J-0200000-04 ELINS (Amendment 0001).xlsx

XLSX spreadsheet 859 KB Posted

Attached to
Base Operations Support (BOS) Services/Caretaker Services at U. S. Naval Facility, Argentia, Newfoundland
Solicitation number
N62470-19-B-2011
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINs-Base Period-Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT A - BASE PERIOD - RECURRING WORK
CLIN 0001
In total, ELINs A001-A005 sum to Line Item 0001 and represent the Recurring Work award for the Base Period of performance.
Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 THROUGH A005
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (USD)Total Price (USD)
A001Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3
A001AAEntry Control Point Services, Spec item 3.112MO$ - 0$ - 0
A001ABRoving Guard Services, Spec item 3.212MO$ - 0$ - 0
A002Specification 1502000 Facility Investment (ST), Spec Item 3
A002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A002ABUrgent Service Orders, Spec item 3.1.212MO$ - 0$ - 0
A002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
A002ADPM Program, Spec Item 3.212MO$ - 0$ - 0
A002AERoof Inspection, Spec Item 3.312MO$ - 0$ - 0
A003Specification 1503010 Custodial (FX), Spec Item 3
A003AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0
A003ABCustodial Services Orders, Spec Item 3.212MO$ - 0$ - 0
A004Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
A004AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
A004ABStorm Drainage Systems, Spec Item 3.212MO$ - 0$ - 0
A004ACGrounds Maintenance Service Orders, Spec Item 3.312MO$ - 0$ - 0
A005Specification 1503060 Pavement Clearance (FX), Spec Item 3
A005AASnow and Ice Removal Services, Spec Item 3.112MO$ - 0$ - 0

TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 THROUGH A005) $ - 0

&"Times New Roman,Regular"Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-Base Period-Non Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT A - BASE PERIOD - NON-RECURRING WORK
CLIN 0002
Non-Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 THROUGH A705
ELINShort DescriptionLong DescriptionUnit Price (USD)Unit of IssueEstimated QuantityExtended Price (USD)
Specification 1502000 - Facility Investment
A700Generator Rental (300KW)Price per day to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple facilties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.EA10$0.00
A701Pothole RepairProvide labor, management, supervision, tools, material, and equipment required to patch pothole in road services. Assume average hole to be 12" x 12" x 3 " . The Contractor shall obtain shovel, rake and broom, dump patching material into hole & spread around, rake surface to further spread, sweep sides, and roll patching material with roller. Complete all work within 1 working day or as specified in the order.EA20$0.00
Specification 1503060 -Pavement Clearances
A702Snow RemovalProvide labor, management, supervision, tools, material, and equipment required to perform snow and ice removal services. The Contractor shall remove snow and ice from parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Areas also include sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, and other similar areas. Complete all work within 1 working day or as specified in the order.EA30$0.00
Unit Priced Labor (UPL) Work
A703Unit Priced Composite Skilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians. The composite labor hour rate should be an average of various trades such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
HR445$0.00
A704Unit Priced Composite Unskilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.HR775$0.00
A705Material and Equipment Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.(Estimated Maximum Material and Equipment Cost)LSNTE$40,000.00

TOTAL FOR LINE ITEM 0002 - BASE PERIOD - NON-RECURRING WORK (ELINs A700 THROUGH A705) $40,000.00

&"Times New Roman,Regular"Page &P of &N

ELINs-1st Opt-Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT B - FIRST OPTION PERIOD - RECURRING WORK
CLIN 0003
In total, ELINs B001-B005 sum to Line Item 0001 and represent the Recurring Work award for the First Option Period of performance.
Recurring Work Price - First Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 THROUGH B005
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (USD)Total Price (USD)
B001Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3
B001AAEntry Control Point Services, Spec item 3.112MO$ - 0$ - 0
B001ABRoving Guard Services, Spec item 3.212MO$ - 0$ - 0
B002Specification 1502000 Facility Investment (ST), Spec Item 3
B002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
B002ABUrgent Service Orders, Spec item 3.1.212MO$ - 0$ - 0
B002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
B002ADPM Program, Spec Item 3.212MO$ - 0$ - 0
B002AERoof Inspection, Spec Item 3.312MO$ - 0$ - 0
B003Specification 1503010 Custodial (FX), Spec Item 3
B003AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0
B003ABCustodial Services Orders, Spec Item 3.212MO$ - 0$ - 0
B004Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
B004AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
B004ABStorm Drainage Systems, Spec Item 3.212MO$ - 0$ - 0
B004ACGrounds Maintenance Service Orders, Spec Item 3.312MO$ - 0$ - 0
B005Specification 1503060 Pavement Clearance (FX), Spec Item 3
B005AASnow and Ice Removal Services, Spec Item 3.112MO$ - 0$ - 0

