_F_Section_F_Deliverables.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
FACILITY SUPPORT SERVICES (FSS) AT U. S. NAVAL RESEARCH LABORATORY (NRL) IN WASHINGTON, DC.
Solicitation number
N6247018R3012
Issued by

About this file

This document outlines deliverables required under a federal facilities support services contract for the Naval Research Laboratory in Washington, DC. The contract involves various facility support services such as custodial, grounds maintenance, waste management, pest control, and facility investment and management. Required deliverables include training certifications, permits, inspection reports, management plans, schedules and work orders. Delivery dates range from 15 to 30 days after award for initial plans and certifications, to daily, weekly or monthly status updates. Distribution is primarily to the Contracting Officer and Facility Support Contract Manager. The related solicitation is for facility support services at the Naval Research Laboratory locations in Washington, DC, to be awarded on a best-value tradeoff basis.

View the file

Other files

File Type Posted
_J-1503060_Pavement_Clearance_Amendment_0007.pdf PDF
N62470-18-R-3012_NRL_Amendment_0007.pdf PDF
J-0200000-13_ELINS_Amendment_0007.xlsx XLSX spreadsheet
_J-0200000-13_ELINS_(Amendment_0006).xlsx XLSX spreadsheet
N62470-18-R-3012_NRL_FSS_Amendment_0006.pdf PDF
_J-1_Past_Performance_Questionnaire_(Amendment_0006).pdf PDF
_J-1502000-03_Facility_Investment_Inventory_(Amendment_0006).xlsx XLSX spreadsheet
J-0200000-13_ELINS_Amendment_0005.xlsx XLSX spreadsheet
N62470-18-R-3012_NRL_FSS_Amendment_0005.pdf PDF
_J-3_Section_B,_Supplies_or_Services_and_Prices_(Amendment_0004).pdf PDF
N62470-18-R-3012_NRL_FSS_Amendment_0004.pdf PDF
_J-12_Post-Award_Contractors_Limitations_on_Subcontracting_Certification_(Amendment_0004).pdf PDF
_J-0200000_Management_and_Administration_(Amendment_0004).pdf PDF
Attachment_J-10_Pre-Proposal_Conference_PowerPoint.pdf PDF
Attachment_J-12_Post_Award_Contractors_Limitations...pdf PDF
_NRL_FSS_Amendment_0003.pdf PDF
Attachment_J-11_Site_Visit_Sign_in_Sheet.pdf PDF
1502000_J_Facility_Investment_Amend_0002.pdf PDF
N62470-18-R-3012_Amendment_0002.pdf PDF
Attachment_J-9_NRL_Map_Instructions.pdf PDF
N62470-18-R-3012_NRL_FSS_RFP_Amendment_0001.pdf PDF
_J-1_Past_Performance_Questionnaire.docx DOCX document
_N62470-18-R-3012_NRL_FSS_RFP.pdf PDF
_J-2_Corporate_Experience_Project_Data_Sheet.docx DOCX document
N6247018R3012_N62470-18-R-3012_Pre-Solicitation_Notice.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION F 0200000

