N6134018R0056_Attachment-DRAFT_Sup_Addendum_AA_Surface_NON_LCS_17_Apr_18.pdf

PDF 274 KB Posted

Attached to
T-45 Automatic Backup Oxygen System Award Notice
Solicitation number
N6134018R0056
Issued by

About this file

N6134018R0056_Attachment-DRAFT_Sup_Addendum_AA_Surface_NON_LCS_17_Apr_18.pdf

View the file

Other files

File Type Posted
N6134018R0056_COMS_Site_Survey_Agenda_SD_17May18_-_Final.pptx PPTX presentation
N6134018R0056_Appendix_C-2_LCS_Training_Facility_Mayport,_FL_ver1_17_May_18.pdf PDF
N6134018R0056_Appendix_C-1_LCS_Training_Facility_San_Deigo,_CA_ver1_17_May_18.pdf PDF
N6134018R0056_APPENDIX_A-8_(H)_SWOS_DET_San_Diego_15_April_2018_Draft.pdf PDF
N6134018R0056_APPENDIX_A-12_(P)_NAVAL_STATION_DDG-1000_16_May_2018.pdf PDF
N6134018R0056_APPENDIX_B-2_(M)_SWOS_TTE_SAN_DIEGO_15_April_2018_Draft.pdf PDF
N6134018R0056_APPENDIX_A-6_(F)_NSST_15_April_2018_Draft.pdf PDF
N6134018R0056_APPENDIX_A-3_(C)_EWTGPAC_15_April_2018_Draft.pdf PDF
N6134018R0056_APPENDIX_A-4_(D)_CSCS_FLEASWPAC_San_Diego_17_May_2018.pdf PDF
N6134018R0056_APPENDIX_B-1_(L)_TSC_TTE_GREAT_LAKES_DRAFT.pdf PDF
N6134018R0056_APPENDIX_A-10_(K)_TSC_GREAT_LAKES_DRAFT.pdf PDF
N6134018R0056_APPENDIX_A-9_(J)_RTC_GREAT_LAKES_DRAFT.pdf PDF
N6134018R0056_Attachment-DRAFT_Surface_COMS_PWS_17_Apr_18.pdf PDF
N6134018R0056_Attachment_Great_Lakes_Basemap.pdf PDF
N6134018R0056_Attachment-DRAFT_Sup_Addendum_AC_LCS_Specific_17_Apr_18.pdf PDF
N6134018R0056_Attachment-DRAFT_Sup_Addendum_AB_Surface_COMS_TTE_17_Apr_18.pdf PDF
N6134018R0056_Surface_COMS_Industry_Day_Site_Visit.pdf PDF
N6134018R0056_Attachment-Accept_Docs.PDF PDF
N6134018R0056_Attachment-Access_Reg_Form.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURFACE COMS ADDENDUM A N61340-18-R-XXXX

PWS # 66410-A-0448

17 April 2018

SUPPLEMENTAL ADDENDUM AA

SURFACE

(NON-LCS)

1.0 INFORMATION. The following paragraphs augment PWS Addendum A, with specific requirements to Surface (NON-LCS) requirements. For site specific requirements refer to the following

Appendices/Attachments. Table 1 below provides an overview of document structure developed for this

PWS.

ADDENDUM A

SURFACE COMS

PWS 66410-A-0448

SUPPLEMENTAL ADDENDUM AA

SURFACE (NON- LCS)

APPENDIX A-1

Expeditionary Warfare Training Group Atlantic (EWTGLANT) Little

Creek, VA

APPENDIX A-2

Center For Surface Combat Systems Learning Site (CSCS)

Detachment East Norfolk, VA

APPENDIX A-3

EWTGPAC Coronado, San Diego, CA

APPENDIX A-4

Center for Surface Combat Systems (CSCS) FLEASWPAC San

Diego, CA

APPENDIX A-5

CSCS Unit Dam Neck, VA

APPENDIX A-6

Navigation, Seamanship, Shiphandling Trainer(s) (NSST)

APPENDIX A-7

Surface Warfare Officer School Detachment Norfolk, VA

APPENDIX A-8

Surface Warfare Officer School Detachment San Diego, CA

APPENDIX A-9

Recruit Training Center (RTC) Great Lake, IL

APPENDIX A-10

Training Support Center (TSC) COMS Great Lakes, IL

APPENDIX A-11

Training Support Center (TSC) Training Support (TS) Great Lakes, IL

APPENDIX A-12

Naval Service Training Command ROTC Conning Officer Virtual

Environment (COVE)

TABLE 1

2.0 PAINTING AND PRESERVATION / CLEANLINESS. The Contractor shall establish a schedule to be approved by the site TA and provided to the COR on the 30TH day of October, for the fiscal year, for painting and preservation for each area. The Contractor shall perform yearly painting and preservation of the equipment, to keep the laboratory areas in a continuous state of high material readiness as defined by the Government during Zone Inspections. The Contractor’s yearly schedule for painting and preservation shall also include all floors, steps, and handrails within a 10’ radius of the equipment to include renovation of any non-skid surfaces. The Contractor shall ensure that operational, seldom used and non-operational equipment is continuously preserved and cleaned after maintenance is performed in addition to keeping the immediate workspace surrounding such equipment clean after maintenance is performed yearly. All paint and painting supplies will be provided by the Government only for the maintenance areas identified in the TTE Appendices.

3.0 CONTRACTOR INSTALLED. When requested by the COR, the Contractor shall install

Government approved trainer modifications at each site, as a matter of normal maintenance effort, which

APPENDIX A-13

Naval Station, San Diego, CA DDG-1000

APPENDIX A-14 (R)

Center for Surface Combat Systems (CSCS) Detachment PACNW, Everett, WA

APPENDIX A-15 (S)

Surface Warfare Officer School (SWOS) Detachment Everett, WA

APPENDIX A-16 (T)

Center for Surface Combat Systems (CSCS) Detachment, Pearl

Harbor, HI

APPENDIX A-17 (U)

Surface Warfare Officer School (SWOS) Detachment, Pearl Harbor, HI

APPENDIX A-18 (X)

Surface Warfare Officer School (SWOS) Detachment, Mayport, FL

APPENDIX A-19 (Z)

Surface Warfare Officer School (SWOS) Detachment, Sasebo, Japan

APPENDIX A-20 (AB)

Center for Surface Combat Systems (CSCS) Detachment, Yokosuka, Japan

APPENDIX A-21 (AC)

Surface Warfare Officer School (SWOS) Detachment, Yokosuka, Japan shall be considered within the scope of this contract. Installations of trainer modifications are estimated not to exceed 40 man hours per modification or 320 man-hours per year per site. Modifications requiring

16 man-hours or less shall not interfere with scheduled training and shall be completed within thirty (30) days of Contractor receipt of the modification directive. Modifications requiring greater than 16 man hours to install may require an extension of the compliance period or temporary reduction / stand-down of training operations as approved by the COR. Approved extensions to the compliance period will be in proportion to man hours required for installation. The duration of a training curtailment period will be in proportion to the Contractor’s work force size. Acceptance testing of Contractor installed changes or modifications may be conducted as deemed appropriate by the Government. At Government discretion, these hours can be used for any training system, equipment PWS, and transferred between any site covered under this contract. The COR at each site is responsible for tracking and efficient utilization of these man-hours and for the coordination of the transfer of any hours from one site to another. The

Contractor's monthly report shall identify the modification(s), the number of modification man-hours used and balance remaining for each site. Such modifications, except safety, shall be accomplished within 30 calendar days from receipt or direction from the COR. Safety modifications shall be accomplished within

24 hours, unless additional time is authorized by the COR. Equipment used or removed as a result of the modification shall be identified, added to or deleted from the inventory, and the applicable Attachment updated. Removed equipment shall be turned over to the COR for disposition.