TOTAL FOR LINE ITEM 0003 - FIRST PERIOD - RECURRING WORK (ELINs B001 THROUGH B005) $ - 0

&"Times New Roman,Regular"Page &P of &N

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-1st Opt-Non Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT B - FIRST PERIOD - NON-RECURRING WORK
CLIN 0004
Non-Recurring Work Price - First Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 THROUGH B705
ELINShort DescriptionLong DescriptionUnit Price (USD)Unit of IssueEstimated QuantityExtended Price (USD)
Specification 1502000 - Facility Investment
B700Generator Rental (300KW)Price per day to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple facilties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.EA10$0.00
B701Pothole RepairProvide labor, management, supervision, tools, material, and equipment required to patch pothole in road services. Assume average hole to be 12" x 12" x 3 " . The Contractor shall obtain shovel, rake and broom, dump patching material into hole & spread around, rake surface to further spread, sweep sides, and roll patching material with roller. Complete all work within 1 working day or as specified in the order.EA20$0.00
Specification 1503060 -Pavement Clearances
B702Snow RemovalProvide labor, management, supervision, tools, material, and equipment required to perform snow and ice removal services. The Contractor shall remove snow and ice from parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Areas also include sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, and other similar areas. Complete all work within 1 working day or as specified in the order.EA30$0.00
Unit Priced Labor (UPL) Work
B703Unit Priced Composite Skilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians. The composite labor hour rate should be an average of various trades such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
HR445$0.00
B704Unit Priced Composite Unskilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.HR775$0.00
B705Material and Equipment Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.(Estimated Maximum Material and Equipment Cost)LSNTE$40,000.00

TOTAL FOR LINE ITEM 0004 - FIRST PERIOD - NON-RECURRING WORK (ELINs B700 THROUGH B705) $40,000.00

&"Times New Roman,Regular"Page &P of &N

ELINs-2nd Opt-Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT C - SECOND OPTION PERIOD - RECURRING WORK
CLIN 0005
In total, ELINs C001-C005 sum to Line Item 0001 and represent the Recurring Work award for the Second Option Period of performance.
Recurring Work Price - Second Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 THROUGH C005
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (USD)Total Price (USD)
C001Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3
C001AAEntry Control Point Services, Spec item 3.112MO$ - 0$ - 0
C001ABRoving Guard Services, Spec item 3.212MO$ - 0$ - 0
C002Specification 1502000 Facility Investment (ST), Spec Item 3
C002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
C002ABUrgent Service Orders, Spec item 3.1.212MO$ - 0$ - 0
C002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
C002ADPM Program, Spec Item 3.212MO$ - 0$ - 0
C002AERoof Inspection, Spec Item 3.312MO$ - 0$ - 0
C003Specification 1503010 Custodial (FX), Spec Item 3
C003AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0
C003ABCustodial Services Orders, Spec Item 3.212MO$ - 0$ - 0
C004Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
C004AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
C004ABStorm Drainage Systems, Spec Item 3.212MO$ - 0$ - 0
C004ACGrounds Maintenance Service Orders, Spec Item 3.312MO$ - 0$ - 0
C005Specification 1503060 Pavement Clearance (FX), Spec Item 3
C005AASnow and Ice Removal Services, Spec Item 3.112MO$ - 0$ - 0

TOTAL FOR LINE ITEM 0005 - SECOND OPTION PERIOD - RECURRING WORK (ELINs C001 THROUGH C005) $ - 0

&"Times New Roman,Regular"Page &P of &N

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-2nd Opt-Non Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT C - SECOND PERIOD - NON-RECURRING WORK
CLIN 0006
Non-Recurring Work Price - Second Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 THROUGH C705
ELINShort DescriptionLong DescriptionUnit Price (USD)Unit of IssueEstimated QuantityExtended Price (USD)
Specification 1502000 - Facility Investment
C700Generator Rental (300KW)Price per day to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple facilties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.EA10$0.00
C701Pothole RepairProvide labor, management, supervision, tools, material, and equipment required to patch pothole in road services. Assume average hole to be 12" x 12" x 3 " . The Contractor shall obtain shovel, rake and broom, dump patching material into hole & spread around, rake surface to further spread, sweep sides, and roll patching material with roller. Complete all work within 1 working day or as specified in the order.EA20$0.00
Specification 1503060 -Pavement Clearances
C702Snow RemovalProvide labor, management, supervision, tools, material, and equipment required to perform snow and ice removal services. The Contractor shall remove snow and ice from parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Areas also include sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, and other similar areas. Complete all work within 1 working day or as specified in the order.EA30$0.00
Unit Priced Labor (UPL) Work
C703Unit Priced Composite Skilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians. The composite labor hour rate should be an average of various trades such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
HR445$0.00
C704Unit Priced Composite Unskilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.HR775$0.00
C705Material and Equipment Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.(Estimated Maximum Material and Equipment Cost)LSNTE$40,000.00

TOTAL FOR LINE ITEM 0006 - SECOND PERIOD - NON-RECURRING WORK (ELINs C700 THROUGH C705) $40,000.00

&"Times New Roman,Regular"Page &P of &N

ELINs-3rd Opt-Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT D - THIRD OPTION PERIOD - RECURRING WORK
CLIN 0007
In total, ELINs D001-D005 sum to Line Item 0001 and represent the Recurring Work award for the Third Option Period of performance.
Recurring Work Price - Third Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 THROUGH D005
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (USD)Total Price (USD)
D001Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3
D001AAEntry Control Point Services, Spec item 3.112MO$ - 0$ - 0
D001ABRoving Guard Services, Spec item 3.212MO$ - 0$ - 0
D002Specification 1502000 Facility Investment (ST), Spec Item 3
D002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
D002ABUrgent Service Orders, Spec item 3.1.212MO$ - 0$ - 0
D002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
D002ADPM Program, Spec Item 3.212MO$ - 0$ - 0
D002AERoof Inspection, Spec Item 3.312MO$ - 0$ - 0
D003Specification 1503010 Custodial (FX), Spec Item 3
D003AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0
D003ABCustodial Services Orders, Spec Item 3.212MO$ - 0$ - 0
D004Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
D004AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
D004ABStorm Drainage Systems, Spec Item 3.212MO$ - 0$ - 0
D004ACGrounds Maintenance Service Orders, Spec Item 3.312MO$ - 0$ - 0
D005Specification 1503060 Pavement Clearance (FX), Spec Item 3
D005AASnow and Ice Removal Services, Spec Item 3.112MO$ - 0$ - 0

TOTAL FOR LINE ITEM 0007 - THIRD OPTION PERIOD - RECURRING WORK (ELINs D001 THROUGH D005) $ - 0

&"Times New Roman,Regular"Page &P of &N

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-3rd Opt-Non Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT D - THIRD PERIOD - NON-RECURRING WORK
CLIN 0008
Non-Recurring Work Price - Third Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs D700 THROUGH D705
ELINShort DescriptionLong DescriptionUnit Price (USD)Unit of IssueEstimated QuantityExtended Price (USD)
Specification 1502000 - Facility Investment
D700Generator Rental (300KW)Price per day to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple facilties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.EA10$0.00
D701Pothole RepairProvide labor, management, supervision, tools, material, and equipment required to patch pothole in road services. Assume average hole to be 12" x 12" x 3 " . The Contractor shall obtain shovel, rake and broom, dump patching material into hole & spread around, rake surface to further spread, sweep sides, and roll patching material with roller. Complete all work within 1 working day or as specified in the order.EA20$0.00
Specification 1503060 -Pavement Clearances
D702Snow RemovalProvide labor, management, supervision, tools, material, and equipment required to perform snow and ice removal services. The Contractor shall remove snow and ice from parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Areas also include sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, and other similar areas. Complete all work within 1 working day or as specified in the order.EA30$0.00
Unit Priced Labor (UPL) Work
D703Unit Priced Composite Skilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians. The composite labor hour rate should be an average of various trades such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
HR445$0.00
D704Unit Priced Composite Unskilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.HR775$0.00
D705Material and Equipment Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.(Estimated Maximum Material and Equipment Cost)LSNTE$40,000.00