0200000 Management and Administration
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionDistributionFrequency
2.2.1.2N/ARequest to Work Outside Government’s Regular Working HoursAt least seven calendar days prior to requested dayKOAs required
2.3.1N/ARequired Conferences and Meeting MinutesWithin two working days after the meetingKOAs required
2.3.3.1N/APartnering Meeting MinutesWithin one week after the partnering meetingKOSemi-annually or as required
2.3.3.2N/APartnering CharterWithin one week after the initial partnering meetingKOEach update
2.3.4N/APermits and LicensesBefore work commences and as requested by the KOKOAs specified
2.3.5N/ACertificate of InsuranceWithin 15 calendar days after award.KOAs specified
2.6.4N/AEmail Notification of Deliverable UploadImmediately upon upload of deliverable to websiteKO/FSCMPer occurrence
2.6.6.2N/AService Provider Flat-fileAt the end of the following work day when updates are requiredKOAs required
2.6.6.2N/AAsset Flat-FileAt the end of the following work day when updates are requiredKOAs required
2.6.6.2N/ACharacteristic Meter Flat-FileAt the end of the following work day when updates are requiredKOAs required
2.6.6.2N/ASample Delimited Flat-FileWithin 15 calendar days after awardKOAs specified
2.6.6.3N/AList of Personnel Requiring MAXIMO AccountsNo later than 45 days prior to start of the contract and within seven calendar days of changesKOAs specified
2.6.7.1N/AQuality Management PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesKOAs specified
2.6.7.2N/AQC Inspection FileWithin five calendar days of completion/ termination of the contractKOAs specified
2.6.7.3N/AContractor Quality Inspection and Surveillance ReportFirst work day of each monthKOMonthly
2.6.8N/AProperty Management PlanNo later than 30 days prior to start of the contract and within seven calendar days of changesKOAs specified
2.7.1N/AOrganizational ChartWithin 15 calendar days after awardKOAs specified
2.7.1N/AKey Personnel Resumes and QualificationsNo less than 15 days prior to contract and NLT five days prior to changesKOAs specified
2.7.2.6N/AProof of Legal ResidencyPrior to be admitted to site of workKOAs specified
2.7.3N/AContractor Labor Hours (eCMRA) ReportNo later than 31 OctoberKOAnnually
2.8.1N/AEmployee ListUpon request.KO/FSCMAs required
2.8.4N/ADBIDS EnrollmentWithin 30 working days of contract start and as changes occurSecurity/KOSemi-annually
2.8.7FD87 & OF-306Access to Sensitive Unclassified InformationPrior to employee access to sensitive unclassified informationSecurity ManagerAs required
2.9.1N/AAccident Prevention PlanWithin 15 calendar days after award and within seven calendar days of changeKOAnnually, as specified
2.9.2N/AActivity Hazard AnalysisTogether with the Accident Prevention Plan and for changesKOAs specified
2.9.3N/ACompliance Plans, Programs, and ProceduresTogether with the Accident Prevention Plan and for changesKOAs specified
2.9.5J-0200000-04NAVFAC Contractor Incident Reporting System (CIRS)Within five calendar days of accidentKOAs required
2.9.5J-0200000-04Weight Handling Equipment Accident ReportWithin 15 working days of accidentKOAs required
2.9.5J-0200000-04Crane and Rigging Gear Near Miss ReportWithin 15 working days of accidentKOAs required
2.9.7N/AMonthly On-Site Labor ReportFirst work day of each monthKOMonthly
2.9.8N/AOSHA Citations and Violations Corrective Action ReportWithin 48 hours after receiving a citationKO, SafetyAs required
2.9.10N/ASafety CertificationsWithin 15 calendar days after award and as old certifications expireKO, SafetyAs specified
2.10.1.1N/AWater Conservation PlanWithin 15 calendar days after award and for changesKOAs specified
2.10.1.2N/AEnvironmental Protection PlanWithin 15 calendar days after award and within seven calendar days of changeKO/NRL EVAs required
2.10.2.1N/AClass I ODS ReportWithin 24 hours following delivery of refrigerant to DLAKO/NRL EVAs required
2.10.2.5N/AEmergency Planning and Community Right-To-Know Act (EPCRA) ReportWithin 15 calendar days after contract award and not less than 10 working days prior to planned use of hazardous materialKO/NRL EVAs specified
2.10.2.5J-0200000-12Contractor Hazardous Material Inventory LogWithin 15 calendar days after the end of each calendar year and at termination of the contractKO/NRL EVAnnually
2.10.2.12J-0200000-04Hazardous Air Pollutant (HAPs)Monthly and Semi-AnnualKO/NRL EVMonthly and Semi-Annual
2.10.3N/ASustainable Procurement and Practices PlanWithin 15 calendar days after award and within 15 calendar days after exercised option periodKOAnnually
2.10.3N/ASustainable Delivery of Services ReportWithin five calendar days after each contract periodKOAnnually
2.10.3.2N/ARecovered Material CertificationAs specifiedSPAR, IEOWhen a product containing recovered materials is equal to or better than the original and could be use
2.14.1N/AWork Above Recurring Work LimitationsWithin two hours of identificationKOAs specified
2.15.1.1N/ANon-Recurring Work FedMallFirst work day of each monthKO, FSCMMonthly
2.15.2.1J-0200000-13Non-Recurring Work ProposalIndicated in RFPKOAs required
NMIC1503020 – Pest Control
1503020/2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/2.3.1N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.2N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.4N/AEquipment Calibration and Droplet Analysis Report15 days prior to the start of work and after every 50 hours of ULV equipment use.KO, COR, EVAs required
1503020/2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2Pest Control Trouble Calls
1503020/3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NMIC1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
1503050 _ Grounds
1503050/2.3.7.1N/AWater Conservation PlanAs specifiedKO, COR, EV30 days after award/Annually
1503050/3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050/3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050/3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required
1503060 Pavement Clearance
1503060/3.1.1N/ASchedule for Pavement Sweeping ServicesWithin 30 calendar days after contract awardKO, CORAs required
1503060/3.2.1.1Snow Removal PlanWithin 30 calendar days after contract awardKO, CORAs required

FortWashington Custodial

1503010/2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
FortWashington1503020 – Pest Control
1503020/2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
FortWashington1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
FortWashington1503050 _ Grounds
1503050/3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050/3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050/3.1.3N/ADebris Removal ScheduleAs specifiedKO, CORAs required

NSMA Custodial

1503010/2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
NSMA1503020 – Pest Control
1503020/2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NSMA1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
NSMA1503050 _ Grounds
1503050/3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050/3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050/3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required

&A

&UDELIVERABLES

N62470-18-R-3002 Page &P of &N

SECTION F 1501000

1501000 Facility Management
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionDistributionFrequency
2.2.1N/AProof of Certification, Training, LicensingWithin 15 calendar days after awardKOOnce for initial submittal, then as requested.
2.3.1N/AList of Personnel Requiring MAXIMO AccountsNo later than 45 days prior to start of the contract and within seven calendar days of changesKOPer occurrence
3.1.3N/ADaily Status UpdateBy COB each dayNRL R&D/FSCMAs specified
3.1.3N/AWeekly Maximo ReportMondaysNRL R&D/FSCMWeekly
3.2.1N/ASummary of NAVFAC MAXIMO Asset ChangesFirst work day of each monthKOMonthly
3.2.1N/AAsset Tag SampleNo later than 45 days prior to start of the contractKOAs specified
NMIC1503020 – Pest Control
1503020/ 2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/ 2.3.1N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.2N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.4N/AEquipment Calibration and Droplet Analysis Report15 days prior to the start of work and after every 50 hours of ULV equipment use.KO, COR, EVAs required
1503020/ 2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2Pest Control Trouble Calls
1503020/ 3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NMIC1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
1503050 _ Grounds
1503050 /2.3.7.1N/AWater Conservation PlanAs specifiedKO, COR, EV30 days after award/Annually
1503050 /3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050 /3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required
1503060 Pavement Clearance
1503060/3.1.1N/ASchedule for Pavement Sweeping ServicesWithin 30 calendar days after contract awardKO, CORAs required
1503060/3.2.1.1Snow Removal PlanWithin 30 calendar days after contract awardKO, CORAs required

Fort Washington Custodial

1503010/ 2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/ 3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/ 3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/ 3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
Fort Washington1503020 – Pest Control
1503020/ 2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/ 2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/ 3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
Fort Washington1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
Fort Washington1503050 _ Grounds
1503050 /3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1.3N/ADebris Removal ScheduleAs specifiedKO, CORAs required

NSMA Custodial

1503010/ 2.2.1N/APathogen Training PlanUpon requestKOUpon request
1503010/ 3.1N/AAnnual Work Schedule1 each yearKOWithin 15 days after award and annually thereafter
1503010/ 3.1N/AMonthly Work PlanFirst work day of each monthKOMonthly
1503010/ 3.2N/AUnscheduled Services ReportFirst work day of each monthKOMonthly
NSMA1503020 – Pest Control
1503020/ 2.2.1N/ACertification for Contractor Personnel30 calendar days prior to start of work.KO, COR, EVAs required
1503020/ 2.3.1N/ABusiness Licensing5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.2N/APermits5 days prior to the start of work requiring permits.KO, COR, EVAs required
1503020/ 2.3.5N/APlanned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use. Electronically via NOPRSKO, COR, EV1 for each pesticide per pest.
1503020/3N/AContractor's Work Plan30 calendar days prior to start of workKO, COR, EVAs required
1503020/3N/AReport of Conditions Conducive to Pest Infestation1 working day after citing conditions.KO, COR, EVAs required
1503020/3.2.2N/APest Control Trouble Calls
1503020/ 3.3J-1503020-12Report of Pest Management OperationsBy the 15th of the following month. Electronically via NOPRSKO, COR, EVMonthly
NSMA1503030 _ ISWM
1503030/2.3.1N/AWeight TicketingAs specifiedKO, CORMonthly and Annually
1503030/2.3.2N/APermits and LicensesWithin 30 calendar days after contract awardKO, CORAs required
NSMA1503050 _ Grounds
1503050 /3N/ASDS sheets and catalog cut sheets or samples for fertilizer and mulchWithin 30days prior to useKO, COR, EVAs required
1503050 /3.1N/ASoil Analysis test results and proposed fertilizerAs specifiedKO, COR, EV15 days after receipt of the test results
3.1.2Vegetation ControlWithin 30days prior to useKO, COR, EVAs required
1503050 /3.4N/ADebris Removal ScheduleAs specifiedKO, CORAs required

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1502000

1502000 Facility Investment
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionDistributionFrequency
2.2.1N/AProof of Certification, Training, LicensingWithin 15 days after awardKOOnce for initial submittal, then as requested.
3.1N/AService Order Summary ReportFirst work day of each monthNRL/FSCMMonthly
3.1.1N/AEmergency Service Order Status ReportWithin 30 minutes of completion of an emergency service orderNRL/FSCMAs specified
3.2N/AProject Work Order Summary ReportFirst work day of each monthNRL/FSCMMonthly
3.3N/APreventive Maintenance Program Plan30 calendar days after contract awardKOAnnually
3.3N/AMonthly PM Program Work ScheduleFive work days prior to the beginning of each monthNRL/FSCMMonthly
3.3N/AMonthly Unaccomplished PM ReportFirst work day of each monthNRL/FSCMMonthly
3.3.4N/AMonthly Operating Records UPSFirst work day of each monthNRL/FSCMMonthly
3.4N/AIntegrated Maintenance Program Plan30 calendar days after contract awardKOAnnually
3.4N/AMonthly IMP Work ScheduleFive work days prior to the beginning of each monthNRL/FSCMMonthly
3.4N/AMonthly IMP Status ReportFirst work day of each monthNRL/FSCMMonthly
3.4.1.2N/AHVAC Water Testing and Treatment ProgramWithin 15 days after award or as requested by the KONRL/FSCMOnce for initial submittal, then as updated
3.4.1.2N/AHVAC Water Treatment Test ReportFirst work day of each monthNRL/FSCMMonthly
3.4.5N/AGenerator Maintenance Report and Auto-Run RecordFirst work day of each monthNRL EV/FSCMMonthly
3.5N/AInspection, Testing, and Certification Program Summary ReportFirst work day of each monthNRL/FSCMMonthly
3.5N/AInspection, Testing, and Certification ScheduleFirst work day of each monthNRL/FSCMMonthly
3.6N/AOther Recurring Services Program Summary ReportFirst work day of each monthNRL/FSCMMonthly
3.6.4N/AInspection and Cleaning ScheduleFirst work day of each monthNRL/FSCMMonthly
3.6.5N/AAcid Neutralization Systems Maintenance LogFirst work day of each weekNRL EV/FSCMWeekly
3.6.8N/AOil Water Separator Cleaning ScheduleFirst work day of each monthNRL EV/FSCMMonthly
3.6.9N/AInstallation Facilities Monitoring LogFirst work day of each weekNRL/FSCMWeekly
3.6.10N/ADeficiency Report Mass Notification SystemPer occurrence, within scheduled maintenance periodNRL/FSCMPer Occurrence

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1503030

1503030 ISWM
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionDistributionFrequency
2.3.1N/AWeight Tickets with Total Tabulated TonnageFirst work day of each monthNRL/FSCMMonthly
2.3.2N/APermits and LicensesWithin 15 calendar days after awardKOOnce for initial submittal, then as requested.

&A

&UDELIVERABLES

Page &P of &N

SECTION F 1503060

1503060 Pavement Clearance
Annex/ Spec ItemForm Attachment NumberDeliverable TitleDate (s) of SubmissionDistributionFrequency
3.1N/APavement Sweeping Services Plan and ScheduleWithin 30 calendar days after contract awrd of changesNRL/FSCMAs required