This document provides details on a solicitation for maintenance, repair, and preservation work on a naval vessel. The Navy seeks a firm-fixed price contract to perform work on the Caisson One, including blasting and preserving the hull and tanks, replacing seals and other hardware, conducting inspections, cleaning systems, and undertaking various mechanical and electrical repairs. The work must be performed at a shipyard facility located in the Puget Sound, Washington region capable of drydocking the 94-foot vessel. The period of performance is scheduled from June 28, 2022 to December 12, 2022. The solicitation is open to all contractors and will be awarded on a lowest-price technically acceptable basis in accordance with FAR 15. The Navy Department, Naval Supply Systems Command is the contracting agency.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to RFC 003-004
3) Question: (SOW Work Item: 324-11-001 Mimic Board, Install) Can the Navy provide a rip out drawing showing the equipment and cables they want removed?
Can the Navy supply a drawing showing the new installation including an exact material list?
Response:
Question: (SOW Work Item: 324-11-001 Mimic Board, Install) Can the Navy provide a rip out drawing showing the equipment and cables they want removed?
Answer:
See Errata 1 for Work Item 324-11-001. The drawing listed in item 324-11-001 paragraph 2.2 is removed from the SOW and is replaced by the enclosed drawing titled, CA1_Mimic_Mod_Rev1.
See Errata 1 for Work Item 324-11-001. In item 324-11-001, Paragraph 2.10 and reference drawing titled
320-6814397_Ripout has been added to SOW Work Item 324-11-001.
Drawing is included in Attachment J-6b Caisson One Additional Reference Drawings. Offerors may submit request for the attachment via email to Brittany Chartier at brittany.chartier@navy.mil and to
Charles Smith at Charles.r.smith13@navy.mil.
Question: Can the Navy supply a drawing showing the new installation including an exact material list?
Answer:
There are no additional material lists available.
4) Question: The OEM for the replacement seals appears to be out of business. Can the Navy provide an alternate vendor, or will these need to be custom fabricated?
Response: The Statement of Work does not designate a specific seal vendor. Vendors that can manufacture the seal in accordance with the Statement of Work are in business and operating.
mailto:brittany.chartier@navy.mil mailto:Charles.r.smith13@navy.mil