MAXIMO fields required for work order data are listed on the Service Provider Information spreadsheet provided in J-0200000-06.
Asset Data
Asset data includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected. Specific NAVFAC MAXIMO fields required for asset data are listed on the Asset Information spreadsheet provided in J- 0200000-07. Utilities assets require the additional data listed on the Specification Information spreadsheet provided in J-0200000-08. When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset.
Condition Assessment Data
Condition assessment data includes all necessary information for the accurate condition rating of all assets in support of the Infrastructure Condition Assessment Program (ICAP). Specific NAVFAC MAXIMO fields required for condition assessment data are listed on the Characteristic Meter Reading Information spreadsheet provided in J- 1501000-04.
METHODS FOR DATA SUBMISSION
The Contractor shall provide work order, asset, specification, and condition assessment data using the methods as specified in Section C. Additional details are provided below for submission of data via Direct Entry and Flat File methods.
METHOD 1: Direct Data Entry
In this method a Contractor obtains authorized access as specified in Section C and directly enters data into NAVFAC MAXIMO. Detailed guidance on NAVFAC MAXIMO System Access Procedures is provided in J- 0200000-10. All reference value verification is provided by NAVFAC MAXIMO.
All Contractors who obtain authorized access will be granted entry only within the applicable NAVFAC MAXIMO screens necessary to enter work order, asset, specification, and condition assessment data. Contractors are only authorized to view, edit, report or otherwise access data related to their work. Any unauthorized attempt to do otherwise may be grounds for removal of access privileges. Contractors will be assigned a specific work center code for their work and shall utilize this code for all such data entry and retrieval.
METHOD 2: NAVFAC MAXIMO Flat File Data Exchange
The Contractor will utilize the data formats contained in the Service Provider Information provided in J-0200000- 06, Asset Information provided in J-0200000-07, Specification Information provided in J-0200000-08, and Characteristic Meter Reading Information provided in J-1501000-04. The Contractor shall use their own internal systems to generate the flat file data into the format required. The Contractor is responsible for ensuring that data is correct and validated to meet the Maximo data requirements. If any data gets rejected the Contracting Officer will send the “rejected” data back to Contractor and the Contractor shall correct and resubmit the data within 24 hours.
In all cases of data rejects, the Contractor shall communicate with the Contracting Officer to rectify the data rejects.
Flat File Data Validation and Preparation
NAVFAC MAXIMO has several interfaces to assist in data transfer, many interfaces are used for multiple purposes to efficiently load or modify existing data in the system. Because of those multiple uses for each interface there are strict rules on how the data must be prepared for successful submission and loading.
The format required for flat files is detailed in the spreadsheets described below:
SERVICE PROVIDER INFORMATION – (Spreadsheet provided in J-0200000-06) –contains the format and data elements for submission of Work Order Information.
ASSET INFORMATION – (Spreadsheet provided in J-0200000-07) – contains the format and data elements for submission of new or updated Asset Information.
SPECIFICATION INFORMATION – (Spreadsheet provided in J-0200000-08) – generally only used for Utilities assets, contains the format and data elements for submission of additional fields related to new or updated Asset Information.
CHARACTERISTIC METER READING INFORMATION – (Spreadsheet provided in J-1501000-04) – contains the format and data elements for submission of updated Condition Assessment Information.
Service Provider, Asset, Specification, & Characteristic Meter Reading Information Spreadsheet Format
Tab 1 – General Information - Version number, change log, etc.
Tab 2 – Field Information – Field Name, Data Type, short description on field use and related information including Content Notes and NAVFAC MAXIMO Field Name.
Tab 3 – Flat File Data Layout
The Contractor is required to validate their data prior to submission…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .