This document contains a solicitation for maintenance, repair, and preservation work on the Caisson One vessel. The Navy seeks a firm-fixed price contract to accomplish all required work at the contractor's ship repair facility located in the Puget Sound, WA region between June 2022 and December 2022. Services include docking and cleaning the vessel, hull and tank repairs and preservation, inspection and testing of systems, valve replacement, actuator replacement, and non-skid installation. Offerors must be registered in SAM and have relevant NAICS codes to access drawings. The Navy anticipates awarding a contract in late May 2022 to the lowest priced technically acceptable proposal following a full and open competition under NAICS 336611 with a size standard of 1,250 employees.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to RFC 009-011
9) Question: Please provide serial numbers for all 22 actuators listed in para 1.3. They are needed for the repair facility to provide us with all of the specific specifications of each actuator for repair purposes and allow for an accrete (accurate) quote.
1.3.1 Quantity (8 EA) Valve Operators for 8 Inch and 12 Inch Valves, identified as drawing item number E-4 of 2.6
1.3.2 Quantity (4 EA) Valve Operators for 18 Inch and 20 Inch
Valves, identified as drawing item number E-5 of 2.6
1.3.3 Quantity (10 EA) Valve Operators for 30 Inch and 36 Inch
Valves, identified as drawing item number E-6 of 2.6
Response: Please see the table below.
10) Question: OEM is requesting the serial numbers off the existing actuators to be able to correctly identify the parts required. Can the Navy provide the serial numbers?
Response: Please see the table above in Question #9 Response.
11) Question: The sub-contractors for the new overhaul requirements are having difficulty getting parts quotes from the OEM sources vendors and material suppliers. Contractor requests a one-week extension to the proposal deadline to be able to put together a comprehensive submittal.
Response: Please see Solicitation Amendment 0006.