C04.7 - Attachment J-7 - Growth Management Request Form.docx
DOCX document 18 KB Posted
- Solicitation number
- N4523A22R1050
About this file
This solicitation seeks proposals for maintenance, repair and preservation of Caisson 1. The Department of the Navy Naval Supply Systems Command will award a firm-fixed price contract to drydock, clean, blast and preserve the vessel's hull and tanks. Additional work includes hull weld repairs, tank cleaning, hatch and valve repairs, alarm and ventilation system work, pump and actuator replacements, non-skid installation and operational testing. The period of performance is from June 28, 2022 to December 12, 2022. Offerors must have a ship repair facility located in the Puget Sound, Washington region capable of drydocking the 94-foot vessel. Proposals are due by February 9, 2022 with award anticipated in late May 2022 to the lowest priced technically acceptable offeror. The North American Industry Classification System code is 336611 for ship building and repair with a size standard of 1,250 employees.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4523A22R1050 Growth Management Request Form
| Request Number: |
| Ship/Hull: |
| SOW Para(s): |
| CFR Number(s): |
Caisson 1
| Prepared by COR: | Date: | |||
| Period of Performance: | to | CLIN(s) | ACRN: | |
| Growth Management Process Utilized |
N/A Small Dollar Value Growth
Authorized N/A of N/A
X Level Of Effort (LOE) to Completion
1. Statement of Work Requirements:
1.1 Scope:
1.2 Location of Work:
2. References:
3. Requirements:
4. Government Furnished Material (GFM):
Price for Statement of Work Requirements Small Dollar Value Growth Pre-Priced Amount per Occurrence $__N/A_____
OR
LOE to Completion:
Contractor proposal for work under this request must be completed with the current period of performance unless a schedule revision is included in the terms.
| Contractor Estimate: |
| Labor (MHs): |
| Material ($): |
| Subcontractor ($): |
| Total Price (Fully Burdened): |
| Negotiated Price: |
| Labor (MHs): |
| Material ($): |
| Subcontractor ($): |
| Total Price (Fully Burdened): |
Total price calculations are based upon the formulary established for work items in the base contract; see rates contained under Section B, Note C of the contract.
Agreement to Negotiated Price:
Date:
PSNS Project Manager / Agreement to Negotiated Amount
Date:
Contractor Representative / Agreement to Negotiated Amount
| Date: | ||
| PSNS Contracting Officer / Agreement to Negotiated Amount | Growth Mgmt. Effective Date |
Final Acceptance / Completion of Work Signatures:
Date:
Contractor Representative
Date:
PSNS Contracting Officer’s Representative