TOTAL FOR LINE ITEM 0008 - THIRD PERIOD - NON-RECURRING WORK (ELINs D700 THROUGH D705) $40,000.00

&"Times New Roman,Regular"Page &P of &N

ELINs-4th Opt-Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT E - FORTH OPTION PERIOD - RECURRING WORK
CLIN 0009
In total, ELINs E001-E005 sum to Line Item 0001 and represent the Recurring Work award for the Forth Option Period of performance.
Recurring Work Price - Fourth Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs E001 THROUGH E005
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (USD)Total Price (USD)
E001Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3
E001AAEntry Control Point Services, Spec item 3.112MO$ - 0$ - 0
E001ABRoving Guard Services, Spec item 3.212MO$ - 0$ - 0
E002Specification 1502000 Facility Investment (ST), Spec Item 3
E002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
E002ABUrgent Service Orders, Spec item 3.1.212MO$ - 0$ - 0
E002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
E002ADPM Program, Spec Item 3.212MO$ - 0$ - 0
E002AERoof Inspection, Spec Item 3.312MO$ - 0$ - 0
E003Specification 1503010 Custodial (FX), Spec Item 3
E003AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0
E003ABCustodial Services Orders, Spec Item 3.212MO$ - 0$ - 0
E004Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
E004AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
E004ABStorm Drainage Systems, Spec Item 3.212MO$ - 0$ - 0
E004ACGrounds Maintenance Service Orders, Spec Item 3.312MO$ - 0$ - 0
E005Specification 1503060 Pavement Clearance (FX), Spec Item 3
E005AASnow and Ice Removal Services, Spec Item 3.112MO$ - 0$ - 0

TOTAL FOR LINE ITEM 0009 - FOURTH OPTION PERIOD - RECURRING WORK (ELINs E001 THROUGH E005) $ - 0

&"Times New Roman,Regular"Page &P of &N

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-4th Opt-Non Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT E - FOURTH PERIOD - NON-RECURRING WORK
CLIN 0010
Non-Recurring Work Price - Fourth Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs E700 THROUGH E705
ELINShort DescriptionLong DescriptionUnit Price (USD)Unit of IssueEstimated QuantityExtended Price (USD)
Specification 1502000 - Facility Investment
E700Generator Rental (300KW)Price per day to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple facilties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.EA10$0.00
E701Pothole RepairProvide labor, management, supervision, tools, material, and equipment required to patch pothole in road services. Assume average hole to be 12" x 12" x 3 " . The Contractor shall obtain shovel, rake and broom, dump patching material into hole & spread around, rake surface to further spread, sweep sides, and roll patching material with roller. Complete all work within 1 working day or as specified in the order.EA20$0.00
Specification 1503060 -Pavement Clearances
E702Snow RemovalProvide labor, management, supervision, tools, material, and equipment required to perform snow and ice removal services. The Contractor shall remove snow and ice from parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Areas also include sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, and other similar areas. Complete all work within 1 working day or as specified in the order.EA30$0.00
Unit Priced Labor (UPL) Work
E703Unit Priced Composite Skilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians. The composite labor hour rate should be an average of various trades such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
HR445$0.00
E704Unit Priced Composite Unskilled Labor Work - MUST BE NEGOTIATED BY KOProvide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.HR775$0.00
E705Material and Equipment Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.(Estimated Maximum Material and Equipment Cost)LSNTE$40,000.00

TOTAL FOR LINE ITEM 0010 - FOURTH PERIOD - NON-RECURRING WORK (ELINs E700 THROUGH E705) $40,000.00

&"Times New Roman,Regular"Page &P of &N

ELINs-5th Opt-Recurring

ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-B-2011
EXHIBIT F - FIFTH OPTION PERIOD - RECURRING WORK
CLIN 0011
In total, ELINs F001-F005 sum to Line Item 0001 and represent the Recurring Work award for the Fifth Option Period of performance.
Recurring Work Price - Fifth Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs F001 THROUGH F005
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (USD)Total Price (USD)
F001Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3
F001AAEntry Control Point Services, Spec item 3.112MO$ - 0$ - 0
F001ABRoving Guard Services, Spec item 3.212MO$ - 0$ - 0
F002Specification 1502000 Facility Investment (ST), Spec Item 3
F002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
F002ABUrgent Service Orders, Spec item 3.1.212MO$ - 0$ - 0
F002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
F002ADPM Program, Spec Item 3.212MO$ - 0$ - 0
F002AERoof Inspection, Spec Item 3.312MO$ - 0$ - 0
F003Specification 1503010 Custodial (FX), Spec Item 3
F003AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .